STANDARD MATERIAL CONSUMPTION FOR VARIOUS ITEMS

(A) SR. NO. 1 2 3 (B) SR. NO. ITEMS IN PLINTH Excavation in black cotton soil Compacted murum filling Rubble soiling 23 cm (9) thick UNIT PER 100 cft 1 cum 100 cft 1 cum 100 sft 1 sqm CEMENT LOOSE SOIL 150 cft 1.5 cum LOOSE MURUM 150 cft 1.50 cum 90 cft 0.26 cum SAND METAL 25 mm (1) 65 cft 0.65 cum 65 cft 0.65 cum METAL 20 mm ( ) 20 cft 0.20 cum 20 cft 0.20 cum 65 cft 0.65 cum 65 cft 0.65 cum METAL 12 mm () RUBBLE

CONCRETE ITEMS

UNIT PER

1 2 3 4

P.C.C. (1 : 4 : 8) P.C.C. (1 : 3 : 6) R.C.C. (1 : 2 : 4) R.C.C. (1 : 1 : 3)

100 cft 1 cum 100 cft 1 cum 100 cft 1 cum 100 cft 1 cum

9 bags 3.18 bags 12 bags 4.24 bags 17 bags 6.00 bags 22 bags 7.77 bags

60 cft 0.60 cum 60 cft 0.60 cum 60 cft 0.60 cum 60 cft 0.60 cum

20 cft 0.20 cum 20 cft 0.20 cum

(C) SR. CONCRETE BLOCKS NO. Solid cement concrete block 30x15x20 cm (12 x 6 x 8) Solid cement concrete block 30x10x20 cm (12 x 4 x 8)

UNIT PER 35 Nos. 35 Nos. 50 Nos. 50 Nos.

CEMENT

SAND

1 2

11 bags 1 bags 1 bags 1 bags

3.75 cft 0.11 cum 3.75 cft 0.11 cum

SHINGLE METAL 12 mm () 2.50 cft 7.00 cft 0.07 cum 0.20 cum 2.50 cft 0.07 cum 7.00 cft 0.20 cum

STONE GRIT 5.50 cft 0.16 cum 5.50 cft 0.16 cum

STONE DUST 2.50 cft 0.07 cum 2.50 cft 0.07 cum

(D)
SR. NO. MASONRY ITEMS (excluding R.C.C. band UNIT PER CEMENT SAND RUBBLE BRICKS 23X 10X 7 cm BRICKS 23X 15X 9 cm BRICKS 23X 10X 7 cm BRICKS 23X 10X 7 cm

1 2 3 4 5

U.C.R. masonry in C.M. 1:6 23 cm (9) B.B.M. in C.M. 1:6 15 cm (6) B.B.M. in C.M. 1:6 10 cm (4) B.B.M. in C.M. 1:4 15 cm (6) concrete block masonry in C.M. 1:6 10 cm (4) concrete block masonry in C.M. 1:4

100 cft 1 cum 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm

4.50 bags 1.60 bags 2.50 bags 0.27 bags 1.50 bags 0.16 bags 1.00 bags 0.11 bags 1.00 bags 0.11 bags 1.00 bags 0.11 bags

40 cft 125 cft 0.40 cum 1.25 cum 20 cft 0.06 cum 15 cft 0.05 cum 8 cft 0.25 cum 11 cft 0.03 cum 8 cft 0.25 cum

1000 Nos. 110 Nos. 400 Nos. 45 Nos. 475 Nos. 50 Nos. 145 Nos. 16 Nos. 145 Nos. 16 Nos.

(E)
SR. NO. PLASTERING ITEMS UNIT PER CEMENT SAND

Sanla finish plaster 12.5 mm () thick a) In C.M. 1 : 4 b) In C.M. 1 : 5 c) In C.M. 1 : 6

Sanla finish plaster 20 mm () thick a) In C.M. 1 : 4 b) In C.M. 1 : 5 c) In C.M. 1 : 6 Sanla faced plaster Single coat 15 to 20 mm thick a) In C.M. 1 : 4 b) In C.M. 1 : 5 c) In C.M. 1 : 6 Sanla faced plaster Double coat 15 to 20 mm thick a) In C.M. 1 : 4

