Thiruvananthapuram Municipal Corporation City Development Plan
EXECUTIVE SUMMARY
Executive Summary i
Thiruvananthapuram Municipal Corporation City Development Plan
EXECUTIVE SUMMARY
BACKGROUND
JNNURM is a basic platform provided by central Government to the states and Urban Local Bodies for
improving the urban infrastructure in a financially sustainable manner and to integrate the poor with service
delivery system. In Kerala two cities Thiruvananthapuram and Kochi has been included under the JNNURM.
The objective of CDP for Thiruvananthapuram is to identify and plan the future economic growth of the city
and to reduce urban poverty. This can be achieved by developing proper framework, enhancing the
creditworthiness of the Municipal Corporation and integrating the urban poor with the service delivery
systems. Through this opportunity the Municipal Corporation plans to look at the various financing options
for city development including private sector participation, thereby inviting participation of business,
industries, civic groups, NGOs, and communities in local decision making.
2001 census
Thiruvananthapuram Urban Agglomeration Area in sq.km Population
Thiruvananthapuram city 141.74 7,44,983
Kozhakuttam (out growth) 5.03 14,410
Sreekariyam (out growth) 8.87 21,431
Kudappanakunnu (out growth) 7.69 38,175
Vattiyoorkavu (out growth) 11.11 41,890
Kovalam (out growth) 3.33 28,746
Total 177.77 8,89,635
FINANCING ARRANGEMENT
As per the JNURM norms, for a city with a population of less than 10 lakhs, Government of India would fund
80 percent of the total project cost as Grant and the State Government and ULB will each fund 10 per cent
of the total project cost. Various financing options can also be considered by the ULB to finance the
proposed projects. It is planned to pool the funds received from the ADB assisted KSUD Project for the
contributions to be made from the Thiruvananthapuram Corporation.
With the Mayor as the Chairman, the Core Committee held a series of consultations with Councilors, political
leaders, MLA, senior officials of government, senior functionaries of various government organizations,
residents associations, professional organizations, senior citizens, representatives of the centers of
physically & mentally challenged, representatives of INTACH, IMA, ADS, CDS, women’s organisations,
NGOs, bank officials, media personnel, etc.
All the relevant reports and studies undertaken so far on various sectors were also studied for formulation of
the CDP.
Executive Summary ii
Thiruvananthapuram Municipal Corporation City Development Plan
The above were considered to be integrated with the permissible components under Urban Infrastructure &
governance and Basic services to the urban poor, which are the sub-missions under JNNURM.
As the outcome of the above exercise, the priority project components were identified. Assistance of the
respective sector agency was sought to finalize the scope of the priority components to identify the sub-
components, work out the implementation cost of the individual components and to prepare phasing plan.
The traditional dignified Capital City of Thiruvananthapuram aspires to become a national city with
its strength as a centre of advanced studies, as the hub of modern technology based industries and
as a national harbour city, offering high quality of environment for living, working and visiting
URBAN INFRASTRUCTURE
Major project components and approximate costs under urban infrastructure sector were planned and
worked out by the respective departments based on stakeholder consultations and existing studies /
projects. The project components under each sector and the estimated cost are briefed in the subsequent
pages.
WATER SUPPLY
Thiruvananthapuram Water Supply Scheme, commissioned in 1933, is one of the oldest Water Supply
Schemes in India. The scheme is fully owned and maintained by the Kerala Water Authority. The present
scheme area comprises 183.76 sq. km with complete coverage of Thiruvananthapuram Corporation (141.74
sq. km) and partial coverage of adjoining Panchayats viz. Sreekariyam, Kudappanakunnu and
Vattiyoorkavu. Karamana river is the source of water for the Thiruvananthapuram water supply scheme.
There are two reservoirs constructed at the upstream of the river for sufficient storage of water – at
Aruvikkara (2 Million Cubic Meter storage capacity) & Peppara (70 Million Cubic Meters storage capacity; 25
km upstream of Aruvikkara reservoir). The service area is broadly divided into 5 zones viz. Peroorkada
Zone, PTP Zone, Low Level Zone, Observatory Zone and Manvila Zone. There are water treatment plants at
Aruvikkara, PTP Nagar and Vellayambalam. Presently the average per capita consumption is around 174
litres per day. The distribution system consists of a complicated network of total length of 2,280 km. The
network is designed for 24 hours water supply.
A new project for the augmentation of the scheme has been taken up by the KWA at a cost of Rs.275.7
crores (revised cost Rs.311.91 crores) with loan assistance from JBIC. The execution of works is expected
to start within 3 months. The ultimate water demand in the service area by 2031 is 410 mld at the rate of 200
lpcd for urban, domestic use along with a provision of non-domestic and industrial requirements and 135
lpcd for peripheral areas. This reflects a wide supply-demand gap of 185 mld by 2031. The ongoing JBIC
project when commissioned by 2009, can supplement 74 mld still leaving the gap of 111 mld. This gap is
proposed to be compensated by a three-way approach. (i) Augment the system by 76 mld to bring more
water to the city (ii) Bring down the Unaccounted For Water (UFW) losses to the range of 15% from 35.5%
by adequate rehabilitation measures and (iii) Cut off some boundary areas from the city WSS by providing
small WSS exclusively for these areas. Out of the supply-demand gap of 185 mld, 74 mld will be taken care
of by 2009 on commissioning of the JBIC project; another 76 Mld will be taken care of by (i) above and the
balance 35 mld by (ii) and (iii) . The ultimate aim on completion of the JNNURM Project is 100% coverage of
the service area with 24/7 water supply till 2031. It is proposed to pool the projects under JBIC with that
under JNNURM so as to achieve the desired objective of 100% coverage with 24/7 water supply.
Executive Summary iv
Thiruvananthapuram Municipal Corporation City Development Plan
Citizen Relation Management: The activities envisaged are modernization and extension of the pilot
complaint redressal system of TWSS using better communication systems aimed at providing total
consumer satisfaction.
The total cost for the proposed projects is estimated to be Rs.1042.41 crores distributed over a period of six
years from 2006-2007 to 2011-2012.
SEWERAGE
Thiruvananthapuram Sewerage Scheme [TSS] covers the old Corporation area, having an extent of 74.93 sq. km.
with 50 wards. The scheme area is divided into seven blocks viz., A, B, C, D, E, F and G, for the convenience of
execution of sewerage system. Among the above blocks sewerage facility is available fully or partially in the blocks A
to E.
Block A covers an area of 13.84 sq. km and was commissioned in 1945. The block has 3 lifting stations, one main
pumping station from where the sewage is pumped to a sewage farm at Valiyathura. This Block was recently
augmented. Block B is spread in an area of 5.51 sq. km and was commissioned in 1965. This Block also has a
pumping station from where the sewage is pumped to the Valiyathura sewage farm. The total area of Block C is 4.12
sq. km and was partially commissioned in 1970. This Block covers most of the low lying parts of the city and has a
pumping station which discharges the sewage to the Valiyathura sewage farm. There is a proposal to install a lifting
station in some low lying areas of this Block and also to extend the sewage network in other parts of the Block. Block
D was partially commissioned in 2004 and is divided in to two zones. It covers the areas along the National Highway.
There are four pumping stations in the Block from where the sewage is pumped to the Valiyathuram sewage farm.
Block E is divided into four zones out of which one zone was commissioned in 2004 and the work in remaining three
zones is in the process where land acquisition works are under progress.
The key issues and challenges with respect to sewerage network in the city are:
The existing sewerage network is very old and requires urgent rehabilitation, since frequent
overflows are common.
Sewage overflow from the unsewered areas of the city and adjoining areas into the water body
creates nuisance and unhygienic conditions.
The existing sewage farm at Valiyathura is overloaded, resulting in overflow and seepage to the
Parvathy Puthanar Canal and surrounding water bodies in the area and results in pollution of the
water bodies. This envisages the need for a modern Sewage Treatment Plant at Valiyathura.
New development areas need to be brought under the sewerage network.
i. Rehabilitation of existing network and pump houses in Blocks A, B and C is urgently needed as the
design period of the sewer network is over.
ii. Rehabilitation of Sewerage facility in Medical College Campus and other Government Hospitals is in
dilapidated condition and needs repair and up gradation.
iii. Sewerage system in unsewered areas of Blocks A, B and C.
iv. Sewerage System in unsewered areas of Blocks D and E.
v. Extension of Sewerage System to F&G blocks- coastal belt which is generally thickly populated.
vi. Sewerage System to the extended Corporation area.
vii. Sewerage System to adjoining Panchayats in the urban agglomeration consisting of outgrowths of
Kazhakkoottam, Sreekaryam, Kudappanakkunnu and Vattiyoorkavu. The estimated sewage load from
the area is 45 Mld. Kovalam, an outgrowth of the city and also an important tourist destination is
proposed to be covered under the sewerage network.
viii. Sewerage System to the proposed International Container Trans-shipment Terminal at Vizhinjam which
is expected to contribute to increased activity in the area.
ix. Procurement of equipment for maintenance of sewerage system which needs to be strengthened for the
proper functioning of the system.
x. Construction of Sewage Treatment Plant to prevent large-scale contamination of surface and ground
water. The proposed capacity of the STP is 250 Mld. It is proposed to set up a modern Sewage
Executive Summary v
Thiruvananthapuram Municipal Corporation City Development Plan
Treatment Plant, to treat the sewage being pumped to Muttathara. The total sewage load of the
extended Corporation area is 250 Mld. Full fledged Sewage Treatment Plants are also to be constructed
to cater to the requirement of outgrowths of Kazhakkuttom, Sreekaryam, Kudappanakkunnu,
Vattiyoorkavu and Kovalam and the anticipated sewage load is 60 Mld. A Sewage Treatment Plant of
10Mld is proposed to be constructed for the benefit of Medical College Campus, and a 15Mld Sewage
Treatment Plant is proposed to cater to the need of Container Terminal Area at Vizhinjam.
The total cost for the proposed projects is estimated to be Rs. 1081.0 crores distributed over a period of six
years from 2006-2007 to 2011-2012.
Water Conservation is another important area that needs immediate attention. Inspite of abundant water
resources, the city is facing water scarcity. Hence conservation of water is needed to restore the water for
future needs. The developing areas surrounding the city are witnessing lot of construction activities where
large scale filling of wet lands has resulted in blockage of natural drains and reduction in ground water
recharge.
Key Issues
The condition of existing rivers as natural drainage for storm water is deteriorating. Dumping of
domestic wastes and non domestic waste from slaughter houses, markets, hotels, etc., discharge of
sewages directly into the rivers and unscientific and indiscriminate methods of sand mining are resulting
in the erosion of river bed and its banks.
Due to reduced cross sectional area of rivers, flash floods have become common during down pour.
Recurrent floods as a result of insufficient drainage are the perpetual problem faced by
Thiruvananthapuram city since several years. Thampanoor and East Fort areas are the worst affected
with tremendous water logging.
Transitory measures to prevent water logging is tried from time to time to ease the graveness of the
situation. However, an abrupt rain of high intensity disrupts the city life considerably. A permanent
solution to the problem is to be found.
Regular stagnation of water results in environment and health hazards.
The reclamation of water bodies and low lying areas or encroachments for development is the main
reason for water logging. Most of the flood moderation zones inside the city have already been
converted into concrete dwellings and apartments resulting in excessive run off.
Improper maintenance of the already existing drains coupled with excessive run off is the root cause of
flooding inside the city. In-depth study of the present status of the drains, their carrying capacity,
anticipated flood discharge and the probable routing / rerouting may be devised and implemented for
restoring / enhancing the status of drainage network inside the city to solve the issue to a significant
extent.
Executive Summary vi
Thiruvananthapuram Municipal Corporation City Development Plan
- Plantation of bamboo and other soil retaining plants on the river banks;
- Putting up parks on river banks at four locations;
- Repairs to the damaged retaining walls already constructed in Karamana river;
- Easing of curves & removal of islands to facilitate easy and smooth flow ;
- Construction of cross drains for a length of 15 km in the river; and
- Detailed investigation for providing boundary stones.
Killi River
- The river retaining structures for a length of 5 km has to be raised in order to protect the bund
at different locations.
- Lack of sufficient leading drains to take storm water to the river constantly erodes the river
bunds. To tackle this issue, surface drains are to be constructed along the bund on the land
side to take the storm water for a length 5 km on either side at the required locations along with
inlets structures.
- In order to reduce the velocity of flow and to retain water for retention and storage construction
of ten cross bars are required in the river portion. This may act as silt traps also.
- Crossing the bridge at three places is required to be provided to meet the increasing demand
of traffic. Also the provision of 15 foot over bridges at different locations within the city is also
included for public convenience.
- To curb dumping waste in to the river at the crossing portions like bridges, fencings are to be
provided. Also lamp post and benches are proposed at the bathing ghats to make better
ambience.
The civic sense of the people and the feeling of ownership of the public property are to be inculcated through
constant awareness programmes and media. The implementation of these proposals can yield sustainable
benefits only if participation of its beneficiaries is assured.
The estimated cost for storm water drainage and flood control is Rs. 96.40 crores and for water conservation
measures is Rs.79.35 crores. Thus, the total estimated amount under this sector is Rs.175.75 crores.
ENVIRONMENT
Air Pollution
The Kerala State Pollution Control Board is continuously monitoring the ambient air quality at 13 stations
through out the State. Of these, four monitoring stations are located in Thiruvananthapuram city area. The
monitoring results, obtained from these stations show that the quality of air is broadly satisfactory in the city.
However the Respirable Particulate Matter & Particulate Matter is occasionally exceeding the quality limits.
The trend shows that the concentration of the pollution parameters are steadily increasing mainly due to
various developmental activities in the city area in general and the increase in the density of automobile
population and road conditions in particular.
Water Pollution
The water pollution in the city can be broadly classified into two types - pollution in the surface water bodies
and coastal pollution.
Coastal Pollution:
In Thiruvananthapuram, one of the main reasons for coastal pollution is the discharge of untreated domestic
wastes due to lack of treatment facilities.
Noise Pollution
Studies conducted show that the noise levels are very high in certain areas of Thiruvananthapuram city. The
studies reveal that one of the main reasons for high noise levels in major streets and commercial areas is
over crowding of automobiles resulting in blowing horns.
Industrial Pollution
Thiruvananthapuram city is not having many industries. The industries, which are making discharge of
wastewater, are brought under the consent administration of the Water (Prevention and Control of Pollution)
Act, 1974. There is full proof mechanism to deal with any violation from the part of industries.
Disaster Management
Due to location and geographical features of the city, it is vulnerable to a number of natural disasters like
coastal erosion, floods, landslides in some high ranges, earthquakes and tsunami.
i. Coastal erosion
Unlike other parts of the country, Kerala seacoast, including Thiruvananthapuram is thickly populated and as
a result the loss due to sea erosion is relatively very high.
ii. Flood
The short duration of intense rainfall, insufficient drainage, etc. create conditions leading to floods in the city.
In Thiruvananthapuram city Karamana River and Killi River are the main channels for storm water drainage.
Sharp meandering of the rivers has lead to bank erosion and thereby deposit of eroded material in the river
bed forming small islands that have reduced the capacity of the rivers. This results in flash floods during
heavy rains.
Also many low lying areas in the city centre get flooded during monsoons as carrying capacities of the
leading drains are not sufficient.
Air Pollution
- In order to reduce air pollution, it is proposed to install five automatic ambient air quality monitoring
stations at major stations in the city with digital display arrangements.
- Emission from automobiles is to be minimized. In this connection, detailed study has to be conducted on
the replacement of diesel with CNG.
- Adequate attention to be given for maintaining better road conditions. Projects under this are covered
under Traffic & Transportation sector.
Water Pollution
• Side protection and strengthening of the Parvathy Puthanar canal are to be taken up to prevent
pollution. Projects under these are covered under the sector on Storm Water Drainage.
• The drainage connections to the Parvathy Puthanar canal and to all public water bodies are necessarily
to be cut off and septic tanks to be provided for all the houses.
• Planting trees along the river and canal banks and by the side of the roads. Maintenance and upkeep of
these trees to be entrusted with some agency.
• Modern machinery for dry wretting, in places of coir wretting on the sides of T.S canal, can be procured
and given to the societies on proper agreement so that the present state of wretting and the resultant ill
effects can be controlled.
Disaster management
• Shelter belts can be constructed as complementary structures along the coastal line to provide
adequate safety to coastal erosion.
Present practice of sea wall construction is to be supplemented with the plantation of mangroves;
destruction due to tsunami can thus be addressed to some extent.
• Use of artificial offshore reefs as an alternate method to prevent sea erosion. Detailed study and
consultancy is recommended.
• Thiruvananthapuram falls in the Zone III of seismic map. Hence safety devices like fire hydrants need to
be provided in the identified congested areas in the city centre. Also in newly developing areas strict
adherence to the Kerala Municipality Building Rules, 1999 can ensure availability of recreational open
spaces in sub divisions for residential development.
Solid Waste Management is one of the mandatory functions of Thiruvananthapuram Municipal Corporation.
