Você está na página 1de 85

Table 1.

Average Price of Building Materials for Peninsular Malaysia (BMDAM)


No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
1 Ordinary Portland Cement (bulk) MT 60 del 217.00 219.00 224.00 233.00 222.33 219.00

2 Granite Aggregate 3/4" MT 60 ex 15.67 15.67 17.00 17.33 17.33 16.00

3 Normal River Sand MT 30 ex 12.50 15.33 16.50 7.00 6.00 7.67

4 Fine River Sand for Plastering MT 30 ex 15.33 23.33 22.67 7.00 10.67 9.00

5 Normal Mining Sand MT 30 ex 12.33 15.00 15.83 13.00 6.00 13.67

6 Fine Mining Sand for Plastering MT 30 ex 15.00 21.67 21.00 17.67 10.67 16.67

7 Mild Steel Round Bars - 10mm, MS146 MT 14 del 1,861.67 1,861.67 1,861.67 1,861.67 1,861.67 1,861.67

8 Mild Steel Round Bars - 12mm, MS146 MT 14 del 1,824.67 1,855.00 1,824.67 1,824.67 1,824.67 1,824.67

9 Mild Steel Round Bars - 16mm, MS146 MT 14 del 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67

10 Mild Steel Round Bars - 20mm, MS146 MT 14 del 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67

11 Mild Steel Round Bars - 22mm, MS146 MT 14 del 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67

12 Mild Steel Round Bars - 25mm, MS146 MT 14 del 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67

13 Mild Steel Round Bars - 32mm, MS146 MT 14 del 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67 1,757.67

14 High Tensile Deformed Bars - 10mm, MS146 MT 14 del 1,901.67 1,901.67 1,901.67 1,901.67 1,901.67 1,901.67

15 High Tensile Deformed Bars - 12mm, MS146 MT 14 del 1,861.67 1,861.67 1,861.67 1,861.67 1,861.67 1,861.67

16 High Tensile Deformed Bars - 16mm, MS146 MT 14 del 1,796.67 1,796.67 1,796.67 1,796.67 1,796.67 1,796.67

17 High Tensile Deformed Bars - 20mm, MS146 MT 14 del 1,796.67 1,796.67 1,796.67 1,796.67 1,796.67 1,796.67

18 High Tensile Deformed Bars - 25mm, MS146 MT 14 del 1,796.67 1,796.67 1,796.67 1,796.67 1,796.67 1,796.67

19 High Tensile Deformed Bars - 32mm, MS146 MT 14 del 1,796.67 1,796.67 1,796.67 1,796.67 1,796.67 1,796.67

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
20 BRC Fabric - A6, MS145 m2 30 del 4.38 4.38 4.38 4.38 4.38 4.40

21 BRC Fabric - A7, MS145 m2 30 del 6.00 6.00 5.99 6.10 6.10 6.10

22 BRC Fabric - A8, MS145 m2 30 del 7.65 7.58 7.65 7.80 7.80 7.80

23 BRC Fabric - A9, MS145 m2 30 del 9.92 9.92 9.98 10.15 10.15 10.15

24 BRC Fabric - A10, MS145 m2 30 del 12.67 12.64 12.74 12.90 12.90 12.90

25 Ready Mix Concrete - Normal Mix - Grade 10 m3 30 del 144.67 137.33 146.67 150.67 141.33 148.33

26 Ready Mix Concrete - Normal Mix - Grade 15 m3 30 del 151.67 145.00 152.33 152.33 146.67 152.67

27 Ready Mix Concrete - Normal Mix - Grade 20 m3 30 del 155.67 150.00 157.00 157.00 152.00 157.67

28 Ready Mix Concrete - Normal Mix - Grade 25 m3 30 del 162.33 157.67 164.33 165.33 160.00 163.33

29 Ready Mix Concrete - Normal Mix - Grade 30 m3 30 del 170.67 167.00 171.67 173.33 169.00 172.00

30 Ready Mix Concrete - Normal Mix - Grade 35 m3 30 del 179.33 176.00 180.00 182.33 178.33 180.00

31 Ready Mix Concrete - Normal Mix - Grade 40 m3 30 del 189.67 186.33 190.33 192.00 188.33 190.00

32 Clay Brick - Pallet piece 30 del 0.26 0.24 0.24 0.28 0.26 0.26

33 Smooth Face Facing Brick, Red piece 30 del 0.58 0.56 0.58 0.62 0.61 0.62

34 Cement Sand Brick - Pallet piece 60 del 0.16 0.15 0.17 0.16 0.16 0.18

35 Precast Concrete Hollow Block 90mm x 190mm x piece 60 del 1.57 1.45 1.57 1.57 1.50 1.57
390mm M.S 27 1996

36 Plain Gypsum Partition Board ,1.2m x 2.4m x 12mm sheet 30 del 25.00 25.00 25.00 25.00 25.00 25.00
thick, Boral/ Armstrong

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m2 = Square Metre, m3 = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
37 Laminated Gypsum Partition Board, 1.2m x 2.4m x sheet 30 del 39.17 38.00 39.17 39.17 38.40 38.87
12mm thick, Boral/ Armstrong

38 CorrugatedRoofingSheet- sheet 60 del 22.60 22.60 22.00 21.27 21.27 22.03


76mmDoubleWidth,1065mmx2440mmx4mm
(Hume/ Malex/ UAC)

39 Interlocking Concrete Tiles - Standard Duotone piece 60 del 1.48 1.48 1.49 1.50 1.46 1.50
Colour (Monier Elabana)

40 MS Decking - Lysaght Clean Colorbond - Kliplok Hi- m2 60 del 53.30 53.30 54.80 55.02 55.02 53.80
Ten 0.53mm TCT

41 MS Decking - Lysaght Clean Colorbond - Spandek m2 60 del 46.97 46.97 48.80 49.32 49.32 47.80
Hi-Ten 0.47mm TCT

42 MS Decking - Lysaght Clean Colorbond - Trimdek m2 60 del 42.13 42.13 45.47 44.93 44.93 42.47
Hi-Ten 0.47mm TCT

43 MS Decking - Ajiya AP Rib Hi-Tensile G28, 0.40mm m2 60 del 38.43 38.43 38.87 39.06 39.06 38.43
TCT, Clean Colorbond (Commercial)

44 MS Decking - Ajiya AP Rib Hi-Tensile G26, 0.47mm m2 60 del 42.70 42.70 43.20 43.39 43.39 42.70
TCT, Clean Colorbond (Commercial)

45 MS Decking - Ajiya AP Rib Hi-Tensile G24, 0.53mm m2 60 del 46.13 46.13 46.47 46.91 46.91 46.13
TCT, Clean Colorbond (Commercial)

46 MS Decking - Ajiya Euro Step Roofing M350 G28, m2 60 del 39.20 39.20 39.60 39.85 39.85 39.20
0.40mm TCT, Clean Colorbond

47 MS Decking - Ajiya Euro Step Roofing M350 G26, m2 60 del 44.83 44.83 44.97 45.58 45.58 44.83
0.47mm TCT, Clean Colorbond

48 MS Decking - Ajiya Euro Step Roofing M350 G24, m2 60 del 48.03 48.03 48.43 48.84 48.84 48.03
0.53mm TCT, Clean Colorbond

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m2 = Square Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
49 Glazed Ceramic Floor Tiles, Standard Light Colour piece 60 del 0.71 0.76 0.74 0.74 0.71 0.71
200mm x 200mm x 8mm - Grade 1

50 Glazed Ceramic Floor Tiles, Standard Light Colour piece 60 del 1.52 1.52 1.52 1.55 1.53 1.53
300mm x 300mm x 8mm - Grade 1

51 Plain Homogenous Floor Tiles, Standard Light piece 60 del 1.06 1.06 1.10 1.05 1.05 1.05
Colour 200mm x 200mm x 8mm - Grade 1

52 Plain Homogenous Floor Tiles, Standard Light piece 60 del 2.13 2.13 2.12 2.05 2.05 2.05
Colour 300mm x 300mm x 8mm - Grade 1

53 Polished Granite Slab - Local Grey 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

54 Polished Granite Slab - Melaka Rose 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

55 Polished Granite Slab - Tampin Blue 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

56 Polished Granite Slab - Terengganu Green 1' x 1' x piece 60 del 25.00 25.00 24.00 25.00 25.00 25.00
20mm

57 Local Polished Marble Slab W1/P1, 300mm x piece 60 del 3.50 3.50 3.30 3.50 3.50 3.50
300mm x 10mm

58 Vitrified Porcelain Tiles - Niro Granite, Pietra Evo 1, piece 60 del 3.13 3.13 3.03 3.13 3.13 3.13
Beigo - P11, 300mm x 300mm x 20mm

59 Vitrified Porcelain Tiles- Niro Granite, Pietra Evo 1, piece 60 del 3.13 3.13 3.07 3.13 3.13 3.13
Noce - P12, 300mm x 300mm x 20mm

60 Vitrified Porcelain Tiles -Niro Granite, Nordik Stone, piece 60 del 12.83 12.83 12.55 12.83 12.83 12.83
Bora N02, 450mm x 450mm x 20mm

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
61 Vitrified Porcelain Tiles - Niro Granite, Nordik Stone, piece 60 del 12.83 12.83 12.55 12.83 12.83 12.83
Kosawa N04, 450mm x 450mm x 20mm

62 Glazed Ceramic Wall Tiles, Standard Light Colour, piece 60 del 0.71 0.71 0.76 0.75 0.74 0.71
200mm x 200mm x 6mm - Grade 1

63 Glazed Ceramic Wall Tiles, Standard Light Colour, piece 60 del 0.83 0.83 0.85 0.86 0.84 0.88
200mm x 250mm x 6mm - Grade 1

64 Plain Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 3.65 3.65 3.62 3.68 3.68 3.65
1220mm x 3.2mm (UAC/ Hume/ Malex)

65 Plain Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 6.45 6.45 6.45 6.45 6.45 6.45
1220mm x 4.5mm (UAC/ Hume/ Malex)

66 Plain Cellulose Fibre Ceiling Sheet, 1220mm x sheet 60 del 7.17 7.28 7.22 7.33 7.33 7.28
1220mm x 3.2mm (UAC/ Hume/ Malex)

67 Plain Cellulose Fibre Ceiling Sheet, 1220mm x sheet 60 del 12.88 12.88 12.88 12.00 12.00 12.88
1220mm x 4.5mm (UAC/ Hume/ Malex)

68 Decorative Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 4.93 4.93 4.88 4.97 4.97 4.93
1220mm x 3.2mm (UAC/ Hume/ Malex)

69 Decorative Cellulose Fibre Ceiling Sheet,1220mm x sheet 60 del 9.70 9.70 9.57 9.70 9.70 9.70
1220mm x 3.2mm (UAC/ Hume/ Malex)

70 Plain Gypsum Ceiling Board, 610mm x 1220mm x sheet 60 del 4.70 4.70 4.70 4.70 4.70 4.70
9.5mm (Boral/Armstrong)

71 Galvanised Iron Pipes - 15mm Diameter (Maruichi), 6m run 60 del 28.53 28.53 28.53 28.40 28.40 28.53
MS863 - Class A

72 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 42.50 42.50 42.50 41.17 41.17 42.50
MS863 - Class A

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
73 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 58.63 58.63 58.63 58.17 58.17 58.63
MS863 - Class A

74 Galvanised Iron pipes - 15mm Diameter (Maruichi), 6m run 60 del 35.47 35.47 35.47 35.30 35.30 35.47
MS863 - Class B

75 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 45.93 45.93 45.93 45.70 45.70 45.93
MS863 - Class B

76 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 66.87 66.87 66.87 66.83 66.83 66.87
MS863 - Class B

77 Galvanised Iron pipes - 15mm Diameter (Maruichi), 6m run 60 del 42.20 42.20 42.20 41.93 41.93 42.20
MS863 - Class C

78 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 54.23 54.23 54.23 53.97 53.97 54.23
MS863 - Class C

79 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 83.87 83.87 83.87 83.70 83.70 83.87
MS863 - Class C

80 PVC Pressure pipes Class D, grey colour 50mm 4m run 60 del 21.45 21.45 21.45 21.45 21.45 21.45
Diameter (Paling), MS 628

81 PVC Pressure pipes Class D, grey colour 50mm 6m run 60 del 33.00 33.00 32.67 33.00 33.00 33.00
Diameter (Dulon), MS 628

82 PVC Pressure pipes Class D grey colour 65mm 6m run 60 del 45.73 45.73 45.73 45.63 45.63 45.73
Diameter (Paling), MS 628

83 PVC Pressure pipes Class D, grey colour 80mm 6m run 60 del 63.40 63.40 63.40 63.40 63.40 63.40
Diameter (Paling), MS 628

84 PVC pipes Class O, grey colour 32mm Diameter 4m run 60.00 del 7.23 7.23 7.23 7.20 7.20 7.23
(Paling), MS 762

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
85 PVC pipes Class O, grey colour 50mm Diameter 4m run 60.00 del 10.30 10.30 10.27 10.30 10.30 10.30
(Paling), MS 762

86 PVC Pressure pipes Class E,grey colour 25mm 6m run 60 del 9.93 9.93 9.93 9.93 9.93 9.93
Diameter (Dulon), MS 628

87 PVC Pressure pipes Class E,grey colour 50mm 6m run 60 del 29.40 29.40 29.40 29.37 29.37 29.40
Diameter (Dulon), MS 628

88 PVC Pressure pipes Class E,grey colour 25mm 4m run 60 del 8.78 8.78 8.78 8.78 8.78 8.78
Diameter (Paling), MS 628

89 PVC Pressure pipes Class E,grey colour 50mm 4m run 60 del 26.80 26.80 26.80 26.80 26.80 26.80
Diameter (Paling), MS 628

90 PVC Pressure pipes Class E, grey colour 65mm 6m run 60 del 56.00 56.00 56.00 56.00 56.00 56.00
Diameter (Paling), MS 628

91 PVC Pressure pipes Class E, grey colour 80mm 6m run 60 del 80.76 80.76 78.13 78.13 78.13 80.76
Diameter (Paling), MS 628

92 PVC Pressure pipes Class 6 grey colour 20mm 4m run 60 del 8.49 8.49 8.25 8.22 8.22 8.49
Diameter (Paling), MS 628

93 PVC Pressure pipes Class 6 grey colour 25mm 4m run 60 del 12.43 12.43 12.03 12.03 12.03 12.43
Diameter (Paling), MS 628

94 PVC Pressure pipes Class 7,grey colour 20mm 4m run 60 del 10.78 10.78 10.43 10.43 10.43 10.78
Diameter (Paling), MS 628

95 PVC Pressure pipes Class 7,grey colour 25mm 4m run 60 del 15.63 15.63 15.13 15.13 15.13 15.63
Diameter (Paling), MS 628

96 PVC Pressure pipes Class 7, grey colour 32mm 4m run 60 del 21.07 21.07 20.40 20.40 20.40 21.07
Diameter (Paling), MS 628

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
97 PVC Pressure pipes Class 7, grey colour 50mm 4m run 60 del 35.21 35.21 34.10 34.10 34.10 35.21
Diameter (Paling), MS 628

98 HDPE Pipe PN 10 - 50mm Diameter, MS1058 100m roll 60 del 408.97 408.97 396.33 396.33 396.33 389.60

99 HDPE Pipe PN 12.5 - 25mm Diameter, MS1058 100m roll 60 del 132.00 132.00 128.00 128.00 128.00 128.00

100 HDPE Pipe PN 12.5 - 40mm Diameter, MS1058 100m roll 60 del 334.43 334.43 324.00 324.00 324.00 324.00

101 HDPE Pipe PN 12.5 - 50mm Diameter, MS1058 100m roll 60 del 510.77 510.77 495.00 495.00 495.00 495.00

102 HDPE Pipe PN16 - 20mm Diameter, MS1058 100m roll 60 del 101.70 101.70 98.67 98.67 98.67 98.93

103 HDPE Pipe PN16 - 25mm Diameter, MS1058 100m roll 60 del 151.13 151.13 146.67 146.67 146.67 147.33

104 HDPE Pipe PN16- 50 mm Diameter, MS1058 100m roll 60 del 610.67 610.67 592.00 592.00 592.00 588.18

105 Fibre Reinforced Plastic Sectional Tank - 1000 6 panels 60 del 1,550.33 1,550.33 1,530.33 1,530.33 1,530.33 1,550.33
Litres / 220 Gallons, AL Tank, 6 panels

106 Fibre Reinforced Plastic Sectional Tank - 1000 6 panels 60 del 1,700.00 1,616.67 1,740.00 1,770.00 1,770.00 1,700.00
Litres / 220 Gallons, RP Tank, 6 panels

107 Fibre Reinforced Plastic Sectional Tank - 1000 6 panels 60 del 1,520.00 1,520.00 1,483.33 1,450.00 1,450.00 1,520.00
Litres / 220 Gallons, MuiTank, 6 panels

108 Fibre Reinforced Plastic Sectional Tank - 1000 6 panels 60 del 1,670.00 1,670.00 1,633.33 1,600.00 1,600.00 1,670.00
Litres / 220 Gallons, G-FRP, 6 panels

109 Polytank - Circular , 100 Gallons, MS1225 - Weida No. 60 del 96.07 94.23 101.40 103.07 103.07 96.07
Equivelant

110 Polytank - Circular, 200 Gallons, MS1225 - Weida No. 60 del 162.50 159.17 179.17 179.17 179.17 162.50
Equivelant

111 Polytank - Square, 100 Gallons, MS1225 - Weida No. 60 del 93.83 93.83 96.17 111.17 111.17 105.17
Equivelant

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
112 Polytank - Square, 200 Gallons, MS1225 - Weida No. 60 del 195.42 191.42 207.75 207.75 207.75 205.08
Equivelant

113 Wash Hand Basins - 560mm x 406mm, white colour Set 60 del 47.07 46.07 47.07 46.07 47.07 47.07
- Dotex WB702, Globe

114 Wash Hand Basins - 560mm x 406mm, white colour Set 60 del 59.17 57.83 60.17 58.83 60.17 59.17
- Jacqueline WB 142, Claytan

115 Water Closet Eastern - Bengal ACBL-000, white Item 60 del 45.00 45.00 46.00 46.00 46.00 45.00
colour , without cistern, Johnson-Suisse

116 Water Closet Eastern- Orissa, standard colour, with Set 60 del 423.33 423.33 423.33 423.33 423.33 423.33
cistern, GBH

117 Water Closet Western- WC 644, white Item 60 del 123.90 121.27 123.90 124.40 125.57 123.90
colour,without cistern, Claytan

118 Water Closet Western- Windsor with push button 6L Set 60 del 441.67 443.33 450.00 445.00 446.67 445.00
cistern, standard colout, Johnson-Suisse

119 Water Closet Western- Vanessa with 6L/3L dual low Set 60 del 916.67 916.67 916.67 916.67 916.67 916.67
level cistern, standard colour, GBH

120 Water Closet Western- WC 602 Sina without Item 60 del 89.20 86.73 91.87 89.20 90.20 89.20
cistern, white colour, Claytan

121 Urinal Bowl, Santana 320 c/w hanger , flange, Set 60 del 359.33 356.17 370.00 360.17 366.67 362.67
ceramic waste & cleansing set, Johnson Suisse,
white

122 Urinal Bowl, Richmond c/w hanger, plastic insert, Item 60 del 126.00 124.33 126.00 122.00 123.67 126.00
Johnson Suisse, white

123 Stainless Steel Sinks - Single Bowl Single Drainer - Item 60 del 70.00 69.33 70.00 71.00 71.00 70.00
Lay on type, 42" x 18"

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
124 Paint - ICI Dulux Standard Colour - Weathershield 5 litres 60 del 106.00 106.00 106.00 106.00 106.00 106.00