100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm

1.50 bags 0.16 bag 1.20 bags 0.13 bag 1.00 bags 0.11 bag 2.4 bags 0.26 bag 1.90 bags 0.21 bag 1.60 bags 0.17 bag 2.25 bags 0.24 bag 1.8 bags 0.19 bag 1.5 bags 0.16 bag 3.75 bags 0.41 bag

11.0 cft 0.03 cum 11.0 cft 0.03 cum 11.0 cft 0.03 cum 18 cft 0.06 cum 18 cft 0.06 cum 18 cft 0.06 cum 17.0 cft 0.05 cum 17.0 cft 0.05 cum 17.0 cft 0.05 cum 28.0 cft 0.09 cum

SANLA (30 Kg bag) 0.60 bag 0.07 bag 0.60 bag 0.07 bag 0.60 bag 0.07 bag 0.60 bag 0.07 bag 0.60 bag 0.07 bag 0.60 bag 0.07 bag

b) In C.M. 1 : 5 c) In C.M. 1 : 6

100 sft 1 sqm 100 sft 1 sqm

3.0 bags 0.32 bag 2.5 bags 0.27 bag

28.0 cft 0.09 cum 28.0 cft 0.09 cum

(F)
SR. NO. FLOORING & TILING UNIT PER CEMENT SAND LIME (30 kg/bag) TILES WHITE CEM ENT

1 2

Mosaie tile flooring (25 cm x 25 cm) Mosaie tile flooring (25 cm x 12.5 cm) Stone flooring (marble, kotah, tandoor etc. (45 cm x 60 cm uncut size) (after cutting 40 cm x 55 cm) Rough shahabad stone flooring (45 cm x 60 cm uncut size) (after cutting 40 cm x 55 cm) Chequered tile flooring (25 cm x 25 cm) Crazy (Tukda) mosaic flooring

100 cft 1 cum 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm

1.0 bags 1.11 bags 2.0 bags 0.65 bags 2.0 bags 0.22 bags 0.75 bags 0.08 bags 1.25 bags 0.13 bags 2.50 bags 0.27 bags 3.5 bags 0.38 bags 3.5 bags 0.38 bags

16 cft 0.05 cum 2 cft 0.01 cum 16 cft 0.05 cum 18 cft 0.06 cum 16 cft 0.05 cum 16 cft 0.05 cum 16 cft 0.05 cum

2.0 bags 0.2 bags

150 Nos. 16 Nos. 125 Nos. 14 Nos. 43 Nos. 5 Nos.

5 kg 0.55 kg 2 kg 0.65 kg 2 kg 0.221 kg

4 5

2.0 bags 0.2 bags 2.0 bags 0.2 bags 2.0 bags 0.2 bags

40 Nos. 4 Nos. 150 Nos. 16 Nos. required tukda required tukda

6 I.P.S. flooring Glazed tile dado (15 cm x 15 cm)

7 8

100 sft 1 sqm 100 sft 1 sqm

420 Nos. 45 Nos.

2 kg 0.22 kg

(G)
SR. NO. WATER PROOFING UNIT PER CEMENT SAND BRICKBAT LIME (30 kg/bag) KAVADI (in kg) WHITE CEM ENT

1 2 3

Brickbat coba W/P in W.C. bath, toilet etc. Brickbat coba W/P To terrace. Glazed china mosaie (Kavadi) type W/P to terrace (including brick bat coba)