About 270 MT per day of solid waste is generated in Thiruvananthapuram Corporation, out of which 200
tones is collected by the Corporation every day, thus having a collection efficiency of 75%. The per capita
waste generation is estimated to be 350 grams per day. The composition of waste generation indicate that
maximum waste generated in the city is domestic waste (53%) followed by commercial waste (app. 20%)
and street sweeping (18 %).
Solid waste management in Thiruvananthapuram Corporation is specific to three areas. The first area
includes 25 wards where comprehensive door to door collection is being carried out under the “Capital City
Clean City” project. For this purpose the Corporation has provided two types of buckets to each household –
green bucket for biodegradable waste and white bucket for non biodegradable waste. Initial feedback
indicates that the programme is highly successful. Around 64% of the households have been covered in
selected 25 wards under this scheme which is 27% of the total households in the city. Collection of waste is
done by women groups formed under the Kudumbashree project and similar groups of other organisations.
The waste so collected is directly transferred to Corporation vehicles at specific transfer points at scheduled
time without touching the ground. The second part consisting of wards belonging to the old corporation area
which are not included under Capital City Clean City at present. In these wards collection of waste is being
done from identified open collection points. The third area comprises of wards from the panchayats that had
been merged with the Corporation in 2000. Here also collection of waste is done at regular intervals (one to
four times a week) from identified open collection points.
The waste collected from various wards is then transported to the processing centre for treatment at
Vilappilsala, located about 16km from the Corporation. Here a mechanical compost treatment plant having a
capacity of maximum 300 tons per day has been set up and operated by a private operator.
Though there are no studies available on future trends of per capita waste generation, there is no doubt that
the quantity of waste generated is bound to increase substantially with the growing population. The actual
Executive Summary ix
Thiruvananthapuram Municipal Corporation City Development Plan
trend during the last 3 years shows that the quantity of waste collected and transported has increased from
132 tons/ day in 2003 to over 200 tons/day at present. However, this is mainly due to better collection and
transportation and not due to an absolute increase in quantity of waste generated.
Issues
Segregation of waste not practiced in the wards other than those under the Capital City Clean City
Project.
Lack of effective public participation in segregation of recyclable waste and storage of waste at source.
Awareness building or direct community involvement in waste minimization & practice of reduce, reuse
recycle and recover.
Lack of dustbins at the collection points.
Institutional strengthening and human resources development
Incomplete collection and transportation
Unscientifically designed transport vehicles
Absence of sanitary engineered landfill and recycling plants
Limited capacity of existing compost treatment plant considering the future increase in solid waste
generation.
Challenges
Bringing about behavioral change in the people
Designing of proper equipments & vehicles
Solving issues related to compost plant & sale of compost
Executive Summary x
Thiruvananthapuram Municipal Corporation City Development Plan
Proposal to set up a plastic recycling unit to reduce the quantity of waste being brought to land fill site
thereby prolonging its life. Establishment of a sorting and storage facility for recyclable waste is also
essential.
Framing of comprehensive byelaws for solid waste management taking into consideration the relevant
provisions of the Municipal Solid Waste Management and Handling Rules, 2000.
Decentralized management of solid waste should be promoted thereby reducing the quantity of waste
reaching the streets. Decentralized treatment plants like aerobic / anaerobic composting; vermi-
composting, bio-gas plants, etc. should be given priority to save cost and to mitigate the ill effects.
Biogas plants (waste to energy plants) can be considered in markets, slaughter house, schools and
other such institutions based on quantity & nature of waste. These should be supported by massive
awareness campaigns to bring about a change in behavior of the public.
Decentralized methods should also be adopted to cater to the solid waste management in surrounding
Panchayats. Awareness campaigns where principle of 4 R’s - Reduce, Reuse, Recycle & Resource
recovery should be promoted. Requisite training and equipments may be provided for promoting
suitable methods of decentralized processing of waste.
One or more market based integrated SWM plants can also be set up. Each integrated SWM plant to
have a biogas plant, vermi composting unit and a waste segregation facility. Each Panchayat also to set
up a collection facility for non biodegradable waste which is to be sorted out and sold off for recycling.
This work can be entrusted to CBOs or NGOs. Payment may be collected from each household for
removal of such waste.
The estimated costing for solid waste and bio-medical waste management is Rs.51.0 crores.
With the growing population and lack of effective transport system, the city is witnessing a continuous growth
in the traffic, resulting in congestion, accidents, reduced average speeds and several other problems
associated with this. The city has the basic transport infrastructure with bus terminal, railway station and
domestic and international airport terminals. However, due to growing demand and substantial growth
potential, there is an urgent need for enhancement of existing transport system to provide efficient
connectivity at city, state, national and international levels. A detailed analysis of the existing traffic and
transportation system in the city has been done in detail in the report. The situation analysis reveals that
more areas outside the city will have to be opened up for development in order to decongest the CBD area.
Some of the major issues that need to be addressed in developing the transport system in the project area
are:
Various studies on traffic and transportation for the city and the city region have been undertaken in
different contexts which have brought out the salient issues, which need to be tackled as short term
measures and long term measures. Therefore it is possible to directly identify the priorities for project
preparation and implementation.
A few major activity nodes have either already developed or are being developed immediately around
the city. These activity zones, which become major job providers, attract heavy traffic converging to
them from the city. Therefore it is necessary to address the issue of improved connectivity to these
development zones.
Urban activities have a tendency to converge into the city centre causing increased traffic density and
greater stress on infrastructure. This trend can be positively utilised for urban development if these new
growth factors can be guided to selected development corridors, which are planned and developed not
only to accommodate these activities, but also to provide for the required infrastructure support.
Road corridors which link to the regional roads should be prioritized for development and these radial
links should be interconnected by ring roads. Such a network would avoid convergence of traffic
unnecessarily to the city centre.
Maximisation of the available ROW (right of way) of roads, by suitable rehabilitation measures and
planned use of the road space avoiding non-traffic activities getting located within the ROW.
Planned parking facilities for vehicles. The city does not generally have planned off-street parking
spaces, whether at grade or multilevel. As a result of this precious road space is invaded for on-street
Executive Summary xi
Thiruvananthapuram Municipal Corporation City Development Plan
parking, affecting traffic movement, especially in a situation where 70 percent of the roads have V/C
ratio (volume capacity ratio) greater that 0.70. (source: CTTS)
Surveys reveal that the share of public (mass) transport system in the city region is only slightly more
than 50 percent. This is decreasing every year. This results in the city roads being flooded with single
passenger occupied vehicles, invading precious road space. This situation is due to various factors like,
inefficiency of the existing bus transport system and vehicle market getting flooded with two and four
wheelers luring the public with financial assistance. An efficient urban transport system has to attract at
least 60 to 70 percent of the travelling public to the mass transport system. This would not only reduce
traffic volume on the city roads, but would also reduce accident rate and reduce expenditure on road
development and maintenance.
High accident rate at the road intersections (junctions) – need for signalization of intersections where
traffic volumes are high.
‘Status hazard’ of being a capital city – attracting frequent demonstrations and road blocks- always
leading to ad hoc traffic diversion measures – lack of ‘intelligent transport systems’
Increasing road accidents
Poor road lighting
Inadequate pedestrian facilities
Need for greater coordination of agencies / departments
The proposals for the traffic and transportation sector are based on the situation analysis and the potential
for new development. Various studies and projects were also referred to form part of schemes/ programmes
like KSUDP, Thiruvananthapuram Capital City Development, Vizhinjam Port development,
Thiruvananthapuram Airport development, Techno Park expansion plans and development plans of
railways. The projects also include road projects that could not be taken up by the Corporation due to lack of
funds. The stakeholder consultations made to aid formulation of projects are also made use of in framing the
projects.
The strategy adopted for identifying the projects gave emphasis on opening up more areas outside the city
for development and thus to decongest the CBD area. Bypasses, ring roads, links to arterial roads, area
development plans, off street parking, efficient public transport system and traffic management are the
measures suggested in the various identified projects for the transport sector.
Sl.No Components
A Projects that strengthen linkages with NH & regional roads 26 km @ Rs 2.50
crores per km
B Projects for improvement of major links in the city road network 53 km @ Rs
2.5 crores per km
C Intermediate and inner ring road
D Outer ring road for city region
E Development of roads in and around major activity zones - Kazhakuttom,
Chackai -Airport - Kochuveli, Vizhinjam, Kudappanakunnu, Medical College
Hospital, Karakulam & Peyad
Sl.No Components
L Public Transport System Improvement
i LRTS /EMU train from Kazhakuttam - Anayar - Air port - Manacaud - Chalai -
Killipalam (Ist phase) 12 km including Feasibility study & DPR @ Rs. 65 crores per
km
ii LRTS / EMU train / additional link to Ulloor
iii Introduction of HCBS (High Capacity Bus System) along selected corridors and
regulation to discourage personal vehicles along these road corridors (Feasibility
studies & Implementation through PPP)
iv Quality up gradation of KSRTC services
HR training
Improvement of existing infrastructure like bus depots, workshops
Computerization of depots and corporate office
Augmentation and replacement of old buses
v Bus terminals (for KSRTC & Private Buses)
Upgradation of Thampanoor bus stand & new bus stand at Enchakkal
Kochu Veli, Kodappanakkunnu, Kovalam, Thirumala, Medical College
Construction of Operating Terminals for private long distance omni buses
Sl.No Components
Providing public utilities near high density pedestrian areas (25 nos)
Total (Projects for Environmental Management)
Grand Total
The estimated cost of the projects envisaged is about Rs. 3786.54 crores.
HERITAGE
Thiruvananthapuram the capital city of Kerala State, has a continuous cultural heritage of more than
thousand years. It has inherited a number of beautiful buildings some of which were given a peculiar brick
red colour like the Napier Museum and its two entrance gates, University College, Fine Arts College,
Government Arts College, old S.M.V school building (present district court buildings at Vanchiyoor) and the
traditional style buildings of General Hospital, Ayurveda College Hospital, Malayalam Department of
University College, etc. Along with the construction of office buildings residential areas were also developed.
A number of temples, churches and mosques were also constructed in the suburban areas of the temple
town of Thiruvananthapuram, which gradually developed as a cosmopolitan township.
An inventory of the heritage buildings have been made and documented by the Art & Heritage Commission
of Government of Kerala during 2004-06 consisting of traditional residential streets, planned fortified
settlement, temples, churches (during the colonial period), historic palaces, ponds/sacred tanks, educational
institutions, historic public buildings, historic public gardens and remains of old cantonment.
The areas which require conservation of precincts including restoration and preservation of heritage
buildings and natural heritage in Thiruvananthapuram can be broadly classified as follows:
1. Fort Area Heritage Zone
2. Palayam Area
3. Shanghumughom Area
4. Thycaud Area
The buildings that are outside these identified areas are also listed under proposed conservation projects.
Some of the interventions needed for revitalization of the Fort Area, a premier heritage area in the State,
have been taken by the State Government. Certain legislative measures and projects for conservation of
these areas on a piecemeal basis have also been taken up.
The priority project components for conservation of the four identified areas and buildings outside these
areas are:
Palace Complex Heritage Precinct
Valiya Koyikkal Heritage Precinct
Arat Road Heritage Precinct
Vadakkenada Environs Heritage Precinct
Mithranandapuram precinct
Mathilakom ( Main temple) precinct
Items of work included for restoration of buildings and their premises include replacement of decayed/
missing structural wooden members; restoration of laterite/ brick masonry works in lime mortar, lime
plastering; restoration of storm water drainage works, restoration of decorative works in wood; repairs of
doors & windows and providing suitable fixtures; repairs & restoration of ceiling; aluminum sheet protective
cover for roof; roof tiling, paving with appropriate flooring materials, electrification works; removal of recent
additions and alterations and surface coatings to/on the historic structures & premises and corrections if any
required with appropriate material; protective coatings on wood, correcting sunken basements, providing
smoke detecting & fire extinguishment arrangements, protective mesh to prevent entry of bats, lightning
arresters and anti-termite treatment; clearing away debris by lorry load far away from the vicinity of heritage
zone, lighting & illuminating the buildings & premises; landscaping, restoration of the ponds, construction of
protective retaining walls, site clearance and removal of destructive vegetation; paving pathways,
restoration/ transplantation/ reconstruction of compound walls, construction or reconstruction/ remodeling of
other structures within the premises in harmony with the heritage character of the areas.
The fort wall restoration would include clearing and restoring the Fort and rampart inside and outside the fort
wall and paving the same to provide a walk way around. It would comprise of landscaping work including
lighting and removal of encroachments and other constructions and their rehabilitation wherever required.
The total project cost estimated for conservation of heritage in identified areas is Rs.125.4 crores. For details
refer Table: Phase.7.1.
TOURISM DEVELOPMENT
The State and Thiruvananthapuram district being blessed with unmatched diversity provide immense scope
for tourism and is considered as one of the sectors, which can drive its economy and attain socio-economic
development. Thiruvananthapuram city is a hub to reach all the neighbouring tourist destinations that include
renowned beaches (Kovalam, Varkala), historic monuments, backwater stretches, hill stations (Ponmudi)
and a rich cultural heritage.
Thiruvananthapuram is one of the leading districts on the basis of tourist arrival to Kerala. It is continuing as
the second leading district in terms of foreign tourist arrivals and third leading district in terms of domestic
tourist arrival to the State. The tourist arrival to this district is showing an increasing trend over the years.
Between 2001 and 2005, the foreign tourist arrival has increased by 89.78% and the domestic tourist arrival
has increased by 11.63%. Also this district is contributing more than 34% of the total foreign tourist arrivals
and more than 14% of the domestic tourist arrivals to the State.
Some of the important tourist destinations in the district are Kovalam Beach, located 16 km south of
Thiruvananthapuram; Neyyar Dam, a popular picnic spot, located 32 km away from the city; Varkala, a
seaside resort and spa and an important Hindu centre of pilgrimage; Ponmudi, a hill resort at 1000 m above
mean sea level located 61 km away from Thiruvananthapuram city. Some of the major tourist destinations
within the city are Padmanabha Swamy temple, dedicated to Lord Vishnu, known for Kerala and Dravidian
style of architecture; Kuthiramalika Palace Museum, with rare specimen of workmanship in the traditional
Travancore style of architecture; Napier Museum, an Indo-Saracenic structure built in the 19th century; Sree
Chithra Art Gallery, displaying select paintings of Raja Ravi Varma, Svetlova, and Nicholas Roerich;
Shangumugham Beach, situated 8 km away from the city, a favourite haunt of sunset watchers; Veli Tourist
Village, a picnic spot adjoining Veli Lake meeting the Arabian Sea; Akkulam Tourist Village, a picnic spot
with boating facilities and children’s park. The other tourist attractions in the Thiruvananthapuram city and
Executive Summary xv
Thiruvananthapuram Municipal Corporation City Development Plan
surroundings include Kanakakunnu Palace, Observatory Hills, Zoological Park apart from large number of
heritage buildings and monuments.
Strategies
The strategies in tourism development include the following:
Implementation of "Tourism Vision 2025" with focus on sustainable development by conservation
and preservation of heritage
Development of selected tourist destination with proper planning for development so as to retain
high quality of aesthetic and environmental beauty and to develop the destinations in a sustainable
and eco-friendly manner
Development of basic infrastructure and ensure cleanliness of tourist destinations
Development of specialized tourism like eco-tourism, health tourism, rural tourism, adventure
tourism and plantation tourism besides back-water tourism
To develop Infrastructure through private sector and Public - Private-Partnership with Government
acting as a facilitator and catalyst
Continuation of extensive and aggressive marketing of Kerala at National and International markets
as a unique tourist destination for up-market clientele with specific reference to
Thiruvananthapuram
Promotion of domestic tourism especially pilgrim tourism
Strengthening local tourism initiated by local Governments
Ensure quality in tourism services and facilities
Human resource development
To ensure safety and security of tourists
To develop and promote souvenir, handicrafts, artefacts & shopping industry
Formation of new tourism zones
Proposed Projects
A detailed list of infrastructure projects to be taken up by various line departments is included under the
tourism sector in the report. The projects that would be taken up by the Tourism department are:
Tourist Facilitation and entertainment complex at Kovalam
Beautification and landscaping of waterfront and other areas at Kovalam
Development of Edakkallu and surrounding at Kovalam
Development of Kerala Gramam at Kovalam
Development of various undeveloped beach stretches in and around Kovalam for the dispersal of
tourism activities
Beautification and providing Tourist facilities at Parvathi Puthanar Canal from Akkulam to Kovalam
Beautification and providing tourist facilities at Karamana River including facilities for river cruising
Development of Valiathura -Shanghumugom Beach as a leisure zone including tourist facilities,
childrens park, landscaped area etc
Development of veli including parking area, shopping malls, conference facilities, children’s park,
landscaping, fountains etc
Waterfront development at Akkulam including walkways
Development of Akkulam tourist village and surrounding
Development of Arts and Crafts Village
Development of Tourist facilitation complexes at Vizhinjam and Kochuveli
The estimated cost for all the above mentioned projects is Rs.197.0 crores.
SOCIAL INFRASTRUCTURE
Under social infrastructure, the major components covered include markets, education, health and leisure &
sportsabatoirs, crematoriam ground etc. . A brief description has been made on the availability and status of
social infrastructure especially markets in the project area.
