MINUTES OF THE MEETING OF ZONAL C01\1!\llTTEE (ZONE"A"PLAJNS) OF SCHEDULE
OF RATES 1987 HELD ON 23/10/09 AT I'ATlALA.
/ Zone"A"
A meeting
held on 23~lO-09
ofthe zonal conmliUee Zone"A" for Plains for Common Schedule or rates was
in P.W.D. Rest Halls':, Patiala to fix the Premium on C.S.R.-1987 applicable to
Superintending Engineer,
J. . q~
Er.
r~r.
Er. G.L.Arora,
G.K.
N.S.
Sohan
Er. 1'.S.
A.K.
JagpaJ
M..P.
Ajmer Walia,
Gupta,.
Brar,
Nayyar,
Lal,
D.S.Bhatti,
Singla,
Gflrg,
Harvinder
Arvinder
Gill, .Singh,
Singh,
Singh,
Singh, 14.
13.
12.
9.
10.
11.
8. Patiala
Const. (Convener)
(Member)
Circle
1'.S.E.11. Civil
Superintending No
Sanitation 2,I'WD
Works Circle.
Engineer,
Engincer,
Circle, 13&R 131'.,
~
The following members F-5,
wereShakti
Bathinda.
W/S
CCC,
Canst.&GI-ITP,
Amritsar
Lehra Circle,
Gidderbflhfl.
PWD,
LB.,
Dy. IB
Chief Vihar,
(Member)
PSEB,
PWD
(Drainage)
U.B.D.C., Patiala
(Member)
Engineer,.
(Member)
present
Mobabat
Superintending inlhe B&R (Member)
Circle
(Member) Branch,
meeting:
Engineer,
Cf
The committee reviewed the premium already approved in the meeting helel on
05-09-2008 on various chapters of C.S.R. ] 987. There are some represel1tatiolls Jiolll v[lrious
workers unions to increase the wages of daily wages working in their department. I.l was
9iscussed that the premium fixed on Labour Chapter is not sufficient for various items and
ftirther steep rise in prices due to increase in rates of bricks, cement, Inbour ami falls in prices of
steel was also discussed. After detailed discussion anu deliberations committee decided (0 revise
the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :-
EPF of the labour employed/supplied by the contractor and labour ceSS to be paid has been
. induded in the premium.
These shall be deemed to have taken effect from the date of isslle.
,1.96
1.98
23,1A8,
1.24,1.51
I
above C.S.R
to
1.28,
-
Sr.
II
Item
Item
.",
No.
-<;'~ ,
930%
750%Ii
1100%
CHAPTER
1200%
1.1,
. No. 1.8
870% .' I
I
Premium
above
I _'\
lA,
\::;jO
\
1.6,
,
'--' <:r-
NO.C.S.R
through on
1rate
DAILY
I
1.100
465%
Chapter
I WAI;ES
.
Nc.
-
2
570% on
Premium II
I
540%
400%
840%
800%
700%
735%
610%
710%
950%
835°Ir,
660%
900%
580%
1000%
555%
720%
615%
440%
525%>
815%
1330%
650%
550%
745%
500%
sFriday 23 October 2009
labour rate
680%
1080%
480%
i
I
'1
,
685%
1~ I~
3 Friday 23 October 2009
Sr. No. Chapter No. Premium on Premium on
labour rate through rate
above C.S.R. above C.S.R
C.S.RChpater No. 2(MONTHL Y WAGES)
Pay grades are being regulated by the Ptnjab GO'll.
Chapter No.3 (MATERIALS)
No premium has been fixed on items on this chapter except item No. 3.1(h) to
3.1(k),3.12,3.14(g) as this chapter is only for basic analysis purpose.
Item No. 3.1 (a) to 3.1(g), 3.11 --~
. Rates approved by the Chief Engineer, Pb. PWD B&R Br.,Patiala shall be applicable.
Item No. 3.1 (h) to 3.1 (k), 3.12 650%
- Item No. ":3. 14(g) Brick bats from well Burnt or Burnt bricks
(a) f:c:-..ritsar,Jalandhar, Kapurthala,Gurdaspur
Tarn Taran; Hoshiarpur, Nawanshahar Distt 650%
(b) For Bathinda, Faridkot;
Moga, Muktsar and Mansa Distt . 650%'
(c) For Ferozepur, .
Patiala, Fatehgarh Sahib Distt . 650%
(d) For Barnala & Ludhiana Distt . 650%
(e) For Sangrur Distt ' . 650%
(f) Chandigarh(U.T.)Ropar & MohaliDistt. 650%
Note:- Premium on carriage bas been revised keeping in view the Hon'ble Supreme Court
directions to stop over-loading. These rates are worked out taking into consideration the
stipulated load to be carried by the vehicle. If during the execution of work, it is found that
over-loading of material is carried by the agencies then the carriage rates al'e to be reduced
l;ly 50% and the recovery will be made from the bill of the agency. Suitable condition to this
effect is to be provided in the NIT . .The field stafT will certify that the actual carriage of
material is within the norms and no over-loading has been done.
