Você está na página 1de 3

QUANTITATIVO AO PARA CONTENO DA RUA AURINO VILA (=>270,00m)

RESUMO AO CA-50 e CA-60


BITOLA
COMPRIM. kg/m
Kg
5.0
5,624.64
0.16
899.94
6.3
4,252.50
0.25 1,063.13
8.0
3,307.50
0.40 1,323.00
QUANTITATIVO AO PARA CONTENO DA LATERAL DA FBRICA (=>260,00m)
RESUMO AO CA-50 e CA-60
BITOLA
COMPRIM. kg/m
Kg
5.0
3,868.80
0.16
619.01
8.0
4,290.00
0.40 1,716.00

QUANTITATIVO DE ALVENARIA E CONCRETO PARA CONTENO DA RUA AURINO VILA E DA


LATERAL DA FBRICA
ALVENARIA COM BLOCO 0,39x0,19x0,14m
ITEM/LOCAL
COMPRIM. ALTURA REA TOTAL REA BLOCO
BLOCO - AURINO VILA
270.00
0.90
243.00
0.07
BLOCO - LAT. FBRICA
260.00
1.10
286.00
0.07
TOTAL
CONCRETO 20MPa
COMPRIM. ALTURA LARGURA
VOLUME
CONCRETO - A. VILA (BLOCOS)
270.00
0.90
0.10
24.30
CONCRETO - A. VILA (BASE) 1
270.00
0.25
1.10
74.25
CONCRETO - A. VILA (BASE) 2
270.00
0.10
0.14
3.78
SUBTOTAL
102.33
CONCRETO - LAT. FBRICA (BLOCOS)
260.00
1.10
0.10
28.60
CONCRETO - LAT. FBRICA (BASE) 1
260.00
0.10
0.85
22.10
CONCRETO - LAT. FBRICA (BASE) 2
260.00
0.30
0.14
10.92
CONCRETO - LAT. FBRICA (BASE) 3
260.00
0.71
0.30
27.69
CONCRETO - LAT. FBRICA (BASE) 4
260.00
0.10
0.14
3.64
SUBTOTAL
92.95
TOTAL
195.28
CONCRETO MAGRO
CONC. MAGRO - A. VILA
270.00
0.05
1.20
16.20
CONC. MAGRO - LAT. FBRICA
260.00
0.05
1.00
13.00
TOTAL
29.20
MATERIAL PARA DRENAGEM
COMPRIM. QUANT TAMANHO
TOTAL
TUBO ESGOTO DN50 - AURINO VILA
270.00
90.00
0.25
22.50
TUBO ESGOTO DN50 - LAT. FABRICA
260.00
87.00
0.25
21.75
TOTAL
44.25
BIDIM - AURINO VILA
270.00
90.00
1.00
90.00
BIDIM - LATERAL FBRICA
260.00
87.00
1.00
87.00
TOTAL
177.00

QUANT BLOCOS
3,280.00
3,860.00
7,140.00

und

Você também pode gostar