Item
1
33KV CB
33KV LI
33KV BI
33KV CT
Structure in MT
Lightning arresters
Control cable
Earthing
Add
Spares
Transportation
Erection
10
Testing & Comm.
Contingency
T&P
11
12
Price escalation on Sl no B
13
Civil works
14
Contingency on Sl. No 13
15
16
17
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
2
FOR FINANCIAL YEAR 2014-15
Estimated cost of 1 No. 33KV Bus coupler bay
(w.e.f.01.04.2014)
( For internal circulation only)
Sl.No.
Item
1
33KV CB
33KV BI
33KV CT
Structure in MT
Control panel
Control cable
Earthing
Add
Spares
Transportation
Erection
8
Testing & Comm.
Contingency
T&P
Adminstrative and estiblishment charges on Sl. No B
9
10
Price escalation on Sl no B
11
Civil works
12
Contingency on Sl. No 11
13
14
15
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
3
FOR FINANCIAL YEAR 2014-15
Estimated cost of adding 1 No. 132KV Bay at 132KV Grid Substation
(w.e.f.01.04.2014)
( For internal circulation only)
Sl.
Item
1
132KV CB
132KV PT
132KV CT
132KV LA
132KV LI
132KV BI
132KV TI
132KV PI
10
132KV DPP
11
Structure (MT)
12
Control cable
13
14
15
16
17
Erection
Testing & Comm.
Contingency
T&P
Note :-
18
19
Price escalation on Sl no B
20
Civil works
21
22
Contingency on Sl. No 20
23
24
25
1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4
FOR FINANCIAL YEAR 2014-15 Estimated
cost of adding 132KV Bus coupler bay
(w.e.f.01.04.2014)
( For internal circulation only)
Sl.No.
Item
1
132KV CB
132KV BI
132KV PI
132KV CT
Structures (MT)
Control cable
9
Testing & Comm.
Contingency
T&P
10
11
12
Civil works
13
14
15
16
17
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
5
FOR FINANCIAL YEAR 2014-15
Cost of increasing capacity for (40-20) MVA at 132KV substation.
(w.e.f.01.04.2014)
( For internal circulation only)
Sl.No.
Equipment
1
40 MVA Transformer
33KV CB
120KV LA
33KV LA
Add
Spares
Transportation
7
Erection
Testing & Comm.
Contingency
Price escalation on Sl no B
10
Civil works
11
Contingency on Sl. No 10
12
13
14
15
CREDIT
Cost of 1 no.20MVA T/F
Cost of 1 no.33KV MOCB
Cost of 3 nos.33KV CTs
Cost of 33KV BI
16
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of 20 MVA T/F have been taken from turnkey tender specification No. ESD-324, as these are
not being procured since more than 10 years.
6
FOR FINANCIAL YEAR 2014-15
Cost of increasing capacity for (63-40) MVA at 132KV substation.
(w.e.f.01.04.2014)
( For internal circulation only)
Sl.No.
Equipment
1
63MVA Transformer
33KV CB
120KV LA
33KV LA
Add
Spares
Transportation
Erection
7
Testing & Comm.
Contingency
T&P
8
Price escalation on Sl no B
10
Civil works
11
Contingency on Sl. No 10
12
13
14
15
CREDIT
Cost of 1 no.40MVA T/F
Cost of 1 no.33KV MOCB
Cost of 3 nos.33KV CTs
Cost of 33KV BI
16
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
7
FOR FINANCIAL YEAR 2014-15
Cost of adding II-20 MVA, 132/33KV T/F at 132KV substation (Main & Transfer bus). (w.e.f.01.04.2014)
( For internal circulation only)
Sl.No.
Equipment
1
Transformer(20MVA,132/33KV)
Circuit breaker
a. 132KV
b. 33KV
33KV LI
BI
a. 132KV
b. 33KV
Post insulators
Current transformers
a. 132KV
b. 33KV
PT(33KV)
LAs
a. 132KV
b. 33KV
10
Structures (MT)
11
Cables
12
13
14
15
16
Testing & Comm.
Contingency
T&P
17
18
Price escalation on Sl no B
19
Civil works
Contingency on Sl. No 19
20
21
22
23
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of 20 MVA T/F have been taken from turnkey tender specification No. ESD-324, as these are
not being procured since more than 10 years.
