Você está na página 1de 18

-7.

000
Chainage At:3071.70M -3.750
-2.050
-1.875
38
-0.500
0.000
0.500
1.875
37 2.050
3.750
7.000

36 -7.000
-6 -4 -2 0 2 4 6 -4.155
-1.875
0.000
1.875
4.155
Name of work :- Upgradation of Barpeta Jania Howly Road under AACP in Barpeta District of Assam. 7.000
CONTRACT NO.BR-7A
CROSS SECTION AREA -7.000
( IN BARPETA END APPROCH OF BRIDGE NO.4/1) -3.750
Cross section No. : 7 Chainage: 3071.70 M Datum RL =30.00 FL = 40.995 -1.875
Existing Up to the Crown of the new
Earthwork in Core
Datum RL pavement 0.000
Level C/L C/L C/L 1.875
Offset Level Area Offset Level Area Offset Level Area 3.750
7.000
30.00 -7.000 39.830 -7.000 39.830 -7.000 39.830
30.00 -3.750 40.675 33.321 -4.155 40.580 29.033 -3.750 40.864 33.627
30.00 -2.050 40.705 18.173 -1.875 40.659 24.212 -1.875 40.929 20.431
30.00 -1.875 40.705 1.873 0.000 40.725 20.048 + 0.000 40.995 20.554
30.00 -0.500 40.725 14.733 1.875 40.659 20.048 + 1.875 40.929 20.554
30.00 0.000 40.725 5.363 4.155 40.580 24.212 3.750 40.864 20.431
30.00 + 0.500 40.735 5.365 7.000 40.465 29.936 7.000 40.465 34.659
30.00 + 1.875 40.670 14.716
30.00 + 2.050 40.625 1.863
30.00 + 3.750 40.460 17.922
30.00 + 7.000 40.465 34.003
147.332 147.489 150.257

Sectional Area in Core = 0.157 Sq.m


Sectional Area in Subgrade & Shoulder = 1.785 Sq.m
(-) Area of GSB = 4.10 X 0.100 = 0.410 Sqm
(-) Area of WBM Grade-II= 3.90 X 0.075 = 0.292 Sqm
(-) Area of WBM Grade-III= 3.75 X 0.075 = 0.281 Sqm
Total Deduction =0.983 Sqm

LENGTH OF THE SECTION = 10.00 M


TOP WIDTH OF THE SECTION= 7.50 M
SLOPE= 1 : 1.5
OVERALL CROSSFALL= 3.5%
HEIGHT OF SUBGRADE= NIL
HEIGHT OF SUB-BASE (GSB) = 100 mm
TOP WIDTH OF THE SUB-BASE (GSB)= 4.10 M
HEIGHT OF BASE (WBM GR.-II & III)= 150 mm
TOP WIDTH OF THE BASE (WBM Gr.-II)= 3.90 M
TOP WIDTH OF THE BASE (WBM Gr.-III)= 3.75 M

FE, LBGI ARE, LBGI RE, LBGI, BARPETA CONTRACTOR


39.830
40.675
40.705
40.705
40.725
40.725
40.735
40.670
40.625
40.460
40.465

39.830
40.580
40.659
40.725
40.659
40.580
40.465

39.830
40.864
40.929

40.995
40.929
40.864
40.465

3.750
7.5 1.875
0.13 0.07
0.860
0.71
0.15 0.08
0.02
-7.000
Chainage At:3091.70M -3.750
-2.050
-1.875
38
-0.500
0.000
0.500
1.875
37 2.050
3.750
7.000

36 -7.000
-6 -4 -2 0 2 4 6 -4.155
-1.875
0.000
1.875
4.155
Name of work :- Upgradation of Barpeta Jania Howly Road under AACP in Barpeta District of Assam. 7.000
CONTRACT NO.BR-7A
CROSS SECTION AREA -7.000
( IN BARPETA END APPROCH OF BRIDGE NO.4/1) -3.750
Cross section No. : 6 Chainage: 3091.70 M Datum RL =30.00 FL = 40.965 -1.875
Existing Up to the Crown of the new
Earthwork in Core
Datum RL pavement 0.000
Level C/L C/L C/L 1.875
Offset Level Area Offset Level Area Offset Level Area 3.750
7.000
30.00 -7.000 40.555 -7.000 40.555 -7.000 40.555
30.00 -3.750 40.495 34.206 -4.155 40.550 30.021 -3.750 40.834 34.757
30.00 -2.050 40.580 17.914 -1.875 40.629 24.144 -1.875 40.899 20.375
30.00 -1.875 40.590 1.852 0.000 40.695 19.992 + 0.000 40.965 20.498
30.00 -0.500 40.685 14.627 1.875 40.629 19.992 + 1.875 40.899 20.498
30.00 0.000 40.695 5.345 4.155 40.550 24.144 3.750 40.834 20.375
30.00 + 0.500 40.705 5.350 7.000 40.725 30.263 7.000 40.725 35.033
30.00 + 1.875 40.735 14.740
30.00 + 2.050 40.735 1.879
30.00 + 3.750 40.715 18.233
30.00 + 7.000 40.725 34.840
148.985 148.556 151.535

