Heat
Recovery
Power
Plant
M.L.C.F.L.
Mianwali
Training Report
All thanks and praises to Allah. The Almighty who helps in solving our difficulties. Allah
is the source of all knowledge. He gave me the wisdom, guidance and enabled me to undertake
and complete this work.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 2
Dedication
I would like to dedicate the report to Waste Heat Recovery Power Plant Erection team who
guided me throughout my training period and still doing their best for me. To be here in this
organization and working with such a hard work team at this level is a matter of proud for me.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 3
Vision
“In order to remain competitive in the market the management at Maple Leaf continuously re
evaluates its business strategies. With the increase of furnace oil prices the company adopted
coal as a more cost efficient and environmentally friendly fuel for kiln firing. Today the
management believes that the future lies in exploring the possibilities of alternative and cheaper
fuels such as waste firing. This would further reduce production costs whilst promoting a culture
of environmental awareness, health and safety.”
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 4
Mission Statement
• “To develop and implement good practices in the field of development and management
of people, for application both by professional members and the community within
M.L.C.F.L.”
• “To serve the professional as well as the social interest of the personnel at M.L.C.F.L.”
• “To uphold the highest ideals in the management and development of people.”
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 5
Contents
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 6
List of tables
List of Figures
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 7
List of Abbreviations
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 8
Executive Summary
T he quest for higher efficiencies has spurred the innovation of energy efficient technologies
such as waste heat recovery. The recovery and utilization of waste heat not only conserves
fuel, usually fossil fuel, but also reduces the amount of waste heat and greenhouse gases dumped
to the environment. Waste Heat Recovery (WHR) is an energy efficient technology that promises
a financially viable and environment-friendly option in demand-side energy management
(DSM).
5% of global carbon dioxide emissions originate from cement production. About half of it from
calcination and half of combustion processes. Waste heat recovery is an option to reduce CO2
emissions considerably.
Waste heat from the flue gases are estimated to provide a total of 13.9 MW for the factory’s
additional Electrical energy requirement.
The Clean Development Mechanism (CDM) is one of the several financing options considered
for the proposed project. CDM is one of three mechanisms established by the Kyoto Protocol and
allows emission reduction projects that assist developing countries in achieving sustainable
development and that generate “Certified Emission Reduction” (CER) for use by the investing
country or company.
Considering the above, the project is beneficial, viable and worth implementing. The company
will realize increased profits and employment from expanding operations while contributing to
the protection of the environment. The feasibility study has shown than as an energy efficient
demand-side option, waste heat recovery promises a large potential for energy savings, foreign
exchange savings and greenhouse gas abatement. The replication of this project in the production
of the country will stimulate investment and pave the way for cleaner economic growth and
sustainable development for the country.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 9
1
Maple Leaf Cement Factory
M aple Leaf Cement Factory Limited is the third largest cement producer in Pakistan. It
was setup in 1956 as a joint collaboration between the West Pakistan Industrial
Development Cooperation and Government of Canada. In 1992 Kohinoor Group acquired the
ownership and management of M.L.C.F.L. under the privatization policy of the Government of
Pakistan. Presently,
Kohinoor Group is the holding company for M.L.C.F.L.
M.L.C.F.L. is strategically located at Iskanderabad, near the city of Daudkhel, an area which is
rich in raw materials required for the production of cement. M.L.C.F.L. has an ISO
9000/9001/9004/19011: 2000 certification and manufactures high quality cement products
(Ordinary Portland Cement, White Cement, Sulphate Resistant Cement, Low Alkali Cement and
Oil Well Cement).
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 10
2
Introduction to Cement and Green House
Gases
C ement is considered one of the most important building materials around the world. It is
mainly used for the production of concrete. Concrete is a mixture of inert mineral
aggregates, e.g. sand, gravel, crushed stones, and cement. Cement consumption and production is
closely related to construction activity, and therefore to the general economic activity.
Cement is one of the most produced materials around the world. Due to the importance of
cement as a construction material, and the geographic abundance of the main raw materials, i.e.
limestone, cement is produced in virtually all countries. The widespread production is also due to
the relative low price and high density of cement that limits ground transportation because of the
relative high costs.
The energy consumption by the cement industry is estimated at about 2% of the global primary
energy consumption, or almost 5% of the total global industrial energy consumption. Due to the
dominant use of carbon intensive fuels, e.g. coal, in clinker making, the cement industry is also a
major emitter of CO2 emissions. Besides energy consumption, the clinker making process also
emits CO2 due to the calcining process.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 11
3
Clean Development Mechanism Overview
Background
The Kyoto Protocol establishes legally binding commitments for the reduction of four
greenhouse gases (carbon dioxide, methane, nitrous oxide, sulphur hexafluoride), and two groups
of gases (hydrofluorocarbons and perfluorocarbons ) produced by "Annex I" (industrialized)
nations, as well as general commitments for all member countries. As of January 2009[update],
183 parties have ratified the protocol, which was initially adopted for use on 11 December 1997
in Kyoto, Japan and which entered into force on 16 February 2005. Under Kyoto, industrialized
countries agreed to reduce their collective GHG emissions by 5.2% compared to the year 1990.