Thiruvananthapuram is a prominent regional market. Most of the markets selling various kind of produce are
located in Chalai area of the city. One of the major drawbacks of Chalai market is that it is extremely
congested with a mix of whole sale and retail activities and needs urgent redevelopment. There are other
sub-markets and zonal markets which if developed can share the load of Chalai market. Other than these
prominent markets there are some informal roadside markets, vegetable & fruit stalls in various housing
colonies and vendor markets.
Some of the projects proposed for market development in the project area are:
Chalai Market extension and Redevelopment (Includes construction of new market building,
Redevelopment works in the market, Traffic improvement, Improvement of surface water drainage
facilities, SWM improvements)
Develop of two acres of land in Palayam Market for public market development which would include
vegetable stall, fish and meat stall, stall for general merchandise and open vending platform with roof.
Development of zonal markets at Manacaud, Peroorkada, Vattiyurkkavu and Punnakkamughal
Area level markets within the city at 12 locations (Ulloor, Sreevaraham, Kadakompally, Poonkulam,
Kuravankonam, Pachalloor, Mannanthala, Pongumudu, Poonthura, Vallakkadavu, Valiyathura,
Thirumala)
Redevelopment of whole sale market at Pangodu
Construction of building Material Markets at Ulloor, Ambalathara, Peroorkada and Pappanamcodu
The total estimated cost for market development in the project area is Rs.123.80 crores and that under
social infrastrucure is Rs.156.30 Crores.
Details of priority projects & their costing for education, health and sports have not been worked out since
these sectors do not fall under the purview of JNNURM as per the guidelines issued by Government of India.
categorization/classification etc. of urban slums, based on which the slums can be notified. The Act
itself requires drastic change in view of the post enactment developments and present day realities.
Land tenure is a critical issue in addressing the problems of the poor. In the absence of tenure rights,
the poor people living in slums are not in a position to access social and economic benefits under
poverty reduction programmes. They also do not have freedom to upgrade their houses, as they do not
have title over the land on which they reside.
Deficiency of infrastructure & deterioration of existing infrastructure pose a serious problem due to poor
maintenance.
Poverty alleviation programmes, projects for housing for the poor and projects for provision of
infrastructure for the poor generally consider only the identified housing areas. The informal settlements
and the scattered poor population are rarely taken as beneficiaries.
The convergence of programmes and co-ordination between institutions to address the problems in an
integrated and meaningful way is a major challenge in effective implementation of poverty reduction
programmes.
The present manpower working in the Local Government Institution and with the NGOs lack expertise to
provide professionalism in planning and implementation. They generally base the strategies on
experience and the felt need for short horizons.
Lack of awareness among the poor on the opportunities for better living and employment.
The report details the strategies for the realization of goals through effective implementation that include
development of a database of urban poor; development of participatory planning process; policy framework
for land tenure for poor; Provision of clean environment; education through setting Remedial Education
Centres; organizing Children’s Neighbourhood Groups; Special packages for the coastal poor; development
of self employment opportunities; Geriatric Care; Street Children; packages for women in distress; Social
security needs of the poor; Special packages for mentally and physically challenged; re-habilitation of
destitutes; convergence of poverty reduction programmes; provision of infrastructure; capacity building of
staff; and bringing the poor and destitute to the mainstream.
1. General Projects
c. Other projects
i) Urban Slums
Based on the location features and the general population characteristics a detailed categorization
of the Slums in the city has been attempted which included slums located in low lying areas;
located along the sides of canals and water bodies; located adjacent to sewage and drainage
ponds; slums with concentration of fisher folk and Scheduled Caste population. These slums have
also been categorized on the basis of their characteristics. Justification for the various interventions
being suggested is done taking four slums as case studies of these categories - Kanjirampara SC
Colony in the peripheral area of the city, Chengalchoola (Rajeev Nagar) slum located in the central
city area, Karimadom Colony in the central market area and by the side of a sewage pond and
Poonthura Pambur Colony, near the coastal area.
v) Geriatric
Project components are identification of old age people requiring special care; Setting up of
geriatric care centers (10 N0s) and; Transportation facilities for daily commuters
v) Women in distress
Project components include Socio economic survey to identify the women in distress; Establishing
gender resource center (4 Nos); Setting up of short stay homes (5Nos); Setting up of skill
development centers (3 Nos); Formation of Adolescent girls clubs and; Renovation and
maintenance of existing short stay home / Abala mandiram etc.
The estimated cost for all the above mentioned projects is Rs.577.20 crores.
Executive Summary xx
Thiruvananthapuram Municipal Corporation City Development Plan
Contents
PART - A
INTRODUCTION, STATUS STUDIES, DEVELOPMENT VISION
1.0 INTRODUCTION 1
1.1 Background 1
1.2 Objective and Scope of City Development Plan 3
1.3 Process of Preparation of CDP 4
1.4 City Planning Efforts - An Overview 7
1.4.1 Master Plan/Development Plan for Thiruvananthapuram 7
1.4.2 Studies on Transportation by NATPAC 9
1.4.3 Report on Urban Slums in Kerala 10
1.4.4 Kerala Urban Development Project (KUDP) 10
1.4.5 Theerapatham Urban Development Project 11
1.4.6 Comprehensive Traffic & Transportation Study (CTTS) Report - CES 11
1.4.7 Report on Solid Waste Management – Vilappilsala 12
1.4.8 Preliminary Report on Thiruvananthapuram Development Vision-CES 12
1.4.9 Draft Final Report on Thiruvananthapuram Development Vision –
Ernst & Young 14
1.4.10 JBIC Report on Water Supply Up-Gradation Project 15
1.4.11 Evaluation of Decentralisation Process in Thiruvananthapuram
Municipal Corporation 16
1.4.12 Review of Existing National and State Level Policies 17
1.4.13 Vision 2010 – On the Lines of Mission Initiated by President of India 26
1.5 Structure of the Report 27
PART - B
DEVELOPMENT OF URBAN INFRASTRUCTURE
6.0 SEWERAGE 76
6.1 Existing Sewerage Scheme 76
6.2 Major Developments and Initiatives 77
6.3 Key Issues, Challenges and Goals 77
6.4 Priority Project Components 78
6.5 Broad Costing & Phasing 81
PART – C
BASIC SERVICES TO THE URBAN POOR
PART - D
REFORMS, ORGANISATIONAL STRUCTURE, CITY INVESTMENT PLAN, PROJECT
MANAGEMENT
Annexure
Annexure 4 : Maps
Thiruvananthapuram Municipal Corporation City Development Plan
List of Tables
Table 1.1: Development Plan (2001) Status 8
Table 3.1: Urban Population of India 38
Table 3.2: Details of Urban Population In Kerala 39
Table 3.3: Demographic Details of TRIDA Area 39
Table 3.4: Demographic Details of TRIDA Area, 2001 39
Table 3.5: Demographic Details of Thiruvananthapuram Urban Agglomeration, 2001 40
Table 3.6: Population Projection for Thiruvananthapuram Ua
(MC and the Five Panchayats in Full) 41
Table 3.7: Category of Workers in the Urban Areas of Thiruvananthapuram District 43
Table 3.8: Category of Workers in Thiruvananthapuram Urban Agglomeration 44
Table 3.9: Distribution of Main Workers in Thiruvananthapuram UA 44
Table 3.10: Work Participation Rate in Urban Slums in Kerala 45
Table 3.11: Trends in State Net Domestic Product 45
Table 3.12: Trends in District Net Domestic Product 46
Table 3.13: Trends In Per Capita Income (At Constant Price) 46
Table 3.14: Land Use Pattern (2001) 49
Table 5.1: Thiruvananthapuram Water Supply Scheme 64
Table 5.2: Salient Features of Existing Water Supply Scheme 66
Table 5.3: Details of Water Tariff for Domestic Connections 66
Table 5.4: Details of Water Tariff for Non-Domestic Connections 67
Table 5.5: Details of Water Tariff for Industrial Connections 67
Table 5.6: Broad Costing and Phasing for Water Supply 74
Table 6.1: Broad Costing and Phasing for Sewerage 81
Table 7.1: Broad Costing and Phasing for Storm Water Drainage 98
Table 8.1: Broad Costing and Phasing for Environment 107
Table 9.1: Source of Solid Waste Generation 108
Table 9.2: Households Covered Under Capital City Clean City Project 110
Table 9.3: Composition of Hospital Waste in Percentage 112
Table 9.4: Guidelines for Bio-Medical Waste Collection 112
Table 9.5: Time Frame for Implementing Goals 113
Table 9.6: Broad Costing and Phasing for Solid Waste Management 117
Table 10.1: Road Network in Thiruvananthapuram City 121
Table 10.2: Classification of Major Roads in Thiruvananthapuram 122
Table 10.3: Peak Hour Traffic Distribution at Selected Locations 123
Table 10.4: Peak-Hour Traffic Volume on Selected Road Stretches 124
Table 10.5: Traffic Growth Rate during 2000-04 124
Table 10.6: Speed and Delay Characteristics at Selected Links 124
Table 10.7: Details Of Through Traffic of Commercial Vehicles 125
Table 10.8: Mid-Block Pedestrian Count at Selected Outer City Locations 126
Table 10.9: District Level Growth Trend of Motor Vehicles 126
Table 10.10: Modal Distributions in the City and Panchayat Area 127
Table 10.11: Peak Hour On–Street Parking Accumulation 131
Table 10.12: Parking Deficiencies on MG Road 131
Table 10.13: Details of Road Accidents in Thiruvananthapuram District 133
Table 10.14: Details of Street Light Availability at Selected Road Sections 134
Table 10.15: Thiruvananthapuram City Road Improvement Projects 135
Table 10.16: Road Projects under KSUDP with ADB Assistance. 135
Table 10.17: Broad Costing and Phasing For Traffic and Transportation 144
Table 12.1: Heritage Projects for Fort Area Heritage Zone 159
Table 12.2: Heritage Projects for Palayam Heritage Zone 160
Table 12.3: Heritage Projects for Shanghumugham Heritage Area 160
Table 12.4: Heritage Projects for Thycaud Area 160
Table 12.5: Heritage Projects for Other Buildings 161
Table 12.6: Phasing of Heritage Projects 161
Table 12.7: Details of Tourists Arrival 162
Table 12.8: Proposed Projects under Tourism 166
Thiruvananthapuram Municipal Corporation City Development Plan
P
PAAR
RTT A
A
IIN
NTTR
ROOD
DUUC
CTTIIO
ONN,, S
STTA
ATTU
USSS
STTU
UDDIIE
ESS,, D
DEEV
VEELLO
OPPM
MEEN
NTT V
VIIS
SIIO
ONN
Thiruvananthapuram Municipal Corporation City Development Plan
1.0 INTRODUCTION
1.1 Background
India’s growth is synonymous with the growth of Indian cities and towns. The cities and
towns are acting as major growth centers and act as the hub of many social and economic
activities. According to the 2001 Census, the urban content of the Country’s population was
about 28 percent of the total population of the country. This is estimated to increase to about
40 percent by the year 2021. The current contribution of the cities towards the country’s
Gross Domestic Product (GDP) is about 50-55 percent, which is likely to grow with the
increasing urban population and concentration of productive economic sectors in the cities.
Due to increasing pressures of growing urban population, most of the cities and towns are
lacking in basic services and the quality of life in the cities degenerate. The Urban Local
Bodies and other institutions, who are the service providers, face acute shortage of capacity
and resources, notwithstanding the 74th Constitutional Amendment. Unplanned growth, over
stressed and non-reliable civic infrastructure, inadequate financial resources and
dissatisfying urban governance would have a significant impact if not addressed timely and
in a planned manner.
Considering that this state of cities is incompatible with the country’s socio-economic
development objectives and considering the country’s growing role in the world economy,
Government of India has launched a major urban infrastructure development programme
viz., Jawaharlal Nehru National Urban Renewal Mission (JNNURM), for promoting reforms
and investments in the selected 63 cities. Thiruvananthapuram is one of the eligible cities
under the programme.
1
Thiruvananthapuram Municipal Corporation City Development Plan
Geography
Thiruvananthapuram is located at 8.5oN 76.9o E on the west coast, near the southern tip of
mainland India. The city is sandwiched between the Western Ghats and the Arabian Sea.
The city is built on hills by the sea shore. The region can be divided into three geographical
regions, the lowlands, the midlands and the high lands. The lowland is a narrow stretch
comprising of shorelines, rivers and deltas, dotted with coconut palms. The midland region
comprises of low hills and valleys adjoining the Ghats. The highlands form the eastern
suburbs of the city. Ponmudi and Mukkunimala are hill-resorts near the city.
Climate
The city has a tropical climate and therefore does not experience distinct seasons. The
mean maximum temperature 34 °C and the mean minimum temperature is 21 °C. The
humidity is high and rises to about 90% during the monsoon season.
2
Thiruvananthapuram Municipal Corporation City Development Plan
India. This placed Thiruvananthapuram on the IT map of India and it is today one of the most
promising in the country in terms of competitiveness and capability.
The construction of the mega Deep Water Container Trans-shipment Port at Vizhinjam is
expected to begin in 2007. It is to be built in three phases, and expected to be a key
competitor in the ports business (especially for container transshipment), with the
international shipping lanes between Europe and the Far East very close to the port, and
also with major ports like Colombo, Kochi and Tuticorin in close proximity.
The exponential growth of the services and IT based sectors coupled with its prominence as
the state capital and tourist centre has caused considerable strain on the transport
infrastructure of the city. To tackle this crisis, several multi-million dollar construction projects
are now underway including the construction of several new underpasses and flyovers,
scheduled to be completed by early 2007.
Thiruvananthapuram, apart from being the capital of India’s most literate and socially
developed State, is a strategically important city in Southern India. Being the biggest city
with a credible infrastructure in India’s deep south, it is an important city for both military
logistics and civil aviation in the southern part of the country. It is the headquarters of the
Southern Air Command of the Indian Air Force and a base for the Military.
The future prospects of Thiruvananthapuram are manifold. Potential future growth areas
include Tourism (medical and eco-tourism), civil aviation and air-cargo, commercial activity
through upcoming port (at Vizhinjam), software development parks, media and the arts, etc.
Beach resorts and also ayurveda resorts are coming up at a rapid pace, especially along the
International Beach of Kovalam and Varkala coast.
3
Thiruvananthapuram Municipal Corporation City Development Plan
The CDP for Thiruvananthapuram helps to identify and plan the future economic growth of
the city and to reduce urban poverty. This can be achieved by developing proper framework,
enhancing the creditworthiness of the municipal corporation and integrating the urban poor
with the service delivery systems.
Through this opportunity the municipal corporation plans to look at the various financing
options for city development including private sector participation, thereby inviting
participation of business, industries, civic groups, NGOs, and communities in local decision
making.
The CDP is both a perspective and a vision for the future development of
Thiruvananthapuram city. It presents the following:
An in-depth analysis of the existing situation, covering the demographic, economic,
financial, infrastructure, physical, environmental and institutional aspects;
Identifies the strengths and weaknesses of the city’s development, in consultation
with the stakeholders and civil society;
Outlines the issues faced by the poor in the city and its peripheries;
Develops a vision of the city for a long-term perspective;
Formulates sector specific goals and strategies to achieve the vision;
Formulates a city investment plan and a financing strategy, considering alternative
sources of financing the projects to be derived based on the vision and
accompanying strategy and programmes; and
Focus of the reforms to be carried out at the state level and local level to ensure
improvement in urban governance and service delivery.
4
Thiruvananthapuram Municipal Corporation City Development Plan
under the chairmanship of the worshipful Mayor Sri C. Jayan Babu; and to go ahead with the
preparation of CDP utilising the services of the Core Committee members.
The list of members of the Core Committee is given in Annexure 1.
The Core Committee in its first meeting decided to prepare the CDP assigning the specific
tasks among the members themselves and also to constitute Working Groups co-opting
members who are experts in the respective fields.
The basic planning concepts were discussed in the core committee meeting. The issues to
be addressed in general pertaining to the various sectors of development in tune with the
growth direction, the development activities that are already on the anvil, development
potential etc. were taken in to consideration. Approach papers for individual sectors were
prepared by the working groups concerned to throw light on the issues in the discussions.
Simultaneously, all the earlier studies and project reports pertaining to the development
sectors in Thiruvananthapuram were collected and reviewed.
A small team was formed as a Rapid Action Group (RAG) comprising of the Mayor/
Representative of Mayor, Deputy Mayor, a senior experienced spatial planning expert,
Project Engineer of the Corporation as representative of the Corporation Secretary, two
Planners to assist and Convenor of the Core Committee, who is also a Spatial Planner.
These experts also debated at length on the strengths and weaknesses of the city region,
development potential of the city region, Development Vision of the city and the possible
strategies to be adopted for attaining the Vision of Development. A draft paper on this was
also prepared and discussed in the Core Committee.
The RAG met daily and decided on the modus operandi to be followed in the formulation of
CDP, which was approved in the subsequent Core Committee meetings. Accordingly a
series of stakeholder consultations were planned. The first discussion was held with the
Councillors of the Corporation, where the approach papers were presented for each sector
separately, raising the major issues to be discussed. The Councillors interacted well and
came up with many suggestions. Even though some of the suggestions were ward specific,
the issues confronting the City as a whole were also discussed suggesting suitable
alternative propositions. Table showing all consultation meetings held with various groups is
appended in Annexure 2.