Sectional Area in Core = -0.430 Sq.m


Sectional Area in Subgrade & Shoulder = 1.996 Sq.m
(-) Area of GSB = 4.10 X 0.100 = 0.410 Sqm
(-) Area of WBM Grade-II= 3.90 X 0.075 = 0.292 Sqm
(-) Area of WBM Grade-III= 3.75 X 0.075 = 0.281 Sqm
Total Deduction =0.983 Sqm

LENGTH OF THE SECTION = 10.00 M


TOP WIDTH OF THE SECTION= 7.50 M
SLOPE= 1 : 1.5
OVERALL CROSSFALL= 3.5%
HEIGHT OF SUBGRADE= NIL
HEIGHT OF SUB-BASE (GSB) = 100 mm
TOP WIDTH OF THE SUB-BASE (GSB)= 4.10 M
HEIGHT OF BASE (WBM GR.-II & III)= 150 mm
TOP WIDTH OF THE BASE (WBM Gr.-II)= 3.90 M
TOP WIDTH OF THE BASE (WBM Gr.-III)= 3.75 M

FE, LBGI ARE, LBGI RE, LBGI, BARPETA CONTRACTOR


40.555
40.495
40.580
40.590
40.685
40.695
40.705
40.735
40.735
40.715
40.725

40.555
40.550
40.629
40.695
40.629
40.550
40.725

40.555
40.834
40.899

40.965
40.899
40.834
40.725

3.750
7.5 1.875
0.13 0.07
0.860
0.71
0.15 0.08
0.02
-20.000
Chainage At:3111.70M -18.000
-15.500
-11.500
38
-5.500
0.000
5.500
11.500
37 15.500
22.500
25.000

36 -20.000
-6 -4 -2 0 2 4 6 -4.155
-1.875
0.000
1.875
4.155
Name of work :- Upgradation of Barpeta Jania Howly Road under AACP in Barpeta District of Assam. 25.000
CONTRACT NO.BR-7A
CROSS SECTION AREA -20.000
( IN BARPETA END APPROCH OF BRIDGE NO.4/1) -3.750
Cross section No. : 5 Chainage: 3111.70 M Datum RL =30.00 FL = 40.475 -1.875
Existing Up to the Crown of the new
Earthwork in Core
Datum RL pavement 0.000
Level C/L C/L C/L 1.875
Offset Level Area Offset Level Area Offset Level Area 3.750
25.000
30.00 -20.000 38.005 -20.000 38.005 -20.000 38.005
30.00 -18.000 38.485 16.490 -4.155 40.060 143.117 -3.750 40.344 149.084
30.00 -15.500 38.555 21.300 -1.875 40.139 23.027 -1.875 40.409 19.456
30.00 -11.500 38.805 34.720 0.000 40.205 19.073 + 0.000 40.475 19.579
30.00 -5.500 39.295 54.300 1.875 40.139 19.073 + 1.875 40.409 19.579
30.00 0.000 40.205 53.625 4.155 40.060 23.027 3.750 40.344 19.456
30.00 + 5.500 40.625 57.283 25.000 38.580 194.271 25.000 38.580 201.065
30.00 + 11.500 39.645 60.810
30.00 + 15.500 39.055 37.400
30.00 + 22.500 38.595 61.775
30.00 + 25.000 38.580 21.469
419.171 421.587 428.219

Sectional Area in Core = 2.416 Sq.m


Sectional Area in Subgrade & Shoulder = 5.649 Sq.m
(-) Area of GSB = 4.10 X 0.100 = 0.410 Sqm
(-) Area of WBM Grade-II= 3.90 X 0.075 = 0.292 Sqm
(-) Area of WBM Grade-III= 3.75 X 0.075 = 0.281 Sqm
Total Deduction =0.983 Sqm