National limitations range from 8% reductions for the European Union and some others to 7%
for the United States, 6% for Japan, and 0% for Russia. The treaty permitted GHG emission
increases of 8% for Australia and 10% for Iceland.
Countries with commitments under the Kyoto Protocol to limit or reduce greenhouse gas
emissions must meet their targets primarily through national measures. As an additional means
of meeting these targets, the Kyoto Protocol introduced three market-based mechanisms, thereby
creating what is now known as the “carbon market.”
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 12
The Kyoto mechanisms are:
1. Emissions Trading
2. The Clean Development Mechanism (CDM)
3. Joint Implementation (JI)
Emissions trading, as set out in Article 17 of the Kyoto Protocol, allows countries that have
emission units to spare - emissions permitted them but not "used" - to sell this excess capacity to
countries that are over their targets.
Since carbon dioxide is the principal greenhouse gas, people speak simply of trading in carbon.
Carbon is now tracked and traded like any other commodity. This is known as the "carbon
market."
The Clean Development Mechanism (CDM), defined in Article 12 of the Protocol, allows a
country with an emission-reduction or emission-limitation commitment under the Kyoto
Protocol to implement an emission-reduction project in developing countries. Such projects can
earn saleable certified emission reduction (CER) credits, each equivalent to one ton of CO2,
which can be counted towards meeting Kyoto targets.
The mechanism is seen by many as a trailblazer. It is the first global, environmental investment
and credit scheme of its kind, providing standardized emissions offset instrument, CERs.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 13
A CDM project activity might involve, for example, a rural electrification project using solar
panels or the installation of more energy-efficient boilers. As WHRPP at M.L.C.F.L. is an
example of CDM certified project.
The mechanism stimulates sustainable development and emission reductions, while giving
industrialized countries some flexibility in how they meet their emission reduction or limitation
targets.
The mechanism is overseen by the CDM Executive Board, answerable ultimately to the
countries that have ratified the Kyoto Protocol.
Operational since the beginning of 2006, the mechanism has already registered more than
1,000 projects and is anticipated to produce CERs amounting to more than 2.7 billion tonnes
of CO2 equivalent in the first commitment period of the Kyoto Protocol, 2008–2012.
Joint implementation offers Parties a flexible and cost-efficient means of fulfilling a part of
their Kyoto commitments, while the host Party benefits from foreign investment and
technology transfer.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 14
have approval of the host Party and participants have to be authorized to participate by a
Projects starting as from the year 2000 may be eligible as JI projects if they meet the
relevant requirements, but ERUs (emission reduction units) may only be issued for a
crediting period starting after the beginning of 2008.
If a host Party does not meet all, but only a limited set of eligibility requirements,
verification of emission reductions or enhancements of removals as being additional has to
be done through the verification procedure under the Joint Implementation Supervisory
Committee (JISC). Under this so-called “Track 2” procedure, an independent entity
accredited by the JISC has to determine whether the relevant requirements have been met
before the host Party can issue and transfer ERUs.
A host Party which meets all the eligibility requirements may at any time choose to use the
verification procedure under the JISC (Track 2 procedure).
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 15
4
Waste Heat
W aste heat is heat, which is generated in a process by way of fuel combustion or chemical
reaction, and then “dumped” into the environment even though it could still be reused for
some useful and economic purpose. The essential quality of heat is not the amount but rather its
“value”.
Recovery of waste heat has a direct effect on the efficiency of the process. This is reflected by
reduction in the utility consumption & costs, and process cost.
a) Reduction in pollution: A number of toxic combustible wastes such as carbon monoxide gas, sour
gas, carbon black off gases, oil sludge, Acrylonitrile and other plastic chemicals etc, releasing to
atmosphere if/when burnt in the incinerators serves dual purpose i.e. recovers heat and reduces the
environmental pollution levels.
b) Reduction in equipment sizes: Waste heat recovery reduces the fuel consumption, which leads to
reduction in the flue gas produced. This results in reduction in equipment sizes of all flue gas
handling equipments such as fans, stacks, ducts, burners, etc.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 16
5
Development of a Waste Heat Recovery
System
U nderstanding the process is essential for development of Waste Heat Recovery system.
This can be accomplished by reviewing the process flow sheets, layout diagrams, piping
isometrics, electrical and instrumentation cable ducting etc. Detail review of these documents
will help in identifying:
After identifying source of waste heat and the possible use of it, the next step is to select suitable
heat recovery system and equipments to recover and utilize the same.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 17
5.1.2 Economic Evaluation of Waste Heat Recovery System
It is necessary to evaluate the selected waste heat recovery system on the basis of financial
analysis such as investment, depreciation, payback period, rate of return etc.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 18
5.3 Gas Flow Diagram in Cement Plant and WHRPP
The following diagram shows a schematic of tie in of waste heat recovery power plant boilers
gas ducts with existing cement plant .
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 19
6
Waste Heat Recovery in M.L.C.F.L.
