Você está na página 1de 4
No.5-76/21 m wernmront of tnd of Environment & Forests (1a-1) Division) Paryavaran Bhavan, New Bethie1 10003 Dated the 28" January, 20008 1 4/6 laning of Pune to Solapar section of NH-9 from Kun, 40.000 t0 Sui: Environmental clearance of Maharashtra under NHDP phase-SEL by National Highways Km, 249,000 in the Sta Authority of Indie - regarding. from National Highway Authority of India vse letters Reference is invited 38.2007 and No.11013/1/2UGM(Eny, 599, dated 28.12.2007 have bees No. 110131/2K/GM(Env. 502, dat taken into account. district n the stote of Moharesti It passes throngh 34 villages which are starts from Jan 40.000 to Kim.144.400 from Yawat nesr Pune to lndapur ionltursl: 45.90 %, Forest 7.94 %, Industrial Area 12.67 % and Barren ‘vaties from 40 1 to 45 m. The proposed ROW is 60m. The project road Forest Area. Total length which is passing throwgh forest is. 10,800 kan. posed to be acquired for the paoject, in which agricultural land is 192.74 rosed at Indapur town having length 7-14 kin, Service Roads are proposed 50. There are 37 no. tminor bridges, 1 major bridge, 301 culverss, 20 ‘bus stop lay beys are proposed. The proposed corridor does not passes snctuary ete, but this section ends at point (ie., Ki, 144.400) near the d Saictsary About 1616 no of trees are going to be felled against which jj. Environmental monitoring & management cost during construction & The capital cost of the project is Rs.821.27 erores. The profile of the wand profile, In general 40% of the corridor is plein terrain end 60% Is 2, The project road falls in Punt in Dound & Indapur Talula. town, Existing Jand use pattern is Land 33.03°%. Existing Right of wa} passes through 12 patches of Reserv Approximately 308.97 ha of land prt hia, forest Jand is 21.17. Bypass i pr in the town area having length 30. underpasses, ¢ tcuck lay bays and 6 through any National Park, Wildlife] poundazy of Great Indian Bustard Bi S000 no trees are Koing 10 be plant ‘operation pase is Ts.9.36504 ror cerrlageway is clase to the natural rolling tefrain. boy Expert Appraisal Confer at is meeting held on 22°40 24% August, 3. The proposal was consider ‘and has recommended. 2007 and 28" & 29” September, 2007 fined in the Ministry ef Environment & Forests and enwviromnental red under Environmient Implict Assessment Notification, 2006 subject fing conditions. 4, The proposal has been ex clearance to the project is hereby acc efective iniplementation of the fale (A) Specific Conditions: {i) Sidevalk:should be provided along the bridees. te noise wherever they are high (i) Appropriate measures as per TRC norms shauld be taken to mitigat fally as tinbitated locality for local eorminunity Gil Adgquate numberof underpasses|should be provided poy, eatle crossings, bus bey’, muck lnybays should be provided should ensure that anita! crossings ana! «stile mderpasses in dFores project propor rovided f . Pr (si) Projet proponent sould sup Scie for harvesting anwar ‘The details of the rainwater harvest ‘system may be provided t0 this Ministry within 3 months ffom the date of receipt ofthis leter (siti) The project proponent should ensure that the drain should be shifted inside end the utlity coridor ‘should be taken to the edge and should be raised to serve as footpath. recheck the necessity to provide a pavement under the median and (Gx) The project proponent should the details within 3 months from the date of receipt of this let. information provided and provid () To prevent damage to the agricultural land, the drainage Low should be diverted to the natural course avoiding the agricultural land. (iy Necessary mitigaive measures against adverse impact to the water bodies that are to affected should be provided. “(ai)_Enoroachment from outsiders and ribbon development should be contolled (sii) The road profile should be raised on the low lying structures to prevent flooding of road. (xiv) ‘The number of cross ‘works may be increased for fiee flow of water during floods as the ‘alignment passes through micro drainage areas and flood passage areas. (av) Green belt developiment may be undertaken as suggested in EMP. (si) The project proponent shoul obtain necessary permission fom the State Irrigation Department bf ‘drawing water from the river sources for the purpose of the proposed construction activity. No groundwater Should be drawn for.the project if this ig essential, permission from the concemed Authority should be taken in this regard. (avi). Permission from Groundwater Board for extraction of groundwater should be obtained and thei recommendations should be implemented. Covi) The hot mix plat shoukd be located atleast 500 ms. away from the habitation and onthe barren land to avoid its adverse impact on the human population. (rx) ‘The embankmenis/slopes and the slope left aftr cutting will be provided with vegetative wrfing ‘avoid soil erosion. F~ Ga)’ Noise barriers should be provided at appropriate locations particularly inthe areas where te alignment passes through inhabited areas schoolshoopitals, so ato ensure thatthe noise levels do not exces the prescribed standards. (oxi) “The project should be implemented anly after obtaining clearance under Forest (Conservation) Act 1980 for the forestland falling under the road section. fly ah utlisation as per provisions under Notification $.0. 