MINUTES OF THE MEETING OF ZONAL C01\1!\llTTEE (ZONE"A"PLAJNS) OF SCHEDULE
OF RATES 1987 HELD ON 23/10/09 AT I'ATlALA.

/ Zone"A"
A meeting
held on 23~lO-09
ofthe zonal conmliUee Zone"A" for Plains for Common Schedule or rates was
in P.W.D. Rest Halls':, Patiala to fix the Premium on C.S.R.-1987 applicable to

Superintending Engineer,
J. . q~
Er.
r~r.
Er. G.L.Arora,
G.K.
N.S.
Sohan
Er. 1'.S.
A.K.
JagpaJ
M..P.
Ajmer Walia,
Gupta,.
Brar,
Nayyar,
Lal,
D.S.Bhatti,
Singla,
Gflrg,
Harvinder
Arvinder
Gill, .Singh,
Singh,
Singh,
Singh, 14.
13.
12.
9.
10.
11.
8. Patiala
Const. (Convener)
(Member)
Circle
1'.S.E.11. Civil
Superintending No
Sanitation 2,I'WD
Works Circle.
Engineer,
Engincer,
Circle, 13&R 131'.,
~
The following members F-5,
wereShakti
Bathinda.
W/S
CCC,
Canst.&GI-ITP,
Amritsar
Lehra Circle,
Gidderbflhfl.
PWD,
LB.,
Dy. IB
Chief Vihar,
(Member)
PSEB,
PWD
(Drainage)
U.B.D.C., Patiala
(Member)
Engineer,.
(Member)
present
Mobabat
Superintending inlhe B&R (Member)
Circle
(Member) Branch,
meeting:
Engineer,

Cf

The committee reviewed the premium already approved in the meeting helel on

05-09-2008 on various chapters of C.S.R. ] 987. There are some represel1tatiolls Jiolll v[lrious

workers unions to increase the wages of daily wages working in their department. I.l was

9iscussed that the premium fixed on Labour Chapter is not sufficient for various items and

ftirther steep rise in prices due to increase in rates of bricks, cement, Inbour ami falls in prices of
steel was also discussed. After detailed discussion anu deliberations committee decided (0 revise

the ceiling premium on various chapters or C.S.R. 1987 Zone-"A" for plains as under :-

The rates/premium is without ServiceTax as it is not applicable in sOllle departments.

EPF of the labour employed/supplied by the contractor and labour ceSS to be paid has been
. induded in the premium.
These shall be deemed to have taken effect from the date of isslle.
,1.96
1.98
23,1A8,
1.24,1.51
I
above C.S.R
to
1.28,
-
Sr.
II
Item
Item
.",
No.
-<;'~ ,
930%
750%Ii
1100%
CHAPTER
1200%
1.1,
. No. 1.8
870% .' I
I
Premium
above
I _'\
lA,
\::;jO
\

1.6,
,
'--' <:r-
NO.C.S.R
through on
1rate
DAILY
I

1.100
465%
Chapter
I WAI;ES
.
Nc.
-
2

570% on
Premium II
I
540%
400%
840%
800%
700%
735%
610%
710%
950%
835°Ir,
660%
900%
580%
1000%
555%
720%
615%
440%
525%>
815%
1330%
650%
550%
745%
500%
sFriday 23 October 2009

labour rate
680%
1080%
480%
i
I
'1
,

685%
1~ I~
3 Friday 23 October 2009
Sr. No. Chapter No. Premium on Premium on
labour rate through rate
above C.S.R. above C.S.R
C.S.RChpater No. 2(MONTHL Y WAGES)
Pay grades are being regulated by the Ptnjab GO'll.
Chapter No.3 (MATERIALS)
No premium has been fixed on items on this chapter except item No. 3.1(h) to
3.1(k),3.12,3.14(g) as this chapter is only for basic analysis purpose.
Item No. 3.1 (a) to 3.1(g), 3.11 --~
. Rates approved by the Chief Engineer, Pb. PWD B&R Br.,Patiala shall be applicable.
Item No. 3.1 (h) to 3.1 (k), 3.12 650%

