Arkel Engineering / Operations Branch

Camp Leatherneck, Afghanistan

Daily Sit-Rep Date: 16-Sep-10


Project Controls
First Last Job #1 Hours Job #2 Hours Job #3 Hours
Laureto Abarquez
Marlon Javate
Rodrigo Sabado SH 10
Henry Hermosura On R&R
Mohamed Safeer SH 10
Punch Out Team
First Last Job #1 Hours Job #2 Hours Job #3 Hours
Christopher Maghanoy on R&R
Victor Hipol 6217 10
Edison Quiming 6217 10
Fabrication Team
First Last Job #1 Hours Job #2 Hours Job #3 Hours
Hendricks Rodriguez
Florencio Oclarit WH 10
Tony Jones Jude on R&R
Christopher Fuentes SH 10
Bonifacio Basa SH 10
Marcos Bitan Lakeshore 10
Endranal Apollo WH 10
Siyaram Sah Kalwar WH 10
Ravi Charan Sharmabadhai SH 10
Ashok Mahato SH 10
Starts Of Day % Complete
Job # walls / Sidings Trusses Roof Posts Vinyl Flashings Punchout Clips

6217 65%

End Of Day % Complete


Job # walls / Sidings Trusses Roof Posts Vinyl Flashings Punchout Clips

6217 100%

Legend:
SH - Shop - FM Operations, (Assemble Panels and Machine Maintenance as noted)
WH - Warehouse (Flashings, Brackets, Clips, Straps and Claddings)
STANDING SEAM MACHINE LOGS
Camp Leatherneck, Afghanistan

RAL Starting Meter's Ending Meter's Total Meter's


Job ID Number
OO92 1015 Width Usage Usage Ran

6217 610 308.04 520.4 212.36


3501 610 0 1445.2 1445.2
3501 610 1445.2 3037.39 1592.19
6217 610 3037.39 3829.36 791.97
ACCOM 610 0 355.54 355.54
ACCOM 610 355.54 887.19 531.65
6217 610 0 858.83 858.83
6217 610 858.83 1392.07 533.24
ACCOM 610 887.19 1064.2 177.01
6217 610 1392.07 2227.8 835.73
6217 610 2227.8 2477.56 249.76
6217 610 2477.56 2944.69 467.13
6217 610 2944.69 3570.25 625.56
6217 610 3570.25 4083.01 512.76
6217 610 4083.01 4457.68 374.67
ACCOM 610 4457.68 4953.94 496.26
6224 610 4953.94 5313.44 359.5
6224 610 5313.44 5668.94 355.5
6224 610 5668.94 6164.24 495.3
6224 610 6164.24 6656.54 492.3
6220 610 6656.54 7775.04 1118.5
Gazebo 610 7775.04 7909.13 134.09
Shop 610 7909.13 7929.7 20.57
6226 610 7929.7 8395.74 466.04
6221 610 8395.74 9379.69 983.95
6222 610 9379.69 10381.69 1002
6217 610 10381.69 10802.79 421.1
6217 610 10802.79 11754.79 952
6217 610 11754.79 12288.79 534
6217 610 12288.79 13138.79 850
6217 610 13138.79 13161.39 22.6
CAPE 610 13161.39 13545.35 383.96
CAPE 610 13545.35 13567.85 22.5
CAPE 610 13567.85 13593.85 26
Date REMARKS

24-Jun-10 ROOFING ONLY


25-Jun-10 BPA ROOF CLADDINGS
26-Jun-10 BPA ROOF CLADDINGS
28-Jun-10 (3RDBLDG.) WALL CLADDINGS
28-Jun-10 WALL CLADDINGS (144 OF 410pcs.)
29-Jun-10 WALL CLADDINGS (361 OF 410pcs.)
29-Jun-10 (4TH BLDG.)ROOF CLADDINGS (150 pcs.)
30-Jun-10 (4TH BLDG.)COMPLETE
7-Jul-10 WALL CLADDINGS (410 OF 410pcs.)
16-Jul-10 (5TH BLDG.)CLADDINGS 100%, (6TH BLDG) CLADDINGS 35%-walls only
17-Jul-10 (6TH BLDG) CLADDINGS 100%-walls only
19-Jul-10 (5TH BLDG.) ROOF CLADDINGS - 35%
20-Jul-10 (5TH BLDG.) ROOF CLADDINGS - 100%
21-Jul-10 (6TH BLDG.) ROOF CLADDINGS - 60%
22-Jul-10 (6TH BLDG.) ROOF CLADDINGS - 100%, 6215 CLADDINGS 100%
22-Jul-10 CEILING CLADDINGS
31-Jul-10 WALL CLADDINGS 100%
31-Jul-10 WALL CLADDINGS 100%
2-Aug-10 ROOF CLADDINGS 100%
2-Aug-10 ROOF CLADDINGS 100%
3-Aug-10 ROOF CLADDINGS (194 of 360)
3-Aug-10 GAZEBO ROOF CLADDINGS
4-Aug-10 SHOP CLADDINGS
13-Aug-10 WALL CLADDINGS - CAPE Project
16-Aug-10 BPA ROOF CLADDINGS (360 of 360)
26-Aug-10 BPA ROOF CLADDINGS (334 of 334)
26-Aug-10 (7TH BLDG.)ROOF CLADDINGS (74 pcs.)
27-Aug-10 (7TH BLDG.)ROOF CLADDINGS 100% / WALL CLADDINGS 100%
31-Aug-10 (8TH BLDG.) WALL CLADDINGS 100%
1-Sep-10 (8TH BLDG.) ROOF CLADDINGS 100%
04-Sep--10 ADDITIONAL ROOFS FOR 0099 BUILDING
10-Sep-10 WALL CLADDINGS - CAPE Project
15-Sep-10 ADDITIONAL WALL CLADDINGS - CAPE Project
16-Sep-10 ADDITIONAL WALL CLADDINGS - CAPE Project
FM MACHINE LOGS