LENGTH OF THE SECTION = 10.00 M


TOP WIDTH OF THE SECTION= 7.50 M
SLOPE= 1 : 1.5
OVERALL CROSSFALL= 3.5%
HEIGHT OF SUBGRADE= NIL
HEIGHT OF SUB-BASE (GSB) = 100 mm
TOP WIDTH OF THE SUB-BASE (GSB)= 4.10 M
HEIGHT OF BASE (WBM GR.-II & III)= 150 mm
TOP WIDTH OF THE BASE (WBM Gr.-II)= 3.90 M
TOP WIDTH OF THE BASE (WBM Gr.-III)= 3.75 M

FE, LBGI ARE, LBGI RE, LBGI, BARPETA CONTRACTOR


38.005
38.485
38.555
38.805
39.295
40.205
40.625
39.645
39.055
38.595
38.580

38.005
40.060
40.139
40.205
40.139
40.060
38.580

38.005
40.344
40.409

40.475
40.409
40.344
38.580

3.750
7.5 1.875
0.13 0.07
0.860
0.71
0.15 0.08
0.02
-25.000
Chainage At:3131.70M -22.500
-15.500
-11.500
38
-5.500
0.000
5.500
11.500
37 15.500
22.500
25.000

36 -25.000
-6 -4 -2 0 2 4 6 -4.155
-1.875
0.000
1.875
4.155
Name of work :- Upgradation of Barpeta Jania Howly Road under AACP in Barpeta District of Assam. 25.000
CONTRACT NO.BR-7A
CROSS SECTION AREA -25.000
( IN BARPETA END APPROCH OF BRIDGE NO.4/1) -3.750
Cross section No. : 4 Chainage: 3131.70 M Datum RL =30.00 FL = 37.655 -1.875
Existing Up to the Crown of the new
Earthwork in Core
Datum RL pavement 0.000
Level C/L C/L C/L 1.875
Offset Level Area Offset Level Area Offset Level Area 3.750
25.000
30.00 -25.000 36.205 -25.000 36.205 -25.000 36.205
30.00 -22.500 35.383 14.485 -4.155 37.240 140.126 -3.750 37.524 145.868
30.00 -15.500 35.395 37.723 -1.875 37.319 16.597 -1.875 37.589 14.169
30.00 -11.500 35.745 22.280 0.000 37.385 13.785 + 0.000 37.655 14.292
30.00 -5.500 36.160 35.715 1.875 37.319 13.785 + 1.875 37.589 14.292
30.00 0.000 37.385 37.249 4.155 37.240 16.597 3.750 37.524 14.169
30.00 + 5.500 37.365 40.563 25.000 38.630 165.401 25.000 38.630 171.634
30.00 + 11.500 39.055 49.260
30.00 + 15.500 40.905 39.920
30.00 + 22.500 39.800 72.468
30.00 + 25.000 38.630 23.038
372.699 366.292 374.422

Sectional Area in Core = -6.407 Sq.m


Sectional Area in Subgrade & Shoulder = 7.147 Sq.m
(-) Area of GSB = 4.10 X 0.100 = 0.410 Sqm
(-) Area of WBM Grade-II= 3.90 X 0.075 = 0.292 Sqm
(-) Area of WBM Grade-III= 3.75 X 0.075 = 0.281 Sqm
Total Deduction =0.983 Sqm

LENGTH OF THE SECTION = 10.00 M


TOP WIDTH OF THE SECTION= 7.50 M
SLOPE= 1 : 1.5
OVERALL CROSSFALL= 3.5%
HEIGHT OF SUBGRADE= NIL
HEIGHT OF SUB-BASE (GSB) = 100 mm
TOP WIDTH OF THE SUB-BASE (GSB)= 4.10 M
HEIGHT OF BASE (WBM GR.-II & III)= 150 mm
TOP WIDTH OF THE BASE (WBM Gr.-II)= 3.90 M
TOP WIDTH OF THE BASE (WBM Gr.-III)= 3.75 M