125 Paint - ICI Dulux Standard Colour - Pearl Glo 5 litres 60 del 90.00 90.00 90.00 90.00 90.00 90.00

126 Paint - ICI Dulux Standard Colour - Pentalite 5 litres 60 del 80.00 80.00 80.00 80.00 80.00 80.00

127 Paint - ICI Dulux Standard Colour - Gloss Finish 5 litres 60 del 118.00 118.00 118.00 118.00 118.00 118.00

128 Paint - ICI Dulux Standard Colour - Timbertone, 5 litres 60 del 84.00 84.00 84.00 84.00 84.00 84.00
Clear Glossy

129 Paint - Nippon Standard Colour - Weatherbond 5 litres 60 del 86.00 86.00 86.00 86.00 86.00 86.00

130 Paint - Nippon Standard Colour - Satin Glo 5 litres 60 del 73.00 73.00 73.00 73.00 73.00 73.00

131 Paint - Nippon Standard Colour - Supermatex 7 litres 60 del 27.00 27.00 27.00 27.00 27.00 27.00

132 Paint - Nippon Standard Colour - 9000 Gloss Finish 5 litres 60 del 82.67 82.67 82.67 82.67 82.67 82.67

133 Paint - Nippon Standard Colour - Timber Finish 5 litres 60 del 72.67 72.67 72.67 72.67 72.67 72.67

134 Paint - Par Standard Colour - Weathercoat 5 litres 60 del 88.00 88.00 88.00 88.00 88.00 88.00

135 Paint - Par Standard Colour - Silk 5 litres 60 del 77.00 77.00 77.00 77.00 77.00 77.00

136 Paint - Par Standard Colour - Supermatt 5 litres 60 del 64.00 64.00 64.00 64.00 64.00 64.00

137 Paint - Par Standard Colour -Super Gloss 5 litres 60 del 80.00 80.00 80.00 80.00 80.00 80.00

138 Paint - Par Standard Colour - Timbercote 5 litres 60 del 73.00 73.00 73.00 73.00 73.00 73.00

139 Paint - Sissons Standard Colour - All Weather 5 litres 60 del 80.00 80.00 80.00 80.00 80.00 80.00

140 Paint - Sissons Standard Colour - Silk Glo 5 litres 60 del 69.00 69.00 69.00 69.00 69.00 69.00

141 Paint - Sissons Standard Colour - Siscolux 5 litres 60 del 65.00 65.00 65.00 65.00 65.00 65.00

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
142 Paint - Sissons Standard Colour - Tungolac 5 litres 60 del 80.00 80.00 80.00 80.00 80.00 80.00

143 Paint - Sissons Standard Colour - Siscoseal 5 litres 60 del 76.00 76.00 76.00 76.00 76.00 76.00

144 Steel Louvres Windows Without Iron Bars - Single No. 60 del 8.40 8.30 8.00 8.10 8.03 8.40
Control, 8 Blades

145 Mild Steel Hollow Sections - 2" x 3' x 3.2mm 6m length 60 del 110.33 110.33 105.07 104.40 104.40 110.33
Handrail

146 Mild Steel Hollow Sections - 1/2" x 1/2" x 1mm 6m length 60 del 6.83 6.83 6.63 6.43 6.43 6.83
Square Baluster

147 Square Hollow Sections - 12mm x 12mm x 1.0mm MT 60 del 3,382.67 3,382.67 3,180.00 3,180.00 3,180.00 3,382.67
(0.357kg/m)

148 Square Hollow Sections - 50mm x 50mm x 3.0mm MT 60 del 3,222.67 3,222.67 3,060.00 3,046.67 3,046.67 3,222.67
(4.38kg/m)

149 Square Hollow Sections - 150mm x 150mm x MT 60 del 3,358.00 3,358.00 3,196.67 3,170.00 3,170.00 3,358.00
4.5mm (20.5kg/m)

150 Rectangular Hollow Sections - 75mm x 50mm x MT 60 del 3,212.67 3,212.67 3,056.67 3,036.67 3,036.67 3,212.67
3.2mm (5.8 kg/m)

151 Rectangular Hollow Sections - 150mm x 100mm x MT 60 del 3,302.67 3,302.67 3,126.67 3,120.00 3,120.00 3,302.67
4.5mm (16.9 kg/m)

152 Rectangular Hollow Sections - 200mm x 100mm x MT 60 del 3,302.67 3,302.67 3,126.67 3,120.00 3,120.00 3,302.67
4.5mm (20.5 kg/m)

153 Universal Beams - 102mm x 102mm x 8.76mm MT 60 del 3,456.67 3,456.67 3,293.33 3,260.00 3,260.00 3,456.67
(19.35kg/m)

154 Universal Beams - 356mm x 368mm x 13.33mm MT 60 del 3,456.67 3,456.67 3,293.33 3,260.00 3,260.00 3,456.67
(162.2kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
155 Universal Beams - 400mm x 400mm (197kg/m) MT 60 del 3,963.33 3,963.33 3,750.00 3,733.33 3,733.33 3,963.33

156 Rolled Steel Joists - 152mm x 76mm x 5.84mm MT 60 del 3,750.00 3,750.00 3,543.33 3,533.33 3,533.33 3,750.00
(17.88kg/m)

157 Rolled Steel Joists - 178mm x 102mm x 6.35mm MT 60 del 3,497.33 3,497.33 3,320.00 3,303.33 3,303.33 3,497.33
(23.84kg/m)

158 Rolled Steel Joists - 203mm x 102mm x 5.84mm MT 60 del 3,352.67 3,352.67 3,180.00 3,170.00 3,170.00 3,352.67
(25.33 kg/m)

159 Equal Engles - 38mm x 38mm x 3.8mm (2.17 kg/m) MT 60 del 2,330.67 2,330.67 2,198.33 2,196.67 2,196.67 2,330.67

160 Equal Engles - 50mm x 50mm x 4mm (3.06 kg/m) MT 60 del 2,326.67 2,326.67 2,198.33 2,193.33 2,193.33 2,326.67

161 Equal Engles - 65mm x 65mm x 6mm (5.91kg/m) MT 60 del 2,334.67 2,334.67 2,201.67 2,203.33 2,203.33 2,334.67

162 Unequal Angles - 90mm x 80mm x 7mm (9.04 MT 60 del 2,525.33 2,525.33 2,378.33 2,380.00 2,380.00 2,525.33
kg/m)

163 Unequal Angles - 125mm x 75mm x 7mm MT 60 del 2,565.33 2,565.33 2,411.67 2,413.33 2,413.33 2,565.33
(10.7kg/m)

164 Unequal Angles - 175mm x 90mm x 9mm MT 60 del 2,594.67 2,594.67 2,441.67 2,443.33 2,443.33 2,594.67
(18.2kg/m)

165 U Channels - 75mm x 40mm x 5mm (6.92 kg/m) MT 60 del 2,742.00 2,742.00 2,595.00 2,596.67 2,596.67 2,742.00

166 U Channels - 230mm x 80mm x 8mm (28.4 kg/m) MT 60 del 3,466.67 3,466.67 3,283.33 3,283.33 3,283.33 3,466.67

167 U Channels - 380mm x 100mm x 10.5mm MT 60 del 3,588.00 3,588.00 3,380.00 3,376.67 3,376.67 3,588.00
(54.5kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
168 Lipped Channels - 100mm x 50mm x 20mm x 3mm MT 60 del 3,436.00 3,436.00 3,246.67 3,243.33 3,243.33 3,436.00
(5.19kg/m)

169 Lipped Channels - 150mm x 65mm x 20mm x 3mm MT 60 del 3,346.67 3,346.67 3,163.33 3,160.00 3,160.00 3,346.67
(7.07 kg/m)

170 Lipped Channels - 200mm x 75mm x 20mm x 3mm MT 60 del 3,414.67 3,414.67 3,226.67 3,220.00 3,220.00 3,414.67
(8.72 kg/m)

171 Solid Wooden Timber Door 3' x 7' (LLC/ Sandor) piece 60 del 202.33 200.67 200.67 197.33 197.33 200.67

172 Solid Wooden Timber Door 4' x 7' (LLC/ Sandor) piece 60 del 305.67 307.33 304.00 307.33 304.00 310.67

173 PVC door 35mm x 750mm x 2100mm (Astino/ piece 60 del 74.00 75.67 75.67 75.67 74.00 75.67
Quality Class)

174 PVC door 38mm x 840mm x 2100mm (Astino/ piece 60 del 86.00 91.00 91.00 91.00 89.33 91.00
Quality Class)

175 One Hour Firedoor (Sijil Perakuan Bahan, Jabatan piece 60 del 583.33 576.67 583.33 576.67 570.00 570.00
Bomba) (Sandor/ Techdor)

176 Two Hours Firedoor (Sijil Perakuan Bahan, Jabatan piece 60 del 1,066.67 1,050.00 1,066.67 1,053.33 1,053.33 1,053.33
Bomba) (Sandor/ Techdor)

177 Plywood - Shuttering Board, 4' x 8' x 12mm piece 60 del 50.00 50.00 49.33 50.00 49.33 48.33

178 Valley Board (MHW) 1" x 6" x 8' up MT 60 del 1,176.67 1,150.00 1,180.33 1,185.00 1,162.33 1,174.67

179 Reinforced Concrete Pile, 150mm x 150mm per metre 60 ex 104.83 105.23 102.17 102.17 102.17 108.83
(153mm x 147mm x 150mm) 4.5mm wire size, BS length
8004 HUME

180 Reinforced Concrete Pile, 200mm x 200mm per metre 60 ex 159.87 159.87 157.60 170.67 170.27 182.27
(204mm x 196mm x 200mm) 4.5mm wire size, BS length
8004 HUME

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
181 Concrete Pipes 450mm (18"), Class X pipes, MS piece 60 del 64.67 64.27 64.13 66.63 63.13 65.57
881 HUME

182 Concrete Pipes 450mm (18"), Class Y pipes, MS piece 60 del 72.93 72.53 73.60 74.93 71.93 73.77
881 HUME

183 Concrete Pipes 750mm (30"), Class X pipes, MS piece 60 del 116.87 116.07 119.40 123.40 116.07 121.67
881 HUME

184 Concrete Pipes 750mm (30"), Class Y pipes, MS piece 60 del 129.50 127.90 128.17 133.57 131.83 131.83
881 HUME

185 Standard Size Box Culvert Without Dry Weather piece 60 del 262.73 261.93 258.33 280.43 258.33 276.77
Flow 900mm x 900mm, BS 5400 HUME

186 Standard Size Box Culvert Without Dry Weather piece 60 del 360.67 360.67 346.67 401.10 395.43 395.43
Flow 1200mm x 1200mm, BS 5400 HUME

187 Prestressed Concrete Beam, M-Beams, M5, BS piece 60 del 7,573.33 7,573.33 7,156.67 7,280.00 7,153.33 7,573.33
5400 HUME - 10,000mm x 970mm X 960mm (8
tons) - 10 metres

188 Prestressed Concrete Beam, M-Beams, M5, BS piece 60 del 9,740.00 9,740.00 9,203.33 9,363.33 9,200.00 9,740.00
5400 HUME - 15,000mm x 970mm x 960mm (12
tons) - 15 metres

189 Prestressed Concrete Beam, M-Beams, M5, BS piece 60 del 12,686.67 12,686.67 11,966.67 12,177.67 11,966.67 12,686.67
5400 HUME - 20,000mm x 970mm x 960mm ( 16
tons) - 20metres

190 Precast Concrete Spun Piles - 450mm diameter x piece 60 del 673.03 673.03 645.17 640.33 630.00 683.37
70mm thickness x 6m (217kg/m), Class A

191 Precast Concrete Spun Piles - 600mm diameter x piece 60 del 1,130.42 1,130.42 1,077.43 1,075.20 1,058.20 1,147.42
90mm thickness x 6m (375kg/m), Class A

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex January 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
192 Precast Concrete Spun Piles - 450mm diameter x piece 60 del 696.05 696.05 662.60 661.87 651.53 706.39
80mm thickness x 6m (242kg/m), Class B

193 Precast Concrete Spun Piles - 600mm diameter x piece 60 del 1,160.20 1,160.20 1,105.67 1,103.33 1,086.00 1,177.53
100mm thickness x 6m (408kg/m), Class B

194 Precast Concrete Spun Piles - 450mm diameter x piece 60 del 755.35 755.35 725.43 719.53 707.87 767.02
80mm thickness x 6m (242kg/m), Class C

195 Precast Concrete Spun Piles - 600mm diameter x piece 60 del 1,245.92 1,245.92 1,189.67 1,187.10 1,167.77 1,265.25
100mm thickness x 6m (408kg/m), Class C

196 Steel Sheet Piles - U type, ISP-II, 400mm x 100mm MT 60 del 3,650.00 3,650.00 3,650.00 3,633.33 3,633.33 3,650.00
x 10.5mm (48.0kg/m)

197 Steel Sheet Piles - U type, ISP-III A (E), 400mm x MT 60 del 3,356.67 3,356.67 3,356.67 3,350.00 3,350.00 3,356.67
150mm x 13.1mm (58.40kg/m)

198 Steel Sheet Piles - U type, ISP-IV, 400mm x 170mm MT 60 del 3,370.00 3,370.00 3,370.00 3,366.67 3,366.67 3,370.00
x 15.5mm (76.10kg/m)

199 Steel Sheet Piles - Box type, ISP-II (A), ISP-II (B) MT 60 del 3,666.67 3,666.67 3,666.67 3,650.00 3,650.00 3,666.67
244mm x 400mm

200 Steel Sheet Piles - Box type, ISP-III(A), ISP-III (B) MT 60 del 3,373.33 3,373.33 3,373.33 3,366.67 3,366.67 3,373.33
297mm x 400mm

201 Steel Sheet Piles - Box type, ISP-IV(A), ISP-IV (B) MT 60 del 3,373.33 3,373.33 3,373.33 3,366.67 3,366.67 3,373.33
342mm x 400mm

202 Precast Reinforced Concrete Square Pile 150mm x piece 60 del 102.00 102.00 102.00 99.80 98.00 102.00
150mm x 6m

203 Precast Reinforced Concrete Square Pile 200mm x piece 60 del 144.50 144.50 144.50 144.93 143.83 144.50
200mm x 6m

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 2. Average Price of Building Materials for Peninsular Malaysia (DOS)
Period
No. Building Material Unit January 2007
(RM)

1 Broken Local Marble 10-20mm thick ton 269.95

2 Fibrous Plaster Ceiling 4' x 6' x 9mm thick sheet 9.02

3 Clear Float Glass 5mm thick, Local/Imported m² 25.71

4 Figured/Obscured Glass 5mm thick, Local/Imported, inclusive of cutting m² 20.79

5 Tinted Float Glass 5mm thick, Local/Imported, inclusive of cutting m² 33.42

6 Tinted Float Glass 6mm thick, Local/Imported, inclusive of cutting m² 40.50

7 Tinted Reflective Glass 6mm thick, Local/Imported, inclusive of cutting m² 75.63

8 Aluminium Extrusions Natural, Anodised Finish Solid Section kg 15.33

9 Aluminium Extrusions Natural Anodised Finish, Semi Hollow, Hollow Section kg 15.43

10 Plywood MMH Plank 1" x 6" ton 1,133.00

Source of Data : This average price is compiled from data supplied by Department of Statistics, Malaysia (DOS)
MT = Metric Ton or Tonne, m2 = Square Metre
Table 3. Average Price of Building Materials for Peninsular Malaysia (MTIB)
January 2007 (RM)
No. Building Material
Unit (m³) Unit (MT)

1 GMS Heavy Hardwood, Chengal 4,350.00 6,160.00

2 GMS Heavy Hardwood, Balau 2,480.00 3,512.00

3 GMS Heavy Hardwood, Red Balau 1,210.00 1,713.00

4 GMS Heavy Hardwood, Merbau 2,500.00 3,540.00

5 GMS Heavy Hardwood, Mixed Heavy Hardwood 950.00 1,345.00

6 Scantlings Heavy Hardwood, Chengal 4,400.00 6,230.00

7 Scantlings Heavy Hardwood, Balau 2,800.00 3,965.00

8 Scantlings Heavy Hardwood, Red Balau 1,270.00 1,798.00

9 Scantlings Heavy Hardwood, Merbau 2,400.00 3,398.00

10 Scantlings Heavy Hardwood, Mixed Heavy Hardwood 960.00 1,359.00

11 GMS Medium Hardwood, Keruing 1,310.00 1,855.00

12 GMS Medium Hardwood, Kempas 1,300.00 1,841.00

13 GMS Medium Hardwood, Kapur 1,140.00 1,614.00

14 GMS Medium Hardwood, Mengkulang 1,150.00 1,628.00

15 GMS Medium Hardwood, Tualang 760.00 1,076.00

16 GMS Medium Hardwood, Mixed Medium Hardwood 800.00 1,133.00

17 Scantlings Medium Hardwood, Keruing 1,290.00 1,827.00

18 Scantlings Medium Hardwood, Kempas 1,180.00 1,671.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 3. Average Price of Building Materials for Peninsular Malaysia (Continue…)
January 2007 (RM)
No. Building Material
Unit (m³) Unit (MT)

19 Scantlings Medium Hardwood, Kapur 1,270.00 1,798.00

20 Scantlings Medium Hardwood, Mengkulang 1,250.00 1,770.00

21 Scantlings Medium Hardwood, Tualang 900.00 1,274.00

22 Scantlings Medium Hardwood, Mixed Medium Hardwood 890.00 1,260.00

23 GMS Light Hardwood, Dark Red Meranti 1,650.00 2,336.00

24 GMS Light Hardwood, Light Red Meranti 1,310.00 1,855.00

25 GMS Light Hardwood, Red Meranti 1,600.00 2,266.00

26 GMS Light Hardwood, Yellow Meranti 920.00 1,303.00

27 GMS Light Hardwood, White Meranti 980.00 1,388.00

28 GMS Light Hardwood, Mersawa 1,150.00 1,628.00

29 GMS Light Hardwood, Nyatoh 1,370.00 1,940.00

30 GMS Light Hardwood, Sepetir 950.00 1,345.00

31 GMS Light Hardwood, Jelutong 950.00 1,345.00

32 GMS Light Hardwood, Ramin 3,200.00 4,531.00

33 GMS Light Hardwood, Mixed Light Hardwood 762.00 1,079.00

34 Scantlings Light Hardwood, Dark Red Meranti 1,800.00 2,549.00

35 Scantlings Light Hardwood, Light Red Meranti 1,440.00 2,039.00

36 Scantlings Light Hardwood, Red Meranti 1,390.00 1,968.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 3. Average Price of Building Materials for Peninsular Malaysia (Continue…)
January 2007 (RM)
No. Building Material
Unit (m³) Unit (MT)

37 Scantlings Light Hardwood, Yellow Meranti 1,290.00 1,827.00

38 Scantlings Light Hardwood, White Meranti 1,050.00 1,487.00

39 Scantlings Light Hardwood, Mersawa 1,380.00 1,954.00

40 Scantlings Light Hardwood, Nyatoh 1,450.00 2,053.00

41 Scantlings Light Hardwood, Sepetir 870.00 1,232.00

42 Scantlings Light Hardwood, Jelutong 1,100.00 1,558.00

43 Scantlings Light Hardwood, Ramin 3,200.00 4,531.00

44 Scantlings Light Hardwood, Mixed Light Hardwood 850.00 1,204.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
1 Ordinary Portland Cement (bulk) MT 60 del 217.00 219.00 224.00 233.00 217.00 219.00

2 Granite Aggregate 3/4" MT 60 ex 18.00 17.00 20.00 22.00 20.00 21.00

3 Normal River Sand MT 30 ex 12.25 15.50 17.25 7.00 6.50 7.50

4 Fine River Sand for Plastering MT 30 ex 14.50 24.00 23.00 7.00 11.00 10.00

5 Normal Mining Sand MT 30 ex 12.00 16.00 17.25 13.00 6.50 13.00

6 Fine Mining Sand for Plastering MT 30 ex 14.00 24.00 23.00 18.00 11.00 16.50

7 Mild Steel Round Bars - 10mm, MS146 MT 14 del 2,123.50 2,123.50 2,123.50 2,123.50 2,123.50 2,123.50

8 Mild Steel Round Bars - 12mm, MS146 MT 14 del 2,083.00 2,083.00 2,083.00 2,083.00 2,083.00 2,083.00

9 Mild Steel Round Bars - 16mm, MS146 MT 14 del 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00

10 Mild Steel Round Bars - 20mm, MS146 MT 14 del 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00

11 Mild Steel Round Bars - 22mm, MS146 MT 14 del 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00

12 Mild Steel Round Bars - 25mm, MS146 MT 14 del 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00

13 Mild Steel Round Bars - 32mm, MS146 MT 14 del 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00

14 High Tensile Deformed Bars - 10mm, MS146 MT 14 del 2,167.50 2,167.50 2,167.50 2,167.50 2,167.50 2,167.50

15 High Tensile Deformed Bars - 12mm, MS146 MT 14 del 2,123.50 2,123.50 2,123.50 2,123.50 2,123.50 2,123.50

16 High Tensile Deformed Bars - 16mm, MS146 MT 14 del 2,052.00 2,052.00 2,052.00 2,052.00 2,052.00 2,052.00

17 High Tensile Deformed Bars - 20mm, MS146 MT 14 del 2,052.00 2,052.00 2,052.00 2,052.00 2,052.00 2,052.00

18 High Tensile Deformed Bars - 25mm, MS146 MT 14 del 2,052.00 2,052.00 2,052.00 2,052.00 2,052.00 2,052.00

19 High Tensile Deformed Bars - 32mm, MS146 MT 14 del 2,052.00 2,052.00 2,052.00 2,052.00 2,052.00 2,052.00

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
20 BRC Fabric - A6, MS145 m2 30 del 5.33 5.33 5.33 5.33 5.33 5.33