- Item No. ":3. 14(g) Brick bats from well Burnt or Burnt bricks
(a) f:c:-..ritsar,Jalandhar, Kapurthala,Gurdaspur
Tarn Taran; Hoshiarpur, Nawanshahar Distt 650%
(b) For Bathinda, Faridkot;
Moga, Muktsar and Mansa Distt . 650%'
(c) For Ferozepur, .
Patiala, Fatehgarh Sahib Distt . 650%
(d) For Barnala & Ludhiana Distt . 650%
(e) For Sangrur Distt ' . 650%
(f) Chandigarh(U.T.)Ropar & MohaliDistt. 650%

Item No. 3.50 a,b 500%


Chapter No. 4(LOADING & UNLOADING) 460%

Chapter No.5 (CARRIAGE)


All items Upto 40 Km : . 650%
41 Kin. to 60 Km ~ -~ 575%
61 Km. to 150 Km . 325%
151 Km. and above , . 175%

Note:- Premium on carriage bas been revised keeping in view the Hon'ble Supreme Court
directions to stop over-loading. These rates are worked out taking into consideration the
stipulated load to be carried by the vehicle. If during the execution of work, it is found that
over-loading of material is carried by the agencies then the carriage rates al'e to be reduced
l;ly 50% and the recovery will be made from the bill of the agency. Suitable condition to this
effect is to be provided in the NIT . .The field stafT will certify that the actual carriage of
material is within the norms and no over-loading has been done.

Chapter No. 6(EARTH WORK)


All items except Item No. 6.2g(iii), 6.4 . 900%
Item No. 6.2g(iii) . 700%
Item No. 6.4 . 1000%

Chapter No. 7(ROCK CUTTING) . 800%



Chapter No. 8(DEMOLITION) .
All items except Item No. 8.6 :.:, . 850%
Item No. 8.6 . 1100%

Chapter No.9(CENTERING SHUTTERING) 600% 500%

Chapter No.12,13,14,15
All items except item No.13.ll,13.13,13 .17,13.18,
To 13.22,13.41 to 13.44, 13.52 to 13.54, 14.16 to 14.21,
14.23, 14.23(ii), 14.23(iii), 14.25, 14.25(ii) 14.25(iii),
14.26, 14.26(ii), 14.26(iii), 14.29, 14.29(ii), 14.29(iii),
14.31, 14.31(ii), 14.31(iii),14.32, 14.32(ii), 14.32(iii),
14.34, 14.34(ii), 14.34(iii), 14.34(iv)(v), 14.37, 14.37(ii),
14.37(iii),14.37(iv), 14.38 to 14.47, 14.48 A,B.C,D,
14.49 A,B,C,D,14.50, 14.50(ii), 14.50(iii), 14.50(iv),
14.50(v), 14.50(vi), 14.51 to 14.57, 14.57(ii). 14.57(iii),
14.58,14.59,14.60 to 14.64, 14.72 to 14.78,15.12, I 5.13
15.18,15.61 to 15.75. 700% 500%
4 Friday 23 October 2009
Sr. No. Chapter No. Premium on Premium on
labour rate through rate
above C.S.R. above C.S.R
Chapter No.lO(CONCRETE)
All items except item No. 10.23, 10.53 tl) 10.55 700% 495%

Item N o. 10.23 . 440%

Item No.10.53 t9 10.55 10%


(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based 011 Sept. 2008)

Chapter ,lifo. l1(BRICK WORK)


All items -
(a) Amrit$<lf, Jalandhar, Kapurthala, Gurdaspur
Tam Taran, Hoshiarpur, Nawanshahar Distt... 650% 600%
f
(b) For Bathinda, Faridkot,
Moga, Muktsar and Mansa Distt : 650% 560%
(c) For Ferozepur,
. Patia1a, Fatehgarh Sahib IJistt... 650% 590%
(d) For Bamala & Ludhiana Distt 650% 545%
(e) For Sangrur Distt , 650% 575%
(f) Chandigarh(U.T.)Ropar & MohaliDistt. 650% 640%

Note:- The rate of bricks has been taken at kiln site including local taxes.
(a) Amritsar, Jalandhar, Kapurthala, Gurdasptlr
. Tam Taran, Hoshiarpur, Nawanshahar Distt @Rs.2900/per %0 Nos
(b) For Bathinda, Faridkot,
Moga, Muktsar and Mansa Distt;: . @Rs.2600/ per %0 Nos
(c) For Ferozepur,
Patiala, Fatehgarh Sahib Distt . @Rs.2800/ per %0 Nos
(d) For Bamala & Ludhiana Distt . @Rs.2500/ per %0 Nos
(e) For Sangrur Distt . @Rs.2700/ per %0 Nos
(f) Chandigarh(UT)Ropar & MohaliDistt. @Rs.3200/ per %0 Nos