Camp Leatherneck, Afghanistan

FM Steel Gauge Starting Ending Meter's Total


Job ID Number Date
22 (O.75) 20 (O.95) Meter's Usage Usage Meter's Ran

6217 28934 30412 1478 24-Jun-10


6208 30487 30829 342 25-Jun-10
6217 30829 31944 1115 26-Jun-10
6217 31944 32211 267 28-Jun-10
6217 32211 33807 1596 30-Jun-10
6217 33807 34892 1085 1-Jul-10
6217 34892 35411 519 2-Jul-10
6208 35411 35840 429 3-Jul-10
6208 35840 35860 20 6-Jul-10
ACCOM 35860 36018 158 10-Jul-10
6217 36018 37451 1433 12-Jul-10
6217 37451 37536 85 12-Jul-10
6217 37536 39025 1489 13-Jul-10
6217 39025 40110 1085 14-Jul-10
6217 40110 40959 849 14-Jul-10
6217 40959 41588 629 15-Jul-10
6217 41588 43479 1891 15-Jul-10
6217 43479 44160 681 16-Jul-10
6217 44160 44756 596 17-Jul-10
6217 44756 47217 2461 19-Jul-10
6224 47217 49181 1964 28-Jul-10
6224 49181 51290 2109 29-Jul-10
ACCOM 51290 51832 542 30-Jul-10
6217 51832 53145 1313 20-Aug-10
JEFF'S OFFICE 53145 53487 342 23-Aug-10
6217 53487 54382 895 24-Aug-10
6217 54382 57780 3398 26-Aug-10
6217 57780 58105 325 27-Aug-10
6217 58105 59968 1863 1-Sep-10
6217 59968 60273 305 4-Sep-10
OFFICE 60273 60437 164 6-Sep-10
CAPE 60437 61584 1147 8-Sep-10
6217 61584 64949 3365 13-Sep-10
6217 64949 65807 858 14-Sep-10
6217 65807 66227 420 15-Sep-10
6217 66227 66324 97 16-Sep-10
REMARKS

(3RD BLDG.) TRUSSES ONLY


STAGE BRACES ONLY
(3RD BLDG) RUNNERS ONLY
(3RDBLDG.) CEILING RUNNERS ONLY
(3RD BLDG) RUNNERS ONLY
(4TH BLDG.)FM WALLS ONLY - 100%
ADDITIONAL RUNNERS
WORK STATION
WORK STATION ( Additional)
ACCOM. BEDS (10 OF 40)
(4TH BLDG.)FM TRUSSES ONLY - 100%
(5TH BLDG.)FM WALLS ONLY - 8%
(5TH BLDG.)FM WALLS ONLY - 100%
(4TH BLDG.)FM RUNNERS ONLY - 100%
(5TH BLDG.)FM TRUSSES ONLY - 90%
(5TH BLDG.)FM TRUSSES ONLY - 100% (6TH BLDG.)FM TRUSSES 75%
(6TH BLDG.)FM WALLS ONLY - 75%
(6TH BLDG.)FM TRUSSES - 100% , (JEFF'S BED AND DUSTIN'S DESK)
(6TH BLDG.)FM WALLS ONLY - 100%
(5TH BLDG.) & (6TH BLDG.) RUNNERS 100%
WALLS, TRUSSES AND ROOF PANELS
WALLS, TRUSSES AND ROOF PANELS
BUNK BEDS
(7TH BLDG.)FM WALLS ONLY - 10% / TRUSSES - 70%
MANUAL STUDS/ SCRAPS
(7TH BLDG.)FM WALLS ONLY - 90% / TRUSSES - 100%
(7th BLDG) RUNNERS / (8th BLDG) WALLS 100% / TRUSSES 80%
(8th BLDG) WALLS 100% / TRUSSES 100%
(8th BLDG) RUNNERS
ADDITIONAL RUNNERS
OFFICE DESK AND SHELVES/ SCRAPS
CAPE PROJECT
(9th BLDG) WALLS 100% / TRUSSES 15%
(9th BLDG) TRUSSES 60%
(9th BLDG) TRUSSES 100%/ SCRAPS
(9th BLDG) CEILING PANEL 20%
GUTTER MACHINE LOGS
Camp Leatherneck, Afghanistan
Starting Meter's Ending Meter's Total Meter's
Job ID GM56
Usage Usage Ran
Number 5" 6" OO92 1015

6204 0 73.14 73.14


6208 73.14 124.18 51.04
6213 124.18 203.48 79.3
Bldg 0137 1P 203.48 244.28 40.8
Bldg 0137 2P 244.28 285.08 40.8
OFFICE 285.08 320.68 35.6
6217 320.68 811.68 491
6217 811.68 933.68 122
Date REMARKS

23-Jun-10 GUTTERS
12-Jul-10 GUTTERS (8 PCS OF 16' AND 2 PCS OF 20')
15-Jul-10 GUTTERS (12 PCS OF20')
2-Aug-10 GUTTERS
2-Aug-10 GUTTERS
13-Aug-10 GUTTERS
31-Aug-10 GUTTERS FOR 0099 BUILDINGS
7-Sep-10 ADDITIONAL GUTTERS FOR 0099 BUILDINGS