21 BRC Fabric - A7, MS145 m2 30 del 7.18 7.18 7.18 7.18 7.18 7.18

22 BRC Fabric - A8, MS145 m2 30 del 9.18 9.18 9.18 9.18 9.18 9.18

23 BRC Fabric - A9, MS145 m2 30 del 11.75 11.75 11.75 11.75 11.75 11.75

24 BRC Fabric - A10, MS145 m2 30 del 15.23 15.23 15.23 15.23 15.23 15.23

25 Ready Mix Concrete - Normal Mix - Grade 10 m3 30 del 146.00 130.00 135.00 126.00 110.00 128.00

26 Ready Mix Concrete - Normal Mix - Grade 15 m3 30 del 152.50 135.00 140.00 133.00 115.00 133.00

27 Ready Mix Concrete - Normal Mix - Grade 20 m3 30 del 157.00 140.00 145.00 140.00 120.00 138.00

28 Ready Mix Concrete - Normal Mix - Grade 25 m3 30 del 163.00 147.00 151.00 147.00 127.00 145.00

29 Ready Mix Concrete - Normal Mix - Grade 30 m3 30 del 172.00 155.00 158.00 154.00 135.00 153.00

30 Ready Mix Concrete - Normal Mix - Grade 35 m3 30 del 181.00 164.00 164.00 170.00 144.00 162.00

31 Ready Mix Concrete - Normal Mix - Grade 40 m3 30 del 191.00 174.00 173.00 177.00 154.00 172.00

32 Clay Brick - Pallet piece 30 del 0.26 0.24 0.24 0.29 0.26 0.26

33 Smooth Face Facing Brick, Red piece 30 del 0.58 0.54 0.58 0.63 0.64 0.64

34 Cement Sand Brick - Pallet piece 60 del 0.17 0.16 0.18 0.17 0.18 0.17

35 Precast Concrete Hollow Block 90mm x 190mm x piece 60 del 1.80 1.63 1.80 1.80 1.70 1.80
390mm M.S 27 1996

36 Plain Gypsum Partition Board ,1.2m x 2.4m x 12mm sheet 30 del 25.50 25.50 25.50 25.50 25.50 25.50
thick, Boral/ Armstrong

Source of Data: This average price is compiled from data supplied by BMDAM
m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
37 Laminated Gypsum Partition Board, 1.2m x 2.4m x sheet 30 del 40.25 38.50 40.25 40.25 39.10 39.80
12mm thick, Boral/ Armstrong

38 Corrugated Roofing Sheet - 76mm Double Width, sheet 60 del 22.80 22.80 22.80 22.80 22.80 22.80
1065mm x 2440mm x 4mm (Hume/ Malex/ UAC)

39 Interlocking Concrete Tiles - Standard Duotone piece 60 del 1.47 1.44 1.48 1.53 1.47 1.50
Colour (Monier Elabana)

40 MS Decking - Lysaght Clean Colorbond - Kliplok Hi- m2 60 del 55.05 55.05 57.30 57.63 56.30 55.80
Ten 0.53mm TCT

41 MS Decking - Lysaght Clean Colorbond - Spandek m2 60 del 50.57 50.57 53.32 54.09 52.82 51.82
Hi-Ten 0.47mm TCT

42 MS Decking - Lysaght Clean Colorbond - Trimdek m2 60 del 46.18 46.18 51.18 50.38 50.68 46.68
Hi-Ten 0.47mm TCT

43 MS Decking - Ajiya AP Rib Hi-Tensile G28, 0.40mm m2 60 del 37.85 37.35 37.85 37.85 37.85 37.85
TCT, Clean Colorbond (Commercial)

44 MS Decking - Ajiya AP Rib Hi-Tensile G26, 0.47mm m2 60 del 42.20 41.70 42.20 42.20 42.20 42.20
TCT, Clean Colorbond (Commercial)

45 MS Decking - Ajiya AP Rib Hi-Tensile G24, 0.53mm m2 60 del 47.45 46.95 47.45 47.45 47.45 47.45
TCT, Clean Colorbond (Commercial)

46 MS Decking - Ajiya Euro Step Roofing M350 G28, m2 60 del 42.60 42.10 42.60 42.60 42.60 42.60
0.40mm TCT, Clean Colorbond

47 MS Decking - Ajiya Euro Step Roofing M350 G26, m2 60 del 47.95 47.45 47.95 47.95 47.95 47.95
0.47mm TCT, Clean Colorbond

48 MS Decking - Ajiya Euro Step Roofing M350 G24, m2 60 del 54.00 53.50 54.00 54.00 54.00 54.00
0.53mm TCT, Clean Colorbond

Source of Data: This average price is compiled from data supplied by BMDAM
m² = Square Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
49 Glazed Ceramic Floor Tiles, Standard Light Colour piece 60 del 0.75 0.74 0.75 0.75 0.75 0.75
200mm x 200mm x 8mm - Grade 1

50 Glazed Ceramic Floor Tiles, Standard Light Colour piece 60 del 1.45 1.44 1.45 1.45 1.50 1.45
300mm x 300mm x 8mm - Grade 1

51 Plain Homogenous Floor Tiles, Standard Light piece 60 del 1.08 1.07 1.13 1.13 1.13 1.13
Colour 200mm x 200mm x 8mm - Grade 1

52 Plain Homogenous Floor Tiles, Standard Light piece 60 del 1.95 1.95 1.95 1.98 2.00 2.00
Colour 300mm x 300mm x 8mm - Grade 1

53 Polished Granite Slab - Local Grey 1' x 1' x 20mm piece 60 del 18.00 18.00 17.50 18.00 18.00 18.00

54 Polished Granite Slab - Melaka Rose 1' x 1' x 20mm piece 60 del 18.00 18.00 17.50 18.00 18.00 18.00

55 Polished Granite Slab - Tampin Blue 1' x 1' x 20mm piece 60 del 18.00 18.00 17.50 18.00 18.00 18.00

56 Polished Granite Slab - Terengganu Green 1' x 1' x piece 60 del 25.00 25.00 23.50 25.00 25.00 25.00
20mm

57 Local Polished Marble Slab W1/P1, 300mm x piece 60 del 3.50 3.50 3.20 3.50 3.50 3.50
300mm x 10mm

58 Vitrified Porcelain Tiles - Niro Granite, Pietra Evo 1, piece 60 del 3.15 3.15 3.00 3.15 3.15 3.15
Beigo - P11, 300mm x 300mm x 20mm

59 Vitrified Porcelain Tiles- Niro Granite, Pietra Evo 1, piece 60 del 3.15 3.15 3.05 3.15 3.15 3.15
Noce - P12, 300mm x 300mm x 20mm

60 Vitrified Porcelain Tiles -Niro Granite, Nordik Stone, piece 60 del 12.66 12.16 12.16 12.66 12.66 12.66
Bora N02, 450mm x 450mm x 20mm

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
61 Vitrified Porcelain Tiles - Niro Granite, Nordik Stone, piece 60 del 12.66 12.16 12.16 12.66 12.66 12.66
Kosawa N04, 450mm x 450mm x 20mm

62 Glazed Ceramic Wall Tiles, Standard Light Colour, piece 60 del 0.65 0.68 0.75 0.70 0.73 0.73
200mm x 200mm x 6mm - Grade 1

63 Glazed Ceramic Wall Tiles, Standard Light Colour, piece 60 del 0.80 0.79 0.80 0.80 0.80 0.80
200mm x 250mm x 6mm - Grade 1

64 Plain Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 3.68 3.68 3.68 3.68 3.68 3.68
1220mm x 3.2mm (UAC/ Hume/ Malex)

65 Plain Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 6.65 6.65 6.65 6.65 6.65 6.65
1220mm x 4.5mm (UAC/ Hume/ Malex)

66 Plain Cellulose Fibre Ceiling Sheet, 1220mm x sheet 60 del 7.35 7.33 7.35 7.35 7.35 7.35
1220mm x 3.2mm (UAC/ Hume/ Malex)

67 Plain Cellulose Fibre Ceiling Sheet, 1220mm x sheet 60 del 13.30 13.30 13.30 13.30 13.30 13.30
1220mm x 4.5mm (UAC/ Hume/ Malex)

68 Decorative Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 5.10 5.10 5.10 5.10 5.10 5.10
1220mm x 3.2mm (UAC/ Hume/ Malex)

69 Decorative Cellulose Fibre Ceiling Sheet,1220mm x sheet 60 del 9.95 10.00 9.95 9.95 9.95 9.95
1220mm x 3.2mm (UAC/ Hume/ Malex)

70 Plain Gypsum Ceiling Board, 610mm x 1220mm x sheet 60 del 4.50 4.50 4.50 4.50 4.50 4.50
9.5mm (Boral/Armstrong)

71 Galvanised Iron Pipes - 15mm Diameter (Maruichi), 6m run 60 del 28.80 28.80 28.80 28.60 28.60 28.80
MS863 - Class A

72 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 42.75 42.75 42.75 40.75 40.75 42.75
MS863 - Class A

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
73 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 58.45 58.45 58.45 57.75 57.75 58.45
MS863 - Class A

74 Galvanised Iron pipes - 15mm Diameter (Maruichi), 6m run 60 del 35.20 35.20 35.20 34.95 34.95 35.20
MS863 - Class B

75 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 44.90 44.90 44.90 44.55 44.55 44.90
MS863 - Class B

76 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 67.30 67.30 67.30 67.25 67.25 67.30
MS863 - Class B

77 Galvanised Iron pipes - 15mm Diameter (Maruichi), 6m run 60 del 42.30 42.30 42.30 41.90 41.90 42.30
MS863 - Class C

78 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 53.35 53.35 53.35 52.95 52.95 53.35
MS863 - Class C

79 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 81.80 81.80 81.80 81.55 81.55 81.80
MS863 - Class C

80 PVC Pressure pipes Class D, grey colour 50mm 4m run 60 del 20.80 20.80 20.80 20.80 20.80 20.80
Diameter (Paling), MS 628

81 PVC Pressure pipes Class D, grey colour 50mm 6m run 60 del 32.50 32.50 32.50 32.50 32.50 32.50
Diameter (Dulon), MS 628

82 PVC Pressure pipes Class D grey colour 65mm 6m run 60 del 44.25 44.25 44.25 44.25 44.25 44.25
Diameter (Paling), MS 628

83 PVC Pressure pipes Class D, grey colour 80mm 6m run 60 del 62.00 62.00 62.00 62.60 62.60 62.60
Diameter (Paling), MS 628

84 PVC pipes Class O, grey colour 32mm Diameter 4m run 60 del 7.05 7.05 7.05 7.05 7.05 7.05
(Paling), MS 762

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
85 PVC pipes Class O, grey colour 50mm Diameter 4m run 60 del 10.10 10.10 10.10 10.10 10.10 10.10
(Paling), MS 762

86 PVC Pressure pipes Class E,grey colour 25mm 6m run 60 del 9.80 9.80 9.80 9.80 9.80 9.80
Diameter (Dulon), MS 628

87 PVC Pressure pipes Class E,grey colour 50mm 6m run 60 del 29.40 29.40 29.40 29.40 29.40 29.40
Diameter (Dulon), MS 628

88 PVC Pressure pipes Class E,grey colour 25mm 4m run 60 del 8.55 8.34 8.55 8.55 8.55 8.55
Diameter (Paling), MS 628

89 PVC Pressure pipes Class E,grey colour 50mm 4m run 60 del 25.35 25.35 25.35 25.35 25.35 25.35
Diameter (Paling), MS 628

90 PVC Pressure pipes Class E, grey colour 65mm 6m run 60 del 55.60 55.60 55.60 55.60 55.60 55.60
Diameter (Paling), MS 628

91 PVC Pressure pipes Class E, grey colour 80mm 6m run 60 del 77.80 77.80 77.80 77.80 77.80 77.80
Diameter (Paling), MS 628

92 PVC Pressure pipes Class 6 grey colour 20mm 4m run 60 del 8.65 8.35 8.35 8.35 8.35 8.65
Diameter (Paling), MS 628

93 PVC Pressure pipes Class 6 grey colour 25mm 4m run 60 del 12.23 12.23 12.23 12.23 12.23 12.23
Diameter (Paling), MS 628

94 PVC Pressure pipes Class 7,grey colour 20mm 4m run 60 del 10.85 10.95 10.85 10.85 10.85 10.85
Diameter (Paling), MS 628

95 PVC Pressure pipes Class 7,grey colour 25mm 4m run 60 del 15.68 15.68 15.10 15.10 15.10 15.68
Diameter (Paling), MS 628

96 PVC Pressure pipes Class 7, grey colour 32mm 4m run 60 del 21.35 21.35 21.35 21.35 21.35 21.35
Diameter (Paling), MS 628

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
97 PVC Pressure pipes Class 7, grey colour 50mm 4m run 60 del 35.28 35.28 35.28 35.28 35.28 35.28
Diameter (Paling), MS 628

98 HDPE Pipe PN 10 - 50mm Diameter, MS1058 100m roll 60 del 389.00 389.00 389.00 389.00 389.00 389.00

99 HDPE Pipe PN 12.5 - 25mm Diameter, MS1058 100m roll 60 del 126.50 126.50 126.50 126.50 126.50 126.50

100 HDPE Pipe PN 12.5 - 40mm Diameter, MS1058 100m roll 60 del 322.00 322.00 322.00 322.00 322.00 322.00

101 HDPE Pipe PN 12.5 - 50mm Diameter, MS1058 100m roll 60 del 487.50 487.50 487.50 487.50 487.50 487.50

102 HDPE Pipe PN16 - 20mm Diameter, MS1058 100m roll 60 del 100.50 100.50 100.50 100.50 100.50 100.50

103 HDPE Pipe PN16 - 25mm Diameter, MS1058 100m roll 60 del 148.50 148.50 148.50 148.50 148.50 148.50

104 HDPE Pipe PN16- 50 mm Diameter, MS1058 100m roll 60 del 595.00 595.00 595.00 595.00 595.00 595.00

105 Fibre Reinforced Plastic Sectional Tank - 1000 6 panels 60 del 1,632.50 1,632.50 1,602.50 1,602.50 1,602.50 1,632.50
Litres / 220 Gallons, AL Tank, 6 panels

106 Fibre Reinforced Plastic Sectional Tank - 1000 6 panels 60 del 1,665.00 1,540.00 1,725.00 1,770.00 1,735.00 1,665.00
Litres / 220 Gallons, RP Tank, 6 panels

107 Fibre Reinforced Plastic Sectional Tank - 1000 6 panels 60 del 1,530.00 1,530.00 1,475.00 1,425.00 1,425.00 1,530.00
Litres / 220 Gallons, MuiTank, 6 panels

108 Fibre Reinforced Plastic Sectional Tank - 1000 6 panels 60 del 1,605.00 1,605.00 1,550.00 1,500.00 1,500.00 1,605.00
Litres / 220 Gallons, G-FRP, 6 panels

109 Polytank - Circular , 100 Gallons, MS1225 - Weida No. 60 del 96.95 90.20 96.95 96.95 96.95 96.95
Equivelant

110 Polytank - Circular, 200 Gallons, MS1225 - Weida No. 60 del 172.65 160.15 172.65 172.65 172.65 172.65
Equivelant

111 Polytank - Square, 100 Gallons, MS1225 - Weida No. 60 del 97.25 92.25 97.25 97.25 97.25 97.25
Equivelant

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
112 Polytank - Square, 200 Gallons, MS1225 - Weida No. 60 del 202.10 186.60 202.10 202.10 202.10 202.10
Equivelant

113 Wash Hand Basins - 560mm x 406mm, white colour - Set 60 del 60.00 58.50 60.00 58.50 60.00 60.00
Dotex WB702, Globe

114 Wash Hand Basins - 560mm x 406mm, white colour - Set 60 del 60.50 58.50 62.00 60.00 62.00 60.50
Jacqueline WB 142, Claytan

115 Water Closet Eastern - Bengal ACBL-000, white Item 60 del 44.00 44.00 45.50 45.50 45.50 44.00
colour , without cistern, Johnson-Suisse

116 Water Closet Eastern - Orissa II, standard colour, Set 60 del 455.50 455.50 455.50 455.50 455.50 455.50
with cistern, GBH

117 Water Closet Western - WC 644, white colour, Item 60 del 120.50 118.75 120.50 120.75 121.50 120.50
without cistern, Claytan

118 Water Closet Western - Windsor with push button Set 60 del 448.00 445.50 453.00 445.50 448.00 448.00
6L cistern, standard colout, Johnson-Suisse

119 Water Closet Western - Vanessa with 6L/3L dual Set 60 del 900.00 900.00 900.00 900.00 900.00 900.00
low level cistern, standard colour, GBH

120 Water Closet Western - WC 602 Sina without Item 60 del 76.00 74.50 80.00 76.00 72.00 76.00
cistern, white colour, Claytan

121 Urinal Bowl, Santana 320 c/w hanger , flange, Set 60 del 340.00 330.25 355.00 340.25 350.00 340.00
ceramic waste & cleansing set, Johnson Suisse,
white

122 Urinal Bowl, Richmond c/w hanger, plastic insert, Item 60 del 123.50 121.00 124.50 121.00 123.50 123.50
Johnson Suisse, white

123 Stainless Steel Sinks - Single Bowl Single Drainer - Item 60 del 72.50 71.50 71.50 72.50 72.50 72.50
Lay on type, 42" x 18"

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
124 Paint - ICI Dulux Standard Colour - External Acrylic 5 litres 60 del 106.00 106.00 106.00 106.00 106.00 106.00
Emulsion, Weathershield

125 Paint - ICI Dulux Standard Colour - Internal 5 litres 60 del 90.00 90.00 90.00 90.00 90.00 90.00
Emulsion Luxury, waterbase, Pearl Glo

126 Paint - ICI Dulux Standard Colour - Internal 5 litres 60 del 80.00 80.00 80.00 80.00 80.00 80.00
Emulsion, waterbase, Pentalite

127 Paint - ICI Dulux Standard Colour - Gloss Oilbased, 5 litres 60 del 118.00 118.00 118.00 118.00 118.00 118.00
Gloss Finish

128 Paint - ICI Dulux Standard Colour - Timber/ Wood, 5 litres 60 del 84.00 84.00 84.00 84.00 84.00 84.00
Timbertone, Clear Glossy

129 Paint - ICI Dulux Standard Colour - Undercoat, 5 litres 60 del 87.00 87.00 87.00 87.00 87.00 87.00
Speed

130 Paint - Nippon Standard Colour - External Acrylic 5 litres 60 del 85.50 85.50 85.50 85.50 85.50 85.50
Emulsion, Weatherbond

131 Paint - Nippon Standard Colour - Internal Emulsion 5 litres 60 del 75.00 75.00 75.00 75.00 75.00 75.00
Luxury, waterbase, Satin Glo

132 Paint - Nippon Standard Colour - Internal Emulsion, 7 litres 60 del 27.00 27.00 27.00 27.00 27.00 27.00
waterbase, Supermatex

133 Paint - Nippon Standard Colour - Gloss Oilbased, 5 litres 60 del 83.00 83.00 83.00 83.00 83.00 83.00
9000 Gloss Finish