8
FOR FINANCIAL YEAR 2014-15
Cost of adding IInd 40MVA,132/33KV transformer at 132KV substation(Main & Transformer bus)
(w.e.f.01.04.2014)
( For internal circulation only)
Sl.No.
Equipment
A.
EQUIPMENTS
Transformer(40 MVA,132/33KV)
Circuit breaker
a.
132KV
b. 33KV
3
33KV LI
BI
a.
132KV
b. 33KV
5
Post insulators
Current transformers
a.
132KV
b.
33KV (400-200/1A)
c.
33KV (800-400/1A)
PT(33KV)
LAs
a.
b. 33KV
10
Structures (MT)
11
Cables
12
13
14
15
16
Testing & Comm.
Contingency
T&P
17
18
Price escalation on Sl no B
19
Civil works
20
Contingency on Sl. No 19
21
22
132KV
23
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of 20 MVA T/F have been taken from turnkey tender specification No. ESD-324, as these are
not being procured since more than 10 years.
9
FOR FINANCIAL YEAR 2014-15
Cost Schedule of 132/33KV substation (Radial) with 1x20MVA,132/33KV Transformer
(w.e.f.01.04.2014)
( For internal circulation only)
Sl.
Equipment
No.
1
20 MVA,132KV T/F
132KV CB
132KV CT
132KV LI
132KV BI
132KV PI
132KV PT
132KV LA
33KV CB
10
33KV CT
11
33KV PT
12
33KV LA
13
33KV LI
14
33KV BI
15
16
17
18
19
20
Battery set
21
22
ACDB
23
24..
Stn.Lightning arrangement
25
26
Structures (MT)
27
Pale fencing
28
29
30
Testing & Comm.
Contingency
T&P
31
32
Price escalation on Sl no B
33
IDC on Sl.no C
34
35
Civil works
36
37
IDC on Sl.no 35
38
Contingency on Sl. No 35
39
40
41
42
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of 20 MVA T/F have been taken from turnkey tender specification No. ESD-324, as these are
not being procured since more than 10 years.
Cost
Sl.No
of 132/33KV substation w
Equipment
Circuit breaker
a.
132KV
b.
33KV
Line Isolators
a.
132KV
b.
33KV
Bus Isolator
a.
132KV
b.
33KV
Tandem Isolator
Current T/F
a.
132KV
a.
132KV
b.
33KV
a.
132KV
b.
33KV
a.
132KV
b.
33KV
PT
LA
Post Insulators
10
Transformers
a.
20MVA,132/33KV
b.
250KVA,33/0.4KV
Control panel
a) T/F control & relay panel
b) B/C Panel
c) Double feeder panel
d) Distance protection panel
e) 33KV tripple feeder panel
U/F relay panel
11
12
13
14
Structures (MT)
15
Battery set
16
17
ACDB
18
19
20
21
Fire fighting
22
Fencing
Add
Spares
Transportation
Erection
23
Testing & Comm.
Contingency
T&P
24
25
Price escalation on Sl no B
26
IDC on Sl.no C
27
28
Civil works
29
30
IDC on Sl.no 28
31 Contingency on Sl. No 28
32 Adminstrative and estiblishment charges on Sl. No 28
33 Design & Engineering / Consultancy
34 UPERC & Electrical Inspector Charges (on B+28)
35 Forest clearance & ROW
Note :-
1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of 20 MVA T/F have been taken from turnkey tender specification No. ESD-324, as these are
not being procured since more than 10 years.
Cost
Sl.No.
of 132/33KV substation w
Equipment
Circuit breaker
a.
132KV
b.
33KV
Line Isolators
a.
132KV
b.
33KV
Bus Isolator
a.
132KV
b.
33KV
Tandem Isolator
Current T/F
a.
a.
132KV
b.
33KV
a.
132KV
b.
33KV
a.
132KV
b.
33KV
PT
LA
Post Insulators
Transformers
10
a.
40MVA,132/33KV
b.
250KVA,33/0.4KV
Control panel
a) T/F control & relay panel
b) B/C Panel
c) Double feeder panel
d) Distance protection panel
e) 33KV tripple feeder panel
11
132KV
12
13
14
Structures (MT)
15
Battery set
16
17
ACDB
18
19
20
21
Fire fighting
22
Fencing
Add
Spares
Transportation
Erection
23
Testing & Comm.
