Excavators
CYCLETIME ESTIMATING CHARTS
“The digging cycle of the excavator is composed of
‘our segments
Tr Loud Buckst 3, Dump Bucket
2 Swing Loaded 4. Swing Empty
‘oral excavator eye time is dependent om machine
size (small machines en eye faster than linge machines)
fand job conditions. With excellent job conditions the
‘Exewato can eye fas. As job conditions become more
Severe (tougher diguing. deeper trench, more obstaces