763 (E) dated 14.9.1999 as amended vide S.0 (xxii) Detailed plan for use of tif in the project may be made and submitted to the Ministry. In any case, 797 (E) dated 27.8.2003 must be adhered to. (B) General Conditions: (Adequate provision for infrastrapture facilities including water supply fuel and sanitation ms be ensured Aa Sensection workers during the construction phase of the project in order to avoid any damage to the environment. (i) Appropriate measures must be taken while undertaking digging activities to avoid any likely degradation water quality. fr (ii) Borrow pits for earth, quarry site in view the following (@) No excavation or durap! (W)No excavation or dum valuable or sensitive lo (©) Excavation work shou! Development Agencies (@ Construction spoils in allowed to contaminate ing on private property is carried out without written consent ofthe “ng. should be allowed on wetlands, forest areas or other ¢00 tions. id be done in consultation with ‘working in the zea; and Fuding bituminous material and other hazardous materials must nt ‘water courses and the dump sites for such materials must be secured so is: the Soil Conservation and Wate they should not leach into the ground water. iv) The construction material shou! ‘opened, specific approvals from ___v) Adequate precautions should affect the environment adverse! vii) The projectsafected people, if bbe furnished to the Ministry. viii) ix) The project proponent will set the EMP etc as well as stipulated environment x) Full support should be extended proponents during their insp action plan including action protection activities. xi) A six-Monthly monitoring repo regarding the implementation xii) The Ministry or any other safeguards, subsequently, if de 1) The Ministry reserves th ‘complied with tothe satisfoct xiv)In the event of a change in pro ‘be made to the Ministry of Envi xv) The project proponents shoul closure and final approval o development work. xviJA copy of the clearance letter suggestion/representation has xvii) Safety provisions such as ‘the project proponent. Th norms/guidelines. xviii) State Pollution Control Bot District Industries Centre and vi) Borrow pits and other scars T “Adequate financial provision must be made in the project to imple ‘taken reports in respect of mit Jct profile or change inthe implementation agency, 2 fresh fe bus base, service roads, int lé be obtained only from approved quarries. In case new quarries are to be the competent authority should be obtained in this regard. taken during transportation of the construction material so that it does n0 4 during the road construction should be properly levelled and tested 1, should be adequately rehabilitated and the details in this regard should sent the aforesaid safeguards. separate environmental management cell fr effective implementation of 1 safeguards under the supervision of a Senior Executive. to the officers of this Ministry/Regional Office at Bhopal by the project ion of the project for monitoring purposes by furnishing full detals and iigative measures and other environmental st should be submited to the Regional Office of this Ministry at Bhops! the stipulated conditions, rity niay stipulate any other conditions or environmental ympetent author ‘which should be complied with. yed necessary, right to revoke this clearance if any of the conditions stipulated are not yn of the Ministry. rence should ironment & Forests as the Ministry, the date of financial inform the Regional office as well late of start of land the project by the concemed authorities and the d will be marked to concerned PanchayaVlocal NGO, if any, from whom any -n received while processing the proposal tersection improvement, etc. will be carried out by project proponent shoukl provide adequate facilites as per TRC 4 should display @ copy of the clearance letter at the Regional Office, ‘ollectar's Office/Tebsildar's officer for 30 days. xin)The project proponent should advertise atleast in two local newspapers widely circulated in the region around the project one of which should be inthe vemacolar language ofthe locality concemed informing that the project has been accorded environmental clearance and copies of clearance letters are available ‘vith the State Polltion Control Board and may also be seen at Website of the Ministry of Environment & Forests at http/l/orww.eavfor nic.in The advertisement should be made within ? days from the dae of isue lf the clearance letter and a copy of the same should be forwarded to the Regional Office of this Ministry at Bhopal xxx) The solid waste generated aoe be safely disposed of orused inthe project itself 5. ‘These stipulations would be enforced among others under the provisions of Water (Prevention and Control of Pollution) Act. 1974, the Air (Prevention and Control of Pollution) Ack 1981, the Eavitonmeat (Protection) Act, 1986, the Public Liability (Insurance) Act, 1991 and EIA Notification 1994 inghiding the Sine te ‘ XN | (Dr. AeSenthil Vel) ‘Additional Director To ‘The Chairman, National Highways Authority of Indio, G-5&6, Sector 10, Dwarka, “New Delhi —110 045. Copy for necessary action to:- 1. Chief Conservator of Forests, Ministry of Environment and Forests, Regional Office, Westem Region, ‘Kendriya Paryavaran Bhavan’, Link Road No3, Ravishankar Road, Bhopal —462016 (M. 2 Menhe: Seartay, Maharashtra State Pollution Control Board, Kalpatara Point, 3% and 4* Floor, Sion Matunga Scheme Road No.8, Opposite Cine Planet Cinems, Near Sion Circle, Sion (East), Mumbai ~ 400022. ' 3. ‘The Secretary, Ministry of Road Transport & Highways, Transport Bhavan, 1, Parliament Street, New Delhi-110001 ‘The Chairman, Central Pollution Control Board, Parivesh Bhavan, CBD-cim- Office Complex, East Arjan ‘Nagar, Delhi -110032. | Director (E), Ministry of Environment & Forests ‘The Regional Office Cell, MoEF. Guard File Monitoring File mnal Director

Você também pode gostar