Item No. 13.11, 13.13 & 13.17


(a) Amritsar, Jalandhar, KapUlihala, Gurdaspur
Tam Taran, Hoshiarpur, Nawanshahar Distt 640% 570%
(b) For Bathinda, Faridkot,.
Moga, Muktsar and Mansa Distt 640% 540%
(c) For Ferozepur,
Patiala, Fatehgarh Sahib Distt 640% 560%
(d) For Bamala & Ludhiana Distt 640% 530%
(e) For Sangrur Distt 640% 550%
(f) Chandigarh(UT)Ropar & MohaliDistt. _ - ~ 640% 590%

Note:- The rate of tiles has been taken at kiln site including local taxes.
(a) Amritsar, Jalandhar, Kapurthala, Gurdaspur
Tam Taran, Hoshiarpur, Nawanshahar Distt @Rs.2950/ per %0 Nos
(b) For Bathinda, Faridkot,
Moga, Muktsar and Mansa Distt . @Rs.2650/ per %0 Nos
(c) For Ferozepur,
Patiala, Fatehgarh Sahib Distt . @Rs.28501 per %0 Nos
(d) For Bamala & Ludhiana Distt . @Rs.25501 per %0 Nos
(e) For Sangrur Distt . @Rs.27501 per %0 Nos
(f) Chandigarh(UT)Ropar & MohaliDistt. @Rs.32501 per %0 Nos

Item No.13.19 to 13.20 . 525% 375%


750%
900%
ROO%
500%

Item No.13.18,13.21,13.22, . 735%


650% ~~ly/
Item No. ] 3.41 to 13.44 .

Item No. 13.52 .

Item No. 13.53,13.54 .


5 Friday 23 October 2009

Sr. No: Chapter No. Premium 011 Premium on


labour rate th rough rate
above C.S.R. above C.S.R
Item No. 14.16 to 14.21
(a) Amritsar, Ja1andhar, Kapurtha1a, Gurdaspur .
Tarn Taran, Hoshiarpur, Nawanshahar DisH 650% 600%
(b) For Bathinda, Faridkot,
Moga, Muktsar and Mansa DisH . 650% 560%
(c) For Ferozepur,
Patia1a, Fatehgarh Sahib DisH . 650% ~90%
(sf) For Barna1a & Ludhiana DisH . 650% 545%
(e) For Sangrur DisH . 650% 575%
(f) Chandigarh(U.T.)Ropar & MohaliDistt. 650% 640%

Item No.14.23, 14.23(ii), 14.23(iii), 14.25,


14.25(ii) 14.25(iii), 14.26, 14.26(ii),
14.26(iii), 14.29, 14.29(ii), 14.29(iii),
14.31, 14.31(ii), 14.31(iii),14.32, 14.32(ii),
14.32(iii) ..; . 575% 450%

Item No.14.34, 14.34(ii),(iii),(iv),(v) . 575%

Item No. 14.38 to 14.46., . 700% 550%

Item No.14.3 7,14.3 7(ii),(iii),(iv) . 575% 450%

Item No.14.48,14.49,14.51& 14:52 deleted & replaced with new item vide A.c.
slip No. 13 dated 20/9/93.
,
500%
275%
600%
550%
325%
300%
Item NOc14.48 A,B.C,D 14.49 A,B,C,D 475%
.

Item No.14.47 400%


475%
575%
500%
525%
625%

Item No.14.50,14.50 ii, iii,iv,v & vi,

Item No.14.53,14.54, .

Item No.14.55 to 14.57 .

Item No. 14.57 ii & iii .

Item No. 14.58,14.59,14.63,14.64

Item No.14.60 to 14.62 .

Item No.14.72

Item No.,14.73 to 14.75 .

Item No. 14.76 .

Note: There is variation in the price of floor spring in the market from Rs. 500/- to 5000/-. According to its
make and as such no premium has been fixed, it may be treated as N.S. item and its rate to be got
approved from the Competent Authority.