Consultations were held as detailed, with the Heads of Institutions and Government
Departments, Chamber of Commerce, Professional Organisations of Architects, Engineers,
Town Planners and Builders, Bar Association, Federation of Residents’ Associations
Thiruvananthapuram (FRAT), Senior Citizens, NGOs, representatives of the centres of
physically & mentally challenged, representatives of INTACH, IMA, ADS, CDS, CBOs,
Women’s Organisations, Bank Officials, Political Leaders, Media Personnel etc.
Individual consultations were also held with the former Chief Secretaries of the State, District
Collector and top level officials / citizens having stake in the development of the City. Apart
from these the MPs and MLAs were also contacted and their valuable opinions were
recorded.
The Presidents of those Panchayats, which form part of the Urban Agglomeration, were
consulted separately and their requirements as part of urban agglomeration,
5
Thiruvananthapuram Municipal Corporation City Development Plan
interrelationships with the city area and integrated planning issues to be addressed were
discussed and considered for action.
All consultations were recorded and tabulated according to the focus areas that emerged out
of the discussions. The Core Committee members attended all consultation meetings and
explained the draft approach paper for each sector. The discussions were very fruitful and
the draft approach papers could be improved finally leading to derivation of strategies and
identification of priority projects under each sector. The suggestions put forth during
consultations were incorporated suitably in the CDP while formulating proposals. The RAG
interacted with the members of the Core Committee and working groups frequently who
supplemented the additional information in filling the identified gaps.
Table showing the various discussions held and the major suggestions is appended.
(Annexure 3).
In the meanwhile the existing national level and state level policies in the identified thrust
areas were listed and reviewed in the context of development of Thiruvananthapuram. The
identified project components for inclusion under JNNURM could thus be substantiated with
specific reference to the relevant aspects of these policies.
The Vision 2010 of H.E. the President of India envisages an integrated high quality
improvement in infrastructure sector, in tune with provisions of basic services to the urban
poor.
The draft Vision Documents prepared earlier for Thiruvananthapuram Capital Region and
the planning attempts made so far were reviewed apart from making an evaluation of the
decentralisation process in the Corporation of Thiruvananthapuram. All sectoral studies
made by different agencies were also looked into in this connection. The recommendations
contained in these studies and the outcome of the planning efforts are given due weightage
while formulating proposals for the CDP.
The process of formulating proposals were cross checked with the aspirations of the ward
sabhas/ward committees held during late 2005 and the beginning of 2006. The
recommendations of the standing committees and the Development Seminar are also used
as inputs to refine the outcome.
Ultimately a general vision was developed for the planning area with focus on the potential
development areas followed by sector specific goals and strategies. The Vision Statement
has been coined keeping in view the SWOT analysis of the urban agglomeration. In spite of
these, sectoral studies highlighting the situation analysis, problems, potentials, and
strategies leading to project identification with broad cost estimates have also been included
in the report.
A generally satisfying task in the CDP preparation has been a long debate on the poor and
their problems and issues. Based on such detailed discussions with the various groups and
based on collection of all available data and studies on the Urban Poor, priority action
programmes were identified and listed. The task included identifying all categories of the
poor population in the city region.
The integrated development package detailing each project and phasing out the
implementation process over the further plan period of 6 years is prepared along with the
6
Thiruvananthapuram Municipal Corporation City Development Plan
City Investment Plan. Phasing has been proposed such that Projects for which Detailed
Project Reports are already available and hence can be implemented easily are covered in
the initial stage of implementation.
An attempt is also made to engender the CDP suggesting in brief how best gender
mainstreaming can be brought in urban governance with focus on the urban poor.
Another important component which attracted a lot of debate was the area of improvements
in Urban Reforms and Governance, improvement in Municipal Finances and bringing about
better Financial Discipline in the TMC.
7
Thiruvananthapuram Municipal Corporation City Development Plan
Industries About 100 Ha proposed for Very few industries have been
industrial development. located in Northwest region
(Panchayat Area covering 33
Ha) This is due to lack of
infrastructure.
Traffic Improvement Porojects Widening of the existing road A total road length of nearly 42
(12 roads have been selected) from Kesavadasapuram to km selected by PWD & TRIDA
Attakulangara (Via Pattom, for upgrading is under
Palayam, East Fort etc.) (Width implementation of which about
21 m to 24m) Widening of the 12 km has been completed
existing road from Ulloor to
Sreekanteswaram and
Sreekanteswaram to
Killippalam connecting Ulloor,
Medical College, Nalumukku,
Uppilammodu Bridge,
8
Thiruvananthapuram Municipal Corporation City Development Plan
9
Thiruvananthapuram Municipal Corporation City Development Plan
The parking studies conducted by NATPAC in 2003 in identified road stretches and the
studies on Inland Water Transport can be considered under JNNURM.
10
Thiruvananthapuram Municipal Corporation City Development Plan
The KUDP was limited to the former city area of Thiruvananthapuram (75 sq. km) and it
envisaged projects for implementation within 5 years, i.e., short-range proposals only. Under
the Road Development and Traffic Management component, KUDP proposed only Road
Development study for identification of candidate roads, which could be taken up for
improvement immediately. Study of Comprehensive Transport Systems was not undertaken
under KUDP.
KUDP was project oriented, i.e., identification of certain road projects for immediate
implementation.
Road Development study under KUDP did not include large scale land acquisition.
Therefore, even for the selected important roads for ‘major road construction programmes,
only limited widening proposal was suggested. (M.G. Road was proposed for widening to
18m and Chalai by-pass to 15m, whereas Master Plan and Detailed Town Planning
Schemes proposed 24m and 21m respectively for these two roads.)
11
Thiruvananthapuram Municipal Corporation City Development Plan
the long-term, as the traffic volume increases and the financial resources become sound to
fund such mass transportation systems.
Major corridors for development have been identified in this study including the options for
MRTS which can be considered under JNNURM.
12
Thiruvananthapuram Municipal Corporation City Development Plan
formulate objectives, action plans, economic base, urban and regional environment,
transportation and infrastructure services.
13
Thiruvananthapuram Municipal Corporation City Development Plan
14
Thiruvananthapuram Municipal Corporation City Development Plan
15
Thiruvananthapuram Municipal Corporation City Development Plan
Project so as to improve to achieve the desired performance. Another unique feature of the
project is the provision of telemetry stations and SCADA system along with the transmission
main work. (The telemetry station will pick up data signals from the SCADA system and will
send to the regional control centre for monitoring the operation of the various units).
For the convenient and effective implementation of the project, the above project
components have been grouped under five packages viz. Intake Works and Treatment
Plant, Transmission Main, Distribution System, Service Reservoirs and Rehabilitation Works.
This JBIC Project is under implementation.
The proposals envisaged in the JBIC Report have been considered while formulating the
vision in the CDP under the Water Supply Scheme.
16
Thiruvananthapuram Municipal Corporation City Development Plan
employments units is necessary. Milk based products also invite our attention. Fishing and
its trade should be scientifically reorganised. The quality of education and public health
should be enhanced. More investments are required for the development of Infrastructure
and for Slum Improvement.
17
Thiruvananthapuram Municipal Corporation City Development Plan
are minimized and access to livelihoods, education, and other social needs, especially for
the marginal segments of the urban population is improved; improving access of business to
markets and the various factors of production; bringing about a more equitable allocation of
road space with people, rather than vehicles, as its main focus; encourage greater use of
public transport and non motorized modes by offering Central financial assistance for this
purpose; enabling the establishment of quality focused multi-modal public transport systems
that are well integrated, providing seamless travel across modes; establishing effective
regulatory and enforcement mechanisms that allow a level playing field for all operators of
transport services and enhanced safety for the transport system users; establishing
institutional mechanisms for enhanced coordination in the planning and management of
transport systems; introducing Intelligent Transport Systems for traffic management;
addressing concerns of road safety and trauma response; reducing pollution levels through
changes in traveling practices, better enforcement, strict norms, technological improvements
etc.; building capacity (institutional and man power) to plan for sustainable urban transport
and establishing knowledge management systems that would service the needs of all urban
transport professionals; promoting the use of cleaner technologies; raising finances, through
innovative mechanisms that tap land as resource for investments in urban transport
infrastructure, associating the private sector in activities where their strengths can be
beneficially tapped; taking up pilot projects that demonstrate the potential as possible best
practices in sustainable urban transport.
The vision formulated under the traffic &transportation sector as part of CDP is well within
the broad framework of this Policy.
18
Thiruvananthapuram Municipal Corporation City Development Plan
effective participation by way of investment for creation of enhanced IWT infrastructure and
fleet operations.
The policy supports for accelerated IWT growth by authorizing Inland Water Authority of
India (IWAI) to raise bonds and / or enter into joint ventures. It also gives in-principle
approval for equity participation by Government / IWAI in BOT projects and levying minimum
customs duty on imported equipments and machinery for development of inland water ways.
It supports the development of IWT by giving tax exemption to investors in this sector similar
to National Highways and by enhancing depreciation rate for inland vessels.
Keeping this policy in view, projects have been identified under the traffic and transportation
sector to develop the existing waterways in the project area for the purpose of shipping and
navigation and also to integrate the waterways to the roadways, railways and airport.
19
Thiruvananthapuram Municipal Corporation City Development Plan
20
Thiruvananthapuram Municipal Corporation City Development Plan
21
Thiruvananthapuram Municipal Corporation City Development Plan
awareness and literacy levels, its superior telecom connectivity, and its propensity for quick
technology absorption.
The objective of the Government is to put in place a package of policy measures and
incentives, which will make Kerala one of the most attractive investment destinations in IT.
The Policy initiatives delineated in this document comprise a three pronged strategy aimed
at:
Creating an appropriate pro-business, pro-enterprise, legal, regulatory and
commercial framework to facilitate the rapid growth of the IT industry in the state;
Establishing Kerala as a global centre for excellence in Human Resources, through
the creation of a large pool of diverse, multi-skilled technically competent manpower
in the State; and
Establishing an internationally competitive business infrastructure and environment
for the IT industry in the State, on par with the best facilities and practices
worldwide.
Objectives
In line with this broad strategy, the Government has set the following immediate objectives
for the promotion of the IT industry in the State.
To establish Kerala as a leading IT destination in the country within the next five
years;
To provide a nurturing and enabling environment conducive to the vigorous growth
of the local IT industry in the State;
To significantly enhance direct and indirect employment creation in the IT sector;
To attain a minimum growth level of 100% every year in IT;
To significantly accelerate the levels of investment inflows including foreign capital
into the hardware, software and ITES sectors;
To aggressively promote the State as the destination of choice for emerging IT
business opportunities including IT Enabled Services, new media products and E-
services. To establish ITES as the definitive core competence of the State;
To develop Kochi as an international media and ICT hub; and
To consolidate and expand the Technopark, Thiruvananthapuram as a leading
software and HR Centre in the region.
IT Infrastructure
The policy envisages developing IT infrastructure on the following lines.
Government Parks Initiative:
The city of Kochi will be promoted as an IT hub where facilities offered will match the
best available worldwide. A Hi-tech park will be developed here, comprising an area
of 200 acres. An IT Corridor connecting the new international airport at
Nedumbassery with the city will also be established as part of the larger proposed
Special Economic Zone continuum. These facilities shall be developed through Joint
Venture partnerships with the private sector and shall endeavour to provide an
22
Thiruvananthapuram Municipal Corporation City Development Plan
international business infrastructure and environment at Kochi. Kochi has all the
necessary enablers in place including virtually unlimited bandwidth on tap from the
VSNL gateway, concentration of quality, technical and non-technical human
resources, a cosmopolitan social infrastructure and environment, and excellent air
connections. These advantages shall be leveraged to make the city amongst the
most preferred IT investment destinations of India.
The total space availability for IT industry shall be augmented by a minimum of
750,000 sq.ft annually for the next two years. Thereafter, for the next three years a
minimum of 1.5 million sq.ft space capacity shall be created annually. These
additional capacities will be created through 100% private sector investments as
well as Joint Venture projects between the Govt. and the private sector.
The Technopark, Trivandrum with about 1 million sq. ft of built up area, has
established itself as one of the leading IT parks in the country. The campus is now
home to several SEI-CMM companies and centres of HR excellence. The IIITM-K,
which commenced functioning in the last year and which offers high-end training in
emerging technologies is expected to move over to an independent campus shortly.
In the second phase of expansion of the park, it is proposed to develop 26 acres
with the participation of the private sector.
The IT Department shall shortly initiate with the help of leading consultants the
exercise of preparation of Master Plans for each of the designated IT parks/ zones.
These Master Plans shall delineate the blueprint for park development and
framework for facilitating private sector participation.
Govt. shall endeavour to maintain uniform, international quality standards for park
infrastructure and services across all State promoted and managed IT parks. A
professional Parks’ Management team will be set up under the Kerala IT
Department for ensuring this.
Built-up space for IT industry shall be classified under a new category “IT Industry”
under the Kerala Building Rules with applicable FAR of 5. This classification shall
apply only for newly built-up space that shall be used predominantly (at least 80% of
carpet area) for IT software industry for a minimum period of 5 years from the date
of first occupation/commissioning.
Govt. shall proactively encourage and facilitate the development of ancillary social
infrastructure in a planned manner including hotels, restaurants, entertainment
multiplexes, hospitals, schools, colleges etc within and appurtenant to the IT parks.
23
Thiruvananthapuram Municipal Corporation City Development Plan
All Parks’ standard compliant IT parks shall be entitled to the FAR classification as
applicable to IT industry under Kerala Building Rules. For other compliant IT parks
that are either entirely for IT hardware industry or for both IT hardware and IT
software industry companies, classified under ‘Industrial’ category of the Kerala
Building Rules, additional FAR of 50% shall be permitted (over currently applicable
FAR of 1.5).
The Kerala State Electricity Board, the Kerala Water Authority, and the Office of the
Chief Town Planning Authority shall each designate a Nodal Officer who shall
facilitate the process of inspection, application processing, and application closure,
for their respective responsibility areas. Response standards shall be announced by
these agencies for the fast track clearance process.
A certified private IT park shall be governed by the same set of industry enabling
regulations that are applicable for the State promoted IT parks.
A private park that qualifies for certification under this scheme shall be promoted by
the State Govt. as an integral part of the State’s IT Infrastructure provided the
promoter of the park so desires.
The scope of the ‘Private IT Parks’ scheme shall be restricted to projects that seek
to provide a minimum of 50,000 sq. ft per project either through creation of fresh
built up space or through conversion of existing space for use by IT industry.
Projects less than the 50,000 sq.ft qualifying stipulation shall still have the benefit of
FAR provided under point 1 provided they are otherwise compliant with the Parks’
standard.
The Government is aware that rapid change and transformation is the essence of this
sector, and acknowledge the need for a dynamically evolving policy that caters to the
changing I.T environment. Hence this policy document is envisaged as an evolving
blueprint that sets out an indicative roadmap. Government will endeavour to improve
upon the components of this policy on the basis of suggestions from stakeholders and
the changing requirements of the sector.
h) Industrial Policy for Kerala
The policy provides for exploring the scope of developing small scale industries, Traditional
Industries, Textiles, Sick Units, Food processing, Biotechnology, Infrastructure. & Service
Sector Industries.
Holistic and eco-friendly projects will be encouraged in tourism as the sector has already
been accepted as an instrument for generation of foreign exchange, employment, poverty
alleviation and sustainable social and economic development. The Government shall
endeavour to facilitate notified Special Economic Zones and bring in a special legal
dispensation enabling a more liberalized environment within specified industrial parks,
estates and notified areas.
The waterways in the State shall be developed with the participation of the private sector
and made navigable particularly for barge transport.
24
Thiruvananthapuram Municipal Corporation City Development Plan
25
Thiruvananthapuram Municipal Corporation City Development Plan
It is hoped that a Service Delivery Policy will help develop and put service standards in place
which would enable citizens, policy makers and service providers to track service
performance and take corrective measures.
26
Thiruvananthapuram Municipal Corporation City Development Plan
27
Thiruvananthapuram Municipal Corporation City Development Plan
challenges. A poverty reduction strategy plan is also outlined in this chapter. Chapter 14
includes the Priority Project Components identified for inclusion under the JNNURM. Project
costing and phasing of implementation are also attempted. The major segment of the urban
poor like urban slums, coastal population, informal sectors and other vulnerable sections are
studied and projects required to address their problems are highlighted.
Chapter 15 gives the status of urban governance and existing / proposed reforms at State &
City level.
Chapter 16 describes the structure and finances of the local governments with
Thiruvananthapuram urban agglomeration and a parastatal body viz. Kerala Water Authority.
Chapter sixteen also gives the City Investment Plan giving sector-wise project identification
and costing.
The CDP concludes with an attempt to identify institutional structure and mechanism for
Project Management and Monitoring. Chapter seventeen deals wholly with the Management
& Implementation Mechanism, this being important for the success of JNNURM.
