There are several types of pile driving method in the piling construction, type of pile driving method used is
Jetty & Seawater Intake
depending on the condition of soil and location of the site . However, different piling machine will be used with for chemicals, coal, power plants , marine
different pile driving methods too. The specification for pile driving mentioned below is generally recommended terminals in Indonesia
www.swijetty.com
for pile driving of prestressed spun concrete piles by using percussion method. Engineers may be required to
modify some of the clauses to suit requirements of different site conditions.
Resonant Machines
High Tech Concrete Recycling Global
Leader-60 % Less Job Costs
How To Do Pile Driving With Percussion Method www.resonantmachines .com
Where such examination reveals defects in the welds, the joints shall either be rejected or repaired. If repeat tests show the weld to be still defective, the
joint shall be rejected. The defective weld shall be removed, replaced with a fresh weld and re-examined.
For the purpose of this Clause, cracks, leaks, laminations, lack of complete fusion, undercutting or reduction in wall thickness adjacent to the weld shall
constitute a defect .
Pile hammers shall be operated at the full rated efficiency and capacity and in the manner specified by the manufacturer, except as directed otherwise by the
Engineer, or noted herein below under Reductiono of Hammer Energy.
When a steam or air hammer is used for driving any type of piles, both the volume and pressure of steam or air recommended by the manufacturer of the
hammer shall be maintained at all times to ensure full energy of the driving blows . Before pile driving is started, the Piling Contractors shall provide written
certification to the Engineer that the pile hammer, compressors and valves have been inspected and found to be in good working condition .
2.4 Driving
The piles shall be driven to the driving resistance or tip elevation as determined by the Engineer from pile load tests. The maximum allowable variation at
the butt end of the pile shall be 150mm in any direction from the location shown on the Drawings or as directed by the Engineer. Any variation beyond
these limits shall be allowed or rejected at the sole discretion of the Engineer.
Bookmark
Related Articles
What Is ICP Piles
How To Produce Super Strength Pile (SS Pile)
Procedure Of How To Drive A Pile
AuGeo Piling System
What Is Bored Piles
E-mail required)
URI
K- E Persson AB
Seamless steelpipes,
Sheet Piles, Piling
equipment, and much
more!
www.kepab.com
Detailing Software
Antiseismic
Technologies Static
Dynamic Analysis
Software
www.pi. gr
Rock Drills
Get Free Import
Quotes Export Ready
Suppliers From India
IndiaMART.com /Industrial_
Plants
香港 敲擊 樂中心 HKPC
Rockin' regular
percussion courses!
ABRSM, Drum set,
Parent & Child
www.hkpercussion .com
Zueblin Cage
Machines
Auto- Reinforce Precast
Products Concrete
Pipes Piles Poles
www.cagemachine .com
Categories
AuGeo Piling System
Bored Pile
Deep Foundation
ICP Pile
Micropile
Pile Driving
Piling
Piling Machine
Retaining Wall
Sheet Piling
Super Strength Pile
Archives
June 2009
May 2009
April 2009
March 2009
Popular Tag
AuGeo Piling System Bored Pile Bored Piles Bored Piling Bored Piling Machine Cast-In- Situ Concrete Cold Formed Steel Concrete Pile Construction Deep Foundation
Extension Pile Ground Treatment ICP Piles Initial Pile Load Test Micropile Micro Pile Micro Piles Percussion Method Pile Pilecap Pile Driving Pile Head Piles Piling Piling
Construction Piling Contractor Piling Machine Precast Concrete Precast Concrete Pile Prestress Pile RC Square Pile Reinfored Concrete Retaining Wall Sheet Pile Sheet
Piling Spun Pile SS Pile Steel Pile Structural Foundation Super Strength Pile Timber Pile
Blogroll
Corrugated Drain Pipe
Dock Pilings
Vinyl Sheet Piling
Google AdSense Almost Spring Theme with SEO by David Law, based on Almost Spring theme
Piping Work | Concrete Curb | Piling | Pile Driving | Piling Construction