Item No.14.77, 14.78 40% 25%


(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based 011 Sept. 2008)

Item No. 15.12,15.13 15.18 ··~650% 450%


Item No.15.61 to 15.75 . 650% 400%
"

6 Friday 23 October 2009


Sr. No. Chapter No. Premium on Premium on
labour rate through rate
above C.S.R. above C.S.R

The above mentioned ceiling premia on through rates are based on the following rates of
materials at Govt. stores.
1. Mild Steel (Bars of all sizes) Rs.340001- perM.T.
2.' Tor Steel (all sizes)/T.M.T.(all sizes FeA15) Rs.340001- per M.T.
3. Structural Steel Rs.340001- per M.T.
4. Cement including cost of bags (PPC) Rs. 255/- per bag
5. Bitumen 25/85 grading for building works Rs.35000/- per M.T.

Note: ;"0 Storage charges and contractor's


'1") profit on these items has beeri accounted for. If the above said
material is arranged by the contractual agency at his own level; the contractor's profit @ 10% may
be ;Ccounted for separately.
2) If the structural steel section weighing more than 40 Kg. per mtL or above is used then difference
in issue rate or market rate(which ever is less) of light weight section may be accounted separately as
the CSR rates are based on light weight section...
3) If OPC cement in stead of PPC cement is allowed to be used due to local condition/importance of
work then difference in cost of PPC & OPC shall be payable extra @ Rs.17 per bag.

Chapter No.16(PAlNTING):
All items except itemNo.16.24 toI6.28 . 675% 550%
450%
900%
850%
500%
600%
. Item No. 16.24 to 16.28 , 550% 550%
625%
.
550%

Chaper No. 17(WOOD WORK) 550%


500% ~.

. (a)Deoder wood (all item) .


(b)Teak wood (all item) .
(c)Hollack wood(all item) : .
(d)item No. 17.34 & 17.35 .
(e)Kail wood & remaining .
items of Chaper No. 17
Excephtem No. 17.50 to17.56
(f)Item No. 17.50 to 17.52 .

Note:- There is variation in the price of door spring, door closer in the market according to its make and as
such no premium has been fixed, it may be treated as N.S. item and its rate to be got approved from
.the Competent Authority.

Item No. 17.53 . 500% 500%

Item No.17.54 to 17.56 25% 5%


(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based on Sept. 2008)

Chapter No. 18
(STEEL AND IRON WORKS)
All items except item No. 18.4, 18.6, 18.7, 18.17, 18.18
18.19,18.20, 18.23(i), 18.23(ii), 18.24, 18.26.
18.29,18.30 to 18.32 650% 595%
1

Item No.18.4 , 650% 600%

Item No.18.6,18.7 , 650% 600%

Item No.18.17 650% 600%

Item No.18.18 650% 495%

Item No.18.19 & 18.20 ; 650% 570%

Item No.18.23(i),(ii) : - - ~650% 600%

Item No.18.24 650% 350%

Item No.18.26 . 600%

Item No.18.29 &18.30 . 650% 500%

Item No.18.31 Same note as per item No. 14.76


Item No.18.32 . 650% 500%
7
Sr. No. C11apter No.
Friday 23 October 2009
Premium on Premium on
labour rate
through rate
Chapter No.19(LINING) above C.S.R. above C.S.R
All items except 19.7, 19.8,19.9,19.26, 9.27 .... 650%
700% 600%
500%
~85%
Item No. 19.7,19.8,19.26,19.27 . 650%
850% 850%
Item No. 19.9 · '" .700%

Chapter No.20(OUTLETS) .

C'i.'?pter NO.21(PILE DRIVING) .

Chapter No.22(WELL SINKING) .

Chapter No.23 ..
(RIVER AND CANAL PROTECTION WORK)
All items except item No. 23.1, 23.5, 23.11,
23.22,23.32,23.33,& 23.45 770%
Item No.
23.1,23.5,23.11,23.22,
23.32, 23.33 & 23.45 . 770%

Chapter No.24 (ROAD WORKS)


Item No.
24.1 ,to 24.7, 24.11 to 24.15
& 24.41 to 24.42 . 500%
Item No.
24.9 & 24.10 .
650%
Item No.
24.16 & 24.17 . 275%
Item No.
24.18 to 24.22,24.46
385%
Item No.
24.23 & 24.24 . 430%
Item No.
24.25 a & 24.26 a . 600%
Item No. 24.25b, 24.26b, 650%
Note: Same note as per Chapter No.5
Item No.
24.29 to 24.33, . 600%
Item No.
24.27,24.28,24.34 . 360%
Item No.
24.35 to 24.40, 24.43
& 24.44 . 700% 495%
Item No.
24.45 . 500% 600%

Note: Item No. 24.8 has been deleted as per A.C. slip No.8
Chapter No.25

(MAINTENANCE OF FURNITURE)
550%
Chapter No.26(MISCELLANEOUS)
AIl item except item No. 26.36 to 26.38, . 650%

Item No.26.36 to 26.38 .