FE, LBGI ARE, LBGI RE, LBGI, BARPETA CONTRACTOR


36.205
35.383
35.395
35.745
36.160
37.385
37.365
39.055
40.905
39.800
38.630

36.205
37.240
37.319
37.385
37.319
37.240
38.630

36.205
37.524
37.589

37.655
37.589
37.524
38.630

3.750
7.5 1.875
0.13 0.07
0.860
0.71
0.15 0.08
0.02
-25.000
Chainage At:3151.70M -22.500
-15.500
-11.500
38
-5.500
0.000
5.500
11.500
37 15.500
22.500
25.000

36 -25.000
-6 -4 -2 0 2 4 6 -4.155
-1.875
0.000
1.875
4.155
Name of work :- Upgradation of Barpeta Jania Howly Road under AACP in Barpeta District of Assam. 25.000
CONTRACT NO.BR-7A
CROSS SECTION AREA -25.000
( IN BARPETA END APPROCH OF BRIDGE NO.4/1) -3.750
Cross section No. : 3 Chainage: 3151.70 M Datum RL =30.00 FL = 37.475 -1.875
Existing Up to the Crown of the new
Earthwork in Core
Datum RL pavement 0.000
Level C/L C/L C/L 1.875
Offset Level Area Offset Level Area Offset Level Area 3.750
25.000
30.00 -25.000 35.605 -25.000 35.605 -25.000 35.605
30.00 -22.500 35.655 14.075 -4.155 37.060 131.997 -3.750 37.344 137.580
30.00 -15.500 35.655 39.585 -1.875 37.139 16.187 -1.875 37.409 13.831
30.00 -11.500 35.655 22.620 0.000 37.205 13.448 + 0.000 37.475 13.954
30.00 -5.500 36.935 37.770 1.875 37.139 13.448 + 1.875 37.409 13.954
30.00 0.000 37.205 38.885 4.155 37.060 16.187 3.750 37.344 13.831
30.00 + 5.500 38.605 43.478 25.000 38.335 160.450 25.000 38.335 166.587
30.00 + 11.500 39.955 55.680
30.00 + 15.500 40.995 41.900
30.00 + 22.500 39.500 71.733
30.00 + 25.000 38.335 22.294
388.019 351.716 359.738

Sectional Area in Core = -36.303 Sq.m


Sectional Area in Subgrade & Shoulder = 7.039 Sq.m
(-) Area of GSB = 4.10 X 0.100 = 0.410 Sqm
(-) Area of WBM Grade-II= 3.90 X 0.075 = 0.292 Sqm
(-) Area of WBM Grade-III= 3.75 X 0.075 = 0.281 Sqm
Total Deduction =0.983 Sqm

LENGTH OF THE SECTION = 10.00 M


TOP WIDTH OF THE SECTION= 7.50 M
SLOPE= 1 : 1.5
OVERALL CROSSFALL= 3.5%
HEIGHT OF SUBGRADE= NIL
HEIGHT OF SUB-BASE (GSB) = 100 mm
TOP WIDTH OF THE SUB-BASE (GSB)= 4.10 M
HEIGHT OF BASE (WBM GR.-II & III)= 150 mm
TOP WIDTH OF THE BASE (WBM Gr.-II)= 3.90 M
TOP WIDTH OF THE BASE (WBM Gr.-III)= 3.75 M

FE, LBGI ARE, LBGI RE, LBGI, BARPETA CONTRACTOR


35.605
35.655
35.655
35.655
36.935
37.205
38.605
39.955
40.995
39.500
38.335

35.605
37.060
37.139
37.205
37.139
37.060
38.335

35.605
37.344
37.409

37.475
37.409
37.344
38.335

3.750
7.5 1.875
0.13 0.07
0.860
0.71
0.15 0.08
0.02
-25.000
Chainage At:3171.70M -22.500
-15.500
-11.500
38
-5.500
0.000
5.500
11.500
37 15.500
22.500
25.000

