DETAILED CUM ABSTRACT ESTIMATE

Civil works construction for the Asthor shed at Baco farm, Ethiopia

MEASUREMENTS Total Qty


Sl No DESCRIPTION No
L B D
1 Excavation for the footings work 6x25 1.00 1.00 1.00 150.00 Cum
1x9 1.00 1.00 1.00 9.00 Cum

Total 159.00 Cum

2 Pre concrete for the footings in (1:2:4) prop


6x25 1.00 1.00 0.30 45.00 Cum
using 20mm aggregate
20 mt shed center columns 1x9 1.00 1.00 0.30 2.70 Cum
Balance concrete footings 6x25 1.00 1.00 1.00 150.00 Cum
1x9 1.00 1.00 1.00 9.00 Cum
Total 206.70 Cum

3 Construction of the RR masonary wall


around
in 1:6 prop with RR stones 1x1 303.00 0.45 0.60 81.81 Cum

4 PCC 1:5:10 with 40mm metal 1x1 72.00 80.00 0.10 576.00 Cum

granolithic flooring 2 " thick with plastering


5 1x1 72.00 80.00 0.05 288.00 Cum
20mm thick in CM(1:3) with smooth finish

Approximate Total cost of the civil works for


the Aster shed of size 71.2 mts x 80mts
3804510 Birrs

EXACT ESTMATE AMOUNT WILL BE ARRIVED ONCE THE RATES OF THE MATERIALS KN
BY LAST WEEK OF JAN
opia

Total
Approximate
Amount in
rates
Birrs

15900
100
Cum

4000 826800
Cum

1000 81810
Cum
3000 1728000
Cum

4000 1152000

Cum

3804510 Birrs

MATERIALS KNOWN