1100%
L-

8 Friday 23 October 2009


Sr. No . . Chapter No. PI emium on labour as well as through
rates above C.S.R.
----------------------------------------------_.~-------------------- ------------- ------------------
~
Chapter No.28(W ATER SUPPLY)
Item No. 28.1 to 28.8 · 900%

Item No. 28 .9(i) 425%


Item No. 28.1 0 to 28.75 except item No 28.1 O(ii), 28.9(ii),
28.14(ii), 28.34b, 28.36, 28.37a, 28.57(a to e) 480%

Item }fl? 28,34b : 580%


_. --~
.•.. Item No. 28.36 , 480%

Item No. 28.37a 470%

Item No. .2857a : 680%

Item No. 28.57b 6800/0

Item No. 28.57c 530%


Item No. 28.57d 630%

Item No. 28.57e 680%

Item No.28.9(ii), 28.10(ii), 28.14(ii) 25%


(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based on Sept. 2008)

Chapter No.29(SEWERAGE AND DRAINAGE)


Item No. 29.1 to 29.6, 29.8 to 29.11... 900%

Item No, 29.7 : ,-,." ;-:-;0/;.650%


Item No. 29.12 to 29.35,29.78 to 29.93

(a) Amritsar, Jalandhar, KapUlthala, Gurdaspur


Tarn Taran, Hoshiarpur, Nawanshahar DisH 600%
(b) For Bathinda, Faridkot,
Moga, Muktsar and Mansa DisH 560%
(c) For Ferozepur,
Patiala, Fatehgarh Sahib Distt 590%
(d) For Bamala & Ludhiana Distt 545%
(e) for Sangrur Distt 575%
(1) Chandigarh(U.T.)Ropar & MohaliDistt. 640%
Item No. 29.36 to 29.62 355%

Item No. 29.63 380%

Item No. 29.64 to 29.77 380%

Chapter No.30 (SANITARY AND INSTALLATION)


All item except item No.30.47,30.65, 30.74 to 30.8],
30.99 (b & d)& 30.102 ~ :..":':".385%
Item No. 30:47 ]70%

Item No. 30.65 · 375%

Item No.30.74 to 30.81 except 30.74 (I)a,b 800%

Item No.30.74 (i) a,b 165%


(This item incorporated vide A&C slip No. 20 dated 26.11.98(Basic rate based on 1997)

Item No.30. 99(b&d) 550%

Item No.30.! 02 380%

Y
9 Friday 23 October 2009
"r. No. Chapter No. Premium on labour as well as through
rates above C.S.R.

Note:- The above mentioned ceiling premia on through rates are based on the following
rates of store material to be issued from the Govt. store.
Lead for caulked joint Rs. 80- per Kg.
In additonto the above mentioned issued rafesof material, storage charges @ 3%
shall be charged extra.

Chapter No.3! (ELECTRICAL INSTALLATION)


Item No .. 31.01A to 31.04 A, 31.06 A to

- ." 31.09 A , 31.19, PCC Poles 31.28 {xxxvii to


xxxviii (atoe)} . 175%

Item No. 31.0 IE to 31.04B, 31.06B, 31.07B, 31.09B


31.05, 31.11 (xiii)to (xxv)
[Except 31.11(i)to(xii)], .

Item No. 31.10, 31.21, 31.24 .

Item No . 31.11 (i)to (xii)[Except 31.11 (xiii)to(xxv)),


. 31.15, GJ. Earthing 31.23[except xii(a to c),
xiv(b)& xvi(a to c)] .

Item No. 31.12,31.13&


G.I.Pipe poles 31.28 )c"'{xv(a to c)r-.31.01~.

Itym No. 31.14,31.l7(iv) &(xiii to xv) .

Item No. 31.16 [Except (iii to xiv)] .

Item No. 31.16 (iii to xiv)]

Item No. 31.17[Except (iv) & (xiii to xv)). .

