Nida Hospiata Pvt. Ltd.

BOQ of Outer Temprorary Structure:


SN

Description

1 4" Thick Brick Soiling


Brick Soiling at Foundation level for
a MS Square Pole
Brick Soiling at Foundation level for
b MS Square Pole
c Brick Soiling at Plinth level
Total
2 5" Thick PCC Work
PCC Work at Foundation level for
a MS Square Pole
PCC Work at Foundation level for
b MS Square Pole
c PCC Work at Plinth level
Total
3 Punning and screeding
Deduction
MS Pole
Concrete Pole
Total
3
a
b
c

PCC Work
PCC in concrete Pole
PCC in Square Pole(Lower Level)
PCC in Square Pole(Lower Level)
PCC in Gutter
Total

4 Half Brick Work


Half Brick Work Around Concrete
a Pole
Half Brick Work in Square
b Pole(Lower Level)
c Half Brick Wall
Total

No.

Length
(ft)

Breadth
(ft)

Height
(ft)

Qty

Remark

36 per sq. ft.

2.5

2.5

25 per sq. ft.

689.83

689.83 per sq. ft.


750.83 per sq. ft.

2.33

2.33

21.7156 per sq. ft.

1.83

1.83

13.3956 per sq. ft.

689.83

689.83 per sq. ft.


724.9412 per sq. ft.

750.83

750.83 per sq. ft.

1.17
1.17
748.49 per sq. ft.

4
4

1.17
1.17

1.17
0.75

4
4
4
1

0.5
1
0.67
1.5

0.5
1
0.67

10.25
10.25 per cum. ft.
2
8 per cum. ft.
1.33 2.388148 per cum. ft.
36.75
55.125 per cum. ft.
75.76315 per cum. ft.

3.33

10.25

4
1

5.33
27.5

2
9.25

136.53

per sq. ft.

per sq. ft.


42.64
254.375 per sq. ft.
433.545 per sq. ft.

5
a
b
c

Full Brick Work


Full Brick Work In Square Pole
Full Brick Wall
Deduction
Door (D1)
Door (D2)
Window (W1)
Window (W2)
MS Pole
Concrete Pole
Total deduction

6 Dry Partition Wall


Deduction
Window (W3)
Door (D3)
Door (D2)
Total Deduction
Total

4
1

1.17
42.5

9
9.25

42.12 per sq. ft.


393.125 per sq. ft.

1
1
1
1
4
4

5.5
2.5
4.5
8
0.75
1.17

7
7
5
5
9
11.5

38.5
17.5
22.5
40
27
53.82
199.32
235.925 per sq. ft.

48.25

337.75 per sq. ft.

1
1
1

7.5
5.5
3.5

5
7
7

37.5
38.5
24.5
100.5
237.25 per sq. ft.

Você também pode gostar