134 Paint - Nippon Standard Colour - Timber/ Wood, 5 litres 60 del 72.00 72.00 72.00 72.00 72.00 72.00
Timber Finish

135 Paint - Nippon Standard Colour - Undercoat, 9000 5 litres 60 del 55.00 55.00 55.00 55.00 55.00 55.00
Undercoat

136 Paint - Par Standard Colour - External Acrylic 5 litres 60 del 89.00 89.00 89.00 89.00 89.00 89.00
Emulsion, Weathercoat

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
137 Paint - Par Standard Colour - Internal Emulsion 5 litres 60 del 79.50 79.50 79.50 79.50 79.50 79.50
Luxury, waterbase, Silk
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

138 Paint - Par Standard Colour - Internal Emulsion, 5 litres 60 del 64.00 64.00 64.00 64.00 64.00 64.00
waterbase, Supermatt

139 Paint - Par Standard Colour - Gloss Oilbased, Super 5 litres 60 del 84.00 84.00 84.00 84.00 84.00 84.00
Gloss

140 Paint - Par Standard Colour - Timber/ Wood, 5 litres 60 del 76.50 76.50 76.50 76.50 76.50 76.50
Timbercote

141 Paint - Par Standar Colour - Undercoat, Undercoat 5 litres 60 del 60.00 60.00 60.00 60.00 60.00 60.00

142 Paint - Sissons Standard Colour - External Acrylic 5 litres 60 del 82.50 82.50 82.50 82.50 82.50 82.50
Emulsion, All Weather

143 Paint - Sissons Standard Colour - Internal Emulsion 5 litres 60 del 72.00 72.00 72.00 72.00 72.00 72.00
Luxury, waterbase, Silk Glo

144 Paint - Sissons Standard Colour - Internal Emulsion, 5 litres 60 del 67.50 67.50 67.50 67.50 67.50 67.50
waterbase, Siscolux

145 Paint - Sissons Standard Colour - Gloss Oilbased, 5 litres 60 del 82.50 82.50 82.50 82.50 82.50 82.50
Tungolac

146 Paint - Sissons Standard Colour - Timber/ Wood, 5 litres 60 del 80.50 80.50 80.50 80.50 80.50 80.50
Siscoseal

147 Paint - Sissons Standard Colour - Undercoat, 5 litres 60 del 41.00 41.00 41.00 41.00 41.00 41.00
Universal

148 Steel Louvres Windows Without Iron Bars - Single No. 60 del 8.20 8.05 7.60 7.75 7.65 8.20
Control, 8 Blades

149 Mild Steel Hollow Sections - 2" x 3' x 3.2mm 6m length 60 del 113.00 106.85 105.10 104.10 104.10 113.00
Handrail

Source of Data: This average price is compiled from data supplied by BMDAM
Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
150 Mild Steel Hollow Sections - 1/2" x 1/2" x 1mm 6m length 60 del 6.70 6.15 6.70 6.40 6.40 7.00
Square Baluster
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
151 Square Hollow Sections - 12mm x 12mm x 1.0mm MT 60 del 3,570.00 3,570.00 3,250.00 3,250.00 3,250.00 3,570.00
(0.357kg/m)

152 Square Hollow Sections - 50mm x 50mm x 3.0mm MT 60 del 3,342.00 3,342.00 3,116.50 3,064.00 3,064.00 3,342.00
(4.38kg/m)

153 Square Hollow Sections - 150mm x 150mm x 4.5mm MT 60 del 3,456.00 3,456.00 3,201.00 3,159.00 3,159.00 3,456.00
(20.5kg/m)

154 Rectangular Hollow Sections - 75mm x 50mm x MT 60 del 3,342.00 3,342.00 3,096.00 3,064.00 3,064.00 3,342.00
3.2mm (5.8 kg/m)

155 Rectangular Hollow Sections - 150mm x 100mm x MT 60 del 3,405.50 3,405.50 3,127.50 3,117.00 3,117.00 3,405.50
4.5mm (16.9 kg/m)

156 Rectangular Hollow Sections - 200mm x 100mm x MT 60 del 3,405.50 3,405.50 3,127.50 3,117.00 3,117.00 3,405.50
4.5mm (20.5 kg/m)

157 Universal Beams - 102mm x 102mm x 8.76mm MT 60 del 3,563.00 3,563.00 3,305.00 3,252.50 3,252.50 3,563.00
(19.35kg/m) / 17.2kg

158 Universal Beams - 356mm x 368mm x 13.33mm MT 60 del 3,563.00 3,563.00 3,305.00 3,252.50 3,252.50 3,563.00
(162.2kg/m) / 152kg

159 Universal Beams - 400mm x 400mm (197kg/m) MT 60 del 3,970.00 3,970.00 3,650.00 3,625.00 3,625.00 3,970.00

160 Rolled Steel Joists - 152mm x 76mm x 5.84mm MT 60 del 3,750.00 3,750.00 3,440.00 3,425.00 3,425.00 3,750.00
(17.88kg/m)

161 Rolled Steel Joists - 178mm x 102mm x 6.35mm MT 60 del 3,546.00 3,546.00 3,280.00 3,255.00 3,255.00 3,546.00
(23.84kg/m)

162 Rolled Steel Joists - 203mm x 102mm x 5.84mm MT 60 del 3,444.00 3,444.00 3,185.00 3,170.00 3,170.00 3,444.00
(25.33 kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit

163 Equal Engles - 38mm x 38mm x 3.8mm (2.17 kg/m) MT 60 del 2,369.00 2,369.00 2,160.50 2,157.50 2,157.50 2,369.00

164 Equal Engles - 50mm x 50mm x 4mm (3.06 kg/m) MT 60 del 2,363.00 2,363.00 2,160.50 2,152.50 2,152.50 2,363.00
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

165 Equal Engles - 65mm x 65mm x 6mm (5.91kg/m) MT 60 del 2,375.50 2,375.50 2,227.50 2,168.00 2,168.00 2,375.50

166 Unequal Angles - 90mm x 80mm x 7mm (9.04 kg/m) MT 60 del 2,588.00 2,588.00 2,370.00 2,370.00 2,370.00 2,588.00

167 Unequal Angles - 125mm x 75mm x 7mm MT 60 del 2,721.50 2,721.50 2,478.50 2,481.50 2,481.50 2,721.50
(10.7kg/m)

168 Unequal Angles - 175mm x 90mm x 9mm MT 60 del 2,642.00 2,642.00 2,642.00 2,415.00 2,415.00 2,642.00
(18.2kg/m)

169 U Channels - 75mm x 40mm x 5mm (6.92 kg/m) MT 60 del 3,065.50 3,065.50 3,065.50 2,678.50 2,678.50 3,065.50

170 U Channels - 230mm x 80mm x 8mm (28.4 kg/m) MT 60 del 3,450.00 3,450.00 3,450.00 3,025.00 3,025.00 3,300.00

171 U Channels - 380mm x 100mm x 10.5mm MT 60 del 3,582.00 3,582.00 3,582.00 3,265.00 3,265.00 3,582.00
(54.5kg/m)

172 Lipped Channels - 100mm x 50mm x 20mm x 3mm MT 60 del 3,506.50 3,506.50 3,207.50 3,202.50 3,202.50 3,506.50
(5.19kg/m)

173 Lipped Channels - 150mm x 65mm x 20mm x 3mm MT 60 del 3,450.00 3,450.00 3,160.50 3,155.00 3,155.00 3,450.00
(7.07 kg/m)

174 Lipped Channels - 200mm x 75mm x 20mm x 3mm MT 60 del 3,402.00 3,402.00 3,120.00 3,110.00 3,110.00 3,402.00
(8.72 kg/m)

175 Solid Decorative Timber Door 3' x 7' (LLC/Sandor), piece 60 del 211.00 208.50 208.50 203.50 203.50 208.50
certified by SIRIM

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit

176 Solid Decorative Timber Door 4' x 7' (LLC/Sandor), piece 60 del 338.50 341.00 336.00 341.00 336.00 346.00
certified by SIRIM

177 PVC door 35mm x 750mm x 2100mm (Astino/ piece 60 del 73.50 76.00 76.00 76.00 73.50 76.00
Quality Class)
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
178 PVC door 38mm x 840mm x 2100mm (Astino/ piece 60 del 86.50 94.00 94.00 94.00 91.50 94.00
Quality Class)

179 One Hour Firedoor (Sijil Perakuan Bahan, Jabatan piece 60 del 620.00 610.00 620.00 610.00 600.00 600.00
Bomba) (Sandor/ Techdor)

180 Two Hours Firedoor (Sijil Perakuan Bahan, Jabatan piece 60 del 1,105.00 1,080.00 1,105.00 1,085.00 1,085.00 1,085.00
Bomba) (Sandor/ Techdor)

181 Plywood - Shuttering Board, 4' x 8' x 12mm piece 60 del 49.50 49.50 49.50 50.50 50.00 48.50

182 Valley Board (MHW) 1" x 6" x 8' up MT 60 del 1,227.00 1,187.50 1,233.00 1,250.00 1,216.00 1,244.50

183 Reinforced Concrete Pile, 150mm x 150mm (153mm piece 60 ex 114.25 109.25 109.75 109.75 109.25 120.75
x 147mm x 150mm) 4.5mm wire size, BS 8004
HUME (3 metre)

184 Reinforced Concrete Pile, 200mm x 200mm (204mm piece 60 ex 180.90 171.90 173.40 174.00 173.40 192.90
x 196mm x 200mm) 4.5mm wire size, BS 8004
HUME (3 metre)

185 Concrete Pipes 450mm (18"), Class X pipes, MS piece 60 del 67.20 65.70 65.20 73.80 63.20 68.20
881 HUME

186 Concrete Pipes 450mm (18"), Class Y pipes, MS piece 60 del 74.90 73.40 72.90 81.15 70.90 75.40
881 HUME

187 Concrete Pipes 750mm (30"), Class X pipes, MS piece 60 del 124.10 119.10 116.60 140.20 111.60 137.60
881 HUME

188 Concrete Pipes 750mm (30"), Class Y pipes, MS piece 60 del 136.25 132.75 129.75 154.35 131.75 147.75
881 HUME

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit

189 Standard Size Box Culvert Without Dry Weather piece 60 del 266.00 248.00 245.50 251.00 246.00 247.00
Flow 900mm x 900mm, BS 5400 HUME

190 Standard Size Box Culvert Without Dry Weather piece 60 del 360.10 363.55 360.70 388.50 362.15 362.60
Flow 1200mm x 1200mm, BS 5400 HUME
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
191 Prestressed Concrete Beam, M-Beams, M5, BS piece 60 del 7,575.00 7,575.00 6,950.00 7,135.00 6,945.00 7,575.00
5400 HUME - 10,000mm x 970mm X 960mm (8
tons) - 10 metres

192 Prestressed Concrete Beam, M-Beams, M5, BS piece 60 del 9,755.00 9,755.00 8,950.00 9,190.00 8,945.00 9,755.00
5400 HUME - 15,000mm x 970mm x 960mm (12
tons) - 15 metres

193 Prestressed Concrete Beam, M-Beams, M5, BS piece 60 del 12,805.00 12,805.00 11,725.00 12,041.50 11,725.00 12,805.00
5400 HUME - 20,000mm x 970mm x 960mm ( 16
tons) - 20metres

194 Precast Concrete Spun Piles - 450mm diameter x piece 60 del 686.80 686.80 629.50 637.75 622.25 702.30
70mm thickness x 6m (217kg/m), Class A

195 Precast Concrete Spun Piles - 600mm diameter x piece 60 del 1,153.98 1,153.98 1,049.00 1,071.15 1,045.65 1,179.48
90mm thickness x 6m (375kg/m), Class A

196 Precast Concrete Spun Piles - 450mm diameter x piece 60 del 710.18 710.18 644.50 658.90 643.40 725.68
80mm thickness x 6m (242kg/m), Class B

197 Precast Concrete Spun Piles - 600mm diameter x piece 60 del 1,183.80 1,183.80 1,076.00 1,098.50 1,072.50 1,209.80
100mm thickness x 6m (408kg/m), Class B

198 Precast Concrete Spun Piles - 450mm diameter x piece 60 del 776.88 776.88 714.50 723.15 705.65 794.38
80mm thickness x 6m (242kg/m), Class C

199 Precast Concrete Spun Piles - 600mm diameter x piece 60 del 1,278.88 1,278.88 1,165.50 1,190.65 1,161.65 1,307.88
100mm thickness x 6m (408kg/m), Class C

200 Steel Sheet Piles - U type, ISP-II, 400mm x 100mm MT 60 del 3,575.00 3,575.00 3,575.00 3,550.00 3,550.00 3,575.00
x 10.5mm (48.0kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit

201 Steel Sheet Piles - U type, ISP-III A (E), 400mm x MT 60 del 3,285.00 3,285.00 3,285.00 3,275.00 3,275.00 3,285.00
150mm x 13.1mm (58.40kg/m)

202 Steel Sheet Piles - U type, ISP-IV, 400mm x 170mm MT 60 del 3,305.00 3,305.00 3,305.00 3,300.00 3,300.00 3,305.00
x 15.5mm (76.10kg/m)
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue…)
No. Description Unit Credit Del or Ex April 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang
203 Steel Sheet Piles - Box type, ISP-II (A), ISP-II (B) MT 60 del 3,575.00 3,575.00 3,575.00 3,550.00 3,550.00 3,575.00
244mm x 400mm

204 Steel Sheet Piles - Box type, ISP-III(A), ISP-III (B) MT 60 del 3,310.00 3,310.00 3,310.00 3,300.00 3,300.00 3,310.00
297mm x 400mm

205 Steel Sheet Piles - Box type, ISP-IV(A), ISP-IV (B) MT 60 del 3,310.00 3,310.00 3,310.00 3,300.00 3,300.00 3,310.00
342mm x 400mm

206 Precast Reinforced Concrete Square Pile 150mm x piece 60 del 104.00 104.00 104.00 100.70 98.00 104.00
150mm x 6m

207 Precast Reinforced Concrete Square Pile 200mm x piece 60 del 144.25 144.25 144.25 144.90 143.25 144.25
200mm x 6m

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 2. Average Price of Building Materials for Peninsular Malaysia (DOS)
Period
No. Description Unit April 2007
(RM)

1 Broken Local Marble 10-20mm thick ton 256.67

2 Fibrous Plaster Ceiling 4' x 6' x 9mm thick sheet 9.99

3 Clear Float Glass 5mm thick, Local/Imported m² 26.31

4 Figured/Obscured Glass 5mm thick, Local/Imported, Inclusive of Cutting m² 19.97

5 Tinted Float Glass 5mm thick, Local/Imported, Inclusive of Cutting m² 33.05

6 Tinted Float Glass 6mm thick, Local/Imported, Inclusive of Cutting m² 42.48

7 Tinted Reflective Glass 6mm thick, Local/Imported, Inclusive of Cutting m² 78.90

8 Aluminium Extrusions Natural, Anodised Finish Solid Section kg 12.83

9 Aluminium Extrusions Natural Anodised Finish, Semi Hollow, Hollow Section kg 12.83

10 Plywood MMH Plank 1" x 6" ton 1,133.00

Source of Data : This average price is compiled from data supplied by Department of Statistics, Malaysia (DOS)
m2 = Square Metre
Table 3. Average Price of Building Materials for Peninsular Malaysia (MTIB)
April 2007 (RM)
No. Description
Unit (m³) Unit (MT)

1 GMS Heavy Hardwood, Chengal 4,350.00 6,160.00

2 GMS Heavy Hardwood, Balau 2,480.00 3,512.00

3 GMS Heavy Hardwood, Red Balau 1,500.00 2,124.00

4 GMS Heavy Hardwood, Merbau 2,500.00 3,540.00

5 GMS Heavy Hardwood, Mixed Heavy Hardwood 1,000.00 1,416.00

6 Scantlings Heavy Hardwood, Chengal 4,400.00 6,230.00

7 Scantlings Heavy Hardwood, Balau 2,800.00 3,965.00

8 Scantlings Heavy Hardwood, Red Balau 1,270.00 1,798.00

9 Scantlings Heavy Hardwood, Merbau 2,400.00 3,398.00

10 Scantlings Heavy Hardwood, Mixed Heavy Hardwood 960.00 1,359.00

11 GMS Medium Hardwood, Keruing 1,300.00 1,841.00

12 GMS Medium Hardwood, Kempas 1,300.00 1,841.00

13 GMS Medium Hardwood, Kapur 1,140.00 1,614.00

14 GMS Medium Hardwood, Mengkulang 1,150.00 1,628.00

15 GMS Medium Hardwood, Tualang 760.00 1,076.00

16 GMS Medium Hardwood, Mixed Medium Hardwood 800.00 1,133.00

17 Scantlings Medium Hardwood, Keruing 1,290.00 1,827.00

18 Scantlings Medium Hardwood, Kempas 1,180.00 1,671.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 3. Average Price of Building Materials for Peninsular Malaysia (Continue…)
April 2007 (RM)
No. Description
Unit (m³) Unit (MT)

19 Scantlings Medium Hardwood, Kapur 1,270.00 1,798.00

20 Scantlings Medium Hardwood, Mengkulang 1,250.00 1,770.00

21 Scantlings Medium Hardwood, Tualang 900.00 1,274.00

22 Scantlings Medium Hardwood, Mixed Medium Hardwood 930.00 1,317.00

23 GMS Light Hardwood, Dark Red Meranti 1,650.00 2,336.00

24 GMS Light Hardwood, Light Red Meranti 1,310.00 1,855.00

25 GMS Light Hardwood, Red Meranti 1,600.00 2,266.00

26 GMS Light Hardwood, Yellow Meranti 920.00 1,303.00

27 GMS Light Hardwood, White Meranti 980.00 1,388.00

28 GMS Light Hardwood, Mersawa 1,150.00 1,628.00

29 GMS Light Hardwood, Nyatoh 1,370.00 1,940.00

30 GMS Light Hardwood, Sepetir 950.00 1,345.00

31 GMS Light Hardwood, Jelutong 1,250.00 1,770.00

32 GMS Light Hardwood, Ramin 3,200.00 4,531.00

33 GMS Light Hardwood, Mixed Light Hardwood 800.00 1,133.00

34 Scantlings Light Hardwood, Dark Red Meranti 1,800.00 2,549.00

35 Scantlings Light Hardwood, Light Red Meranti 1,440.00 2,039.00

36 Scantlings Light Hardwood, Red Meranti 1,390.00 1,968.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 3. Average Price of Building Materials for Peninsular Malaysia (Continue…)
April 2007 (RM)
No. Description
Unit (m³) Unit (MT)

