STS STS RF OUTPUT
STS TYPE INSTALLATION INSTALLATION POWER*
Type
[g] Room
o Stack On Floor
[8J EDGE Flexi STS o Wall Mounted o Sun Shelter
o Pole Mounted 020W
[8J Indoor Cabinet o Container [8j40W
o Outdoor Cabinet
-~-----.-.--.--.--.--. ---------~- ~-~--- _._- Note: * RF output power is one carrier's output RF power
Power system Type ---T
Power S_y_stem Serial NO~-~~==r
PC Serial No.
Rectifier Model/Capacity - ---
Rectifier Serial No.
Available Breaker: Detail check list on individual Battery voltage test
-------·-----------------------I~------------
==_~~=====-:=~~-~=~=~=~=F- --~=~====~~~_==
Rectifier 1 :
Rectifier 2:
Rectifier 3 Rectifier 4:
Rectifier 5:
Rectifier 6:
Rectifier 7:
Rectifier 8:
BATTERIES
--~---~---,-- I
Battery Manufacturer: Battery Model: EOSG 400Ah
---'-,,-------"'--~~-- No. of battery banks: I Battery Breakers:
Battery Type :Gel type Battery Capacity
AH
-----------~
Battery Voltage: Bank 1 V I Bank 2 : V I Bank 3 : V
I I
I. __ . --_ ----, ---,------ __ - -- - .-----~-~-----------------
Battery Bank #1 (V/Cell)
85 --~-. B12
B1 B2 B3 B4 B6 B7 B8 B9 B10 B11
INSTALLATION PHASE & RELATED DOCUMENTS OK N/A Comments
Access/usage permission to building or area is arranged (e.q., keys,
security clearance).
Lightning protection for antenna system checked. ../
Cable ladder/support structure from antenna to entry point to cabinets ,;
checked.
BTS cabinet position and layout in accordance with Nokia Siemens site- ../
specific documents.
Cable ladder position and cable access to top proper side of cabinets for ../
antenna feeder cables,eower, and PCM cables checked.
Flexi EDGE BTS equipment grounding bus bar or ground cables installed ,;
and connected to the main site grounding system
DC power distribution board with clearly labeled fuses/circuit breakers for ../
each cabinet DC checked.
Availability of DC mains supply checked. ../
Alarm systems installed with cables labeled and run to the Alarm Terminal ,;
Block location. 2.2 Delivery Equipments
Power System Description OK N/A Comments
I
Brand & capacity as per required load 'i
Rectifier rack is installed properly ~
Rectifier Rectifier modules are properly working ~
Installation All the rectifier modules are sharing the load properly ~
External alarms are connected and working properly "
All alarm cables should be marked clearly ._j
Batteries are connected In series/parallel to make required .:
voltage 48V with due polarity
Battery screws are tightened properly ._j
There are some gap between batteries installed ._j
Battery Battery terminal are covered with plastic cover ._j
Installation
Positive and Negative terminals are properly connected to ._j
the rectifier corresponding terminal.
Battery should be as per rating ._j
Ground cable is connected to battery rack ~ 2.7 Finish Installation
__ ~ ___ ,u~_,~. __ __ ,,~,,_u,. ____ , ___ ,_ u __ u. _ --'~--------'----'----
COMMISSIONING FILES
-
FILE DATA File Name
Site Information Report (html) Siteinf html [g]
-
_-,,'+ ---,,------.----~--,,------- --_-
BTS Commissioning Report (txt) ~ BTScomreport_ .txt [8J
_-------- 3.2.2 HW Information and BTS tests
[8J TRS units' product codes and serial numbers are added in BTS HW Report file
[8J BTS dummy units' and cabinet parts' product codes and serial numbers are added in BTS HW Report file
[8J BTS EDGE Loop Test results included in Commissioning Report.txt file
~ BTS EDGE Transmitter Output Power Level Test results included in Commissioning Report.txt file
3.2.3 Software Versions
I BTS SW Version
ITEM
132c
VERSION
3.2.4 Remote Access Test
TEST INITIALS / DATE COMMENTS
Remote from BTS Manager to BTS OK/ [8J
.---_ ----_----- -"'_ -, -,- -.-,~- ___ - f--..---,--~,-,~-----,
External Alarm Tests" OK! [g]
,-_,---_-
BTS Restart OK! [8J
--_-_-- * Note: External Alarm (EAC) setting and test result are show in BTS Commissioning Report (txt) and Work Instruction,
Site acceptance certificate for telecom implementation works
C!k4f?uJL -
SITE 10:
SITE ADDRESS:
PO NUMBER:
SITE NAME:
STAGE COMPLETE (Initials/Signature)
EDGE FLEXI STS Site Installation
---,~ .--~-~.--~--------------- --- ... -~---- ~-~-.--- ------
EDGE FLEXI STS Site Commissioning
---.-- ----_-----_----_----- --_--- -- - ------- -- - --~ ~---.-- ------------
EDGE FLEXI STS Site Integration
~---
EDGE FLEXI STS Site Implementation Zip File
Site Folder and Attached Documents Partner states that the whole of supplies detailed above have been Inspected, implemented, tested and unless otherwise stated conform to the specified requirements In the contract or order identified above.
PARTNER's REPRESENTATIVE: DATE _
I
NSN's REPRESENT A TlVE: ~-+-] ~-"'---,~>"J.\~: y'd_~A_\T"f\_VV'- DATE: J n / 0 ~ I ~ 0 II
Select the correct check number and point to check in Flexi BTS Implementation Check List. Type the description of point to check and your comments for failure description.
When completed, type what was done.
r I
Cl~ I
Completed by / date
Check DefecVFailure Description no.
Owner Raised by /date
----------+-------1
------------------+-----------
*1
Customer's REPRESENTATIVE: __ ---:_.....=~~~-r---",.__._-:- __ DATE 3D /o:}; / 2__nll
il-{j TJriA;(O\.....,
NSN's REPRESENTATIVE: ~_\L-#\._""--4c#I-7-\_~'__-'-A"=_t;-O\.-W\.----- DATE: '3 6 I ib ~ I e{ 0 II
Site acceptance certificate for telecom Implementation works
SITE NAME:
{]~{AIL .
(!N/)oOO1;
SITE ADDRESS:
,l}5,{?1tpU 1(/ /JZ/7L{ /Ab
SITE 10:
STAGE COMPLETE (Initials/Signature)
EDGE FLEXI BTS Site Installation
--------------~----------- ~"~"'-~-~---------~-
EDGE FLEXI BTS Site Commissioning
-,~~--~-----~-~--,,-~------ --~--~-------~---~-~--~-~---
EDGE FLEXI BTS Site Integration
EDGE FLEXI BTS Site Implementation Zip File
EDGE BTS Site Folder and Attached Documents
Customer-NSN Site Acceptance Certificate NSN hereby states that the whole of supplies detailed above have been Inspected, implemented, tested and unless otherwise stated conform to the specified requirements in the contract or order identified above.
rrl~~v>. At"w-__ Q fl
NSN's REPRESENTATIVE: __:_~~I---l~---.--_--_ DATE:~/ ~I e<.O It