Risk Sources Affected Project Areas


Risk Risk Affected
Risks Risk
No. Sources Risks Project
No.
Power failure during Areas
3 lab equipment Physical injury
commissioning 1 (during moving or
Failure of UWS installation)
4
connectivity Power failure during
8 Failed drainage University of 3 lab equipment
10 Pipe burst Alberta commissioning
Fire alarm pulled Facilities Damaging equipment
13 5
during move during move
Building codes 6 Movers are absent
14 change for regulatory Damaging
items 7
experiments Migration
15 Elevator fails 8 Failed drainage Process
Physical injury 9 Exploding equipment
1 (during moving or 10 Pipe burst
installation) Power outlets don't
Damaging equipment 12
5 match layout
during move Movers Fire alarm pulled
6 Movers are absent 13
during move
Damaging Building codes
7
experiments 14 change for regulatory
9 Exploding equipment items
2 Late arriving furniture 15 Elevator fails
Available inventory 2 Late arriving furniture
11 matches
Vendors
Available inventory
requirements 11 matches
Procurement
Power outlets don't requirements
12
match layout
Layout Plan
Failure of UWS Stakeholder
4
connectivity Satisfaction