Contingency
T&P
24
25
Price escalation on Sl no B
26
IDC on Sl.no C
27
28
29
30
31
32
Civil works
Price esclation on Sl. No. 28
IDC on Sl.no 28
Contingency on Sl. No
Adminstrative and estiblishment charges on Sl. No 28
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
12
FOR FINANCIAL YEAR 2014-15
Cost of 132/33KV substation with Main & Transfer Scheme having 2x20MVA Transformer with SAS
(w.e.f.01.04.2014)
( For internal circulation only)
Sl.No
Equipment
Circuit breaker
a.
b.
132KV
33KV
Line Isolators
a.
b.
132KV
33KV
Bus Isolator
a.
b.
132KV
33KV
Tandem Isolator
a.
132KV
Current T/F
a.
132KV
2
3
b.
PT
a.
33KV
b.
33KV
132KV
LA
a.
132KV
b.
33KV
Post Insulators
Transformers
a.
20MVA,132/33KV
b.
250KVA,33/0.4KV
Control Panel As per technical specification of SAS
Simplex type control & Relay panel for 40 MVA T/F
Simplex type control & Relay panel for 132KV Transfer B/C
Simplex type control & Relay panel for 132KV Feeders
Simplex type control & Relay panel for 33KV Feeders
Simplex type S/S automation Panel
Optical fibre required for SAS
U/F relay panel
Energy meter 0.2 acc.cls.(ABT)
Control & power cable
Structures (MT)
Battery set
Battery charger & DCDB
ACDB
Bus Bar & insulators
S/S Lightning arrangement
8
9
10
i.
ii
iii
iv
v
vi
11
12
13
14
15
16
17
18
19
20
21
22
Fencing
Add
Spares
Transportation
Erection
Testing & Comm.
Contingency
T&P
23
24
25
26
27
IDC on Sl.no C
Cost of Land (Approx)
28
29
30
31
32
Civil works
Price esclation on Sl. No. 28
IDC on Sl.no 28
Contingency on Sl. No 28
Adminstrative and estiblishment charges on Sl. No 28
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of 20 MVA T/F have been taken from turnkey tender specification No. ESD-324, as these are
not being procured since more than 10 years.
5. Rates of SAS Panels / Optical fibre etc have been taken from turnkey tender specification No. ESD-337.
13
FOR FINANCIAL YEAR 2014-15
Cost of 132/33KV S/S with Main & Transfer Scheme having 2x40MVA Transformer with SAS
(w.e.f.01.04.2014)
( For internal circulation only)
Equipment
Circuit breaker
Sl.No.
1
2
a.
b.
Line Isolators
a.
b.
Bus Isolator
a.
132KV
33KV
b.
33KV
Tandem Isolator
a.
Current T/F
a.
b.
PT
a.
b.
LA
a.
132KV
33KV
132KV
132KV
132KV
33KV
132KV
33KV
132KV
10
i.
ii
iii
iv
v
vi
11
12
13
14
15
16
17
18
19
20
b.
33KV
Post Insulators
Transformers
a.
40MVA,132/33KV
b.
250KVA,33/0.4KV
Control Panel As per technical specification of SAS
Simplex type control & Relay panel for 40 MVA T/F
Simplex type control & Relay panel for 132KV Transfer B/C
Simplex type control & Relay panel for 132KV Feeders
Simplex type control & Relay panel for 33KV Feeders
Simplex type S/S automation Panel
Optical fibre required for SAS
U/F relay panel
Energy meter 0.2 acc.cls.(ABT)
Control & power cable
Structures (MT)
Battery set
Battery charger & DCDB
ACDB
Bus Bar & insulators
S/S Lightning arrangement
Earthmat & earthing
21
Fire fighting
22
Fencing
8
9
Add
Spares
Transportation
Erection
Testing & Comm.
Contingency
T&P
23
24
25
26
27
IDC on Sl.no C
Cost of Land (Approx)
28
29
30
31
32
Civil works
Price esclation on Sl. No. 28
IDC on Sl.no 28
Contingency on Sl. No 28
Adminstrative and estiblishment charges on Sl. No 28
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of 20 MVA T/F have been taken from turnkey tender specification No. ESD-324, as these are
not being procured since more than 10 years.