37 Scantlings Light Hardwood, Yellow Meranti 1,290.00 1,827.00

38 Scantlings Light Hardwood, White Meranti 1,050.00 1,487.00

39 Scantlings Light Hardwood, Mersawa 1,380.00 1,954.00

40 Scantlings Light Hardwood, Nyatoh 1,450.00 2,053.00

41 Scantlings Light Hardwood, Sepetir 870.00 1,232.00

42 Scantlings Light Hardwood, Jelutong 1,100.00 1,558.00

43 Scantlings Light Hardwood, Ramin 3,250.00 4,602.00

44 Scantlings Light Hardwood, Mixed Light Hardwood 850.00 1,204.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

1 Ordinary Portland Cement (50kg) Bag 60 del 10.85 10.95 11.20 11.50 10.85 11.50

2 Ordinary Portland Cement (bulk) MT 60 del 217.00 219.00 224.00 231.00 217.00 226.33

3 Granite Aggregate 3/4" MT 60 ex 18.00 16.67 20.00 22.00 20.00 21.00

4 Normal River Sand MT 30 ex 12.17 15.33 16.50 5.00 7.33 6.67

5 Fine River Sand for Plastering MT 30 ex 15.67 23.33 23.33 10.00 10.67 9.00

6 Normal Mining Sand MT 30 ex 12.00 15.67 16.50 13.00 7.33 13.00

7 Fine Mining Sand for Plastering MT 30 ex 14.00 23.33 23.33 18.00 9.33 17.00

8 Mild Steel Round Bars - 10mm, MS146 MT 14 del 2,091.33 2,091.33 2,091.33 2,091.33 2,091.33 2,091.33

9 Mild Steel Round Bars - 12mm, MS146 MT 14 del 2,063.67 2,063.67 2,063.67 2,063.67 2,063.67 2,063.67

10 Mild Steel Round Bars - 16mm, MS146 MT 14 del 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00

11 Mild Steel Round Bars - 20mm, MS146 MT 14 del 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00

12 Mild Steel Round Bars - 22mm, MS146 MT 14 del 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00

13 Mild Steel Round Bars - 25mm, MS146 MT 14 del 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00

14 Mild Steel Round Bars - 32mm, MS146 MT 14 del 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00 1,983.00

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

15 High Tensile Deformed Bars - 10mm, MS146 MT 14 del 2,138.33 2,138.33 2,138.33 2,138.33 2,138.33 2,138.33

16 High Tensile Deformed Bars - 12mm, MS146 MT 14 del 2,091.33 2,091.33 2,091.33 2,091.33 2,091.33 2,091.33

17 High Tensile Deformed Bars - 16mm, MS146 MT 14 del 2,012.67 2,012.67 2,012.67 2,012.67 2,012.67 2,012.67

18 High Tensile Deformed Bars - 20mm, MS146 MT 14 del 2,012.67 2,012.67 2,012.67 2,012.67 2,012.67 2,012.67

19 High Tensile Deformed Bars - 25mm, MS146 MT 14 del 2,012.67 2,012.67 2,012.67 2,012.67 2,012.67 2,012.67

20 High Tensile Deformed Bars - 32mm, MS146 MT 14 del 2,012.67 2,012.67 2,012.67 2,012.67 2,012.67 2,012.67

21 BRC Fabric - A6, MS145 m2 30 del 5.17 5.17 5.17 5.17 5.17 5.07

22 BRC Fabric - A7, MS145 m2 30 del 6.98 6.98 6.98 6.98 6.98 6.91

23 BRC Fabric - A8, MS145 m2 30 del 8.92 8.92 8.92 8.92 8.92 9.05

24 BRC Fabric - A9, MS145 m2 30 del 11.50 11.40 11.57 11.60 11.50 11.62

25 BRC Fabric - A10, MS145 m2 30 del 14.80 14.67 14.87 14.93 14.80 14.97

26 Ready Mix Concrete - Normal Mix - Grade 10 m3 30 del 149.00 132.67 137.33 129.00 112.67 131.00

27 Ready Mix Concrete - Normal Mix - Grade 15 m3 30 del 155.00 137.67 142.67 136.00 117.67 135.33

28 Ready Mix Concrete - Normal Mix - Grade 20 m3 30 del 159.67 142.33 147.67 142.67 122.67 140.67

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

29 Ready Mix Concrete - Normal Mix - Grade 25 m3 30 del 166.00 149.67 153.33 149.67 129.67 147.67

30 Ready Mix Concrete - Normal Mix - Grade 30 m3 30 del 174.67 157.33 160.00 157.00 137.67 156.33

31 Ready Mix Concrete - Normal Mix - Grade 35 m3 30 del 183.67 166.67 166.67 172.67 146.67 164.67

32 Ready Mix Concrete - Normal Mix - Grade 40 m3 30 del 193.33 176.33 177.00 179.67 157.00 174.67

33 Clay Brick - Pallet piece 30 del 0.26 0.25 0.25 0.28 0.26 0.26

34 Smooth Face Facing Brick, Red piece 30 del 0.59 0.56 0.58 0.62 0.62 0.62

35 Cement Sand Brick - Pallet piece 60 del 0.16 0.15 0.17 0.16 0.17 0.16

36 Precast Concrete Hollow Block 90mm x 190mm x piece 60 del 1.73 1.62 1.73 1.73 1.67 1.73
390mm M.S 27 1996

37 Plain Gypsum Partition Board ,1.2m x 2.4m x 12mm sheet 30 del 25.67 25.67 25.67 25.67 25.67 25.67
thick, Boral/ Armstrong

38 Laminated Gypsum Partition Board, 1.2m x 2.4m x sheet 30 del 39.83 38.67 39.83 39.83 39.07 39.53
12mm thick, Boral/ Armstrong

39 Corrugated Roofing Sheet - 76mm Double Width, sheet 60 del 22.33 22.33 22.33 22.33 22.33 22.33
1065mx2440mmx4mm (Hume/Malex/UAC)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

40 Interlocking Concrete Tile - Standard Duotone Colour piece 60 del 1.45 1.43 1.45 1.48 1.45 1.47
(Monier Elabana)

41 MS Decking - Lysaght Clean Colorbond - Kliplok Hi-Ten m2 60 del 54.90 54.90 56.40 56.62 55.73 55.40
0.53mm TCT

42 MS Decking - Lysaght Clean Colorbond - Spandek Hi- m2 60 del 49.44 49.44 51.28 51.79 50.94 50.28
Ten 0.47mm TCT

43 MS Decking - Lysaght Clean Colorbond - Trimdek Hi- m2 60 del 45.05 45.38 48.38 47.85 48.05 45.38
Ten 0.47mm TCT

44 MS Decking - Ajiya AP Rib Hi-Tensile G28, 0.40mm m2 60 del 37.90 37.57 37.90 37.90 37.90 37.90
TCT, Clean Colorbond (Commercial)

45 MS Decking - Ajiya AP Rib Hi-Tensile G26, 0.47mm m2 60 del 42.90 42.57 42.90 42.90 42.90 42.90
TCT, Clean Colorbond (Commercial)

46 MS Decking - Ajiya AP Rib Hi-Tensile G24, 0.53mm m2 60 del 49.23 48.90 49.23 49.23 49.23 49.23
TCT, Clean Colorbond (Commercial)

47 MS Decking - Ajiya Euro Step Roofing M350 G28, m2 60 del 39.73 39.40 39.73 39.73 39.73 39.73
0.40mm TCT, Clean Colorbond

48 MS Decking - Ajiya Euro Step Roofing M350 G26, m2 60 del 44.97 44.63 44.97 44.97 44.97 44.97
0.47mm TCT, Clean Colorbond

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

49 MS Decking - Ajiya Euro Step Roofing M350 G24, m² 60 del 49.20 48.87 49.20 49.20 49.20 49.20
0.53mm TCT, Clean Colorbond

50 Glazed Ceramic Floor Tiles, Standard Light Colour piece 60 del 0.74 0.73 0.74 0.74 0.74 0.74
200mm x 200mm x 8mm - Grade 1

51 Glazed Ceramic Floor Tiles, Standard Light Colour piece 60 del 1.52 1.51 1.52 1.52 1.55 1.52
300mm x 300mm x 8mm - Grade 1

52 Plain Homogenous Floor Tiles, Standard Light Colour piece 60 del 1.05 1.05 1.09 1.09 1.09 1.09
200mm x 200mm x 8mm - Grade 1

53 Plain Homogenous Floor Tiles, Standard Light Colour piece 60 del 2.03 2.03 2.03 2.05 2.07 2.07
300mm x 300mm x 8mm - Grade 1

54 Polished Granite Slab - Local Grey 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

55 Polished Granite Slab - Melaka Rose 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

56 Polished Granite Slab - Tampin Blue 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

57 Polished Granite Slab - Terengganu Green 1' x 1' x piece 60 del 25.00 25.00 24.00 25.00 25.00 25.00
20mm

58 Local Polished Marble Slab W1/P1, 300mm x 300mm x piece 60 del 3.50 3.50 3.30 3.50 3.50 3.50
10mm

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

59 Vitrified Porcelain Tiles - Niro Granite, Pietra Evo 1, piece 60 del 3.13 3.13 3.03 3.13 3.13 3.13
Beigo - P11, 300mm x 300mm x 20mm

60 Vitrified Porcelain Tiles- Niro Granite, Pietra Evo 1, Noce piece 60 del 3.13 3.13 3.07 3.13 3.13 3.13
P12, 300mm x 300mm x 20mm

61 Vitrified Porcelain Tiles -Niro Granite, Nordik Stone, Bora piece 60 del 12.71 12.38 12.38 12.71 12.71 12.71
N02, 450mm x 450mm x 20mm

62 Vitrified Porcelain Tiles - Niro Granite, Nordik Stone, piece 60 del 12.71 12.38 12.38 12.71 12.71 12.71
Kosawa N04, 450mm x 450mm x 20mm

63 Glazed Ceramic Wall Tiles, Standard Light Colour, piece 60 del 0.69 0.71 0.76 0.72 0.74 0.74
200mm x 200mm x 6mm - Grade 1

64 Glazed Ceramic Wall Tiles, Standard Light Colour, piece 60 del 0.83 0.83 0.83 0.83 0.83 0.83
200mm x 250mm x 6mm - Grade 1

65 Plain Cellulose Fibre Ceiling Sheet, 610mm x 1220mm x sheet 60 del 3.65 3.65 3.65 3.65 3.65 3.65
3.2mm (UAC/ Hume/ Malex)

66 Plain Cellulose Fibre Ceiling Sheet, 610mm x 1220mm x sheet 60 del 6.33 6.33 6.33 6.33 6.33 6.33
4.5mm (UAC/ Hume/ Malex)

67 Plain Cellulose Fibre Ceiling Sheet, 1220mm x 1220mm sheet 60 del 7.30 7.28 7.30 7.30 7.30 7.30
x 3.2mm (UAC/ Hume/ Malex)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

68 Plain Cellulose Fibre Ceiling Sheet, 1220mm x 1220mm sheet 60 del 12.67 12.67 12.67 12.67 12.67 12.67
x 4.5mm (UAC/ Hume/ Malex)

69 Decorative Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 5.00 5.00 5.00 5.00 5.00 5.00
1220mm x 3.2mm (UAC/ Hume/ Malex)

70 Decorative Cellulose Fibre Ceiling Sheet,1220mm x sheet 60 del 9.83 9.87 9.83 9.83 9.83 9.83
1220mm x 3.2mm (UAC/ Hume/ Malex)

71 Plain Gypsum Ceiling Board, 610mm x 1220mm x sheet 60 del 4.60 4.60 4.60 4.60 4.60 4.60
9.5mm (Boral/Armstrong)

72 Galvanised Iron Pipes - 15mm Diameter (Maruichi), 6m run 60 del 28.53 28.53 28.53 28.40 28.40 28.40
MS863 - Class A

73 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 42.50 42.50 42.50 41.17 41.17 41.17
MS863 - Class A

74 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 58.63 58.63 58.63 58.17 58.17 58.17
MS863 - Class A

75 Galvanised Iron pipes - 15mm Diameter (Maruichi), 6m run 60 del 35.47 35.47 35.47 35.30 35.30 35.30
MS863 - Class B

76 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 45.93 45.93 45.93 45.70 45.70 45.70
MS863 - Class B

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

77 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 66.87 66.87 66.87 66.83 66.83 66.83
MS863 - Class B

78 Galvanised Iron pipes - 15mm Diameter (Maruichi), 6m run 60 del 42.20 42.20 42.20 41.93 41.93 41.93
MS863 - Class C

79 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 54.23 54.23 54.23 53.97 53.97 53.97
MS863 - Class C

80 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 83.87 83.87 83.87 83.70 83.70 83.70
MS863 - Class C

81 PVC Pressure pipes Class D, grey colour 50mm 4m run 60 del 21.12 21.12 21.12 21.12 21.12 21.12
Diameter (Paling), MS 628

82 PVC Pressure pipes Class D, grey colour 50mm 6m run 60 del 32.67 32.67 32.67 32.67 32.67 32.67
Diameter (Dulon), MS 628

83 PVC Pressure pipes Class D grey colour 65mm 6m run 60 del 44.73 44.73 44.73 44.73 44.73 44.73
Diameter (Paling), MS 628

84 PVC Pressure pipes Class D, grey colour 80mm 6m run 60 del 64.40 61.75 64.40 64.40 64.40 64.40
Diameter (Paling), MS 628

85 PVC pipes Class O, grey colour 32mm Diameter 4m run 60 del 7.10 7.10 7.10 7.10 7.10 7.10
(Paling), MS 762

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

86 PVC pipes Class O, grey colour 50mm Diameter 4m run 60 del 10.17 10.17 10.17 10.17 10.17 10.17
(Paling), MS 762

87 PVC Pressure pipes Class E,grey colour 25mm 6m run 60 del 9.80 9.80 9.80 9.80 9.80 9.80
Diameter (Dulon), MS 628

88 PVC Pressure pipes Class E,grey colour 50mm 6m run 60 del 29.27 29.27 29.27 29.27 29.27 29.27
Diameter (Dulon), MS 628

89 PVC Pressure pipes Class E,grey colour 25mm 4m run 60 del 8.68 8.54 8.68 8.68 8.68 8.68
Diameter (Paling), MS 628

90 PVC Pressure pipes Class E,grey colour 50mm 4m run 60 del 25.80 25.80 25.80 25.80 25.80 25.80
Diameter (Paling), MS 628

91 PVC Pressure pipes Class E, grey colour 65mm 6m run 60 del 55.53 55.53 55.53 55.53 55.53 55.53
Diameter (Paling), MS 628

92 PVC Pressure pipes Class E, grey colour 80mm 6m run 60 del 77.83 77.83 77.83 77.83 77.83 77.83
Diameter (Paling), MS 628

93 PVC Pressure pipes Class 6 grey colour 20mm Diameter 4m run 60 del 8.42 8.22 8.22 8.22 8.22 8.42
(Paling), MS 628

94 PVC Pressure pipes Class 6 grey colour 25mm Diameter 4m run 60 del 12.05 12.05 12.05 12.05 12.05 12.05
(Paling), MS 628

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

95 PVC Pressure pipes Class 7,grey colour 20mm Diameter 4m run 60 del 10.67 10.67 10.60 10.60 10.60 10.60
(Paling), MS 628

96 PVC Pressure pipes Class 7,grey colour 25mm Diameter 4m run 60 del 15.35 15.35 14.97 14.97 14.97 15.35
(Paling), MS 628

97 PVC Pressure pipes Class 7, grey colour 32mm 4m run 60 del 20.83 20.83 20.83 20.83 20.83 20.83
Diameter (Paling), MS 628

98 PVC Pressure pipes Class 7, grey colour 50mm 4m run 60 del 34.58 34.58 34.58 34.58 34.58 34.58
Diameter (Paling), MS 628

99 HDPE Pipe PN 10 - 50mm Diameter, MS1058 100m roll 60 del 398.67 398.67 398.67 398.67 398.67 398.67

100 HDPE Pipe PN 12.5 - 25mm Diameter, MS1058 100m roll 60 del 128.33 128.33 128.33 128.33 128.33 128.33

101 HDPE Pipe PN 12.5 - 40mm Diameter, MS1058 100m roll 60 del 326.33 326.33 326.33 326.33 326.33 326.33

102 HDPE Pipe PN 12.5 - 50mm Diameter, MS1058 100m roll 60 del 499.33 499.33 499.33 499.33 499.33 499.33

103 HDPE Pipe PN16 - 20mm Diameter, MS1058 100m roll 60 del 100.33 100.33 100.33 100.33 100.33 100.33

104 HDPE Pipe PN16 - 25mm Diameter, MS1058 100m roll 60 del 149.00 149.00 149.00 149.00 149.00 149.00

105 HDPE Pipe PN16- 50 mm Diameter, MS1058 100m roll 60 del 602.33 602.33 602.33 602.33 602.33 602.33

106 Fibre Reinforced Plastic Sectional Tank - 1000 Litres / 6 panels 60 del 1,550.33 1,550.33 1,530.33 1,530.33 1,530.33 1,550.33
220 Gallons, AL Tank, 6 panels

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

107 Fibre Reinforced Plastic Sectional Tank - 1000 Litres / 6 panels 60 del 1,700.00 1,700.00 1,763.33 1,770.00 1,746.67 1,700.00
220 Gallons, RP Tank, 6 panels

108 Fibre Reinforced Plastic Sectional Tank - 1000 Litres / 6 panels 60 del 1,520.00 1,520.00 1,483.33 1,450.00 1,450.00 1,520.00
220 Gallons, MuiTank, 6 panels

109 Fibre Reinforced Plastic Sectional Tank - 1000 Litres / 6 panels 60 del 1,670.00 1,670.00 1,633.33 1,600.00 1,600.00 1,600.00
220 Gallons, G-FRP, 6 panels

110 Polytank - Circular , 100 Gallons, MS1225 - Weida No. 60 del 98.37 95.43 98.37 98.37 98.37 98.37
Equivelant

111 Polytank - Circular, 200 Gallons, MS1225 - Weida No. 60 del 175.93 170.40 175.93 175.93 175.93 175.93
Equivelant

112 Polytank - Square, 100 Gallons, MS1225 - Weida No. 60 del 97.17 97.17 97.17 97.17 97.17 97.17
Equivelant

113 Polytank - Square, 200 Gallons, MS1225 - Weida No. 60 del 198.00 195.07 201.40 201.40 201.40 201.40
Equivelant

114 Wash Hand Basins - 560mm x 406mm, white colour - Set 60 del 53.73 52.73 53.73 52.73 53.73 53.73
Dotex WB702, Globe

115 Wash Hand Basins - 560mm x 406mm, white colour - Set 60 del 58.50 57.17 59.50 58.17 59.50 58.50
Jacqueline WB 142, Claytan

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

116 Water Closet Eastern - Bengal ACBL-000, white colour , Item 60 del 44.33 44.33 45.33 45.33 45.33 44.33
without cistern, Johnson-Suisse

117 Water Closet Eastern- Orissa III standard colour , without Item 60 del 464.00 464.00 464.00 464.00 464.00 464.00
cistern, GBH

118 Water Closet Western- WC 644, white colour,without Item 60 del 122.57 119.93 122.57 122.73 123.23 122.57
cistern, Claytan

119 Water Closet Western- Windsor with push button 6L Set 60 del 448.67 450.33 455.33 450.33 452.00 452.00
cistern, standard colout, Johnson-Suisse

120 Water Closet Western- Vanessa with 6L/3L dual low Set 60 del 966.67 966.67 966.67 966.67 966.67 966.67
level cistern, standard colour, GBH

121 Water Closet Western- WC 602 Sina without cistern, Item 60 del 77.33 76.33 80.00 77.33 74.67 77.33
white colour, Claytan

122 Urinal Bowl, Santana 320 c/w hanger , flange, ceramic Set 60 del 365.00 361.83 371.67 361.83 368.33 368.33
waste & cleansing set, Johnson Suisse, white

123 Urinal Bowl, Richmond c/w hanger, plastic insert, Item 60 del 125.00 123.33 125.67 123.33 125.00 125.00
Johnson Suisse, white

124 Stainless Steel Sinks - Single Bowl Single Drainer - Lay Item 60 del 71.67 71.00 71.00 71.67 71.67 71.67
on type, 42" x 18"

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

125 Paint - ICI Dulux Standard Colour - External Acrylic 5 litres 60 del 112.00 112.00 112.00 112.00 112.00 112.00
Emulsion, Weathershield

126 Paint - ICI Dulux Standard Colour - Internal Emulsion 5 litres 60 del 97.00 97.00 97.00 97.00 97.00 97.00
Luxury, waterbase, Pearl Glo

127 Paint - ICI Dulux Standard Colour - Internal Emulsion, 5 litres 60 del 84.00 84.00 84.00 84.00 84.00 84.00
waterbase, Pentalite

128 Paint - ICI Dulux Standard Colour - Gloss Oilbased, 5 litres 60 del 110.00 110.00 110.00 110.00 110.00 110.00
Gloss Finish

129 Paint - ICI Dulux Standard Colour - Timber/ Wood, 5 litres 60 del 84.00 84.00 84.00 84.00 84.00 84.00
Timbertone, Clear Glossy

130 Paint - ICI Dulux Standard Colour - Undercoat, Speed 5 litres 60 del 87.00 87.00 87.00 87.00 87.00 87.00

131 Paint - Nippon Standard Colour - External Acrylic 5 litres 60 del 84.00 84.00 84.00 84.00 84.00 84.00
Emulsion, Weatherbond

132 Paint - Nippon Standard Colour - Internal Emulsion 7 litres 60 del 78.00 78.00 78.00 78.00 78.00 78.00
Luxury, waterbase, Satin Glo

133 Paint - Nippon Standard Colour - Internal Emulsion, 5 litres 60 del 27.50 27.50 27.50 27.50 27.50 27.50
waterbase, Supermatex

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

134 Paint - Nippon Standard Colour - Gloss Oilbased, 9000 5 litres 60 del 85.00 85.00 85.00 85.00 85.00 85.00
Gloss Finish

