Você está na página 1de 4

ACCEPTANCE TEST DOCUMENT

of
PDH MICROWAVE SYSTEM
(PASOLINK NEO-C 5/10/16 / 40 MB SYSTEM)
1+0 1+1 Hot Stand by 1+1 Space diversity

VENDOR / CONTRACTOR :
PROJECT NAME :
SITENAME & NUMBER :
OPPOSITE :
DATE OF ACCEPTANCE :
ACCEPTANCE STATUS :

PASS, NO PENDING ITEMS

PASS WITH PENDING ITEMS

REJECTED BY XL

ACCEPTANCE BY :
VENDOR

Person Name & Sign, Date

PT XL AXIATA Tbk.

1. Engineer Name & Initial, Date

2. Spv. Engineer Name & Initial, Date

FOR REMOTE FOP SUPERVISOR, THIS PAGE SHALL BE FAXED TO FOP SUPERVISOR TO BE REVIEWER, CHECKED AND SIGNED

PT XL AXIATA Tbk.
FRM / NFOP / 08003
Issue 1.0
rev. 1
Effective Date June 2002

1 Visual Check

1) Serial Number
Equipment Version Serial Number - 1 Serial Number - 2
IDU
ODU
Antenna

2) Antenna
Diameter : Meter

Height : Meter

Polarization : Vertical Horizontal

3) Check the physical out-door installation. Good Fault

4) Check the physical in-door installation. Good Fault

2 Meter reading
Specification
CHECK ITEM ALLOW ABLE RANGE
ODU primary power supply
voltage Dends on cable length between ODU and IDU (3.5 to 4.5 V DC)
Transmitter power Depends on transmitter power (0 to 4.6 V DC)
Receiving Level Depends on transmitter Signal level (0 to 4.6 V DC)
Output Power Depends on transmitter power (< 11,00 Dbm)

Result
Software Vesion (PMCARD) :

Item Radio 1 Radio 2


ODU Primary Power V V
TX Power V dBm V dBm
RX. Level V dBm V dBm
STM 1 Output Power dBm dBm
( When convert to dBm, use factory test data )

3 Transmit Radio Frequency Measurement


Item Radio 1 Radio 2
Channel / SubBand ………… / ……………. ……….. / …………….
Frequency

4 BER Measurement
Item Radio 1 Radio 2
Bit Error Rate

5 Alarm Operation
Item Result
INPUT LOSS
AIS RCVD
BER ALARM
MAIN ALARM
FRM / NFOP / 08003
Issue 1.0
rev. 1
Effective Date June 2002

PENDING ITEMS
Please List down all pending items and timeline to complete it
DATE OF
No. Item PERSON IN CHARGE CONTACT NO
COMPLETION

ADDITIONAL NOTES

ACCEPTANCE PROCESS BY : VERIFIED AND APPROVED BY XL :


FIELD OPERATION

NAME: signature
FIELD OPERATION SUPERVISOR

NAME & DATE NAME : signature

FOR REMOTE FOP SUPERVISOR, THIS PAGE SHALL BE FAXED TO FOP SUPERVISOR TO BE REVIEWER, CHECKED AND SIGNED

PT XL AXIATA Tbk.

Você também pode gostar