28
Thiruvananthapuram Municipal Corporation City Development Plan
2.1 Introduction
After the 73rd and 74th Amendments to the Indian Constitution, Kerala has achieved rapid
strides in realizing the constitutional vision of transforming Local Bodies into institutions of
Local Self Government. Among the States in the country, Kerala is the acknowledged leader
in strengthening and institutionalizing decentralized governance both in rural and urban
areas, with several pioneering innovations and basic reforms.
In order to match the functions, the functionaries previously carrying out the functions have
been placed under the control of the Local Governments. Also commensurate funds have
been transferred to them to discharge the functions effectively. Thus beyond civic duties and
running of utilities, Corporations have become veritable City Governments in charge of
overall development.
Kerala has used decentralization as a vehicle for bringing about fundamental reforms in
different spheres. These are outlined below:
29
Thiruvananthapuram Municipal Corporation City Development Plan
such families below poverty line are brought together into a Neighbourhood Group (NHG),
with each family being represented only by a woman, making the system a vehicle for
empowerment of women as well. NHGs in a Ward are organized into an Area Development
Society (ADS) and all the ADSs within a city are federated into a registered organization
called Community Development Society (CDS). At each level of this three-tier networked
organization there are a set of volunteers from among the women who look after health,
education, community infrastructure, economic development and general management.
Thus this inclusive organization of the poor has become a powerful medium for poverty
reduction. It has strengthened the poor to access entitlements and gain capabilities to move
towards social and economic empowerment. It is this community based organization of the
poor which plans from below for an integrated Anti Poverty Sub-plan in the Corporation. It
has succeeded in generating well-articulated demand for pro-poor public services.
Ten percent of the Government grants given to a Corporation has to be set apart for a
Women Component Plan. This has opened up possibilities of engendering development at
the local level. Similarly a good portion of the allocation to the Corporation is earmarked for
development of Scheduled Castes for which it has to prepare a Special Component Plan.
The City has also to develop a proper plan for the children, the aged and the challenged. A
new initiative has just been launched to identify the destitutes who are expected to constitute
about two percent of the population and prepare an integrated plan to tackle it. This initiative
called “Asraya” has the potential of inducing the City Corporation to be compassionate and
care giving.
All Corporations now have to prepare a Service Delivery Plan listing out the various services
which they provide to citizens, determining the present quality and quantity of the services,
setting realistic target for their improvement and developing a plan of action for attaining
them.
Since a lot of assets have been transferred from Government to the Corporations in addition
to their own assets, Corporations have been directed to prepare Maintenance Plans for
managing their physical assets in a scientific manner utilizing their own funds as well as the
earmarked Maintenance Fund devolved by Government.
30
Thiruvananthapuram Municipal Corporation City Development Plan
(Rs. Lakh)
Corporation Year Development Maintenance Fund General
Fund Non-road Road Purpose
Assets Assets Fund
Thiruvananthapuram 2006-07 3276.75 495.20 254.81 1098.09
2007-08 3604.42 544.72 280.29 1207.89
2008-09 3964.86 599.20 308.31 1328.68
2009-10 4361.35 659.12 339.15 1461.55
2010-11 4797.49 725.03 373.06 1607.71
These funds have been earmarked on the basis of transparent criteria. The Local
Government-wise allocation is shown in a separate document of the budget ensuring
legislative approval and preventing whimsical diversions or non-transfer by the executive.
The funds are given in monthly installments and are untied and the Local Government can
decide their application. Thus the devolution satisfies the key criteria of fiscal
decentralization like predictability, sufficiency, freedom of use, equitability of sharing and
timely flow.
Kerala is the only State where three State Finance Commission Reports have been
submitted and action taken on all of them. Some of the important ongoing fiscal reforms
emerging out of the State Finance Commissions are:
i. Introduction of plinth area based Property Taxation to be effective from the second half of
2006-07;
ii. Introduction of seating capacity-linked taxation for Entertainment Tax;
iii. Introduction of presumptive taxes for certain categories of professions under Profession
Tax;
iv. Introduction of a new Service Tax to realize the cost of providing special services to
localities, as a kind of benefits tax;
v. Linking general non-tax revenues like rents, license fees to the value of money through a
system of graduated automatic increases linked to indices reflecting value of money;
vi. Linking devolution of a portion of the Development Fund to increased revenue efforts on
the part of the local governments;
vii. Tax mapping to reduce escaped tax; and
viii. Updation of asset registers.
As part of the ADB supported Kerala Sustainable Urban Development Project (KSUDP) a
Technical Assistance programme has just been approved to convert the cash based
accounts of City Corporations into a modified accrual system. This exercise is to be
preceded by updation of accounts.
31
Thiruvananthapuram Municipal Corporation City Development Plan
To enable the Local Governments to tap institutional finance as well as funds from the
market, the Local Authorities Loans Act is in force. Also there is a Kerala Urban and Rural
Development Finance Corporation (KURDFC) which was set up in the early seventies, the
first of its kind in the country exclusively for Local Governments. Now a policy decision has
been taken to restructure it into the Kerala Local Government Fund on the lines of the Tamil
Nadu Urban Development Fund.
In order to improve fiscal governance and ensure fiscal accountability certain important
initiatives are currently on. They include:
Government have decided in principle to set up a independent Audit Commission for Local
Governments on the lines of the Audit Commission for Local Governments in UK.
Thus the fiscal reforms of Local Governments undertaken in Kerala are fundamental and
pioneering with the potential of transforming fiscal governance.
32
Thiruvananthapuram Municipal Corporation City Development Plan
6. Twenty persons nominated jointly by the Chairperson and Councillor of the Ward, of
whom, -
Ten shall be from the persons representing the cultural organizations, voluntary
organizations, educational institutions, industrial – commercial establishments which
are functioning in that Ward;
Five shall be from persons representing those working in that Ward as professionals
(experts in agriculture, industry, health, education, engineering etc.); and
Five shall be from persons in the registered trade unions.
Provided that, the members nominated under items (i) and (ii) need not be the residents of
that Ward.”
This shows that Ward Committees are democratic institutions representing different
stakeholders and there is very less of nomination. Even in big cities Ward Sabhas are held
to elicit suggestions for development schemes akin to the Grama Sabhas in rural areas. In
order to ensure involvement of non-government professionals and activists in the local
planning process Working Groups are set up by the City Corporations consisting of elected
councilors, officials and experts from all walks of life including practitioners and activists.
This helps a kind of triangulation of development ideas and project proposals.
These mechanisms have enhanced Citizen engagements and improved citizen interface
with Urban Local Governments. But the quality of participation in urban areas still needs
considerable up gradation. To address this focus is on evolving city- specific models of
practice, through carefully- structured action research with special reference to micro-
planning, social audit and community- based monitoring.
Even before the Right to Information Act, the Kerala Municipality Act had provisions since
1999 for guaranteeing the right to information which is almost total. Matching this right is a
legal provision to come out with Citizen Charters. This process is undergoing refinement with
the involvement of the Centre for Good Governance Hyderabad. Naturally in such a scenario
service delivery assumes importance and all Corporations are experimenting with the
Service Delivery Plans. Social audit completes the picture of citizen control. Here again an
action research project is under way to evolve a suitable methodology facilitating easy and
effective practice.
The Kerala Municipality Act has provision for a Code of Conduct governing the relationship
between officials and elected members. The Code of Conduct is now being elaborated.
Interestingly it is an enforceable Code of Conduct. Formal engagement of NGOs in
development matters is another innovative feature in the local government system in Kerala.
Eminent NGOs having expertise in different fields like water supply, sanitation, slum
development, non-conventional energy, cost effective engineering etc., are accredited after a
due process and such NGOs can take up implementation of works related to their expertise
33
Thiruvananthapuram Municipal Corporation City Development Plan
on a no-profit no-loss basis without going through the open bidding process. The Community
Development Society of women below poverty line is deemed to be an NGO in this respect
so that it can take up small works for the development of the poor especially in slums.
The Trivandrum City Corporation has tied up with the Quality Circle Forum of India to
develop quality circles and bring about an improvement in the overall functioning of the
office. This has had very promising initial results. The Government of Kerala as part of its
Modernizing Government Programme has launched an initiative called Sevana Mudra, akin
to the Charter Mark initiative of UK. This has been tried out in some Village Panchayats and
is to be up-scaled to be applied Corporations also.
The Local Governments in Kerala enjoy a high degree of autonomy. The Government has
no direct executive control over the Local Governments. In order to ensure accountability
two unique institutions are in place. The first is the Ombudsman for Local Self Government
institutions who is a High Court Judge. All issues related to mal-administration, corruption
and non-performance of duties are referred to Ombudsman who has sufficient power to
direct rectification and in cases involving corruption, even to disqualify elected members.
Appeals against administrative / regulatory decisions of Local Governments like issue of
licenses, permits and punitive action have to be preferred before the Appellate Tribunal who
is a District Judge. A recent initiative has been to develop a grievance redressal system in
local governments.
34
Thiruvananthapuram Municipal Corporation City Development Plan
5. An Asset Management Policy to ensure that every Local Government is able to ensure the
upkeep of its public assets including the one transferred by the Government through
preparation of proper Maintenance Plans;
6. A framework for Public-Private Participation in Local Governments has been developed
which enables Local Governments to enter into different kinds of Public Private
Partnership (PPP) arrangements; and
7. A Sanitation Policy is under preparation to provide for total sanitation covering different
aspects like solid and liquid waste management, environmental hygiene and overall
cleanliness.
In order to add to the technical expertise of Local Governments there are two Committees –
a Technical Advisory Committee which has experts drawn from different walks of life
including from outside government to vet the projects prepared by Corporations and a
Technical Committee which accords Technical Sanction. Technical Committees consist of
engineers drawn from Government, academic institutions and non-government
organizations. Issue of Technical Sanction by a joint Committee has the advantage of
multiple check by responsible professionals. These arrangements facilitate the induction of
any professional to upgrade the quality of technical vetting and approval of projects- a
unique way of strengthening Local Government capacity of Kudumbashree.
The State Poverty Eradication Mission is a top quality organization of national acclaim which
acts as a live wire facilitator of anti-poverty programme in Local Governments. It has a team
of highly dedicated and competent officials. The Mission has been declared as the nodal
agency for IHSDP and will play a central role in the BSUP Sub-Mission under JNNURM. A
similar organization is the Information Kerala Mission which is dedicated solely for the
development of IT-based solutions and e-governance initiatives in Local Governments. It has
35
Thiruvananthapuram Municipal Corporation City Development Plan
a rich domain expertise and has succeeded in developing 15 IT-based applications for Local
Governments. It is the key facilitator of computerization in the Corporations.
For building capacity of elected members and officials, the State has a unique institution
called the Kerala Institute of Local Administration. It is rated as the best institution in the
country for providing training to elected representatives with special emphasis on
participatory planning and local governance. It is fast developing into an international
institution with regular tie up with the Government of Sri Lanka for training its Councillors.
Efforts are on to raise it to the level of a South Asian Centre of Excellence for capacity
building of Local Governments.
Kerala has a rich tradition of Local Government Associations which are gaining in
importance in acting as a collective of elected local governments. The Chamber of Municipal
Chairpersons and the Mayors Council are effective organizations, assigned an expanding
role in giving policy feed back to government and expressing the demand for capacity
building.
Kerala also has a unique institution for Local Governments called the State Development
Council modelled on the lines of the National Development Council, headed by the Chief
Minister. Its members include all the Cabinet Ministers, Vice Chairman of the State Planning
Board, Chief Secretary, all Mayors, Presidents of the District Panchayats and
representatives of Local Government associations at the Village Panchayat, Block
Panchayat and Municipality levels. This is a forum for discussing policy issues and
coordination issues.
A very effective mechanism to sort out issues related to decentralization, almost on-line, is
the Coordination Committee headed by the Minister for Local Self Government and having
the Secretaries in charge of Local Self Government, Finance, Planning and SC/ST
Development as permanent members and other Ministers and Secretaries as invitees when
issues related to their portfolio are discussed. It has been empowered by the Council of
Ministers to take all decisions necessary to sort out issues related to decentralization and
Local Governments except creation of staff. This has been a very effective institution in
pushing decentralization to the current levels of achievement.
36
Thiruvananthapuram Municipal Corporation City Development Plan
2.2 Summing Up
Continuous policy support in favour of decentralization right from 1995 spanning across the
ten years of different governments of different political persuasions has been the strong point
of Kerala’s decentralization. Though it followed a big bang approach the State was quick to
settle down to the tasks of developing suitable process and procedure, and setting up
appropriate systems and institutions. After deliberately adopting, a ‘learning by doing’
approach, now it has started crafting appropriate operating systems to run its local
governments efficiently. After a successful People’s Plan Campaign which set the agenda,
the institutionalization phase is on.
As clear from the above description, it is clear that the classical principles of devolution of
functionaries, powers and funds to Local Governments have been fully followed in Kerala-
and ONLY IN KERALA. Thus the state has gone a long way in realizing the core objectives
of JNNURM, that of transforming the 74th Amendment into a replicable and sustainable
model- with critical lessons for all states and cities in decentralization reforms.
The Local Governments of Kerala have attained adequate capacity for participatory
development and the JNNURM offers the right opportunity for attaining their full potential.
37
Thiruvananthapuram Municipal Corporation City Development Plan
Census of India, 2001, shows that the total urban settlements in Kerala have decreased from
197 in 1991 to 159 in 2001. This is because the jurisdiction of a few of the urban settlements
in the state has expanded accommodating the surrounding census towns. The urban
agglomeration however increased from 9 in 1981 to 16 in 1991 and to 17 in 2001. Out of the
159 towns, there are 5 municipal corporations, 53 municipalities, 1 cantonment, 1 township
and 99 non-municipal census towns.
The percentage of urban population of India increased from 10.84 in 1991 to 27.80 in 2001,
whereas, Kerala’s urban population did not show any substantial variation in the last decade.
The total urban population in Kerala varied from 26.4% in 1991 to 26.0 % in 2001. According
to Census 2001, Kerala is administratively divided into 14 districts, 63 taluks, 1364 villages
and 159 towns including 58 statutory towns and 101 census towns. It is observed that the
main cause of urbanization in Kerala is the development of tertiary sectors, unlike in the
States like Tamil Nadu, Andhra Pradesh, Maharashtra and Karnataka, where urbanization is
the result of accelerated industrialization.
District Level
As per Census 2001, Thiruvananthapuram district covers an area of 5.60 percent of the total
area of the State and has about 10.31 percent of the total population. The urban population
of Thiruvananthapuram district is 33.80 percent of the total population and ranks fifth out of
the total 14 districts in the State. The population of Thiruvananthapuram district with respect
to State is as shown in the table below.
38
Thiruvananthapuram Municipal Corporation City Development Plan
Thiruvananthapuram district has five urban areas namely, Thiruvananthapuram City, and
Neyyattinkara, Nedumangad, Attingal and Varkala towns. The availability of major
transportation corridors and importance with respect to tourism, marketing facilities, religious
institutions etc. has accelerated the development of these urban centres. The statutory
towns are located along the major transportation corridors, with Neyyattinkara and Attingal
towns along the NH-47 at about 20 km and 28 km to the south and north respectively from
Thiruvananthapuram city. Nedumangad town is about 20 km to the north east side of the city
along Shencottah road and Varkala town is at 40 km to the north – west along broad gauge
railway lines.
39
Thiruvananthapuram Municipal Corporation City Development Plan
40
Thiruvananthapuram Municipal Corporation City Development Plan
The Thiruvananthapuram City witnessed population growths of 45.6 %, 70.8% and 42.1%
during 1941-51, 1961-71 and 1991-2001, respectively. This growth is mainly attributed to the
extension of city boundaries and merging of adjoining Panchayats to the city.
Sex Ratio
Sex ratio in Thiruvananthapuram Urban Agglomeration is 1034 female to 1000 male in 2001
and remains below the state average of 1058.
Literacy Rate
The literacy rate in Thiruvananthapuram Corporation is 83.82 percent which is less than the
State average of 90.92 percent.
Slum Population
The total slum population in Thiruvananthapuram Corporation is 11667 which accounts to
1.57 percent of the total population. This contributes to 25 per cent of the slum population in
the state. The literacy rate of the slum population in comparison to state population is only
1.28 percent. This is much below the average literacy rate of the State.
3000000
2596112
potential of the city region, the activity 2000000
nodes which are proposed and the jobs 1000000
that these nodes and the city in general 0
1981 1991 2001 2011 2021
that may be generated in the future.
Year
Table 3.6: Population Projection for Thiruvananthapuram UA (MC and the five panchayats in
full)
Sl. Name Year
No. 1981 1991 2001 2011 2021 2031
1 Thiruvananthapuram MC 633481 704375 744983 770448 795913 850130
2 Kazhakkuttam 24895 29469 34131 38837 43543 48770
3 Kudappanakunnu 27118 33534 38175 41929 45682 49340
4 Sreekariyam 34551 42050 49145 56038 62931 70480
5 Vattiyoorkavu 24249 33653 41890 49544 57197 65780
6 Vizhinjam 37298 42402 47170 51770 56370 60880
Total 781592 885483 955494 1008566 1061636 1145380
41
Thiruvananthapuram Municipal Corporation City Development Plan
Population
1000000
600000
885483 955494 1008566 633481
500000 781592 400000
200000
0 2031 0 2031
1981 1991 2001 2011 2021 1981 1991 2001 2011 2021
Years Year
As per this estimate the population of both Thiruvananthapuram UA and the city show
declining growth rate.
