QA/QC Section
DATE ISSUE: 03.18.2014
Project Code:
LQ5080
Activity:
Location:
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.
Engineering Department
QA/QC Section
DATE ISSUE: 03.18.2014
Project Code:
LQ5080
Activity:
Location:
Photo # 4: R
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.
Engineering Department
QA/QC Section
DATE ISSUE: 03.18.2014
Project Code:
LQ5080
Activity:
Location:
Photo # 5: Rubbish
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.
Engineering Department
QA/QC Section
DATE ISSUE: 03.18.2014
Project Code:
LQ5080
Activity:
Location:
2. Photo # 3 shows the result was failed but concrete cohesion and Photo # 4, conducted retest on the s
was done on Primary Tank as a priority segment.
3. Photo # 5: shows rubbish that was not removed but the epoxy coating was already completed.
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.
Engineering Department
QA/QC Section
DATE ISSUE: 03.18.2014
Project Code:
LQ5080
Activity:
Location:
4. Photo #6, Photo # 7 and Photo # 8, it is very clear that the application of Epoxy Coating was completed
Recommendation:
1. Based on the result of the retest on the priority segment- primary tank, mechanical can now start with
can see Photos from 5 to 8 should be rectified and duly checked with JFE Representative.
2. During surface preparation make sure that the LAITANCE should be removed and prior to applicatio
and approved the application because mostly the reason why the results always concrete failure or concre
Prepared and Inspected by:
Noted By:
Noted By:
QA/QC Engineer
Construction Manager
Project Manager
Geoffrey Gimenez
Raul M. Bern
Sign Over Printed Name
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.
Talayan-004
Date:
Supplier/ Subcontractor:
Time:
Scope:
11:00 AM to 06:00 PM
Verification of Materials /
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.
Time:
Scope:
Talayan-004
Friday, September 12, 2014
JAZMED
11:00 AM to 06:00 PM
Verification of Materials /
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.
Talayan-004
Friday, September 12, 2014
Supplier/ Subcontractor:
JAZMED
11:00 AM to 06:00 PM
Time:
Scope:
Verification of Materials /
Photo # 5: Rubbish
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.
Time:
Scope:
Talayan-004
Friday, September 12, 2014
JAZMED
11:00 AM to 06:00 PM
Verification of Materials /
hoto # 4, conducted retest on the same area and the results were all passed. Note: Retest
Talayan-004
Friday, September 12, 2014
JAZMED
Supplier/ Subcontractor:
Time:
Scope:
11:00 AM to 06:00 PM
Verification of Materials /
ank, mechanical can now start with their activities but make sure before they started as you
FE Representative.
be removed and prior to application of epoxy coating JFE Representative should checked
ts always concrete failure or concrete cohesion is due to poor surface preparation.
Acknowledge By:
Maynilad Water Representative
Raul M. Bernal
_____________________
This form is an audit/ report thru observation and witness done by a Quality Assurance Engineer and shall be accomplished and signed by key personnel
]
whoever involved after inspection.