Iskanderabad
• Environmental Development
• Social Development
• Creation of new permanent jobs during construction and operation phase of the
project activity
• Alleviation of poverty by providing labour employment opportunities to the local
community during construction phase
• Positive impact on local communities by avoiding grid electricity which will
become available for domestic consumers
• Economic Development
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 20
• Technology Development
• Diffusion of the new technology in the industrial sector. This would provide
ample opportunity to local engineers and engineering companies to study this
technology and develop similar indigenous technologies which would reduce
future technology imports.
The schematic shows that how much effective is Waste Heat Recovery. Out of 38% Waste heat
in Cement dry process 18% heat can be saved by installation of effective heat recovery
equipment.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 21
6.2 Building Blocks of WHRPP
The following two divisions are involved in waste heat recovery system:
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 22
6.2.1 Grey Cement Plant
Process Description:
Waste gas discharged from the clinker cooler system, and the kiln pre-heater system all contain
useful energy that can be converted into power by installation of a waste heat boiler system that
runs a steam turbine system. This report focuses on the steam turbine system since these systems
have been installed in many plants worldwide and have proven to be economic
Heat recovery has limited application for plants with in-line raw mills, as the heat in the kiln
exhaust is used for raw material drying. So at each step in heat recovery system gases are re-
circulated to existing system after Waste heat recovery boilers.
Waste Heat Recovery Boilers will be installed between pre-heater and Raw Mill of Line-1 and
Line-2. This step will lead to an energy efficient process and clinker electricity (KWh) cost will
be reduced by 26% without using any extra fuel.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 23
Steam Pressure = 1.63 MPa
Its production is 6700 tons per day of clinker. Waste gases, rejected from preheater and clinker
cooler, properties are as given below:
i. Preheater Heat Exchanger 2 (Two Boilers)
Line-2 is a state of art technology and its preheater is double string. So at each string
one boiler is installed and both are identical.
Waste Gas characteristics are as given below:
Waste Gas to be recovered =195,500x2 Nm^3 / hour
Gas Temperature =310°C
Steam characteristics to be generated by waste gas are as given below:
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 24
ii. Clinker Cooler Heat Exchanger 2
Waste Gas characteristics are as given below:
Waste Gas to be recovered =173,000 Nm^3 / hour
Gas Temperature =380°C
Steam characteristics to be generated by waste gas are as given below:
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 25
Installing Waste Heat Recovery Boilers at Line-1 and Line-2
Fig-6 Block Diagram of Waste Heat Recovery Power with Two Cement Lines
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 26
6.2.2 Power Generation Plant
2nd source of waste heat is the exhaust of Wartsila engine. This waste heat comprises only 11%
of total waste heat to be utilized by the project activity. Currently, all the waste heat from this
source is vented to atmosphere without any recycling.
Gas duct will be taken before stack of Wartsila Power Generator.
It can operate in two modes as follows:
I. Gas mode
Wartsila Power Generator mostly works in gas mode as it is economical and gas is available
almost whole year.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 27
II. Diesel Mode
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 28
6.2.3 Block Diagram with Wartsila and GCD
Fig-7 Block Diagram of Waste Heat Recovery Power Plant with Two Cement Lines and Wartsila
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 29
6.2.4 Technical specifications of Heat Recovery units
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 30
7
Power Output
T he total system output power will be 13.9MW. This power will be utilized according to
load flow schemes arranged.
Now let us calculate Proportion of each input to Waste Heat Recovery System.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 31
7.1.1 Percentage of Line-1
I/p %age of Line-1= (Steam generated by Line 1)*100 / (Total Steam Generated)
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 32
Fig-9 Complete Block Diagram of Waste Heat Recovery Power Plant with Two Cement Lines
and Wartsila Electric Generator
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 33
7.2 Power Flow Diagram of Waste Heat Recovery Power Plant
System
The power flow diagram describes how power flows from Waste gases to generator total output
power is 13.9MW.
Fig-10 Power Flow Diagram of Waste Heat Recovery Power Plant System
8
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 34
Health Safety and Environment
8.1 Beliefs:
• Occupational injuries and illnesses are preventable.
• Source reduction/elimination is the best waste management practice. Alternatives to
source reduction/elimination will focus on reuse, recycling and waste minimization.
8.2 Principles:
• People are our most important resource, and as such, safety is our number one (#1)
core value. We must constantly strive to achieve zero (0) injuries and illnesses.
• We are all accountable for ourselves and the safety of others in the workplace.
Working safely is a condition of employment.
• Our efforts must be focused on prevention of occupational injury and illness;
therefore, we will provide requisite training to our employees to empower our
incident prevention culture.
• Whole team, contractors and subcontractors are accountable for performing their
daily activities in a manner consistent with our HSE policy.
• When an injury or serious incident occurs, we will thoroughly and completely
determine its cause and share the lessons learned.
• We will strive to preserve the environment in which we operate by utilizing
resources responsibly and by reducing and eliminating waste from our operations at
the source; however, where wastes are generated, they will be handled safely and
responsibly.
• Our work will be conducted in an atmosphere of trust, openness and cooperation.
Waste Heat Recovery Power Plant Maple Leaf Cement Factory Mianwali Page 35