Escolar Documentos
Profissional Documentos
Cultura Documentos
Nos.
QTY
Unit
Rate
Amount
2
1
1
1
5.20
6.00
5.00
5.00
2.00
2.10
2.50
3.00
1.90
1.50
0.55
0.55
Total
39.52
18.90
6.88
8.25
73.55
Cum
146.00
10738.00
0.30
0.60
0.85
0.60
1.50
0.60
Total
6.24
0.62
2.21
9.59
33.13
24.74
76.53
Cum
1234.00
90255.00
69.09
Cum
4613.00
318712.00
10.00
5528.00
55280.00
Cum
2079.00
14293.00
2413.00
19907.00
Ordinary soil
i)
up to 3.0m depth
Face Wall
For pipe
apron u/s
apron d/s
2
2
2
1
2
1
5.20
5.20
5.20
(7.20+8.03)/2
(7.20+8.03)/2
(8.03+8.46)/2
5.00
2.00
0.10
(0.40+0.10)/2
2.10
1.45
5.00
3.14/4
0.60
x1.20x1.20
Net Quantity
3.39
73.14
2
1
2
2
5.00
(6.99+7.20)/2
5.00
(7.20+7.62)/2
2.00
2.10
(0.45+1.80)/2
2.10
5.00
3.14/4
x1.20x1.20
0.20
0.30
3.89
0.60
Total
0.60
Net Quantity
4.00
6.04
43.76
18.67
72.48
3.39
D
5/tem
9.12
Providing and laying Filter material
p-40
underneath pitching in slopes complete as
per drawing and Technical specification.
u/s apron below boulder pitching
d/s apron below boulder pitching
10.00
1
1
5.00
5.00
2.50
3.00
0.25
0.25
Total
3.13
3.75
6.88
0.30
0.30
Total
3.75
4.50
8.25
1
1
5.00
5.00
2.50
3.00
Cum
S.No.
Description of Item
1/item Construction of embankment / sub-grade
3.12
with Material Obtained from Borrow Pits
p-12 (Construction of embankment with
approved material/selected soil having
C.B.R. > 5 (unless specified otherwise in
the contract) obtained from borrow pits
with all lifts and leads, transporting to site,
spreading, grading to required slope and
compacting to meet requirement of table
300-2)
Nos.
QTY
Unit
Rate
Amount
100.00
(6.00+7.80)/2
0.60
414.00
Cum
223.00
92322.00
75.00
3.50
0.20
52.50
15.00
3.50
0.20
21.00
Total
73.50
cum
460.00
33810.00
0.15
0.15
Total
39.38
15.75
55.13
cum
460.00
Total
25358.00
660675.00
4.10/p
16
Road
Wet Mix Macadam (Providing, laying,
sor
spreading and compacting graded stone
aggregate to wet mix macadam
specification including premixing the
Material with water at OMC in mechanical
mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with
paver in sub- base / base course on well
prepared surface and compacting with
vibratory roller to achieve the desired
density as per clause 406.)
Sub Engineer
1
2
75.00
15.00
3.50
3.50
Executive Engineer
P.W.D. Division Mahasamund