Population projection taking into consideration the growth prospects of the
major activity nodes/zones.
As far as Thiruvananthapuram city region is concerned, population projection based on the
past growth tends and with the concept that in future the natural increase will show a
declining growth trend, in view of the fairly highly improved health sector and high rate of
awareness among the people, may not correctly reflect the future scenario. This statement is
due to the fact that the city is sharing a remarkable potential in attracting major activities,
which may open out tremendous job opportunities in skilled, semi skilled and also unskilled
categories.
In view of this, population projections have to be made with a different and unconventional
approach compared to many traditional approaches that demographers normally adopt. The
approach suggested is as follows.
a) Consider the various new aspiring major activities and the zones where these are
likely to be located;
b) For each activity zone, estimate the probable investment and scale of development;
c) Based on the nature, type and the scale of development, estimate the number of jobs
in the skilled, semi skilled and unskilled categories that may be created;
d) Assumptions to be made on the percentage of jobs that may be availed by the local
population and the percentage of jobs that may require skills from outside the city
region;
e) Out of the jobs which are taken by workers migrating in to the city region, what
percentage would be lone migrants and what percentage would be family migrants;
f) Estimate the total population that would migrate in to the city region and to which part
of the city region;
g) Estimated the number of service sector jobs that may be additionally created for the
activity zone and for the additional population;
h) Estimate the quantum of in-migration for service sector jobs;
42
Thiruvananthapuram Municipal Corporation City Development Plan
i) Estimate the impacts in terms of population increase that may be created in the city
on account of all the above; and
j) Compile the total population of the city region based on the additional in migration
and additional impact with in the city, taking together all the possible potential
development of all the proposed activities and their effect on the growth of existing
activities.
Based on the natural increase of population and assumptions of growth prospects in major
activity nodes / zones like IT and other hi-tech related developments near Kazhakuttom,
Vizhinjam ICTT Zone, Veli-Kovalam tourism zone and Kudappanakkunnu, the population of
Thiruvananthapuram UA is estimated to be 14 lakhs.
43
Thiruvananthapuram Municipal Corporation City Development Plan
Thiruvananthapuram P 248054 16789 (6.8) 30952 (12.5) 15664 (6.3) 184649 (74.4)
(MC) M 187385 12416 (6.6) 23438 (12.5) 6318 (3.4) 145213 (77.5)
F 60669 4373 (7.2) 7514 (12.4) 9346 (15.4) 39436 (65)
Kazhakkuttam P 4506 313 (7.0) 248 (5.5) 38 (0.8) 39.7 (86.7)
(OG) M 3515 229 (6.5) 207 (5.9) 18 (0.5) 3061 (87.1)
F 991 84 (8.5) 41(4.1) 20 (2.0) 846 (85.4)
Sreekaryam P 7001 176 (2.5) 308 (4.4) 130 (1.9) 6387 (91.2)
(OG) M 5250 163 (3.1) 287 (5.5) 69 (1.8) 4704 (89.6)
F 1751 13 (0.8) 21 (1.2) 34 (1.9) 1683 (96.1)
Kudappanakkunnu P 12258 128 (1.0) 336 (2.7) 143 (1.2) 11651 (95.1)
(OG) M 9160 114 (1.2) 299 (3.3) 91 (1.0) 8656 (94.5)
F 3098 14 (0.4) 37 (1.2) 52 (1.7) 2995 (96.7)
Vattiyoorkkavu P 14068 95 (0.7) 402 (2.9) 299 (2.1) 13272 (94.3)
(OG) M 10940 81 (0.7) 352 (3.2) 215 (2.0) 10292 (94.1)
F 3198 14 (0.4) 50 (1.6) 84 (2.7) 2980 (95.3)
Kovalam P 8386 53 (0.6) 66 (0.8) 326 (3.9) 7941 (94.7)
(OG) M 7533 33 (0.5) 54 (0.7) 296 (3.9) 7150 (94.9)
F 853 20 (2.4) 12 (1.2) 30 (3.5) 791 (92.7)
Total P 294273 17554 32312 16600 223939
M 223783 13036 24637 7007 179076
F 70490 4518 7675 9566 48731
Source: Census of India, 2001 (Provisional Figures); * P-Persons; M-Male; F-Female.
Proper comparison of data on the distribution of workers (category wise) could not be done
due to the difference in the categorisation of the main workers in 1971, 1981, 1991 & 2001
Census. However, out of the total main workers 25.61% are engaged in activities other than
agricultural labourers, cultivators and household industries as shown in the table. The
percentage of main workers in the urban agglomeration is increasing almost at a constant
rate.
Table 3.9: Distribution of main workers in Thiruvananthapuram UA
Sl. Type of works Total % of total Total % of total Total % of total
No main main main main main main
workers workers workers workers workers workers
1981 1981 1991 1991 2001 2001
1 Cultivators 957 0.18 6991 0.85 17554 1.97
2 Agricultural labours 8974 1.73 25222 3.05 32312 3.6
3 Livestock, fishing, 17189 2.08 -
forestry
4 Mining & Quarrying 907 0.10
5 Household industries 3056 0.59 31189 3.77 16600 1.86
6 Other than H.I
7 Construction 13096 1.59
8 Trade and 44487 5.38
Commerce
9 Transport and 23757 2.88
communication
10 Others 124668 23.97 81760 9.90 227807 25.61
Total 137655 26.47 244598 29.60 294273 33.09
Source: Census of India, 2001 (Provisional Figures).
44
Thiruvananthapuram Municipal Corporation City Development Plan
30.10 percent of the total workers in the slum areas fall in the category of main workers.
Maximum workers are engaged in activities other than the cultivators, agricultural labourers
and household industries. The table below (2.10) shows that almost 78% of the working
slum population is male.
Table 3.10: Work Participation Rate in Urban Slums in Kerala
Person Male Female
Total Population 11667 5863 5804
Total workers 3993 3106 887
Work Participation Rate of workers (%) 34.2 53 15.3
Work Participation Rate of main workers (%) 30.1 46.8 13.2
Work Participation Rate of marginal workers (%) 4.1 6.2 2.1
Cultivators Nil Nil Nil
Agricultural labourers (%) 0.00 Nil 0.1
Household industry workers (%) 0.1 1.3 1.4
Other workers (%) 98.7 98.7 98.5
Source: Census of India, 2001 (Provisional Figures).
Performance of total net domestic product and the per capita income are higher for
Thiruvananthapuram district compared to the corresponding figures of the State. The overall
net domestic product for the district and the state are showing positive growth and in line
with the structural pattern of a developing economy.
45
Thiruvananthapuram Municipal Corporation City Development Plan
The per capita income of Thiruvananthapuram district is higher than that of the State. The
trend shows that the per capita income of both the district and the state is increasing at
almost similar rates.
Table 3.13: Trends in Per Capita Income (at constant price)
Year State District
Trends of Per Capita Income
20000
Per capita Incom e
10000 12328
2003-04 12328 6.2 13203 6.1 11605
5000
2004-05 13321 8.1 14471 9.6
Source: Economic Review, 2005, State Planning Board. 0
2002-03 2003-04 2004-05
State District
Industrial Development
In the recent past, the State has made serious efforts to identify new opportunities and equip
it to meet the emerging challenges. While traditional industries like handlooms, coir and
cashew are in a difficult phase of development with their inherent problems, the present
Industrial Policy and other related policies of the State are aimed at enhancing investment
opportunities in the State, especially in the industrial sector. Emphasis is on Information
Technology, which has started showing positive signs through promotion of IT enabled
services.
Industrial Parks and Estates
The industrial infrastructure & facilities offered by the State include industrial parks and
industrial estates. About 50 ha of land was developed under this category in the TRIDA area,
of which 25 ha have been allotted, creating employment for 3,500 persons. Apart from
industrial estates, there are mini industrial estates, which come under the Kerala Small
46
Thiruvananthapuram Municipal Corporation City Development Plan
47
Thiruvananthapuram Municipal Corporation City Development Plan
vegetables & flowers, cooked food (through Thattukada), cigarettes, beedi, pan etc.,
stainless steel and plastic household utensils, toys & fancy goods, electronic goods,
cassettes, foot ware, lottery tickets, office stationery, books & periodicals, old & used books,
watch repairing, repairing of optical, umbrella, bags etc., through street vending.
48
Thiruvananthapuram Municipal Corporation City Development Plan
Geologically the city is characterized by sandy soil along the west coast and red laterite soil
in the eastern regions. Granite deposits exist in some parts of the city especially at
Peroorkada and Thirumala.
3.3.2 Land Use Pattern
The land use of Thiruvananthapuram city has changed due to the impact of urbanization.
Various physical, social, political and economical factors have played their decisive roles in
forming the city’s land use pattern. The table provides a break-up of different land use in the
city.
Table 3.14: Land Use Pattern (2001)
Land Use Area (sq.Km) Distribution (%)
Residential area 54.5 38.4
Commercial area 5.3 3.7
Indutrial area 6.9 4.8
Public & semi public 12.2 8.6
Transportation area 9.3 6.5
Agriculture 43.3 30.5
Water course 3.1 2.3
Parks & open spaces 7.3 5.1
Total 141.9 100.0
Source: Development Plan for Thiruvananthapuram, 2001.
49
Thiruvananthapuram Municipal Corporation City Development Plan
50
Thiruvananthapuram Municipal Corporation City Development Plan
d) Poor Management of Water Bodies/Tanks: Karamana River and Killi River used to be
the life lines of the city. Thiruvananthapuram Water Supply Scheme exists on the water
source in Karamana River. Both these rivers are now polluted. The river boundaries are
encroached. Solid wastes are dumped in the rivers. Raw sewage from the individual plots
and occasionally from the City Sewerage System is let off into these rivers. There is urgent
need to clean these rivers, clear the encroachments, prevent waste dumping into the rivers,
propose only planned developments on either side of these rivers and implement 100
percent coverage with sanitation projects for the river front developments.
There are five canals in the city which receive surface water runoff and carry the water to the
sea. They are Ulloor thodu, Pattom thodu, Vanchiyoor thodu, Thekkinakkara thodu, and T.S
canal. All these canals have to be cleaned and conserved, preventing sewage and solid
waste being dumped into these canals.
There are atleast a hundred ponds existing at various places in the city. Most of these ponds
are in an abandoned stage. Like many other ponds which have been encroached upon and
filled up, these existing ponds are also threatened. It is necessary to conserve and develop
these ponds in the city.
Ground water is the primary source for domestic consumption in the newly developed areas
but over extraction has resulted in brackish water, especially along the coastal belt. Ground
water exploitation should be effectively monitored and controlled.
e) Lack of Co-ordination in Planning: Industrial, residential and infrastructure investment
decisions are uncoordinated particularly in the fringe areas where pressures for urban
expansion are increasing and becoming increasingly difficult to monitor and control
development. There is a lack of clarity over departmental responsibilities for land use
planning, development, maintenance and enforcement. This has resulted in ineffective and
uncoordinated decision making processes and actions.
f) Inadequate open space: Most of the public and semi-public spaces are concentrated in
and around the central area of the city. There is lack of adequate organised open spaces at
zonal levels. It is necessary to adopt planned utilisation of the available public open spaces
in every ward of the city as play grounds, parks and gardens allowing space for active and
passive recreation for people. There is also need to bring more land under planned parks
and open spaces.
51
Thiruvananthapuram Municipal Corporation City Development Plan
The roles and activities of men and women in an urban milieu are different. Since women
are often under represented in decision making process, their issues hardly get any
attention.
A. Women in the Economy
Most of the women from urban households are working women, either in the formal or in the
informal sectors. There are many women who work in the services sectors-in government
offices, schools, hospitals, in the newly emerging IT sectors etc. Thiruvananthapuram being
the capital city has the presence and visibility of women working in the formal sectors. Their
specific problems need to find a place in urban planning exercise.
Many women work in the informal sector. There are vendors (fish, vegetables, fruits, flowers
etc). Basic services which the city needs like garbage collection, cleaning etc are performed
by women. A large number of poor women work as domestic maids, sales girls, and in
similar service sectors. All these women bear the double work burden of performing their
own household duties, and also work as earners and providers of the family. So these
differential needs and priorities need to be considered in planning urban infrastructure as
well as basic services for the poor.
Since women are responsible for provision of basic needs in households, there is need to
assist women in reducing their domestic work burden by providing access to safe water, fuel,
facilities for waste disposal, and access to essential requirements to run a home.
As workers and wage earners outside their homefront, they need transportation at the right
time, security while travelling and safe working environment. Most women in the informal
sector may be the sole earners in their families and providing facilities for them clearly
reduces poverty in the households. In Thiruvananthapuram Corporation, there are many
women headed households and also single women households.
B.Poverty Eradication and Women
Kerala has gone a long way in addressing issues of poverty, especially through women. Like
in many places micro credit initiatives have successfully brought many women into public
spaces and have helped them to initiate savings and credit programmes. Some groups have
moved to the next level of starting micro enterprises. But a review of such programmes by
several scholars in Kerala reveal the need for adequate forward and backward linkages like
management skills, marketing support, networking etc. Moreover, product diversification,
quality assurance etc also have to be provided. These are critical in sustaining the process.
These aspects have to be kept in mind while planning the urban infrastructure as well as
basic services for the poor. A centre for women to sell their products, storage spaces,
working spaces etc can be provided for women’s micro –enterprises. Women vendors need
to be consulted in planning markets and shopping complexes.
Another crucial aspect is that, poverty eradication in general does not necessarily address
gender inequalities. Hence conscious efforts are needed to bring in the gender dimension.
Women are not to be viewed as passive beneficiaries but active agents in poverty
eradication. Their capacity to articulate needs and priorities should be enhanced and such
needs should get reflected in budgeting and resource allocation. Women should also be
involved in monitoring and auditing of projects and programmes from a gender angle.
52
Thiruvananthapuram Municipal Corporation City Development Plan
C. Women in Governance
Kerala has legislated that one third of all elected members of the 3 tier Panchayati local
bodies and the municipalities should be women. The 33% elected women members or a
large number of women in Ayalkoottams or ADS/CDS structures do not necessarily mean
that their specific needs and interests are identified and addressed. For women who have
been socialised in the patriarchal society and has internalised its values, it is not ‘automatic
or natural’ to identify their strategic gender interests or those that help to change their status
in society. Identification and articulation of such needs requires broader gender sensitization
and capacity building to undertake institutional gender analysis.
Hence capacity building of elected women and leadership development among grassroot
women’s organizations (ayalkootams, ADS/CDS and other organizations) should form an
integral part of the governance agenda of urban planning. Networking and back up support,
necessary structures for this in the planning of urban infrastructure also is called for. A
resource centre cum meeting place for women under the control of the city corporation may
help partially to achieve this goal.
Such a resource centre for women can act as a strong base to help women achieve their
social and economic rights and also legal awareness to move towards accountability
(awareness raising, legal aid, resources for land titling etc).
D. Women in Transport
In the city of Thiruvananthapuram with large number of working women, transport is a major
issue which has a gender dimension. Transport planning often disregards women's priorities
because the focus is on mobility for all people and the preoccupation is with the journey and
itinerary of formal sector workers and students. Accessibility is often not considered.
Women's travel needs frequently require transport outside of peak hours and to alternative
destinations from those of men. And yet cost cutting inevitably involves a reduction in off-
peak services, a consequence of the economy evaluation made by planners using
conventional cost/benefit measures which ignore the value of the trips women make in their
reproductive role (Levy 1991). It should be noted here that it is not only the priorities of
women that are overlooked by conventional transport planning, but also those of men
outside of centrally located, formal sector employment.
Women engaged in informal sector activities are often burdened with heavy loads like fish or
vegetables. There are many women who carry this by head load because the existing
transportation system does not provide for them. Moreover, working women usually combine
paid work with their domestic responsibilities. Women depend more than men on public
transport and walking than on private cars or two wheelers. Affordable transport systems
circumvent critical destinations; they are overcrowded and sometimes dangerous and are
often unreliable and irregular. This hinders women in their domestic and caring
responsibilities.
Safety while travelling is of paramount importance to women. Measures to ensure safety in
public transport, in bus shelters and on streets should receive special attention. Adequate
street lighting, aid posts in bus stands etc should be planned. Drivers and conductors of
transport vehicles should be sensitized to the specific needs of girls and women and help
lines can be established, information about which can be displayed at major bus
53
Thiruvananthapuram Municipal Corporation City Development Plan
stations/railway stations. This helpline can also provide information regarding safe
accommodation facilities for women who are travelling alone for various needs to the capital
city and who are at risk.
Pedestrians are the most neglected in the planning process which include men, women,
children and the elderly. Foot paths are often reduced to widen roads, which has direct
relation to the safety of women. In a crowded street, if pedestrian space is very narrow and
enclosed with barricades, women are often harassed while walking. Elderly find it very
difficult to walk through a footpath which is uneven.