Chapter No.12,13,14,15
All items except item No.13.ll,13.13,13 .17,13.18,
To 13.22,13.41 to 13.44, 13.52 to 13.54, 14.16 to 14.21,
14.23, 14.23(ii), 14.23(iii), 14.25, 14.25(ii) 14.25(iii),
14.26, 14.26(ii), 14.26(iii), 14.29, 14.29(ii), 14.29(iii),
14.31, 14.31(ii), 14.31(iii),14.32, 14.32(ii), 14.32(iii),
14.34, 14.34(ii), 14.34(iii), 14.34(iv)(v), 14.37, 14.37(ii),
14.37(iii),14.37(iv), 14.38 to 14.47, 14.48 A,B.C,D,
14.49 A,B,C,D,14.50, 14.50(ii), 14.50(iii), 14.50(iv),
14.50(v), 14.50(vi), 14.51 to 14.57, 14.57(ii). 14.57(iii),
14.58,14.59,14.60 to 14.64, 14.72 to 14.78,15.12, I 5.13
15.18,15.61 to 15.75. 700% 500%
4 Friday 23 October 2009
Sr. No. Chapter No. Premium on Premium on
labour rate through rate
above C.S.R. above C.S.R
Chapter No.lO(CONCRETE)
All items except item No. 10.23, 10.53 tl) 10.55 700% 495%
Note:- The rate of bricks has been taken at kiln site including local taxes.
(a) Amritsar, Jalandhar, Kapurthala, Gurdasptlr
. Tam Taran, Hoshiarpur, Nawanshahar Distt @Rs.2900/per %0 Nos
(b) For Bathinda, Faridkot,
Moga, Muktsar and Mansa Distt;: . @Rs.2600/ per %0 Nos
(c) For Ferozepur,
Patiala, Fatehgarh Sahib Distt . @Rs.2800/ per %0 Nos
(d) For Bamala & Ludhiana Distt . @Rs.2500/ per %0 Nos
(e) For Sangrur Distt . @Rs.2700/ per %0 Nos
(f) Chandigarh(UT)Ropar & MohaliDistt. @Rs.3200/ per %0 Nos
Note:- The rate of tiles has been taken at kiln site including local taxes.
(a) Amritsar, Jalandhar, Kapurthala, Gurdaspur
Tam Taran, Hoshiarpur, Nawanshahar Distt @Rs.2950/ per %0 Nos
(b) For Bathinda, Faridkot,
Moga, Muktsar and Mansa Distt . @Rs.2650/ per %0 Nos
(c) For Ferozepur,
Patiala, Fatehgarh Sahib Distt . @Rs.28501 per %0 Nos
(d) For Bamala & Ludhiana Distt . @Rs.25501 per %0 Nos
(e) For Sangrur Distt . @Rs.27501 per %0 Nos
(f) Chandigarh(UT)Ropar & MohaliDistt. @Rs.32501 per %0 Nos
Item No.14.48,14.49,14.51& 14:52 deleted & replaced with new item vide A.c.
slip No. 13 dated 20/9/93.
,
500%
275%
600%
550%
325%
300%
Item NOc14.48 A,B.C,D 14.49 A,B,C,D 475%
.
Item No.14.53,14.54, .
Item No.14.72
Note: There is variation in the price of floor spring in the market from Rs. 500/- to 5000/-. According to its
make and as such no premium has been fixed, it may be treated as N.S. item and its rate to be got
approved from the Competent Authority.
The above mentioned ceiling premia on through rates are based on the following rates of
materials at Govt. stores.
1. Mild Steel (Bars of all sizes) Rs.340001- perM.T.
2.' Tor Steel (all sizes)/T.M.T.(all sizes FeA15) Rs.340001- per M.T.
3. Structural Steel Rs.340001- per M.T.
4. Cement including cost of bags (PPC) Rs. 255/- per bag
5. Bitumen 25/85 grading for building works Rs.35000/- per M.T.
Chapter No.16(PAlNTING):
All items except itemNo.16.24 toI6.28 . 675% 550%
450%
900%
850%
500%
600%
. Item No. 16.24 to 16.28 , 550% 550%
625%
.
550%
Note:- There is variation in the price of door spring, door closer in the market according to its make and as
such no premium has been fixed, it may be treated as N.S. item and its rate to be got approved from
.the Competent Authority.
Chapter No. 18
(STEEL AND IRON WORKS)
All items except item No. 18.4, 18.6, 18.7, 18.17, 18.18
18.19,18.20, 18.23(i), 18.23(ii), 18.24, 18.26.
18.29,18.30 to 18.32 650% 595%
1
Chapter No.20(OUTLETS) .
Chapter No.23 ..
(RIVER AND CANAL PROTECTION WORK)
All items except item No. 23.1, 23.5, 23.11,
23.22,23.32,23.33,& 23.45 770%
Item No.
23.1,23.5,23.11,23.22,
23.32, 23.33 & 23.45 . 770%
Note: Item No. 24.8 has been deleted as per A.C. slip No.8
Chapter No.25
(MAINTENANCE OF FURNITURE)
550%
Chapter No.26(MISCELLANEOUS)
AIl item except item No. 26.36 to 26.38, . 650%
Y
9 Friday 23 October 2009
"r. No. Chapter No. Premium on labour as well as through
rates above C.S.R.
Note:- The above mentioned ceiling premia on through rates are based on the following
rates of store material to be issued from the Govt. store.
Lead for caulked joint Rs. 80- per Kg.
In additonto the above mentioned issued rafesof material, storage charges @ 3%
shall be charged extra.
Note:- The Ceiling premium on item No. 31.28 xxxvi ( a to g) Steel Tubular poles is fixed by
taking the additional weight of base plate which is in addition to the weight shown in
the nomenclature. Because as per IS1 the weight shown in the nomenclature is only
Chapter No.33(HORTICULTURE)
Chapter No.34
(MAINTENACE OF BUILDING ROADS)~ ;:-; -=-.;::. 550%
Superin~nding ~gineer,
Endst.No. ! 0:12 r 4 ,
supe~~ineer,
patial~nvel)yr)~
Constn. Circle No.2,~~&R Sr.,