135 Paint - Nippon Standard Colour - Timber/ Wood, Timber 5 litres 60 del 72.00 72.00 72.00 72.00 72.00 72.00
Finish

136 Paint - Nippon Standard Colour - Undercoat, 9000 5 litres 60 del 55.00 55.00 55.00 55.00 55.00 55.00
Undercoat

137 Paint - Par Standard Colour - External Acrylic Emulsion, 5 litres 60 del 90.00 90.00 90.00 90.00 90.00 90.00
Weathercoat

138 Paint - Par Standard Colour - Internal Emulsion Luxury, 5 litres 60 del 82.00 82.00 82.00 82.00 82.00 82.00
waterbase, Silk

139 Paint - Par Standard Colour - Internal Emulsion, 5 litres 60 del 70.00 70.00 70.00 70.00 70.00 70.00
waterbase, Supermatt

140 Paint - Par Standard Colour - Gloss Oilbased, Super 5 litres 60 del 85.00 85.00 85.00 85.00 85.00 85.00
Gloss

141 Paint - Par Standard Colour - Timber/ Wood, 5 litres 60 del 80.00 80.00 80.00 80.00 80.00 80.00
Timbercote

142 Paint - Par Standar Colour - Undercoat 5 litres 60 del 60.00 60.00 60.00 60.00 60.00 60.00

143 Paint - Sissons Standard Colour - External Acrylic 5 litres 60 del 81.67 81.67 81.67 81.67 81.67 81.67
Emulsion, All Weather

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

144 Paint - Sissons Standard Colour - Internal Emulsion 5 litres 60 del 71.00 71.00 71.00 71.00 71.00 71.00
Luxury, waterbase, Silk Glo

145 Paint - Sissons Standard Colour - Internal Emulsion, 5 litres 60 del 66.67 66.67 66.67 66.67 66.67 66.67
waterbase, Siscolux

146 Paint - Sissons Standard Colour - Gloss Oilbased, 5 litres 60 del 81.67 81.67 81.67 81.67 81.67 81.67
Tungolac

147 Paint - Sissons Standard Colour - Timber/ Wood, 5 litres 60 del 79.00 79.00 79.00 79.00 79.00 79.00
Siscoseal

148 Paint - Sissons Standard Colour - Undercoat, Universal 5 litres 60 del 41.00 41.00 41.00 41.00 41.00 41.00

149 Steel Louvres Windows Without Iron Bars - Single No. 60 del 8.07 7.97 7.80 7.90 7.83 8.07
Control, 8 Blades

150 Mild Steel Hollow Sections - 2" x 3' x 3.2mm Handrail 6m 60 del 110.00 110.00 110.00 110.00 110.00 110.00
length

151 Mild Steel Hollow Sections - 1/2" x 1/2" x 1mm Square 6m 60 del 6.53 6.53 6.53 6.53 6.53 6.53
Baluster length

152 Square Hollow Sections - 12mm x 12mm x 1.0mm MT 60 del 3,446.67 3,446.67 3,233.33 3,233.33 3,233.33 3,446.67
(0.357kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

153 Square Hollow Sections - 50mm x 50mm x 3.0mm MT 60 del 3,278.00 3,278.00 3,127.67 3,092.67 3,092.67 3,278.00
(4.38kg/m)

154 Square Hollow Sections - 150mm x 150mm x 4.5mm MT 60 del 3,417.33 3,417.33 3,247.33 3,219.33 3,219.33 3,417.33
(20.5kg/m)

155 Rectangular Hollow Sections - 75mm x 50mm x 3.2mm MT 60 del 3,268.00 3,268.00 3,104.00 3,082.67 3,082.67 3,268.00
(5.8 kg/m)

156 Rectangular Hollow Sections - 150mm x 100mm x MT 60 del 3,360.33 3,360.33 3,175.00 3,168.00 3,168.00 3,360.33
4.5mm (16.9 kg/m)

157 Rectangular Hollow Sections - 200mm x 100mm x MT 60 del 3,360.33 3,360.33 3,175.00 3,168.00 3,168.00 3,360.33
4.5mm (20.5 kg/m)

158 Universal Beams - 102mm x 102mm x 8.76mm MT 60 del 3,552.00 3,552.00 3,380.00 3,345.00 3,345.00 3,552.00
(19.35kg/m) / 17.2kg

159 Universal Beams - 356mm x 368mm x 13.33mm MT 60 del 3,552.00 3,552.00 3,380.00 3,345.00 3,345.00 3,552.00
(162.2kg/m) / 152kg

160 Universal Beams - 400mm x 400mm (197kg/m) MT 60 del 3,996.67 3,996.67 3,783.33 3,766.67 3,766.67 3,996.67

161 Rolled Steel Joists - 152mm x 76mm x 5.84mm MT 60 del 3,783.33 3,783.33 3,576.67 3,566.67 3,566.67 3,783.33
(17.88kg/m)

162 Rolled Steel Joists - 178mm x 102mm x 6.35mm MT 60 del 3,530.67 3,530.67 3,353.33 3,336.67 3,336.67 3,530.67
(23.84kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

163 Rolled Steel Joists - 203mm x 102mm x 5.84mm (25.33 MT 60 del 3,386.00 3,386.00 3,213.33 3,203.33 3,203.33 3,386.00
kg/m)

164 Equal Engles - 38mm x 38mm x 3.8mm (2.17 kg/m) MT 60 del 2,406.00 2,406.00 2,267.00 2,265.00 2,265.00 2,406.00

165 Equal Engles - 50mm x 50mm x 4mm (3.06 kg/m) MT 60 del 2,402.00 2,402.00 2,267.00 2,261.67 2,261.67 2,402.00

166 Equal Engles - 65mm x 65mm x 6mm (5.91kg/m) MT 60 del 2,410.33 2,410.33 2,311.67 2,272.00 2,272.00 2,410.33

167 Unequal Angles - 90mm x 80mm x 7mm (9.04 kg/m) MT 60 del 2,592.00 2,592.00 2,446.67 2,446.67 2,446.67 2,592.00

168 Unequal Angles - 125mm x 75mm x 7mm (10.7kg/m) MT 60 del 2,681.00 2,681.00 2,519.00 2,521.00 2,521.00 2,681.00

169 Unequal Angles - 175mm x 90mm x 9mm (18.2kg/m) MT 60 del 2,661.33 2,661.33 2,661.33 2,510.00 2,510.00 2,661.33

170 U Channels - 75mm x 40mm x 5mm (6.92 kg/m) MT 60 del 2,893.67 2,893.67 2,634.00 2,635.67 2,635.67 2,893.67

171 U Channels - 230mm x 80mm x 8mm (28.4 kg/m) MT 60 del 3,466.67 3,466.67 3,466.67 3,283.33 3,283.33 3,466.67

172 U Channels - 380mm x 100mm x 10.5mm (54.5kg/m) piece 60 del 3,588.00 3,588.00 3,588.00 3,376.67 3,376.67 3,588.00

173 Lipped Channels - 100mm x 50mm x 20mm x 3mm piece 60 del 3,497.67 3,497.67 3,298.33 3,295.00 3,295.00 3,497.67
(5.19kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

174 Lipped Channels - 150mm x 65mm x 20mm x 3mm piece 60 del 3,406.67 3,406.67 3,213.67 3,210.00 3,210.00 3,406.67
(7.07 kg/m)

175 Lipped Channels - 200mm x 75mm x 20mm x 3mm piece 60 del 3,414.67 3,414.67 3,226.67 3,220.00 3,220.00 3,414.67
(8.72 kg/m)

176 Solid Decorative Timber Door 3' x 7' (Branded), certified piece 60 del 202.33 200.67 200.67 197.33 197.33 200.67
by SIRIM

177 Solid Decorative Timber Door 4' x 7' (Branded), certified piece 60 del 422.33 424.00 420.67 427.33 424.00 427.33
by SIRIM

178 PVC door 35mm x 750mm x 2100mm (Astino/ Quality piece 60 del 74.00 75.67 75.67 75.67 74.00 75.67
Class)

179 PVC door 38mm x 840mm x 2100mm (Astino/ Quality MT 60 del 86.00 91.00 91.00 91.00 89.33 91.00
Class)

180 One Hour Firedoor (Sijil Perakuan Bahan, Jabatan piece 60 ex 590.00 583.33 590.00 583.33 576.67 576.67
Bomba) (Sandor/ Techdor)

181 Two Hours Firedoor (Sijil Perakuan Bahan, Jabatan piece 60 ex 1,073.33 1,056.67 1,073.33 1,060.00 1,060.00 1,060.00
Bomba) (Sandor/ Techdor)

182 Plywood - Shuttering Board, 4' x 8' x 12mm piece 60 del 49.67 49.67 49.67 50.33 50.00 49.00

183 Valley Board (MHW) 1" x 6" x 8' up piece 60 del 1,168.00 1,141.67 1,172.00 1,183.33 1,160.67 1,179.67

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

184 Reinforced Concrete Pile, 150mm x 150mm (153mm x piece 60 del 112.00 108.67 109.00 109.00 108.67 116.33
147mm x 150mm) 4.5mm wire size, BS 8004 HUME - 3
metre

185 Reinforced Concrete Pile, 200mm x 200mm (204mm x piece 60 del 173.47 167.47 168.47 168.47 168.47 181.47
196mm x 200mm) 4.5mm wire size, BS 8004 HUME-3
metre

186 Concrete Pipes 450mm (18"), Class X pipes, MS 881 piece 60 del 67.57 66.57 66.23 70.90 64.90 68.23
HUME

187 Concrete Pipes 450mm (18"), Class Y pipes, MS 881 piece 60 del 75.87 74.87 74.53 78.87 73.20 76.20
HUME

188 Concrete Pipes 750mm (30"), Class X pipes, MS 881 piece 60 del 124.07 120.73 119.07 133.07 115.73 133.07
HUME

189 Concrete Pipes 750mm (30"), Class Y pipes, MS 881 piece 60 del 134.33 132.00 130.00 144.67 131.33 142.00
HUME

190 Standard Size Box Culvert Without Dry Weather Flow piece 60 del 252.00 252.00 252.00 252.00 252.00 252.00
900mm x 900mm, BS 5400 HUME

191 Standard Size Box Culvert Without Dry Weather Flow piece 60 del 386.00 386.00 386.00 386.00 386.00 386.00
1200mm x 1200mm, BS 5400 HUME

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

192 Prestressed Concrete Beam, M-Beams, M5, BS 5400 piece 60 del 7,706.67 7,706.67 7,290.00 7,290.00 7,286.67 7,706.67
HUME - 10,000mm x 970mm X 960mm (8 tons) - 10
metres

193 Prestressed Concrete Beam, M-Beams, M5, BS 5400 piece 60 del 9,912.00 9,912.00 9,375.33 9,375.33 9,372.00 9,912.00
HUME - 15,000mm x 970mm x 960mm (12 tons) - 15
metres

194 Prestressed Concrete Beam, M-Beams, M5, BS 5400 piece 60 del 12,908.67 12,908.67 12,188.67 12,188.67 12,188.67 12,908.67
HUME - 20,000mm x 970mm x 960mm ( 16 tons) -
20metres

195 Precast Concrete Spun Piles - 450mm diameter x 70mm piece 60 del 683.57 683.57 645.37 645.37 640.53 683.57
thickness x 6m (217kg/m), Class A

196 Precast Concrete Spun Piles - 600mm diameter x 90mm piece 60 del 1,148.09 1,148.09 1,078.10 1,078.10 1,075.87 1,148.09
thickness x 6m (375kg/m), Class A

197 Precast Concrete Spun Piles - 450mm diameter x 80mm MT 60 del 707.05 707.05 663.27 663.27 662.53 707.05
thickness x 6m (242kg/m), Class B

198 Precast Concrete Spun Piles - 600mm diameter x MT 60 del 1,178.53 1,178.53 1,106.67 1,106.67 1,104.33 1,178.53
100mm thickness x 6m (408kg/m), Class B

199 Precast Concrete Spun Piles - 450mm diameter x 80mm MT 60 del 767.69 767.69 726.10 726.10 720.20 767.69
thickness x 6m (242kg/m), Class C

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex July 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

200 Precast Concrete Spun Piles - 600mm diameter x MT 60 del 1,266.25 1,266.25 1,190.67 1,190.67 1,188.10 1,266.25
100mm thickness x 6m (408kg/m), Class C

201 Steel Sheet Piles - U type, ISP-II, 400mm x 100mm x MT 60 del 3,650.00 3,650.00 3,650.00 3,650.00 3,633.33 3,650.00
10.5mm (48.0kg/m)

202 Steel Sheet Piles - U type, ISP-III A (E), 400mm x MT 60 del 3,356.67 3,356.67 3,356.67 3,356.67 3,350.00 3,356.67
150mm x 13.1mm (58.40kg/m)

203 Steel Sheet Piles - U type, ISP-IV, 400mm x 170mm x piece 60 del 3,370.00 3,370.00 3,370.00 3,370.00 3,366.67 3,370.00
15.5mm (76.10kg/m)

204 Steel Sheet Piles - Box type, ISP-II(A), ISP-II(B) 244mm piece 60 del 3,666.67 3,666.67 3,666.67 3,666.67 3,650.00 3,666.67
x 400mm

205 Steel Sheet Piles - Box type, ISP-III(A), ISP-III(B) 297mm MT 60 del 3,373.33 3,373.33 3,373.33 3,373.33 3,366.67 3,373.33
x 400mm

206 Steel Sheet Piles - Box type, ISP-IV(A), ISP-IV(B) MT 60 del 3,373.33 3,373.33 3,373.33 3,373.33 3,366.67 3,373.33
342mm x 400mm

207 Precast Reinforced Concrete Square Pile 150mm x piece 60 del 103.73 103.73 103.73 103.73 99.73 103.73
150mm x 6m

208 Precast Reinforced Concrete Square Pile 200mm x piece 60 del 147.13 147.13 147.13 147.13 146.47 147.13
200mm x 6m

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 2. Average Price of Building Materials for Peninsular Malaysia (DOS)
Period
No. Description Unit
July 2007 (RM)

1 Broken Local Marble 10-20mm thick ton 259.64

2 Fibrous Plaster Ceiling 4' x 6' x 9mm thick sheet 9.94

3 Clear Float Glass 5mm thick, Local/Imported m² 26.07

4 Figured/Obscured Glass 5mm thick, Local/Imported, Inclusive of Cutting m² 19.79

5 Tinted Float Glass 5mm thick, Local/Imported, Inclusive of Cutting m² 35.05

6 Tinted Float Glass 6mm thick, Local/Imported, Inclusive of Cutting m² 40.05

7 Tinted Reflective Glass 6mm thick, Local/Imported, Inclusive of Cutting m² 69.70

8 Aluminium Extrusions Natural, Anodised Finish Solid Section kg 14.77

9 Aluminium Extrusions Natural Anodised Finish, Semi Hollow, Hollow Section kg 14.85

10 Plywood MMH Plank 1" x 6" ton 1,133.00

Source of Data : This average price is compiled from data supplied by Department of Statistics, Malaysia (DOS)
m2 = Square Metre
Table 3. Average Price of Building Materials for Peninsular Malaysia (MTIB)
July 2007 (RM)
No. Description
Unit (m³) Unit (MT)

1 GMS Heavy Hardwood, Chengal 4,350.00 6,160.00

2 GMS Heavy Hardwood, Balau 2,485.00 3,519.00

3 GMS Heavy Hardwood, Red Balau 1,505.00 2,131.00

4 GMS Heavy Hardwood, Merbau 2,500.00 3,540.00

5 GMS Heavy Hardwood, Mixed Heavy Hardwood 1,010.00 1,430.00

6 Scantlings Heavy Hardwood, Chengal 4,400.00 6,230.00

7 Scantlings Heavy Hardwood, Balau 2,800.00 3,965.00

8 Scantlings Heavy Hardwood, Red Balau 1,270.00 1,798.00

9 Scantlings Heavy Hardwood, Merbau 2,400.00 3,398.00

10 Scantlings Heavy Hardwood, Mixed Heavy Hardwood 960.00 1,359.00

11 GMS Medium Hardwood, Keruing 1,300.00 1,841.00

12 GMS Medium Hardwood, Kempas 1,300.00 1,841.00

13 GMS Medium Hardwood, Kapur 1,145.00 1,621.00

14 GMS Medium Hardwood, Mengkulang 1,150.00 1,628.00

15 GMS Medium Hardwood, Tualang 780.00 1,104.00

16 GMS Medium Hardwood, Mixed Medium Hardwood 800.00 1,133.00

17 Scantlings Medium Hardwood, Keruing 1,290.00 1,827.00

18 Scantlings Medium Hardwood, Kempas 1,180.00 1,671.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 3. Average Price of Building Materials for Peninsular Malaysia (Continue…)
July 2007 (RM)
No. Description
Unit (m³) Unit (MT)

19 Scantlings Medium Hardwood, Kapur 1,270.00 1,798.00

20 Scantlings Medium Hardwood, Mengkulang 1,250.00 1,770.00

21 Scantlings Medium Hardwood, Tualang 900.00 1,274.00

22 Scantlings Medium Hardwood, Mixed Medium Hardwood 930.00 1,317.00

23 GMS Light Hardwood, Dark Red Meranti 1,670.00 2,365.00

24 GMS Light Hardwood, Light Red Meranti 1,330.00 1,883.00

25 GMS Light Hardwood, Red Meranti 1,600.00 2,266.00

26 GMS Light Hardwood, Yellow Meranti 920.00 1,303.00

27 GMS Light Hardwood, White Meranti 980.00 1,388.00

28 GMS Light Hardwood, Mersawa 1,150.00 1,628.00

29 GMS Light Hardwood, Nyatoh 1,370.00 1,940.00

30 GMS Light Hardwood, Sepetir 950.00 1,345.00

31 GMS Light Hardwood, Jelutong 1,265.00 1,791.00

32 GMS Light Hardwood, Ramin 3,200.00 4,531.00

33 GMS Light Hardwood, Mixed Light Hardwood 800.00 1,133.00

34 Scantlings Light Hardwood, Dark Red Meranti 1,800.00 2,549.00

35 Scantlings Light Hardwood, Light Red Meranti 1,440.00 2,039.00

36 Scantlings Light Hardwood, Red Meranti 1,390.00 1,968.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 3. Average Price of Building Materials for Peninsular Malaysia (Continue…)
July 2007 (RM)
No. Description
Unit (m³) Unit (MT)