E. Women in Housing
Most women from among the poor use the house also as their workplace. Women spend
more time at home than men and if the kitchen has no adequate ventilation and lighting, and
if firewood is used for cooking, this can lead to health problems. Consultation with women is
also important for the design, delivery and maintenance of urban services and communal
facilities. Women's responsibility for household and community management gives them a
particular vested interest in safe water supply, efficient sanitation, solid waste removal and
the provision of affordable and reliable sources of energy.
While Kudumbashree units are enlisted for waste management, care should be taken to
increase their skills and capacities by teaching them to drive vehicles, providing necessary
safety precautions etc. Health insurance should be arranged as the job involves many
occupational health hazards like slipping and falling, dog bites, contamination from the
waste being handled, back pain due to the weight carrying etc.
F. Social Infrastructure
Education, health, recreation etc are areas where specific gender concerns exist.
Addressing the social needs of poor families is a question of life and death. Special efforts
need to be made to identify vulnerable families whose education, health and social security
are to be addressed and provided for. Various programmes can be initiated through public
private partnership (PPP).
The quality of services in the institutions under the municipal city corporation has to be
ensured, with special focus on schools where children from marginalized communities study
especially in coastal areas, slums etc. Supervised study after school hours with the help of
parent teacher associations (PTA) will help the education of girls, who otherwise will be
burdened with household tasks preventing them from focusing on studies.
There is overcrowding in hospitals, lack of privacy in examination rooms and a host of other
problems which require urgent attention.
Recreation is a basic need of human beings and often such a need of women is not
recognized. Public spaces have to be free from harassment and basic facilities like toilets
need to be provided, so that women also can enjoy free time.
Night life activities and Sunday markets need to be promoted. When preparing Detailed
Project Reports this aspects need to be given due consideration so as to ensure gender
mainstreaming in Urban Infrastructure Development, Governance & Poverty Alleviation.
54
Thiruvananthapuram Municipal Corporation City Development Plan
55
Thiruvananthapuram Municipal Corporation City Development Plan
From time immemorial, Thiruvananthapuram has been a centre of learning. It is said that
‘Kanthalloor Sala’ which could be equated to the Nalanda and Takshasila existed in the city.
Large number of institutions of higher learning and advanced research institutions are
located in the city and surroundings. These institutions now attract scholars and researchers
from all over the country. This is one of the key strengths of the Capital City Region.
56
Thiruvananthapuram Municipal Corporation City Development Plan
Kovalam has been a world-class tourist destination, contributing to a large number of foreign
tourist arrivals. The strength of Thiruvananthapuram district in Tourism development lies in
its beaches, backwaters, rich cultural heritage and hill resorts. With the Thiruvananthapuram
International Airport providing the gateway to tourism in Kerala, a substantial increase in
foreign and domestic tourist arrivals in Thiruvananthapuram is envisioned. This would
necessitate substantial upgrading of the tourism infrastructure in the City.
Vizhinjam seacoast 15 km to the south of the city is naturally endowed. The calm waters
with a natural draft of more than 20 meters and within a distance of 7 nautical miles from the
International Shipping route offers a unique location unlike any existing harbours on the
eastern or western coast of India to be developed as an International Container
Transshipment Terminal (ICTT) which would compete with the ICTTs of Colombo, Dubai and
Singapore where transshipment now happens for the Cargo destined to India. With the
commissioning of the ICTT at Vizhinjam the International Cargo arriving in India may cost
much less than what it costs now, contributing to substantial gain in foreign exchange.
Innumerable number of direct and indirect jobs would be created by the harbour. Bunkering
facilities would provide many additional service jobs.
57
Thiruvananthapuram Municipal Corporation City Development Plan
The music – composer – king Maharaja Swatithirunal of the erstwhile kingdom of Travancore
heralded modern medical institutions in the city, by constructing hospitals offering Allopathic
(English) medical facilities. Thiruvananthapuram Medical College, the first medical institution
in the State, the Sree Chithira Thirunal Institute for Medical Science and Technology, the
Rajiv Gandhi Institute of Bio-Technology and a host of hospitals and related medical
institutions situated in the city offer world class facilities for treatment. The inherited strength
of Thiruvananthapuram for ages has been in the field of ayurvedic health facilities, which not
only provide curative facilities but also for holistic health care. A large number of yoga
centres are also located in the city region. These have attracted people from all over the
country and abroad to visit Thiruvananthapuram for health care. The long waiting period and
the heavy expenditure on health care in Europe and America have made
Thiruvananthapuram a destination for health care where the westerners combine this with
tourism. This strength of Thiruvananthapuram can be further expanded in the next decade to
elevate Thiruvananthapuram city as a destination for World Health Tourism.
Being a State capital with varied employment opportunities, the City Region has attracted a
large number of people in the service sectors. Quite a few of them are absorbed in the
informal sector without access to quality housing and basic amenities.
58
Thiruvananthapuram Municipal Corporation City Development Plan
The proposed Development Strategy takes into consideration the following parameters:
The Development Vision for the City region;
The Infrastructure required to support and service the major activity nodes
envisioned in the Development Vision are considered to be prioritized for
development;
The status of the existing infrastructure with regard to Transport, Water Supply,
Sewerage, Surface Water Drainage, Sanitation including Solid Waste Management,
Urban renewal, Conservation etc., their deficiencies and the aspirations of the
stakeholders in improving the level of services are considered in the strategy for
improvement of urban infrastructure;
Infrastructure study based on the network, coverage and level of service in relation
to the development of the city and environs as studied in the Development Plans
and the Sectoral Plans prepared earlier were studied to draft sectoral level
development strategies;
The development potential of the city level resources and the urban governance
machinery are considered in drafting a long term development strategy for the city;
and
The expertise and capability of the various implementing agencies and their
potential to assume additional capacities are considered in adopting a City
Development Strategy and also Sectoral Development Strategies.
The following are the development strategies proposed for Thiruvananthapuram City Region
4.2.1 Strategies for Comprehensive Long Range Development of the City Region
Preparation of a Comprehensive Long Range Urban Development Plan for
Thiruvananthapuram City Region (UDP);
Preparation of Zonal Development Plans (ZDP) for all the identified Development
Nodes within the broad framework of the City Region level Development Plan; and
Preparation of a Priority Action Plan (PAP) for phased implementation of the
identified priority development programmes.
59
Thiruvananthapuram Municipal Corporation City Development Plan
solid waste management, etc. The ZDP shall take into account all these. Compatibility of
land uses and making available developed land for various competing uses being a primary
need, the ZDP shall have an acceptable Land Use Plan, notified as a statutory document
and followed religiously.
Kazhakuttam Techno Zone
The Techno Park in Kazhakuttam is the first IT Park of its kind set up in India. The Techno
Park now has about 35000 employees and it attracts 4000 visitors daily. In the near future
the number of IT companies operating from Techno Park may substantially increase. In
addition, a few IT majors like Infosys are developing their own campuses near the Techno
Park. On completion of these, the additional employment that may be generated is about
33000. After the phase 3 developments also are realized the total number of jobs may be
around one lakh.
The State Government has recently decided to establish a Techno City about 5 km north of
Techno Park on the Kazhakuttam – Attingal NH Corridor. It is estimated that this premises
may provide nearly hundred thousand jobs.
The Kerala Industrial Infrastructure Development Corporation (KINFRA) has developed a
Film and Video Park near Kazhakuttam, which is considered a successful venture. KINFRA
has also developed an Apparel Park on the west of Kazhakuttam. This industrial park is also
fully occupied. These activities have attracted a large number of commercial activities and
service sectors to this zone. The demand for housing has substantially increased.
In spite of these developments happening in this zone, a statutory Development Plan for this
Zone is absent. This is a prime necessity. The CDP shall address all the development issues
and shall prioritise the requirements and lead to Project Preparation for phased
implementation.
Vizhinjam ICTT
Vizhinjam, 15 km south of the city and 5 km south of Kovalam, is the location for Vizhinjam
Harbour proposed to be constructed as an International Container Transshipment Terminal
(ICTT). This Project is in the final stages of clearance and is getting ready for construction on
Public - Private Partnership (PPP) basis. Expected to cost Rs.4000 crores, this Project may
create 10,000 direct jobs and nearly 50,000 indirect jobs. The land based developments may
require container and passenger transport facilities, rail link, commercial activities, service
sector activities, housing etc. Such a development may require infrastructure development
as required for a small town of 100,000 people.
Zonal Development Plan for Vizhinjam Node shall address all these issues.
New Airport Terminal, Second Railway Terminal and Water Transport Terminal
The new Airport Terminal is under construction on the NH Bypass side at Chackai. The
present terminal on the western side of the runway is being shifted to the eastern side of the
runway to facilitate easy access from the city. The Airport Authority of India who has
undertaken the construction of the new terminal has stated that the related facilities required
for the terminal shall be developed by the State Government by acquiring land required for
these.
60
Thiruvananthapuram Municipal Corporation City Development Plan
61
Thiruvananthapuram Municipal Corporation City Development Plan
aspects related to Thiruvananthapuram were often projected in many a forum and in media.
This scenario of infrastructure was the focus of discussions in many Development Seminars
conducted in the city, since it was felt that such a situation is quite demeaning to the capital
city of the State of Kerala.
Subsequent to this, GOK adopted the development agenda for Thiruvananthapuram Capital
Region (TCR). Though problem solving measures, improvement and augmentation of many
a sector was considered under the TCR Development Agenda, the first initiative was taken
with Priority Road Improvement, under which 14 road corridors are considered for widening
and improvement.
The major infrastructure sectors considered for improvement under the JNNURM, based on
the study and analysis of the existing status and the future estimated needs are:
Transport – road development, improvement in road transport terminals,
development of parking facilities, pedestrian facilities, water transport, mass
transport system improvement etc.
Railways have become the main life line of movement of people and goods from
and to the capital city. The inadequacies of the existing rail facilities were highlighted
in the many consultation meetings. The future development needs in terms of
infrastructure needs for the railway systems are included in the project.
Water Supply – improvement of existing distribution system, improvement to
transmission mains, improvement to treatment facilities, development of new
sources, increase in coverage, improvements in quality and level of service,
integration with the ongoing projects, addressing the needs of the urban poor.
Sewerage and sanitation – provision of sewerage system in the uncovered areas of
the city, extending to the adjoining Panchayats and new development areas
addressing the needs of the urban poor.
Storm water drainage – addressing the drainage problem of the City with a
wholesome approach.
62
Thiruvananthapuram Municipal Corporation City Development Plan
P
PAAR
RTT B
B
D
DEEV
VEELLO
OPPM
MEEN
NTT O
OFF U
URRB
BAAN
N IIN
NFFR
RAAS
STTR
RUUC UR
CTTU RE
E
WATER SUPPLY
SEWERAGE
STORM WATER DRAINAGE
ENVIRONMENT
SOLUID WASTE MANAGEMENT
TRAFFIC AND TRANSPORTATION
URBAN REGENERATION
HERITAGE AND TOURISM
SOCIAL INFRASTRUCTURE
63
Thiruvananthapuram Municipal Corporation City Development Plan
The dam at Peppara ensures a steady discharge of water as and when required in to the
Aruvikkara reservoir through the river Karamana. The details of the Water Treatment Plants,
Pumping Mains and Reservoirs of Thiruvananthapuram Water Supply Scheme are shown in
the table 5.1.
Table 5.1: Thiruvananthapuram Water Supply Scheme
Sl.No. Items Details
1 Water Treatment Location Year of
Plants Commissioning Capacity (mld)
1933
a. Vellayambalam 20 Augmented to 36
1962
1972 Augmented to 48
b. Aruvikkara 1983 Augmented to 72
1999 Augmented to 154
1992
c. P.T.P Nagar 14 Augmented to 30
2004
d. Paramala 2006 5
Total 225
2 Pumping Mains Item Length
(high sizes only) 1200 mm CI 8900 m
1200 mm PSC 2422 m
1100 mm PSC 5611 m
64
Thiruvananthapuram Municipal Corporation City Development Plan
e. Storage of water
There are 5 zonal service reservoirs constructed at various locations depending upon the
geographic pattern of the city. The service area is broadly divided into the following viz.
Peroorkada Zone, PTP Nagar Zone, Low Level Zone, Observatory Zone and Manvila Zone.
The hydraulics is designed such that the reservoirs act as balancing reservoirs.
65
Thiruvananthapuram Municipal Corporation City Development Plan
f. Distribution System
The distribution system consists of a complicated network with a total length of 2,280 km.
The length of the large size (300mm to 700mm) transmission main is 72 km. The network is
designed for 24hrs water supply. Online boosters are not common in the distribution network
and are not recommended. Booster pumps direct from the network to the consumer tank is
also not permitted.
g. Physical losses
The recent study on Leak Detection under the Japan Bank for International Cooperation
(JBIC) assisted Kerala Water Supply Project reveals that there is a distribution loss of
35.50%, amounting to 80 mld of treated water. Most of the leaks detected are from the old
corroded system of service connections.
h. Salient features
Table 5.2: Salient features of existing water supply scheme
1 Year of commissioning 1931
2 Capacity - original (1931) 20 mld
3 Capacity Augmented (2006) 225 mld
Two dams in Karamana river
4 Source
70mm3 & 2 mm3 capacity
5 Present Scheme Area 183.76 sq.km
6 Population served (Corporation area) 8.61 lakhs
7 Coastal Population served 0.50 lakhs
8 Status of coverage 75% (Corporation area)
9 Status of supply 24 hrs / 7 days
10 Total number of water connections 172000
11 Distribution network 2280km
12 Transmission main 72km
13 Average per capita supply 174 lpcd
14 Average physical losses 35.50%
66
Thiruvananthapuram Municipal Corporation City Development Plan
b. Non- Domestic
Table 5.4: Details of Water Tariff for Non-Domestic connections
Up to 50 kl Rs. 7.35 per kl+ Service charge Rs. 2
(minimum Rs. 102/-)
Above 50 kl Rs. 10.60 per each addl. kl
c. Industrial
Table: 5.5: Details of Water Tariff for Industrial connections
Up to 10 kl Rs. 10.60 per kl+ Service charge Rs. 2
(minimum Rs.202)
67
Thiruvananthapuram Municipal Corporation City Development Plan
5.4 Growth Trends, Future Demand & Scope for Augmentation of Source
The projected water demand for 2031, at the rate of 200 lpcd for urban domestic use along
with a provision of non-domestic and industrial requirements has been considered for the
development plan. This is taken as 135 lpcd for the adjoining Panchayats in the urban
agglomeration.
The population projection has been worked out in detail as part of the ongoing JBIC project
and also incorporating modifications based on the city development in the area. Drastic
developments in IT Sector in and around Techno Park, Kinfra Park, expansion of Railways,
Tourism potentials, ensuing Vizhinjam port and other development corridors are also
envisaged. The ultimate water demand by 2031 is 410 mld. This reflects a wide supply-
demand gap of 185 mld by 2031. The ongoing JBIC project when commissioned by 2009,
can supplement 74 mld still leaving a gap of 111 mld. This gap is proposed to be
compensated by a three-way approach.
(i) Augment the system by 76 mld to bring more water to the city.
(ii) Bring down the Unaccounted for Water (UFW) losses to the range of 15% by
adequate rehabilitation measures. At present the UFW, which is the sum total of
leakage losses, theft, losses in scouring of lines, unmetered connections etc, is
estimated to be as high as 35.5 %.
(iii) Cut off some boundary areas from the city WSS by providing small WSS exclusively
for these areas.
Out of the supply-demand gap of 185 mld, 74 mld will be taken care of by 2009 on
comissioning of the JBIC project; 76 mld will be taken care of by (i) above and the balance
35 mld by (ii) and (iii) . The ultimate aim on completion of the JNNURM Project is 100%
coverage of the service area with 24/7 water supply till 2031.
68
Thiruvananthapuram Municipal Corporation City Development Plan
69
Thiruvananthapuram Municipal Corporation City Development Plan
70
Thiruvananthapuram Municipal Corporation City Development Plan
71
Thiruvananthapuram Municipal Corporation City Development Plan
Panchayath coming within the tourism zone has been proposed with Vellayani lake as
source. Lake Vellayani is a famous fresh water lake near the city.
A well cum pump house having 9 metre diameter is proposed in the lake. Raw water
Pumping main, 16 mld treatment plant, transmission main, service reservoirs and distribution
net work are included in the project.
v) Improvement of Water Supply Scheme to Pappanamcode & Nemom areas
Pappanamcode and Nemom areas are located on the south-east of the city. This area
includes Pappanamcode Estate, Nemom, Melankode, Ponnumangalam and part of
Thiruvallam ward covering a population of 50,000. This area is presently being catered by a
small Water Supply Scheme with an infiltration gallery in Karamana river at
Thrikkannapuram. Absence of a Water Treatment Plant creates quality problems in the
water supplied. Also shortage of water results in supplies to certain areas on alternate days.
A new project is proposed to cover the above area using nearby source viz Karamana River.
vi) Water Supply Improvements to Vandithadam
The present status of the Vandithadam Water Supply Scheme, which caters to the areas
nearby Kovalam, is far from satisfactory. There exists an old intake well in the Vellayani
Lake and the pressure filter installed is out of order and beyond repairs. Quality of water
supplied is also not good. The scheme can be rehabilitated to serve the coastal population.