Item No. 31.18, 31.26 [v (a to e)], 31.08B '

Item No. 31.20,31.31... ........................................•........

Item No. 31.25

Item No. 31.22

Item No. Copper Earthing 31.23 [xii (a to c), xiv(b)


& xvi (a to c)] _ -.<0'"'.

Item No. 31.26, [Except v (a to e)], 31.27 .

Item No. Over Head Distribution 31.28


[Except X)C"{V (a to c), xxxvi (a to g);
x)C"'{vii
to xxxviii (a to e)], 31.29(i to ii),
x (a to f), )C'«(ato d) & xxiii(a to i) 225%

Item No. Steel Tubular poles 31.28 xxxvi(a to g) . 580%

Note:- The Ceiling premium on item No. 31.28 xxxvi ( a to g) Steel Tubular poles is fixed by
taking the additional weight of base plate which is in addition to the weight shown in
the nomenclature. Because as per IS1 the weight shown in the nomenclature is only

for pole. ~/"'"


10 Friday 23 October 2009
Sr. No. Chapter No. Premium on labour as well as through
rates above C.S.R.
--------------:------------------------------------ --------------------------------------------------

Item No. 31.29[Except (i to ii), x(a to£), -


xx (a to d), xxiii (a to i) ]. . 155%

Item No. 31.30 . 160%

Item No.31.32, to 31.38 .


(These items incorporated vide A&C slip No. 25 dated 10.12.08(Basic rate based on Sept. 2008)
",
Chapter No.32(MA CIDNER Y) . 400%

Chapter No.33(HORTICULTURE)

All items except 33.12,33.21 to 33.31 500%

Item No.33.21 to 33.31 25%


(These items incorporated vide A&C slip No. 25 dated 1O.12.08(Basic rate based on Sept. 2008)

Item No. 33 .12 : , . 600%· .

Chapter No.34
(MAINTENACE OF BUILDING ROADS)~ ;:-; -=-.;::. 550%

Superin~nding ~gineer,

Constn. Circle No.2~~


pati;JConv~). -T' B&R Br.,

Endst.No. ! 0:12 r 4 ,

Copies are forwarded to

1) The Chief Engineer(S) Punjab, PWD B&R Br., Patiala.


2) The Chief Engineer(N.H.) Punjab, PWD B&R Br., Patiala.
3) The Chief Engineer(LP) Punjab, PWD B&R Br., Patiala.
4) The ChiefEngineer(N) Punjab, PWD B&R Br., Patiala.
5) The Chief Engineer(S) Punjab, PWD B&R Br., Patiala.
6) The Chief Engineer(Elect.&B ldg.) Punjab, PWD B&R Br., CHD.
7) The ChiefEngineer,Public Health(G.W.) PWD B&R Br., Patiala.
8) The Chief Engineer(C) Punjab, PSEB,Sect<JrS-A,Ch1ftidigarh.
9-12) The Chief Engineer, Punjab, (IE) ProjectIThein DamlDrainers/Hydal Bhawan See,. ] 8,
Chandigarh.
13) The Chief Engineer, Union Territory, Chandigarh.
14) The Chief Engineer, Punjab Small Scale Industries Corporation, CHD.
(5) The Housing Commissioner, Pb. Housing Development Board, near K.C.Chandigarh.
16) The ChiefEngineer,Goindwal Industrial and investment corpor~tion, CHD.
17) The Chief Engineer,S. Y.L.(Design)Sec.26, Chandigarh.
18) The ChiefEngineer,S.Y.L.(Const.) Sec. 26, Chandigarh.
19) The ChiefEngineer,(Lining) Irrigation Works Pb. Sec. 17, Chandigarh.
20) The ChiefEngineer/General Manager (Tubewell) Pb. State Tubewell C-urporation,
Chandigarh.
21) The Chief Engineer, Mukerian(Hydal Project) Sec.17, Chandigarh.
22) The Chief Engineer, Punjab, PWD (R WS Public Health) Patiala.
23) The Chief Engineer, Pb. Police Housing Corporation Sec. 8-C, CHD.
24) The ChiefEngineer,Pb. Mandi Board, Sec.17, Chandigarh.
25) The Managing Director, Pb. Water Supply and Sewerage Board, CHD.
The above copies may be distributed among the Superintending Engineers and Executive
Engineers.

supe~~ineer,

patial~nvel)yr)~
Constn. Circle No.2,~~&R Sr.,