37 Scantlings Light Hardwood, Yellow Meranti 1,290.00 1,827.00

38 Scantlings Light Hardwood, White Meranti 1,050.00 1,487.00

39 Scantlings Light Hardwood, Mersawa 1,380.00 1,954.00

40 Scantlings Light Hardwood, Nyatoh 1,450.00 2,053.00

41 Scantlings Light Hardwood, Sepetir 870.00 1,232.00

42 Scantlings Light Hardwood, Jelutong 1,100.00 1,558.00

43 Scantlings Light Hardwood, Ramin 3,250.00 4,602.00

44 Scantlings Light Hardwood, Mixed Light Hardwood 850.00 1,204.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

1 Ordinary Portland Cement (bulk) MT 60 del 217.00 219.00 224.00 230.00 217.00 230.00

2 Granite Aggregate 3/4" MT 60 ex 18.00 16.67 20.00 22.00 20.00 21.00

3 Normal River Sand MT 30 ex 12.17 15.33 16.50 8.00 7.33 6.67

4 Fine River Sand for Plastering MT 30 ex 15.67 23.33 23.33 18.00 10.67 9.00

5 Normal Mining Sand MT 30 ex 12.00 15.67 16.50 13.00 7.33 13.00

6 Fine Mining Sand for Plastering MT 30 ex 14.00 23.33 23.33 18.00 9.33 17.00

7 Mild Steel Round Bars - 10mm, MS146 MT 14 del 2,146.33 2,146.33 2,146.33 2,146.33 2,146.33 2,146.33

8 Mild Steel Round Bars - 12mm, MS146 MT 14 del 2,118.67 2,118.67 2,118.67 2,118.67 2,118.67 2,118.67

9 Mild Steel Round Bars - 16mm, MS146 MT 14 del 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33

10 Mild Steel Round Bars - 20mm, MS146 MT 14 del 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33

11 Mild Steel Round Bars - 22mm, MS146 MT 14 del 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33

12 Mild Steel Round Bars - 25mm, MS146 MT 14 del 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33

13 Mild Steel Round Bars - 32mm, MS146 MT 14 del 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33 2,021.33

14 High Tensile Deformed Bars - 10mm, MS146 MT 14 del 2,193.33 2,193.33 2,193.33 2,193.33 2,193.33 2,193.33

15 High Tensile Deformed Bars - 12mm, MS146 MT 14 del 2,162.33 2,146.33 2,146.33 2,146.33 2,146.33 2,146.33

16 High Tensile Deformed Bars - 16mm, MS146 MT 14 del 2,051.00 2,051.00 2,051.00 2,051.00 2,051.00 2,051.00

17 High Tensile Deformed Bars - 20mm, MS146 MT 14 del 2,051.00 2,051.00 2,051.00 2,051.00 2,051.00 2,051.00

18 High Tensile Deformed Bars - 25mm, MS146 MT 14 del 2,051.00 2,051.00 2,051.00 2,051.00 2,051.00 2,051.00

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

19 High Tensile Deformed Bars - 32mm, MS146 MT 14 del 2,051.00 2,051.00 2,051.00 2,051.00 2,051.00 2,051.00

20 BRC Fabric - A6, MS145 m² 30 del 5.32 5.32 5.32 5.32 5.32 5.32

21 BRC Fabric - A7, MS145 m² 30 del 7.32 7.32 7.32 7.32 7.32 7.32

22 BRC Fabric - A8, MS145 m² 30 del 9.35 9.35 9.35 9.35 9.35 9.35

23 BRC Fabric - A9, MS145 m² 30 del 12.22 12.22 12.22 12.22 12.22 12.22

24 BRC Fabric - A10, MS145 m² 30 del 15.48 15.48 15.48 15.48 15.48 15.48

25 Ready Mix Concrete - Normal Mix - Grade 10 m³ 30 del 141.00 132.67 137.33 129.00 112.67 131.00

26 Ready Mix Concrete - Normal Mix - Grade 15 m³ 30 del 147.00 137.67 142.67 136.00 117.67 135.33

27 Ready Mix Concrete - Normal Mix - Grade 20 m³ 30 del 151.67 142.33 147.67 142.67 122.67 140.67

28 Ready Mix Concrete - Normal Mix - Grade 25 m³ 30 del 158.00 149.67 153.33 149.67 129.67 147.67

29 Ready Mix Concrete - Normal Mix - Grade 30 m³ 30 del 166.67 157.33 160.00 157.00 137.67 156.33

30 Ready Mix Concrete - Normal Mix - Grade 35 m³ 30 del 175.67 166.67 166.67 172.67 146.67 164.67

31 Ready Mix Concrete - Normal Mix - Grade 40 m³ 30 del 185.33 176.33 177.00 179.67 157.00 174.67

32 Clay Brick - Pallet piece 30 del 0.26 0.25 0.25 0.28 0.26 0.26

33 Smooth Face Facing Brick, Red piece 30 del 0.69 0.66 0.69 0.72 0.73 0.73

34 Cement Sand Brick - Pallet piece 60 del 0.16 0.16 0.17 0.17 0.17 0.16

35 Precast Concrete Hollow Block 90mm x 190mm x piece 60 del 1.68 1.57 1.68 1.68 1.62 1.68
390mm M.S 27 1996

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

36 Plain Gypsum Partition Board, 1.2m x 2.4m x 12mm sheet 30 del 25.67 25.67 25.67 25.67 25.67 25.67
thick, Boral/Armstrong

37 Laminated Gypsum Partition Board, 1.2m x 2.4m x sheet 30 del 39.83 38.67 39.83 39.83 39.07 39.53
12mm thick, Boral/Armstrong

38 Corrugated Roofing Sheet - 76mm Double Width, sheet 60 del 22.33 22.33 22.33 22.33 22.33 22.33
1065mm x 2440mm x 4mm (Hume/ Malex/ UAC)

39 Interlocking Concrete Tiles - Standard Duotone Colour piece 60 del 1.51 1.47 1.50 1.53 1.48 1.48
(Monier Elabana)

40 MS Decking - Lysaght Clean Colorbond - Kliplok Hi- m² 60 del 54.90 54.90 56.40 56.62 55.73 55.40
Ten 0.53mm TCT

41 MS Decking - Lysaght Clean Colorbond - Spandek Hi- m² 60 del 49.44 49.44 51.28 51.79 50.94 50.28
Ten 0.47mm TCT

42 MS Decking - Lysaght Clean Colorbond - Trimdek Hi- m² 60 del 45.05 45.38 48.38 47.85 48.05 45.38
Ten 0.47mm TCT

43 MS Decking - Ajiya AP Rib Hi-Tensile G28, 0.40mm m² 60 del 37.90 37.57 37.90 37.90 37.90 37.90
TCT, Clean Colorbond (Commercial)

44 MS Decking - Ajiya AP Rib Hi-Tensile G26, 0.47mm m² 60 del 42.90 42.57 42.90 42.90 42.90 42.90
TCT, Clean Colorbond (Commercial)

45 MS Decking - Ajiya AP Rib Hi-Tensile G24, 0.53mm m² 60 del 49.23 48.90 49.23 49.23 49.23 49.23
TCT, Clean Colorbond (Commercial)

46 MS Decking - Ajiya Euro Step Roofing M350 G28, m² 60 del 39.73 39.40 39.73 39.73 39.73 39.73
0.40mm TCT, Clean Colorbond

47 MS Decking - Ajiya Euro Step Roofing M350 G26, m² 60 del 44.97 44.63 44.97 44.97 44.97 44.97
0.47mm TCT, Clean Colorbond

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

48 MS Decking - Ajiya Euro Step Roofing M350 G24, m² 60 del 49.20 48.87 49.20 49.20 49.20 49.20
0.53mm TCT, Clean Colorbond

49 Glazed Ceramic Floor Tiles, Standard Light Colour piece 60 del 0.74 0.73 0.74 0.74 0.74 0.74
200mm x 200mm x 8mm - Grade 1

50 Glazed Ceramic Floor Tiles, Standard Light Colour piece 60 del 1.52 1.51 1.52 1.52 1.55 1.52
300mm x 300mm x 8mm - Grade 1

51 Plain Homogenous Floor Tiles, Standard Light Colour piece 60 del 1.05 1.05 1.09 1.09 1.09 1.09
200mm x 200mm x 8mm - Grade 1

52 Plain Homogenous Floor Tiles, Standard Light Colour piece 60 del 2.03 2.03 2.03 2.05 2.07 2.07
300mm x 300mm x 8mm - Grade 1

53 Polished Granite Slab - Local Grey 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

54 Polished Granite Slab - Melaka Rose 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

55 Polished Granite Slab - Tampin Blue 1' x 1' x 20mm piece 60 del 18.00 18.00 17.67 18.00 18.00 18.00

56 Polished Granite Slab - Terengganu Green 1' x 1' x piece 60 del 25.00 25.00 24.00 25.00 25.00 25.00
20mm

57 Local Polished Marble Slab W1/P1, 300mm x 300mm piece 60 del 3.50 3.50 3.30 3.50 3.50 3.50
x 10mm

58 Vitrified Porcelain Tiles - Niro Granite, Pietra Evo 1, piece 60 del 3.13 3.13 3.03 3.13 3.13 3.13
Beigo - P11, 300mm x 300mm x 20mm

59 Vitrified Porcelain Tiles - Niro Granite, Pietra Evo 1, piece 60 del 3.13 3.13 3.07 3.13 3.13 3.13
Noce - P12, 300mm x 300mm x 20mm

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

60 Vitrified Porcelain Tiles - Niro Granite, Nordik Stone, piece 60 del 12.71 12.38 12.38 12.71 12.71 12.71
Bora N02, 450mm x 450mm x 20mm

61 Vitrified Porcelain Tiles - Niro Granite, Nordik Stone, piece 60 del 12.71 12.38 12.38 12.71 12.71 12.71
Kosawa N04, 450mm x 450mm x 20mm

62 Glazed Ceramic Wall Tiles, Standard Light Colour, piece 60 del 0.69 0.71 0.76 0.72 0.74 0.74
200mm x 200mm x 6mm - Grade 1

63 Glazed Ceramic Wall Tiles, Standard Light Colour, piece 60 del 0.83 0.83 0.83 0.83 0.83 0.83
200mm x 250mm x 6mm - Grade 1

64 Plain Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 3.65 3.65 3.65 3.65 3.65 3.65
1220mm x 3.2mm (UAC/ Hume/ Malex)

65 Plain Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 6.33 6.33 6.33 6.33 6.33 6.33
1220mm x 4.5mm (UAC/ Hume/ Malex)

66 Plain Cellulose Fibre Ceiling Sheet, 1220mm x sheet 60 del 7.30 7.28 7.30 7.30 7.30 7.30
1220mm x 3.2mm (UAC/ Hume/ Malex)

67 Plain Cellulose Fibre Ceiling Sheet, 1220mm x sheet 60 del 12.67 12.67 12.67 12.67 12.67 12.67
1220mm x 4.5mm (UAC/ Hume/ Malex)

68 Decorative Cellulose Fibre Ceiling Sheet, 610mm x sheet 60 del 5.00 5.00 5.00 5.00 5.00 5.00
1220mm x 3.2mm (UAC/ Hume/ Malex)

69 Decorative Cellulose Fibre Ceiling Sheet, 1220mm x sheet 60 del 9.83 9.87 9.83 9.83 9.83 9.83
1220mm x 3.2mm (UAC/ Hume/ Malex)

70 Plain Gypsum Ceiling Board, 610mm x 1220mm x sheet 60 del 4.53 4.53 4.53 4.53 4.53 4.53
9.5mm (Boral/Armstrong)

71 Galvanised Iron Pipes - 15mm Diameter (Maruichi), 6m run 60 del 27.17 27.17 27.17 27.03 27.03 27.03
MS863 - Class A

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

72 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 40.53 40.53 40.53 39.20 39.20 39.20
MS863 - Class A

73 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 55.83 55.83 55.83 55.37 55.37 55.37
MS863 - Class A

74 Galvanised Iron pipes - 15mm Diameter (Maruichi), 6m run 60 del 33.73 33.73 33.73 33.57 33.57 33.57
MS863 - Class B

75 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 43.67 43.67 43.67 43.43 43.43 43.43
MS863 - Class B

76 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 63.50 63.50 63.50 63.47 63.47 63.47
MS863 - Class B

77 Galvanised Iron pipes - 15mm Diameter (Maruichi), 6m run 60 del 40.07 40.07 40.07 39.80 39.80 39.80
MS863 - Class C

78 Galvanised Iron pipes - 20mm Diameter (Maruichi), 6m run 60 del 51.60 51.60 51.60 51.33 51.33 51.33
MS863 - Class C

79 Galvanised Iron pipes - 25mm Diameter (Maruichi), 6m run 60 del 79.77 79.77 79.77 79.60 79.60 79.60
MS863 - Class C

80 PVC Pressure pipes Class D, grey colour 50mm 4m run 60 del 21.42 21.42 21.42 21.42 21.42 21.42
Diameter (Paling), MS 628

81 PVC Pressure pipes Class D, grey colour 50mm 6m run 60 del 32.67 32.67 32.67 32.67 32.67 32.67
Diameter (Dulon), MS 628

82 PVC Pressure pipes Class D grey colour 65mm 6m run 60 del 45.37 45.37 45.37 45.37 45.37 45.37
Diameter (Paling), MS 628

83 PVC Pressure pipes Class D, grey colour 80mm 6m run 60 del 64.90 63.13 64.90 64.90 64.90 64.90
Diameter (Paling), MS 628

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

84 PVC pipes Class O, grey colour 32mm Diameter 4m run 60 del 7.10 7.10 7.10 7.10 7.10 7.10
(Paling), MS 762

85 PVC pipes Class O, grey colour 50mm Diameter 4m run 60 del 10.17 10.17 10.17 10.17 10.17 10.17
(Paling), MS 762

86 PVC Pressure pipes Class E,grey colour 25mm 6m run 60 del 9.80 9.80 9.80 9.80 9.80 9.80
Diameter (Dulon), MS 628

87 PVC Pressure pipes Class E,grey colour 50mm 6m run 60 del 29.27 29.27 29.27 29.27 29.27 29.27
Diameter (Dulon), MS 628

88 PVC Pressure pipes Class E,grey colour 25mm 4m run 60 del 8.78 8.64 8.78 8.78 8.78 8.78
Diameter (Paling), MS 628

89 PVC Pressure pipes Class E,grey colour 50mm 4m run 60 del 25.93 26.80 26.13 26.13 26.13 26.13
Diameter (Paling), MS 628

90 PVC Pressure pipes Class E, grey colour 65mm 6m run 60 del 56.30 56.30 56.30 56.30 56.30 56.30
Diameter (Paling), MS 628

91 PVC Pressure pipes Class E, grey colour 80mm 6m run 60 del 78.93 78.93 78.93 78.93 78.93 78.93
Diameter (Paling), MS 628

92 PVC Pressure pipes Class 6 grey colour 20mm 4m run 60 del 8.55 8.35 8.35 8.35 8.35 8.55
Diameter (Paling), MS 628

93 PVC Pressure pipes Class 6 grey colour 25mm 4m run 60 del 12.25 12.25 12.25 12.25 12.25 12.25
Diameter (Paling), MS 628

94 PVC Pressure pipes Class 7,grey colour 20mm 4m run 60 del 10.80 10.80 10.73 10.73 10.73 10.73
Diameter (Paling), MS 628

95 PVC Pressure pipes Class 7,grey colour 25mm 4m run 60 del 15.58 15.58 15.20 15.20 15.20 15.58
Diameter (Paling), MS 628

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

96 PVC Pressure pipes Class 7, grey colour 32mm 4m run 60 del 21.13 21.13 21.13 21.13 21.13 21.13
Diameter (Paling), MS 628

97 PVC Pressure pipes Class 7, grey colour 50mm 4m run 60 del 35.08 35.08 35.08 35.08 35.08 31.75
Diameter (Paling), MS 628

98 HDPE Pipe PN 10 - 50mm Diameter, MS1058 100m roll 60 del 402.67 402.67 402.67 402.67 402.67 402.67

99 HDPE Pipe PN 12.5 - 25mm Diameter, MS1058 100m roll 60 del 130.10 130.10 130.10 130.10 130.10 130.10

100 HDPE Pipe PN 12.5 - 40mm Diameter, MS1058 100m roll 60 del 329.33 329.33 329.33 329.33 329.33 329.33

101 HDPE Pipe PN 12.5 - 50mm Diameter, MS1058 100m roll 60 del 504.00 504.00 504.00 504.00 504.00 504.00

102 HDPE Pipe PN16 - 20mm Diameter, MS1058 100m roll 60 del 101.67 101.67 101.67 101.67 101.67 101.67

103 HDPE Pipe PN16 - 25mm Diameter, MS1058 100m roll 60 del 151.33 151.33 151.33 151.33 151.33 151.33

104 HDPE Pipe PN16- 50 mm Diameter, MS1058 100m roll 60 del 608.13 608.13 608.13 608.13 608.13 608.13

105 ABS Pipe PN15 Class E - 15mm, MS1419 Kindratech 6m run 60 del 8.98 8.98 8.98 8.98 8.98 8.98

106 ABS Pipe PN15 Class E - 20mm, MS1419 Kindratech 6m run 60 de 14.17 14.17 14.17 14.17 14.17 14.17

107 ABS Pipe PN9 Class C - 25mm, MS1419 Kindratech 6m run 60 del 14.97 14.97 14.97 14.97 14.97 14.97

108 ABS Pipe PN12 Class D - 25mm MS1419 Kindratech 6m run 60 del 17.97 17.97 17.97 17.97 17.97 17.97

109 ABS Pipe PN15 Class E - 25mm MS1419 Kindratech 6m run 60 del 22.50 22.50 22.50 22.50 22.50 22.50

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

110 Fibre Reinforced Plastic Sectional Tank - 1000 Litres / 6 panels 60 del 1,627.67 1,627.67 1,607.67 1,607.67 1,607.67 1,627.67
220 Gallons, AL Tank, 6 panels

111 Fibre Reinforced Plastic Sectional Tank - 1000 Litres / 6 panels 60 del 1,700.00 1,700.00 1,763.33 1,770.00 1,746.67 1,700.00
220 Gallons, RP Tank, 6 panels

112 Fibre Reinforced Plastic Sectional Tank - 1000 Litres / 6 panels 60 del 1,553.33 1,553.33 1,516.67 1,483.33 1,483.33 1,553.33
220 Gallons, MuiTank, 6 panels

113 Fibre Reinforced Plastic Sectional Tank - 1000 Litres / 6 panels 60 del 1,703.33 1,703.33 1,666.67 1,633.33 1,633.33 1,633.33
220 Gallons, G-FRP, 6 panels

114 Polytank - Circular , 100 Gallons, MS1225 - Weida No. 60 del 96.53 95.43 96.53 96.53 96.53 96.53
Equivelant

115 Polytank - Circular, 200 Gallons, MS1225 - Weida No. 60 del 172.60 170.40 172.60 172.60 172.60 172.60
Equivelant

116 Polytank - Square, 100 Gallons, MS1225 - Weida No. 60 del 97.17 97.17 97.17 97.17 97.17 97.17
Equivelant

117 Polytank - Square, 200 Gallons, MS1225 - Weida No. 60 del 204.20 201.27 207.60 207.60 207.60 207.60
Equivelant

118 Wash Hand Basins - 560mm x 406mm, white colour - Set 60 del 53.73 53.73 53.73 53.73 53.73 53.73
Dotex WB702, Globe

119 Wash Hand Basins - 560mm x 406mm, white colour - Set 60 del 58.50 58.50 59.50 59.50 59.50 58.50
Jacqueline WB 142, Claytan

120 Water Closet Eastern - Bengal ACBL-000, white Item 60 del 44.33 44.33 45.33 45.33 45.33 44.33
colour , without cistern, Johnson-Suisse

121 Water Closet Eastern - Orissa III, standard colour, Item 60 del 464.00 464.00 464.00 464.00 464.00 464.00
without cistern, GBH

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

122 Water Closet Western - WC 644, white colour, without Item 60 del 122.57 121.10 122.57 123.90 123.23 122.57
cistern, Claytan

123 Water Closet Western - Windsor with push button 6L Set 60 del 448.67 452.00 452.00 452.00 452.00 452.00
cistern, standard colout, Johnson-Suisse

124 Water Closet Western - Vanessa with 6L/3L dual low Set 60 del 966.67 966.67 966.67 966.67 966.67 966.67
level cistern, standard colour, GBH

125 Water Closet Western - WC 602 Sina without cistern, Item 60 del 89.20 87.73 90.20 90.20 86.53 89.20
white colour, Claytan

126 Urinal Bowl, Santana 320 c/w hanger, flange, ceramic Set 60 del 365.00 368.33 368.33 368.33 368.33 368.33
waste & cleansing set, Johnson Suisse, white

127 Urinal Bowl, Richmond c/w hanger, plastic insert, Item 60 del 125.00 125.00 125.00 125.00 125.00 125.00
Johnson Suisse, white

128 Stainless Steel Sinks - Single Bowl Single Drainer - Item 60 del 71.67 71.67 71.67 71.67 71.67 71.67
Lay on type, 42" x 18"

129 Paint - ICI Dulux Standard Colour - External Acrylic 5 litres 60 del 112.00 112.00 112.00 112.00 112.00 112.00
Emulsion, Weathershield

130 Paint - ICI Dulux Standard Colour - Internal Emulsion 5 litres 60 del 97.00 97.00 97.00 97.00 97.00 97.00
Luxury, waterbase, Pearl Glo

131 Paint - ICI Dulux Standard Colour - Internal Emulsion, 5 litres 60 del 84.00 84.00 84.00 84.00 84.00 84.00
waterbase, Pentalite

132 Paint - ICI Dulux Standard Colour - Gloss Oilbased, 5 litres 60 del 110.00 110.00 110.00 110.00 110.00 110.00
Gloss Finish

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

133 Paint - ICI Dulux Standard Colour - Timber/ Wood, 5 litres 60 del 85.00 85.00 85.00 85.00 85.00 85.00
Timbertone, Clear Glossy