5. Rates of SAS Panels / Optical fibre etc have been taken from turnkey tender specification No. ESD-337.
14
FOR FINANCIAL YEAR 2014-15
Cost of 132/33KV S/S with Main & Transfer Scheme having 1x63MVA and 1x40MVA
Transformer (Conventional type S/S)
(w.e.f. 01.04.2014)
( For internal circulation only)
Sl.No.
Equipment
Circuit breaker
a.
132KV
b.
33KV
Line Isolators
a.
132KV
b.
33KV
Bus Isolator
a.
132KV
b.
33KV
Tandem Isolator
Current T/F
a.
a.
132KV
b.
33KV
c.
33KV (2000-1250/1A)
a.
132KV
b.
33KV
a.
132KV
b.
33KV
PT
LA
Post Insulators
Transformers
a.
10
132KV
63MVA, 132/33KV
b.
40MVA,132/33KV
c.
250KVA,33/0.4KV
11
12
Structures (MT)
13
Battery set
14
15
ACDB
16
17
18
19
20
Fire fighting
21
Fencing
Add
Spares
Transportation
Erection
22
Testing & Comm.
Contingency
T&P
23
24
Price escalation on Sl no B
25
IDC on Sl.no C
26
27
28
29
30
31
Civil works
Price esclation on Sl. No. 28
IDC on Sl.no 28
Contingency on Sl. No 28
Adminstrative and estiblishment charges on Sl. No 28
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
15
FOR FINANCIAL YEAR 2014-15
Cost of 132/33KV substation with Main & Transfer Scheme having 2x63MVA
Transformer (Conventional type S/S)
(w.e.f. 01.04.2014) (
For internal circulation only)
Sl.No.
Equipment
Circuit breaker
a.
132KV
b.
33KV
Line Isolators
a.
132KV
b.
33KV
Bus Isolator
a.
132KV
b.
33KV
Tandem Isolator
Current T/F
a.
a.
132KV
b.
33KV
c.
33KV (2000-1250/1A)
a.
132KV
b.
33KV
a.
132KV
b.
33KV
PT
LA
Post Insulators
Transformers
a.
b.
10
Control panel
a) T/F control & relay panel
b) B/C Panel
c) Double feeder panel
d) Distance protection panel
e) 33KV tripple feeder panel
11
132KV
12
13
Structures (MT)
14
Battery set
15
16
ACDB
17
18
19
20
21
Fire fighting
22
Fencing
63MVA, 132/33KV
250KVA,33/0.4KV
Add
Spares
Transportation
Erection
23
Testing & Comm.
Contingency
T&P
24
25
Price escalation on Sl no B
26
IDC on Sl.no C
27
28
29
30
31
32
Civil works
Price esclation on Sl. No. 28
IDC on Sl.no 28
Contingency on Sl. No 28
Adminstrative and estiblishment charges on Sl. No 28
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
16
FOR FINANCIAL YEAR 2014-15
Cost of 132/33KV S/S with Main & Transfer Scheme having 1x63MVA and 1x40MVA Transformer (With (w.e.f.
01.04.2014)
( For internal circulation only)
Sl.No.
Equipment
Circuit breaker
a.
132KV
b.
33KV
Line Isolators
a.
132KV
b.
33KV
Bus Isolator
a.
132KV
b.
33KV
Tandem Isolator
a.
Current T/F
a.
132KV
b.
33KV
c.
33KV (2000-1250/1A)
a.
132KV
b.
33KV
a.
132KV
b.
33KV
PT
LA
Post Insulators
Transformers
a.
10
63MVA, 132/33KV
b.
40MVA,132/33KV
c.
250KVA,33/0.4KV
11
132KV
12
13
Structures (MT)
14
Battery set
15
16
ACDB
17
18
19
20
21
Fire fighting
22
Fencing
Add
Spares
Transportation
Erection
22
Testing & Comm.
