MSRSAS - PEMP FT-2009- Detailed Project Schedule (Project Duration 28 Weeks) (After clearance from Accounts Section) from eligi students and submit to respective CMs a Activities Responsibilities Date 1 Project Guidelines-Presentation, Announcement of Project Schedule HODs, CMs and ARO | 21" June 2010 to 25" June 2010 = 20" September 2010 Pre-Project Presentation at respective Departments/ Centers HODs, CMs and ARO 21° September 2010 to 1" October 2010 ‘Approval of Project & Project Supervisors) allotment a > _| (inal Project and Supervisors lst and Registration Forms to ARO) HODs and CMs. = _eeher 2010 Interim Project Presentation 20" December 2010 to © | (student should submit the draft thesis for first’3 chapters) HODs, CMs and’ ARO 25" December 2010 7 _| Draft thesis submission to Academic supervisor(s) after consultation with | Respective CMs and Academic a e200 Industry supervisor (if any). Supervisors Final Project Presentation and Viva-voce i" 8 | (rate copy of corrected thesis must be submitted by the student to the panel at the | HODs, CMs and ARO ara een ito time of presentation) Marel Final Submissions #2 Project thesis copies bound as per the format prescribed * 1 CD-(containing soft copy of final thesis, 1-Page Abstract and a . '. 9 4-page Technical paper, Softcopies ofall the references used for | eon’ MS Academic Supervisors and | 51st Miareh 2011 thesis work, model and other support files) * A copy of Group Project Report to be inserted in a pouch at the back of the project thesis 11 | Results to Coventry University Registrar and ARO 2™ Week of ‘April 2011 ‘Note: Any changes in the above Schedule will be notified on the School notice boards. Greah ifr Director i

Você também pode gostar