134 Paint - ICI Dulux Standard Colour - Undercoat, Speed 5 litres 60 del 87.00 87.00 87.00 87.00 87.00 87.00

135 Paint - Nippon Standard Colour - External Acrylic 5 litres 60 del 84.00 84.00 84.00 84.00 84.00 84.00
Emulsion, Weatherbond

136 Paint - Nippon Standard Colour - Internal Emulsion 5 litres 60 del 79.33 79.33 79.33 79.33 79.33 79.33
Luxury, waterbase, Satin Glo

137 Paint - Nippon Standard Colour - Internal Emulsion, 7 litres 60 del 27.67 27.67 27.67 27.67 27.67 27.67
waterbase, Supermatex

138 Paint - Nippon Standard Colour - Gloss Oilbased, 5 litres 60 del 85.00 85.00 85.00 85.00 85.00 85.00
9000 Gloss Finish

139 Paint - Nippon Standard Colour - Timber/ Wood, 5 litres 60 del 72.40 72.40 72.40 72.40 72.40 72.40
Timber Finish

140 Paint - Nippon Standard Colour - Undercoat, 9000 5 litres 60 del 55.33 55.33 55.33 55.33 55.33 55.33
Undercoat

141 Paint - Par Standard Colour - External Acrylic 5 litres 60 del 90.00 90.00 90.00 90.00 90.00 90.00
Emulsion, Weathercoat

142 Paint - Par Standard Colour - Internal Emulsion 5 litres 60 del 82.00 82.00 82.00 82.00 82.00 82.00
Luxury, waterbase, Silk

143 Paint - Par Standard Colour - Internal Emulsion, 5 litres 60 del 70.00 70.00 70.00 70.00 70.00 70.00
waterbase, Supermatt

144 Paint - Par Standard Colour - Gloss Oilbased, Super 5 litres 60 del 85.00 85.00 85.00 85.00 85.00 85.00
Gloss

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

145 Paint - Par Standard Colour - Timber/ Wood, 5 litres 60 del 80.00 80.00 80.00 80.00 80.00 80.00
Timbercote

146 Paint - Par Standar Colour - Undercoat, Undercoat 5 litres 60 del 60.00 60.00 60.00 60.00 60.00 60.00

147 Paint - Sissons Standard Colour - External Acrylic 5 litres 60 del 81.67 81.67 81.67 81.67 81.67 81.67
Emulsion, All Weather

148 Paint - Sissons Standard Colour - Internal Emulsion 5 litres 60 del 71.00 71.00 71.00 71.00 71.00 71.00
Luxury, waterbase, Silk Glo

149 Paint - Sissons Standard Colour - Internal Emulsion, No. 60 del 66.67 66.67 66.67 66.67 66.67 66.67
waterbase, Siscolux

150 Paint - Sissons Standard Colour - Gloss Oilbased, No. 60 del 81.67 81.67 81.67 81.67 81.67 81.67
Tungolac

151 Paint - Sissons Standard Colour - Timber/ Wood, No. 60 del 79.00 79.00 79.00 79.00 79.00 79.00
Siscoseal

152 Paint - Sissons Standard Colour - Undercoat, No. 60 del 41.00 41.00 41.00 27.67 41.00 41.00
Universal

153 Steel Louvres Windows Without Iron Bars - Single Set 60 del 8.07 7.97 7.80 7.90 7.83 8.07
Control, 8 Blades

154 Mild Steel Hollow Sections - 2" x 3" x 3.0mm Handrail 6m 60 del 106.93 106.93 106.93 106.93 106.93 106.93
length

155 Mild Steel Hollow Sections - 1/2" x 1/2" x 1mm Square 6m 60 del 6.37 6.37 6.37 6.37 6.37 6.37
Baluster length

156 Square Hollow Sections - 12mm x 12mm x 1.0mm MT 60 del 3,575.00 3,575.00 3,361.67 3,361.67 3,361.67 3,575.00
(0.357kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

157 Square Hollow Sections - 50mm x 50mm x 3.0mm MT 60 del 3,244.67 3,244.67 3,094.33 3,059.33 3,059.33 3,244.67
(4.38kg/m)

158 Square Hollow Sections - 150mm x 150mm x 4.5mm MT 60 del 3,384.00 3,384.00 3,214.00 3,186.00 3,186.00 3,384.00
(20.5kg/m)

159 Rectangular Hollow Sections - 75mm x 50mm x MT 60 del 3,278.00 3,234.67 3,070.67 3,049.33 3,049.33 3,234.67
3.2mm (5.8 kg/m)

160 Rectangular Hollow Sections - 150mm x 100mm x MT 60 del 3,327.00 3,327.00 3,141.67 3,134.67 3,134.67 3,327.00
4.5mm (16.9 kg/m)

161 Rectangular Hollow Sections - 200mm x 100mm x MT 60 del 3,327.00 3,327.00 3,141.67 3,134.67 3,134.67 3,327.00
4.5mm (20.5 kg/m)

162 Universal Beams - 102mm x 102mm x 8.76mm MT 60 del 3,705.33 3,705.33 3,493.33 3,458.33 3,458.33 3,665.33
(19.35kg/m)

163 Universal Beams - 356mm x 368mm x 13.33mm MT 60 del 3,677.00 3,677.00 3,465.00 3,430.00 3,430.00 3,637.00
(162.2kg/m)

164 Universal Beams - 400mm x 400mm (197kg/m) MT 60 del 4,091.67 4,091.67 3,878.33 3,861.67 3,861.67 4,091.67

165 Rolled Steel Joists - 152mm x 76mm x 5.84mm MT 60 del 3,903.33 3,903.33 3,696.67 3,686.67 3,686.67 3,903.33
(17.88kg/m)

166 Rolled Steel Joists - 178mm x 102mm x 6.35mm MT 60 del 3,620.67 3,620.67 3,443.33 3,426.67 3,426.67 3,620.67
(23.84kg/m)

167 Rolled Steel Joists - 203mm x 102mm x 5.84mm MT 60 del 3,476.00 3,476.00 3,303.33 3,293.33 3,293.33 3,476.00
(25.33 kg/m)

168 Equal Engles - 38mm x 38mm x 3.8mm (2.17 kg/m) MT 60 del 2,579.33 2,579.33 2,400.33 2,398.33 2,398.33 2,539.33

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

169 Equal Engles - 50mm x 50mm x 4mm (3.06 kg/m) MT 60 del 2,558.67 2,558.67 2,383.67 2,378.33 2,378.33 2,518.67

170 Equal Engles - 65mm x 65mm x 6mm (5.91kg/m) MT 60 del 2,583.67 2,583.67 2,445.00 2,405.33 2,405.33 2,543.67

171 Unequal Angles - 90mm x 80mm x 7mm (9.04 kg/m) MT 60 del 2,725.33 2,725.33 2,546.67 2,546.67 2,546.67 2,692.00

172 Unequal Angles - 125mm x 75mm x 7mm (10.7kg/m) MT 60 del 2,881.00 2,881.00 2,619.00 2,621.00 2,621.00 2,781.00

173 Unequal Angles - 175mm x 90mm x 9mm (18.2kg/m) MT 60 del 2,894.67 2,894.67 2,828.00 2,676.67 2,676.67 2,828.00

174 U Channels - 75mm x 40mm x 5mm (6.92 kg/m) MT 60 del 3,060.33 3,060.33 2,717.33 2,719.00 2,719.00 2,977.00

175 U Channels - 230mm x 80mm x 8mm (28.4 kg/m) MT 60 del 3,500.00 3,500.00 3,500.00 3,316.67 3,316.67 3,500.00

176 U Channels - 380mm x 100mm x 10.5mm (54.5kg/m) piece 60 del 4,021.33 4,021.33 3,921.33 3,710.00 3,710.00 3,921.33

177 Lipped Channels - 100mm x 50mm x 20mm x 3mm piece 60 del 3,571.00 3,571.00 3,365.00 3,361.67 3,361.67 3,564.33
(5.19kg/m)

178 Lipped Channels - 150mm x 65mm x 20mm x 3mm piece 60 del 3,500.00 3,500.00 3,280.33 3,276.67 3,276.67 3,473.33
(7.07 kg/m)

179 Lipped Channels - 200mm x 75mm x 20mm x 3mm piece 60 del 3,494.67 3,494.67 3,293.33 3,286.67 3,286.67 3,481.33
(8.72 kg/m)

180 Solid Wooden Timber Door 3' x 7' (LLC/ Sandor) piece 60 del 196.67 195.00 195.00 191.67 191.67 195.00

181 Solid Wooden Timber Door 4' x 7' (LLC/ Sandor) piece 60 del 401.33 399.67 399.67 403.00 399.67 403.00

182 PVC door 35mm x 750mm x 2100mm (Astino/ Quality piece 60 del 70.83 72.50 72.50 72.50 70.83 72.50
Class)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

183 PVC door 38mm x 840mm x 2100mm (Astino/ Quality MT 60 del 86.00 91.00 91.00 91.00 89.33 91.00
Class)

184 One Hour Firedoor (Sijil Perakuan Bahan, Jabatan piece 60 ex 590.00 583.33 590.00 583.33 576.67 576.67
Bomba) (Sandor/ Techdor)

185 Two Hours Firedoor (Sijil Perakuan Bahan, Jabatan piece 60 ex 1,073.33 1,056.67 1,073.33 1,060.00 1,060.00 1,060.00
Bomba) (Sandor/ Techdor)

186 Plywood - Shuttering Board, 4' x 8' x 12mm piece 60 del 49.67 49.67 49.67 49.67 50.00 49.00

187 Valley Board (MHW) 1" x 6" x 8' up piece 60 del 1,168.00 1,141.67 1,172.00 1,183.33 1,160.67 1,179.67

188 Reinforced Concrete Pile, 150mm x 150mm (153mm x piece 60 del 118.13 114.80 115.13 115.13 114.80 122.47
147mm x 150mm) 4.5mm wire size, BS 8004 HUME

189 Reinforced Concrete Pile, 200mm x 200mm (204mm x piece 60 del 183.00 177.00 178.00 178.00 178.00 191.00
196mm x 200mm) 4.5mm wire size, BS 8004 HUME

190 Concrete Pipes 450mm (18"), Class X pipes, MS 881 piece 60 del 80.40 79.40 79.07 83.73 77.73 81.07
HUME - 1.5 metres

191 Concrete Pipes 450mm (18"), Class Y pipes, MS 881 piece 60 del 89.23 88.23 87.90 92.23 86.57 89.57
HUME - 1.5 metres

192 Concrete Pipes 750mm (30"), Class X pipes, MS 881 piece 60 del 150.07 146.73 145.07 159.07 141.73 159.07
HUME - 1.5 metres

193 Concrete Pipes 750mm (30"), Class Y pipes, MS 881 piece 60 del 162.17 159.83 157.83 172.50 159.17 169.83
HUME - 1.5 metres

194 Standard Size Box Culvert Without Dry Weather Flow piece 60 del 290.07 278.07 276.40 276.40 276.73 277.40
900mm x 900mm, BS 5400 HUME

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

195 Standard Size Box Culvert Without Dry Weather Flow piece 60 del 392.43 392.43 392.43 392.43 392.43 392.43
1200mm x 1200mm, BS 5400 HUME

196 Prestressed Concrete Beam, M-Beams, M5, BS 5400 piece 60 del 8,150.67 8,150.67 7,734.00 7,734.00 7,730.67 8,150.67
HUME - 10,000mm x 970mm X 960mm (8 tons) - 10
metres

197 Prestressed Concrete Beam, M-Beams, M5, BS 5400 piece 60 del 10,484.67 10,484.67 9,948.00 9,948.00 9,944.67 10,484.67
HUME - 15,000mm x 970mm x 960mm (12 tons) - 15
metres

198 Prestressed Concrete Beam, M-Beams, M5, BS 5400 piece 60 del 13,648.47 13,648.47 12,928.47 12,928.47 12,928.47 13,648.47
HUME - 20,000mm x 970mm x 960mm ( 16 tons) - 20
metres

199 Precast Concrete Spun Piles - 450mm diameter x piece 60 del 701.87 701.87 663.67 663.67 658.83 701.87
70mm thickness x 6m (217kg/m), Class A

200 Precast Concrete Spun Piles - 600mm diameter x piece 60 del 1,157.75 1,157.75 1,087.77 1,087.77 1,085.53 1,157.75
90mm thickness x 6m (375kg/m), Class A

201 Precast Concrete Spun Piles - 450mm diameter x MT 60 del 722.12 722.12 678.33 678.33 677.60 722.12
80mm thickness x 6m (242kg/m), Class B

202 Precast Concrete Spun Piles - 600mm diameter x MT 60 del 1,226.87 1,226.87 1,155.00 1,155.00 1,152.67 1,226.87
100mm thickness x 6m (408kg/m), Class B

203 Precast Concrete Spun Piles - 450mm diameter x MT 60 del 764.92 764.92 723.33 723.33 717.43 764.92
80mm thickness x 6m (242kg/m), Class C

204 Precast Concrete Spun Piles - 600mm diameter x MT 60 del 1,272.92 1,272.92 1,197.33 1,197.33 1,194.77 1,272.92
100mm thickness x 6m (408kg/m), Class C

205 Steel Sheet Piles - U type, ISP-II, 400mm x 100mm x MT 60 del 3,783.33 3,783.33 3,783.33 3,783.33 3,766.67 3,783.33
10.5mm (48.0kg/m)

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 1. Average Price of Building Materials for Peninsular Malaysia (BMDAM) (Continue...)
No. Description Unit Credit Del or Ex October 2007 (RM)
Term Pulau Selangor Johor Kelantan Perak Pahang
(Days) Pinang

206 Steel Sheet Piles - U type, ISP-III A (E), 400mm x MT 60 del 3,456.67 3,456.67 3,456.67 3,456.67 3,450.00 3,456.67
150mm x 13.1mm (58.40kg/m)

207 Steel Sheet Piles - U type, ISP-IV, 400mm x 170mm x MT 60 del 3,436.67 3,436.67 3,436.67 3,436.67 3,433.33 3,436.67
15.5mm (76.10kg/m)

208 Steel Sheet Piles - Box type, ISP-II(A), ISP-II(B) MT 60 del 3,783.33 3,783.33 3,783.33 3,783.33 3,766.67 3,783.33
244mm x 400mm

209 Steel Sheet Piles - Box type, ISP-III(A), ISP-III(B) MT 60 del 3,490.00 3,490.00 3,490.00 3,490.00 3,483.33 3,490.00
297mm x 400mm

210 Steel Sheet Piles - Box type, ISP-IV(A), ISP-IV(B) MT 60 del 3,490.00 3,490.00 3,490.00 3,490.00 3,483.33 3,490.00
342mm x 400mm

211 Precast Reinforced Concrete Square Pile 150mm x piece 60 del 109.47 109.47 109.47 109.47 105.47 109.47
150mm x 6m

212 Precast Reinforced Concrete Square Pile 200mm x piece 60 del 155.83 155.83 155.83 155.83 155.17 155.83
200mm x 6m

Source of Data: This average price is compiled from data supplied by BMDAM
MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit
Table 2. Average Price of Building Materials for Peninsular Malaysia (DOS)
Period
No. Description Unit October 2007
(RM)

1 Broken Local Marble 10-20mm thick ton 272.11

2 Fibrous Plaster Ceiling 4' x 6' x 9mm thick sheet 9.04

3 Clear Float Glass 5mm thick, Local/Imported m² 25.96

4 Figured/Obscured Glass 5mm thick, Local/Imported, Inclusive of Cutting m² 19.84

5 Tinted Float Glass 5mm thick, Local/Imported, Inclusive of Cutting m² 33.36

6 Tinted Float Glass 6mm thick, Local/Imported, Inclusive of Cutting m² 39.48

7 Tinted Reflective Glass 6mm thick, Local/Imported, Inclusive of Cutting m² 75.72

8 Aluminium Extrusions Natural, Anodised Finish Solid Section kg 15.00

9 Aluminium Extrusions Natural Anodised Finish, Semi Hollow, Hollow Section kg 15.07

10 Plywood MMH Plank 1" x 6" ton 1,133.00

Source of Data : This average price is compiled from data supplied by Department of Statistics, Malaysia (DOS)
m2 = Square Metre
Table 3. Average Price of Building Materials for Peninsular Malaysia (MTIB)
October 2007 (RM)
No. Description
Unit (m³) Unit (MT)

1 GMS Heavy Hardwood, Chengal 4,350.00 6,160.00

2 GMS Heavy Hardwood, Balau 2,490.00 3,526.00

3 GMS Heavy Hardwood, Red Balau 1,505.00 2,131.00

4 GMS Heavy Hardwood, Merbau 2,500.00 3,540.00

5 GMS Heavy Hardwood, Mixed Heavy Hardwood 1,010.00 1,430.00

6 Scantlings Heavy Hardwood, Chengal 4,400.00 6,230.00

7 Scantlings Heavy Hardwood, Balau 2,800.00 3,965.00

8 Scantlings Heavy Hardwood, Red Balau 1,270.00 1,798.00

9 Scantlings Heavy Hardwood, Merbau 2,400.00 3,398.00

10 Scantlings Heavy Hardwood, Mixed Heavy Hardwood 960.00 1,359.00

11 GMS Medium Hardwood, Keruing 1,310.00 1,855.00

12 GMS Medium Hardwood, Kempas 1,310.00 1,855.00

13 GMS Medium Hardwood, Kapur 1,145.00 1,621.00

14 GMS Medium Hardwood, Mengkulang 1,150.00 1,628.00

15 GMS Medium Hardwood, Tualang 780.00 1,104.00

16 GMS Medium Hardwood, Mixed Medium Hardwood 810.00 1,147.00

17 Scantlings Medium Hardwood, Keruing 1,290.00 1,827.00

18 Scantlings Medium Hardwood, Kempas 1,180.00 1,671.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 3. Average Price of Building Materials for Peninsular Malaysia (Continue…)
October 2007 (RM)
No. Description
Unit (m³) Unit (MT)

19 Scantlings Medium Hardwood, Kapur 1,270.00 1,798.00

20 Scantlings Medium Hardwood, Mengkulang 1,250.00 1,770.00

21 Scantlings Medium Hardwood, Tualang 900.00 1,274.00

22 Scantlings Medium Hardwood, Mixed Medium Hardwood 930.00 1,317.00

23 GMS Light Hardwood, Dark Red Meranti 1,690.00 2,393.00

24 GMS Light Hardwood, Light Red Meranti 1,330.00 1,883.00

25 GMS Light Hardwood, Red Meranti 1,600.00 2,266.00

26 GMS Light Hardwood, Yellow Meranti 920.00 1,303.00

27 GMS Light Hardwood, White Meranti 980.00 1,388.00

28 GMS Light Hardwood, Mersawa 1,150.00 1,628.00

29 GMS Light Hardwood, Nyatoh 1,370.00 1,940.00

30 GMS Light Hardwood, Sepetir 950.00 1,345.00

31 GMS Light Hardwood, Jelutong 1,270.00 1,798.00

32 GMS Light Hardwood, Ramin 3,200.00 4,531.00

33 GMS Light Hardwood, Mixed Light Hardwood 800.00 1,133.00

34 Scantlings Light Hardwood, Dark Red Meranti 1,800.00 2,549.00

35 Scantlings Light Hardwood, Light Red Meranti 1,440.00 2,039.00

36 Scantlings Light Hardwood, Red Meranti 1,390.00 1,968.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne
Table 3. Average Price of Building Materials for Peninsular Malaysia (Continue…)
October 2007 (RM)
No. Description
Unit (m³) Unit (MT)

37 Scantlings Light Hardwood, Yellow Meranti 1,290.00 1,827.00

38 Scantlings Light Hardwood, White Meranti 1,050.00 1,487.00

39 Scantlings Light Hardwood, Mersawa 1,380.00 1,954.00

40 Scantlings Light Hardwood, Nyatoh 1,450.00 2,053.00

41 Scantlings Light Hardwood, Sepetir 870.00 1,232.00

42 Scantlings Light Hardwood, Jelutong 1,100.00 1,558.00

43 Scantlings Light Hardwood, Ramin 3,250.00 4,602.00

44 Scantlings Light Hardwood, Mixed Light Hardwood 850.00 1,204.00

Source of Data : This average price is compiled from data supplied by Malaysian Timber Industry Board (MTIB)
m3 = Cubic Metre, MT = Metric Ton or Tonne

Você também pode gostar