LIST OF APPLICABLE WORKSECTIONS

PROJECT REFERENCE NO.: PROJECT TITLE: eNPQS V1.0 1.0 1.0 1.0 1.0

BASE SPECIFICATION VERSION OF GENERAL REQUIREMENTS BASE SPECIFICATION VERSION OF ARCHITECTURE BASE SPECIFICATION VERSION OF CIVIL & STRUCTURE BASE SPECIFICATION VERSION OF MECHANICAL & ELECTRICAL

THE APPLICABLE WORKSECTIONS FOR THIS PROJECT ARE AS FOLLOWS: GENERAL REQUIREMENTS GENERAL REQUIREMENTS ARCHITECTURE A1-10 CURTAIN WALLS A1-20 WINDOWS A1-30 SUN-SCREENS AND LOUVRES A1-40 METAL CLADDING A1-50 ARCHITECTURAL PRECAST CONCRETE CLADDING A1-60 STONE CLADDING A1-70 EXTERNAL MASONRY A1-80-1 EXTERNAL RENDER A1-80-2 EXTERNAL WALL TILING A1-80-3 EXTERNAL PAINTING AND COATING A2-10 METAL ROOFS A2-20 TILE ROOFING A2-30 APPLIED FINISHES FOR FLAT ROOFS A2-40 SKYLIGHTS A3-10 HARDSCAPE A3-20 POOL FINISHES A3-30 SOFTSCAPE A3-40 EXTERNAL METALWORK A3-50 EXTERNAL TIMBERWORK A4-10 INTERNAL PLASTER AND RENDER A4-20 INTERNAL PAINTING AND COATING A4-30 FLOOR SCREEDS AND HARDENERS A4-40 INTERNAL TILING A4-50 TIMBER FLOORING A4-60 RESILIENT FLOORING A4-70 CARPETS A4-80 SUSPENDED CEILING A4-90 RAISED FLOOR A4-100 INTERNAL WATERPROOFING A5-10 DRY WALL PARTITIONS A5-20 INTERNAL MASONRY A5-30 GLASS PARTITIONS A6-10 INTERNAL DOORS A6-20 EXTERNAL DOORS A6-30 ROLLER SHUTTER DOORS A7-10 FIXTURES AND FITTINGS

CIVIL & STRUCTURE C1-10 DEMOLITION AND SITE CLEARANCE C1-20 CONDITION SURVEY AND MONITORING C2-10 SITE INVESTIGATION C2-20 GENERAL EARTHWORKS (EXCAVATION AND FILLING) C2-30-1 DIAPHRAGM WALL C2-30-2 SHEET PILING C2-30-3 CONTIGUOUS BORED PILE WALLS AND SECANT PILE WALLS C2-40-1 JET GROUTING METHOD C2-50 INSTRUMENTATION AND MONITORING C3-10 CONCRETE CONSTRUCTION GENERALLY C3-20 REINFORCEMENT C3-30 FORMWORK AND FALSEWORK C3-40 DESIGNED JOINTS C3-50 WATER-RESISTANCE TO CONCRETE STRUCTURES C3-60 PRECAST CONCRETE WORKS C3-70 PRESTRESSED CONCRETE WORKS C3-80 CONCRETE REPAIR C3-90-1 FERROCEMENT C3-100 SPRAYED CONCRETE C4-10 BORED PILING WORKS C4-20 DRIVEN PILING C4-30 PILE TESTING C5-10 STRUCTURAL STEELWORK C5-20 PROTECTIVE WORKS FOR STRUCTURAL STEELWORK C6-10 BUILDING SEWERS CONSTRUCTION C6-20 BUILDING DRAIN CONSTRUCTION C7-10 CONSTRUCTION OF ESTATE ROADS, DRIVEWAYS AND FOOTWAYS C7-20 PAVING FOR ESTATE ROADS, DRIVEWAYS AND FOOTWAYS C7-30 ROAD ANCILLARIES C8-10 STRUCTURAL TIMBERWORK MECHANICAL & ELECTRICAL E1-10 HV SWITCHGEAR E1-20 GAS INSULATED SWITCHGEAR E1-30 HV RINGMAIN UNITS E1-40 PROTECTIVE RELAYS E2 - POWER TRANFORMERS E3 - EARTHING & BONDING E4-10 LV SWITCHGEAR ASSEMBLIES E4-10-1 AIR CIRCUIT BREAKERS E4-10-2 MOULDED CASE CIRCUIT BREAKERS E4-10-3 PROTECTIVE RELAYS E4-10-4 SWITCHES, DISCONNECTORS & FUSE COMBINATION UNITS E4-10-5 INSTRUMENTS & METERING E4-10-6 POWER FACTOR CORRECTION E4-20 DISTRIBUTION BOARDS USING MCB'S AND FUSES E4-30 DISTRIBUTION PILLARS E5 - ELECTRICITY GENERATING PLANT E6-10 HIGH VOLTAGE POWER CABLES E6-20 LOW VOLTAGE POWER CABLES E6-30 LOW VOLTAGE WIRING CABLES