36 -25.000
-6 -4 -2 0 2 4 6 -4.155
-1.875
0.000
1.875
4.155
Name of work :- Upgradation of Barpeta Jania Howly Road under AACP in Barpeta District of Assam. 25.000
CONTRACT NO.BR-7A
CROSS SECTION AREA -25.000
( IN BARPETA END APPROCH OF BRIDGE NO.4/1) -3.750
Cross section No. : 2 Chainage: 3171.70 M Datum RL =30.00 FL = 37.215 -1.875
Existing Up to the Crown of the new
Earthwork in Core
Datum RL pavement 0.000
Level C/L C/L C/L 1.875
Offset Level Area Offset Level Area Offset Level Area 3.750
25.000
30.00 -25.000 34.505 -25.000 34.505 -25.000 34.505
30.00 -22.500 34.705 11.513 -4.155 36.800 117.822 -3.750 37.084 123.130
30.00 -15.500 35.495 35.700 -1.875 36.879 15.594 -1.875 37.149 13.344
30.00 -11.500 35.825 22.640 0.000 36.945 12.960 + 0.000 37.215 13.467
30.00 -5.500 36.495 36.960 1.875 36.879 12.960 + 1.875 37.149 13.467
30.00 0.000 36.945 36.960 4.155 36.800 15.594 3.750 37.084 13.344
30.00 + 5.500 37.145 38.748 25.000 37.205 145.963 25.000 37.205 151.818
30.00 + 11.500 39.255 49.200
30.00 + 15.500 40.745 40.000
30.00 + 22.500 38.215 66.360
30.00 + 25.000 37.205 19.275
357.355 320.893 328.569

Sectional Area in Core = -36.462 Sq.m


Sectional Area in Subgrade & Shoulder = 6.692 Sq.m
(-) Area of GSB = 4.10 X 0.100 = 0.410 Sqm
(-) Area of WBM Grade-II= 3.90 X 0.075 = 0.292 Sqm
(-) Area of WBM Grade-III= 3.75 X 0.075 = 0.281 Sqm
Total Deduction =0.983 Sqm

LENGTH OF THE SECTION = 10.00 M


TOP WIDTH OF THE SECTION= 7.50 M
SLOPE= 1 : 1.5
OVERALL CROSSFALL= 3.5%
HEIGHT OF SUBGRADE= NIL
HEIGHT OF SUB-BASE (GSB) = 100 mm
TOP WIDTH OF THE SUB-BASE (GSB)= 4.10 M
HEIGHT OF BASE (WBM GR.-II & III)= 150 mm
TOP WIDTH OF THE BASE (WBM Gr.-II)= 3.90 M
TOP WIDTH OF THE BASE (WBM Gr.-III)= 3.75 M

FE, LBGI ARE, LBGI RE, LBGI, BARPETA CONTRACTOR


34.505
34.705
35.495
35.825
36.495
36.945
37.145
39.255
40.745
38.215
37.205

34.505
36.800
36.879
36.945
36.879
36.800
37.205

34.505
37.084
37.149

37.215
37.149
37.084
37.205

3.750
7.5 1.875
0.13 0.07
0.860
0.71
0.15 0.08
0.02
-25.000
Chainage At:3191.70M -22.500
-15.500
-11.500
38
-5.500
0.000
5.500
11.500
37 15.500
22.500
25.000

36 -25.000
-6 -4 -2 0 2 4 6 -4.155
-1.875
0.000
1.875
4.155
Name of work :- Upgradation of Barpeta Jania Howly Road under AACP in Barpeta District of Assam. 25.000
CONTRACT NO.BR-7A
CROSS SECTION AREA -25.000
( IN BARPETA END APPROCH OF BRIDGE NO.4/1) -3.750
Cross section No. : 1 Chainage: 3191.70 M Datum RL =30.00 FL = 38.255 -1.875
Existing Up to the Crown of the new
Earthwork in Core
Datum RL pavement 0.000
Level C/L C/L C/L 1.875
Offset Level Area Offset Level Area Offset Level Area 3.750
25.000
30.00 -25.000 36.365 -25.000 36.365 -25.000 36.365
30.00 -22.500 36.365 15.913 -4.155 37.840 148.047 -3.750 38.124 153.943
30.00 -15.500 37.065 47.005 -1.875 37.919 17.965 -1.875 38.189 15.294
30.00 -11.500 36.605 27.340 0.000 37.985 14.910 + 0.000 38.255 15.417
30.00 -5.500 37.865 43.410 1.875 37.919 14.910 + 1.875 38.189 15.417
30.00 0.000 37.985 43.588 4.155 37.840 17.965 3.750 38.124 15.294
30.00 + 5.500 38.055 44.110 25.000 37.305 157.844 25.000 37.305 163.930
30.00 + 11.500 39.255 51.930
30.00 + 15.500 41.020 40.550
30.00 + 22.500 38.225 67.358
30.00 + 25.000 37.305 19.413
400.615 371.643 379.294