Contingency
T&P
23
24
Price escalation on Sl no B
25
IDC on Sl.no C
26
27
28
29
30
31
Civil works
Price esclation on Sl. No. 28
IDC on Sl.no 28
Contingency on Sl. No 28
Adminstrative and estiblishment charges on Sl. No 28
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of SAS Panels / Optical fibre etc have been taken from turnkey tender specification No. ESD-337.
17
FOR FINANCIAL YEAR 2014-15
Cost of 132/33KV substation with Main & Transfer Scheme having 2x63MVA Transformer with SAS
(w.e.f. 01.04.2014)
Sl.No.
132KV
33KV
a.
b.
Line Isolators
a.
b.
Bus Isolator
a.
b.
Tandem Isolator
a.
Current T/F
a.
b.
PT
132KV
33KV
a.
b.
LA
4
5
8
9
10
i.
ii
iii
iv
v
vi
11
12
13
14
15
16
17
18
19
20
21
22
132KV
33KV
132KV
33KV
132KV
132KV
33KV
a.
132KV
b.
33KV
Post Insulators
Transformers
a.
63MVA,132/33KV
b.
250KVA,33/0.4KV
Control Panel As per technical specification of SAS
Simplex type control & Relay panel for 63 MVA T/F
Simplex type control & Relay panel for 132KV Transfer B/C
Simplex type control & Relay panel for 132KV Feeders
Simplex type control & Relay panel for 33KV Feeders
Simplex type S/S automation Panel
Optical fibre required for SAS
U/F relay panel
Energy meter 0.2 acc.cls.(ABT)
Structures (MT)
Battery set
Battery charger & DCDB
ACDB
Control & power cable
Bus Bar & insulators
S/S Lightning arrangement
Earthmat & earthing
Fire fighting
Fencing
A
Add
23 Spares
Transportation
Erection
Testing & Comm.
Contingency
T&P
24 Adminstrative and estiblishment charges on Sl. No B
25 Price escalation on Sl no B
26 IDC on Sl.no C
27 Cost of Land (Approx)
28 Civil works
29
30
31
32
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4. Rates of SAS Panels / Optical fibre etc have been taken from turnkey tender specification No. ESD-337.
Revised
FOR FINANCIAL YEAR 2014-15
Cost of 132/33KV substation with Two Main & Transfer Bus Scheme having 2x40MVA Transformer
(w.e.f. 01.04.2014) (
For internal circulation only)
Sl.No.
4
5
8
9
10
i.
ii
iii
iv
v
vi
vii
11
12
13
14
15
16
17
Equipment
Circuit breaker
a.
132KV
b.
33KV
Line Isolators
a.
132KV
b.
33KV
Bus Isolator
a.
132KV
b.
33KV
Tandem Isolator
a.
132KV
Current T/F
a.
132KV
b.
33KV
PT
a.
132KV
b.
33KV
LA
a.
132KV
b.
33KV
Post Insulators
Transformers
a.
40MVA,132/33KV
b.
250KVA,33/0.4KV
Control Panel As per technical specification of SAS
Simplex type control & Relay panel for 40 MVA T/F
Simplex type control & Relay panel for 132KV Transfer B/C
Simplex type control & Relay panel for 132KV B/C
Simplex type control & Relay panel for 132KV Feeders
Simplex type control & Relay panel for 33KV Feeders
Simplex type S/S automation Panel
Optical fibre required for SAS
U/F relay panel
Energy meter 0.2 acc.cls.(ABT)
Structures (MT)
Battery set
Battery charger & DCDB
ACDB
Control & power cable
18
19
20
21
22
28
29
30
31
32
Civil works
Price esclation on Sl. No. 28
IDC on Sl.no 28
Contingency on Sl. No 28
Adminstrative and estiblishment charges on Sl. No 28
Note :1. For deposit works, Supervision charges will be taken 15% as per corporation order No. 530 Works14/PCL-2002-40-K/2000 Dated. 22.04.2002 in place of Establishment & Administrative expenses.
2. Schedule of rates for Civil Works has been incorported in accordance with letter No 5603 - Dated.
11.08.2014 from CE (Civil Transmission-II) Lucknow . However when the bay is to be extended
(specially main structure), cost of civil works and structures shall be on actual basis.
3. Rates of 33KV Decentralized items have been taken as received from field units.
4.
Rates of SAS Panels / Optical fibre etc have been taken from turnkey tender specification No.
ESD-337.