E6-40 STRUCTURED CABLING E7 - DRAWPITS, MANHOLES, CABLES LADDERS, CABLE TRAYS, TRUNKING & CONDUITS E8 - BUSBAR TRUNKING E9 - LUMINAIRES & LAMPS E10 - WIRING ACCESSORIES E11 - LIGHTNING PROTECTION SYSTEMS E12 - UNINTERRUPTIBLE POWER SUPPLY E13-10 MASTER ANTENNA & CABLE TV E13-20 PUBLIC ADDRESS SYSTEM E13-30 TELEPHONE SYSTEMS E13-40 AUDIO-VISUAL SYSTEMS E14-10 INTRUDER DETECTION & ALARM E14-20 CLOSED CIRCUIT TV SYSTEMS E14-30 ACCESS CONTROL SYSTEMS E14-40 WATCHMAN TOUR SYSTEMS E14-50 CAR PARKING SYSTEMS E15 - MISCELLANEOUS SYSTEMS F1-10 SPRINKLER CONTROL & ALARM VALVES - WET & PRE-ACTION SYSTEMS AND DRY & PRE-ACTION SYSTEMS F1-20 PIPEWORK, VALVES & FITTINGS F1-30 FIRE PUMPS F1-40 SPRINKLER WATER STORAGE F1-50 RELATED ELECTRICAL WORKS F1-60 SYSTEM COMMISSIONING & TESTING F2 - FIRST AID SYSTEM APPLIANCES F3 - WET & DRY RISING MAIN SYSTEMS F4 - FIRE HYDRANT SYSTEMS F5 - FIRE DETECTION & ALARM SYSTEMS F6 - GAS FLOODING SYSTEMS L1 - LIFTS L2 - ESCALATORS & MOVING WALKWAYS L3 - PLATFORMS FOR THE DISABLED L4 - DUMB WAITERS M1-10 CIRCULATION PUMPS M1-20 PIPEWORK, VALVES & FITTINGS M1-30 EXPANSION TANK M1-40 WATER TREATMENT M1-50 SYSTEM COMMISSIONING & TESTING M2-10 WATER CHILLERS M2-20 COOLING TOWERS M2-30-1 AIR COOLED PACKAGED AIR CONDITIONING UNIT M2-30-2 WATER COOLED PACKAGED AIR CONDITIONING UNIT M2-30-3 CLOSE CONTROL AIR CONDITIONING UNIT M2-30-4 VARIABLE REFRIGERANT VOLUME AIR CONDITIONING UNIT M2-30-5 AIR COOLED SPLIT AIR CONDITIONING UNIT M2-30-6 WINDOW MOUNTED AIR CONDITIONING UNIT M2-40 SYSTEM COMMISSIONING & TESTING M3-10 DUCTWORK SYSTEMS M3-20 AIR SYSTEMS INSULATION M3-30 AIR HANDLING UNITS M3-40 FAN COIL UNITS M3-50 AIR TERMINAL DEVICES M3-60 FANS & FAN UNITS M3-70 SPECIAL EXTRACT SYSTEMS

M3-80 RELATED ELECTRICAL WORKS M3-90 SYSTEM COMMISSIONING & TESTING M4-10 CONTROLS & MONITORING M4-20 SYSTEM COMMISSIONG & TESTING P1 - HOT & COLD WATER SYSTEMS P2 - COMPRESSED AIR SERVICES P3 - BOILER & STEAM SERVICES P4 - SOIL, WASTE & VENT SERVICES P5 - DRAINAGE SERVICES P6 - GAS DISTRIBUTION P7 - SWIMMING POOL FILTRATION & STERILIZATION PLANT