100 sft 1 sqm 100 sft 1 sqm 100 sft 1 sqm

6.0 bags 0.65 bags 4.0 bags 0.43 bags 5.0 bags 0.50 bags

30 cft 0.09 cum 30 cft 0.09 cum 45 cft 0.14 cum

30 cft 0.09 cum 30 cft 0.09 cum 30 cft 0.09 cum

1.20 bags 0.13 bag

125 kg 13.5 kg

25 kg 2.07 kg

CALCULATIONS OF SHUTTERING MATERIAL REQUIREMENT BY QUICK METHOD ESTIMATION FOR 232 sqm (2500 sft) OF SLAB AREA SR. MATERIAL REQUIRED UNIT MULTIPLYING CONSTANT BY THUMB RULE 0.02 0.22 50 sheets of plywood x 65 50 sheets of plywood x 19.82 2500 sft x 0.24 232 sqm x 0.79 600 rft beam bottom x 0.5 183 rft beam bottom x 1.65 2500 sft x 0.16 232 sqm x 1.72 2500 x 0.4 232 x 1.31 2500 x 0.16 232 x 1.72 2500 x 0.020 232 x 0.22 2500 x 0.006 232 x 0.065 2500 x 0.08 232 x 0.86 APPROXIMATE QUANTITY OF MATERIAL REQUIRED 50 Nos. Sheets 50 Nos. Sheets 3250 rft 990 rm 600 rft 183 rm 300 Nos. 300 Nos. 400 Nos. 400 Nos. 1000 rft 305 rm 400 Nos. 400 Nos. 50 kg 50 kg 15 litres 15 litres 200 Nos. 200 Nos.

1 2

Plywood 12 m thick of Size 2.44 x 1.22 m (8-0 x 4-0) Silver oak battern of Size 75 mm x 40 mm (3 x 1 ) Beam bottom planks 40 mm thick (1 ) Wooden props a) For beams b) For slab

2500 sft 232 sqm 2500 sft 232 sqm 2500 sft 232 sqm 2500 sft 232 sqm 2500 sft 232 sqm 2500 sft 232 sqm 2500 sft 232 sqm 2500 sft 232 sqm 2500 sft 232 sqm 2500 sft 232 sqm

3 4

5 6 7 8 9

Wooden batten for supporting Slab plates 75 mm x 75 mm (3 x 3) Steel plates of size 60 mm x 90 cm (2-0 x 3-0) Wire nails Shuttering oil M.S. clamps (Shikanja)

CONSUMPTION OF STEEL IN KG PER SQM OR SFT OF WORK SR. NO. 01 02 03 04 05 06 07 08 ITEMS Footing Columns up to plinth Tie beam Column (super structure) Slab Beam Chajja/loft/lintel Over head water tank TOTAL CONSUMPTION OF STEEL on built-up area 0.55 kg/sqm 0.05kg/sft 2.15 kg/sqm 1.15 kg/sqm 4.80 kg/sqm 7.0 kg/sqm 7.5 kg/sqm 0.55 kg/sqm 0.55 kg/sqm 24.25 kg/sqm 0.20kg/sft 0.10kg/sft 0.45kg/sft 0.65kg/sft 0.70kg/sft 0.05kg/sft 0.05kg/sft 2.25kg/sft

CONSTANTS FOR ESTIMATING THE APPROXIMATE QUANTITIES OF VARIOUS ITEMS PER SQ. M. / SQ. FT. OF BUILT-UP AREA. SR. NO. ITEM APPROX. QTY. SR. NO. ITEM APPROX. QTY.

PER
Excavation R.C.C. below plinth R.C.C. above plinth Internal Masonry External Masonry Internal Plaster/Paint External Plaster/Paint Oil Paint SQ. M. 0.31 cum 0.046 cum 0.290 cum 0.7 sqm 0.9 sqm 3.2 sqm 2.5 sqm 0.62 sqm SQ. FT. 1.00 cft 0.15 cft 0.95 cft 0.7 sft 0.9 sft 3.2 sft 2.5 sft 0.62 sft

PER
SQ. M. SQ. FT. 0.75 sft 0.25 rft 0.05 sft 0.20 sft 0.30 sft 0.17 sft 0.14 sft Flooring a) MM tile b) skirting c) W.C. / Bath d) Dado 0.75 sqm 0.82 rm 0.05 sqm 0.20 sqm 0.30 sqm 0.17 sqm 0.14 sqm

01 02 03 04 05 06 07 08

09

10 11 12

Waterproofing Door Frames Windows