Sectional Area in Core = -28.972 Sq.m


Sectional Area in Subgrade & Shoulder = 6.668 Sq.m
(-) Area of GSB = 4.10 X 0.100 = 0.410 Sqm
(-) Area of WBM Grade-II= 3.90 X 0.075 = 0.292 Sqm
(-) Area of WBM Grade-III= 3.75 X 0.075 = 0.281 Sqm
Total Deduction =0.983 Sqm

LENGTH OF THE SECTION = 10.00 M


TOP WIDTH OF THE SECTION= 7.50 M
SLOPE= 1 : 1.5
OVERALL CROSSFALL= 3.5%
HEIGHT OF SUBGRADE= NIL
HEIGHT OF SUB-BASE (GSB) = 100 mm
TOP WIDTH OF THE SUB-BASE (GSB)= 4.10 M
HEIGHT OF BASE (WBM GR.-II & III)= 150 mm
TOP WIDTH OF THE BASE (WBM Gr.-II)= 3.90 M
TOP WIDTH OF THE BASE (WBM Gr.-III)= 3.75 M

FE, LBGI ARE, LBGI RE, LBGI, BARPETA CONTRACTOR


36.365
36.365
37.065
36.605
37.865
37.985
38.055
39.255
41.020
38.225
37.305

36.365
37.840
37.919
37.985
37.919
37.840
37.305

36.365
38.124
38.189

38.255
38.189
38.124
37.305

3.750
7.5 1.875
0.13 0.07
0.860
0.71
0.15 0.08
0.02
CHANAGE= 80 + 850
62.4
62.2
62
61.8
VERTICAL AXIS

61.6
61.4
61.2
61
60.8
60.6
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

( CROSS SECTION OF RIGID ROAD NHAI 31 C)


Cross section No. : 1 Chainage: 80+850 M Datum RL
Existing
Earthwork in Core
Datum RL
Level C/L C/L
Offset Level Area Offset Level Area
60.00 -11.000 61.174
60.00 -9.500 61.20 1.77825
60.00 -8.000 61.230 1.82025 -8.000 61.230
60.00 -5.875 61.302 2.69025 -4.155 61.590 5.421
60.00 -3.750 61.420 2.892125 -1.875 61.669 3.715
60.00 -2.250 61.519 2.20425 0.000 61.735 3.192 +
60.00 -0.750 61.672 2.39325 1.875 61.669 3.192 +
60.00 0.000 61.735 1.277625 4.155 61.590 3.715
60.00 + 0.750 61.805 1.3275 6.630 62.275 4.782
60.00 + 1.720 62.043 1.86628
60.00 + 2.250 62.120 1.103195
60.00 + 3.750 62.219 3.25425
60.00 + 5.875 62.275 4.774875
60.00 + 6.630 62.290 1.723288
60.00 + 8.000 62.280 3.13045
60.00 + 9.500 62.255 3.40125
60.00 + 11.050 62.235 3.47975
60.00 + 12.000 61.97 1.997375
25.604 24.017

Sectional Area in Core = -1.587


Sectional Area in Subgrade & Shoulder = 2.115
(-) Area of GSB = 9.25 X 0.200 = 1.85 Sqm
(-) Area of DLC 1st layer = 9.00 X 0.075 = 0.675 Sqm
(-) Area of DLC 2nd layer = 9.00 X 0.075 = 0.675 Sqm
Total Deduction =2.000 Sqm

LENGTH OF THE SECTION = 12.00 M


TOP WIDTH OF THE SECTION= 10.25 M
SLOPE= 1 : 2
OVERALL CROSSFALL= 3.5%
HEIGHT OF SUBGRADE= 500 mm
HEIGHT OF SUB-BASE (GSB) = 200 mm
TOP WIDTH OF THE SUB-BASE (GSB)= 9.25 M
HEIGHT OF BASE (DLC-I & II)= 150 mm
TOP WIDTH OF THE BASE (PQC)= 8.50 M
13 14 15 16 17 18

=60.00 FL = 67.546
Up to the Crown of the new
pavement
C/L
Offset Level Area

-8.000 61.230
-3.750 61.874 6.595
-1.875 61.939 3.575
0.000 62.005 3.698
1.875 61.939 3.698
3.750 61.874 3.575
6.630 62.275 5.974

27.115

Sq.m
Sq.m

M
M

mm
mm
M
mm
M

Você também pode gostar