It is proposed to construct a new intake well and a 5 mld full-fledged water treatment plant in
the public land nearby. The pump and pumping mains are also to be replaced to meet the
enhanced capacity.
vii) Water Supply Scheme to International Transshipment Terminal at Vizhinjam
Government of Kerala has embarked on an ambitious project for development of an
International Container Transshipment Terminal (ICTT) at Vizhinjam in Thiruvananthapuram.
An exclusive Water Supply Scheme to cater to the needs of Vizhinjam area considering the
vast demand projections due to this development are proposed to be included under the
JNNURM.
The proposal is to collect raw water from a well cum pump house of 6m diameter at
Vellayani lake, to treat the water in a 3 mld plant near it, collect water in a 1.33 lakh sump
and pump clear water to the proposed OHSR near the Coast Guard station, and to distribute
water by gravity mains.
The total cost of the project works out to Rs. 4.00 crores.
E. Citizen relation management
The activities envisaged are modernization and extension of the pilot complaint redressal
system of TWSS using better communication systems aimed at providing total consumer
satisfaction.
72
Thiruvananthapuram Municipal Corporation City Development Plan
73
Thiruvananthapuram Municipal Corporation City Development Plan
74
Thiruvananthapuram Municipal Corporation City Development Plan
75
Thiruvananthapuram Municipal Corporation City Development Plan
6.0 SEWERAGE
76
Thiruvananthapuram Municipal Corporation City Development Plan
further divided into two sub zones viz. (a) Kowdiar and (b) Ambalamukku-Muttada. Main
sewers in Zone-I are Kowdiar Main, Ambalamukku Main, Muttada Main and
Kesavadasapuram Main. Zone-II on the west side of NH is further subdivided into three
zones viz. (a) Kumarapuram-Kannammoola, (b) Kesavadasapuram-Ulloor and (c) Medical
College sub zones.
This block has four pumping stations. The Medical College lifting station catering to the
needs of the Medical College Complex, Plamoodu lifting station and the Murinjapalam lifting
station discharges sewage to Kannammoola pump house. The sewage is pumped to the
Sewage Farm at Valiyathura from the pumphouse at Kannammoola. Block ‘D’ was partially
commissioned in 2004. Works to provide coverage to the unsewered area in Block D is in
progress. Land acquisition works are also being completed.
Block E. This block includes four zones as detailed below.
(i) Zone-I: Comprising areas of Sasthamangalam, Kowdiar, Peroorkada and
Mannammoola was commissioned during 2004;
(ii) Zone-II: Comprising areas of Maruthankuzhy, Vettamukku, Pangode, Edapazhanji,
Chadiyara and part of Poojappura. Commissioning of Zone-II can be done after the
land acquisition process is completed;
(iii) Zone-III: This zone consists of Vattiyoorkavu, PTP Nagar, and Kanjirampara area.
Land acquisition process has to be completed for the completion of the sewer pipe line
laying works; and
(iv) Zone-IV: This consists of Valiyavila area. The work of this zone has not been started.
Land acquisition work for the pump house site at Valiyavila is to be completed.
77
Thiruvananthapuram Municipal Corporation City Development Plan
78
Thiruvananthapuram Municipal Corporation City Development Plan
works, a screen chamber in the pump house at Kalpakanagar, and erection of pump and
motors are to be executed for commissioning of sewer network in the area.
D. Providing sewerage system in unsewered areas of Blocks D & E
Block ‘D’ covering areas of Ambalamukku, Pattom, Muttada, Kesavadasapuram,
Kannammoola; and Block ‘E’ which covers areas of Peroorkada, and Sasthamangalam, has
been partially commissioned. The work to provide coverage to the unsewered areas of
Blocks D and E is in progress. Land acquisition works are to be completed.
E. Extension of sewerage system to Blocks F & G - Coastal Area
Blocks F&G consist of the coastal area and the area is presently not covered by sewerage
network. Sewer network coverage is to be provided to the coastal belt which is thickly
populated.
F. Sewerage system to the extended Corporation Area
Thiruvananthapuram City is now spread to cover 141.74sq.km with 86 wards and the entire
area is proposed to be covered with sewerage network. The extended area includes –
erstwhile Ulloor panchayat with an area of 16.67 sq.km; Attipra panchayat with an area of
16.03 sq.km; and Kadakampally panchayat with an area of 8.14 sq.km. The former Nemom
panchayat with an area of 12.18 sq.km and the former Thiruvallam Panchayat with an area
of 13.60 sq.km have also been merged to the Corporation.
The anticipated sewage load from the extended area as estimated for 2031 is 100 mld and
the sewage load from the old city area is 150 mld.
Thiruvananthapuram Sewerage Scheme [TSS] presently covers the old city corporation area
having an extent of 74.93 sq.km with 50 wards. The areas newly added to the Corporation
limit are to be covered with sewerage facility.
G. Sewerage system to adjoining Panchayats in the Urban Agglomeration
i) The adjoining panchayat areas of Kazhakkuttam with an area of 19.47 sq.km;
Sreekaryam with an area of 23.73 sq.km; Kudappanakkunnu with an area of 7.69sq.km;
and Vattiyoorkavu with an area of 11.11 sq.km are considered for provision of sewerage
facilities. The anticipated sewage load from the area is 45 mld.
ii.) The proposed International Container Transhipment Terminal, at Vizhinjam is expected
to contribute to increased activity in the area. Kovalam which is an important tourist
centre is also proposed to be provided with sewerage network. Vizhinjam panchayat with
an area of 12.62 sq.km, which also includes the above centres, is proposed to be
covered with sewerage network. A 30 mld Sewage Treatment Plant is proposed to be
constructed to cater to the demand of the area.
H. Procurement of equipment for maintenance of sewerage system.
Parallel to strengthening of the Sewerage System, the maintenance facilities will also have
to be strengthened to ensure proper functioning of the system. Machinery and equipment
required to facilitate carrying out of cleaning and repair works are proposed to be procured.
79
Thiruvananthapuram Municipal Corporation City Development Plan
80
Thiruvananthapuram Municipal Corporation City Development Plan
81
Thiruvananthapuram Municipal Corporation City Development Plan
82
Thiruvananthapuram Municipal Corporation City Development Plan
B. Killi river
The Killi river originates from Nedumangad area. The river is having a width of 20 to 25m
with bed slope of 1:750 to 1:1000 up to the city limit and thereafter maintaining a bed slope
of 1:2000 to 1:3000. The Killi river merges in to the Karamana river at Pallathukadavu. The
river passes through the city for a length of 12.50 km and then flows into the sea through
Edayar island in Thiruvallom panchayat.
The river reaches in Maruthankuzhy, Pangode, Vivekanandanagar, Jagathy, Iranimuttom,
Pallathukadavu are the important reaches inside the city. The river needs protection as the
river passes through highly residential area. Major portion of the river reaches inside the city
have already been taken up for stabilization. The left over areas need to be attended. For
the entire stretch of 12.50 km, passing through the city on either bank, the density of
population is very high. Hence, disposal of waste into the river is a major issue as in the
case of Karamana river. The waste so deposited settles on the down stream and reduces
the depth of the river. Due to the sharp meandering of the river, the bank erosion is
experienced. This eroded material also gets deposited in the river bed and results in the
formation of small islands thereby reducing the capacity of the river resulting in flash floods
during down pour.
All wastes and debris generated in the city area like dismantled waste during demolishing of
structures, during construction, wastes from hotels and hospitals are conveniently dumped in
to the river. The disposal of drainage and organic and inorganic waste from the household
into the river by the local inhabitants, markets and poultry waste also contribute to the
degradation of the river system. Sand mining from the river is also noticed in several parts of
the river. The health hazard and unhygienic situation in Killi river is very serious and
repeated clamour for the upkeep still remain unheard.
C. Drains and leading drains in the city area
Flooding is usually noticed in Thampanoor and East Fort areas. The canal starting from
observatory hills carries the surface water of the upstream reaches and passes through
Thampanoor, crosses the railway line and reaches East Fort area. This stretch of canal
seems to be tricky. Detailed analysis of the drainage pattern of the catchments of this drain
reveals the following:
The carrying capacity of the canal reach at Thampanoor is sufficient to discharge the run off
of its catchments along with the run off of the area adjacent to the railway station and bus
stand. The water collected during a down pour in the area adjacent to the railway station and
bus stand is not being discharged to this drain quickly as the carrying capacity of the leading
drains including the one around Ponnara Sreedharan Park is not sufficient. So the water
collected in the area gets stagnated for a period of time and that causes flooding in
Thampanoor area. So also the cross sectional area of the drain passing through the railway
yard is being reduced year after year due to the accumulation of debris and silt inside the
canal.
The leading drains to Pazhavangadi thodu from the area adjacent to the railway station and
bus stand should be redesigned and reconstructed to carry the water and drain off the area
to the thodu without any stagnation. It is to be ensured that the railway culverts as well as
the canal portion below the railway tracks are frequently cleared off the silt and debris.
83
Thiruvananthapuram Municipal Corporation City Development Plan
84
Thiruvananthapuram Municipal Corporation City Development Plan
and the flow is stagnant in several reaches. During rainy season due to the solid wastes and
heavy mass of silt deposit inside the thodu flooding occurs in the low lying areas. The dhobis
in the city area are polluting this thodu by washing and in slum areas drainage disposal is
diverted into this canal making the contamination level high.
Several housing colonies, houses, commercial establishments, slums are located on the
banks of this thodu and also in certain places semi permanent huts are seen encroached
into the thodu. Whenever the flash flood occurs in the rainy season the thodu overflows at
certain specific locations and cause havoc to the residents. This thodu is having several
rivulets before it reaches Kannanmoola to join the Amayizhanjan thodu. These rivulets also
bring enough silt and other solid wastes. Due to the facts explained above an urgent
restoration is necessary in this reach.
3. Pattom thodu
Pattom thodu is a natural drain having an average width of 12m and has a length of 6.5 km.
It starts from the upper reaches of Kudappanakunnu, on the eastern part of the city and
passes through the major parts of the Thiruvananthapuram City. It collects surface water as
well as storm water from the city area and finally connects to the Amayizhanjan thodu at
Kannammoola. This drain has a major role in controlling the flood in Thiruvananthapuram
City. This thodu is now fully silted and it causes flooding in the city during the monsoon.
Also there is a tendency of public encroachment on the silted area inside the canal which
in turn reduces the carrying capacity of the canal. Hence this drain is to be urgently desilted
and the sides protected.
4. Kannanmoola thodu (Amayizhanjan thodu)
Kannanmoola thodu other wise called Amayizhanjan thodu starts from the up stream side of
Kannanmoola bridge and ends in Akkulam lake .The Kannanmoola thodu is having a width
of 20m to 30m and a length of 6km. Pazhavangadi thodu, Ullor thodu and Pattom thodu join
this thodu near pump house on the upstream side of Kannanmoola bridge. As in the other
canals Kannanmoola thodu is also in a very poor condition in view of its carrying capacity,
bank erosion and low velocity. Unless the condition is improved flooding in these areas are
most likely and the hygienic condition will further worsen.
5. Thekkenekara canal
The Thekkenekara canal is one of the main flood water canals which starts from Karimadom
colony at East Fort and passes through the most populous areas like East Fort,
Padamanabhaswamy Temple,Sreevaraham, Muttathara, N H bye pass and ends in
Parvathy Puthanar near Puthenpalam. The entire stretch is now choked with silt and debris
.About half of the portion is covered with slab and desilting is very tedious in this stretch.
Thekkenekara canal is having a length of 2.5 km and and an average width of 2.5m to 5m
.Several small drains join this canal in various portions and in many places these are to be
reconstructed. The flood water passing through Pazhavangadi thodu can be diverted to this
canal at East Fort and flooding in the city area can be reduced to a certain extent if a
connecting canal is constructed.
85
Thiruvananthapuram Municipal Corporation City Development Plan
6. Kariyil Thodu
Kariyil thodu is a natural drain having an average width of 4m and has a length of 6.00km. It
starts from the upper reaches of Iranimuttom and is passing through Muttathara and
Manacadu villages of Thiruvananthapuram City. It collects drain water as well as storm
water from the city area and finally ends at Parvathy Puthanar. The main branches of the
thodu are Nilama ela thodu and Punnassery ela thodu. These thodus are now fully water
logged due to the silting in the Kariyil thodu. Hence the Kariyil thodu has a major role in
controlling the flood in Thiruvananthapuram City. Hence this drain is to be urgently desilted
and the sides should be protected.
7. Natural drains
Tettiyar and Pangapparathodu are natural drains which, if restored may help drain out water
from the marshy and waterlogged areas near Technopark and College of Engineering,
Thiruvananthapuram.
(i) Tettiyar thodu
The Thettiyar thodu is running in the premises of Technopark and is being silted up.
Protection of this thodu will prevent flooding and water logging in the surroundings of the
Technopark area. Also this thodu is passing through the boundary of Thiruvananthapuram
City.
(ii) Pangappara thodu
This thodu is running in the proximity of Kariyavattom campus and College of Engineering
Thiruvananthapuram. Major portion of the thodu is not in a stable condition to sustain the
seasonal rain water flow. Protection of this thodu is a successful solution of the total flooding
problems in the area and may help prevent water logging.
(iii) Kaimanam-Azhamkal thodu
This drain starts from Kaimanam and runs parallel to Karamana river and finally discharges
into Karamana river. The drain has to be desilted and side protection works are required for
1km.
(iv) Amathara thodu
This drain runs through Nalanda Junction, Charachira and leads to Plamoodu via Kanaka
Nagar in the city. The drain is blocked and ineffective at several places and needs urgent
repairs.
(v) Koori thodu
This canal once used for navigation is one of the leading drains of Parvathy Puthanar. The
entire length is blocked now. This canal is essential for controlling the water logging in
Chakkai area.
(vi) Vattakkayal Thodu
This canal discharges into Paravathy puthanar. The canal starts from a big pond at Chackai
and covers a length of 500m.
86
Thiruvananthapuram Municipal Corporation City Development Plan
87
Thiruvananthapuram Municipal Corporation City Development Plan
Awareness campaign throughout the city is to be held quite frequently and all possible
measures resorted to save as much water as possible. The dilapidated tanks, ponds and
wells are to be regenerated and new ones constructed wherever possible. Due to the fast
development in construction activities especially those associated with Technopark and its
surrounding areas, where large scale filling of wet lands have resulted in blockage of natural
drains and reduction in ground water recharge.
A. Conservation of Ponds (Tanks)
There are 350 ponds in Thiruvananthapuram taluk as per revenue records. Out of this, 212
tanks up to 0.5 ha area within the city need to be revamped to conserve water. The ponds in
the adjacent panchayats of the UA also need conservation.
B. Rain Water Harvesting
Coastal areas are devoid of drinking water facility and some provision for rainwater
harvesting mechanism will be very much appreciated. Rough assessment of the needs in
the coastal belt gives the requirements of 300 tanks/ward. Poundkadavu, Vettukadu.
Kannamthura, Sanghummugham, Chakkai, Vallakadavu, Valiyathura, Muttathara,
Beemapalli, Beemapalli East, Manikavilakom, Puthenpalli, Poonthura, Velar, are some of the
identified wards to be provided with water harvesting mechanisms.
Apart from the above, rain water harvesting needs to be promoted in Public buildings in the
city which can contribute to a substantial part of the water requirement which otherwise
would be discharged as surface runoff. Large number of buildings under the public and semi
public category exist in the city. Also the Kerala Municipality Building Rules 1999 provides
for rain water harvesting in all new constructions which would take care of this aspect in new
developments.
C. Vellayani lake
Vellayani lake, one of the largest fresh water lakes in the State, situated to the south-east of
Thiruvananthapuram city is one of the unique fresh water lakes of Kerala. It is located in
Venganoor, Kalliyoor panchayaths and in some parts of Thiruvananthapuram Corporation.
The exact location is towards north-west of Vellayani Temple and towards East of
Agricultural College surrounded by high lands.
The lake as well as the surrounding places are low lying areas with boundaries stretching
from Nemom on the North-East, Vellayani on the East, Kakkamoola on the South, Kalliyoor
and Vandithadam on the west and Karumom on the North side. Due to the geographical
conditions, the area surrounding the lake is always water logged. The original extent of the
lake was 750 Ha., of which 165 Ha was with Kerala Agricultural University with the reservoir
area of 28 Ha. The balance 557 Ha is with Government and private individuals. It is a fact
that, there is considerable reduction in the area of the lake due to various reasons such as
encroachments.
The main source of submergence is the runoff water getting accumulated in the above area
due to geographical conditions. Also the area being low lying the water table is above the
ground level thus creating the area permanently water logged.
The peculiarity of Vellayani Kayal is that the bed of the Kayal is comparatively at a higher
level than the surrounding submerged areas. This stimulates water percolation thereby
88
Thiruvananthapuram Municipal Corporation City Development Plan
keeping a steady water level which even in summer period will not come down. Even though
the original Kayal area comprises land below reservoir bund, the same is now dewatered to
make it suitable for cultivation. The area where cultivation is now practiced are Pandarakari,
Punjakari, Nilamelkari, Mankilikari and Kanjirathady. The present total area of all these
cultivated land is about 150 hectares.
Dewatering of the entire Kayal was done up to 1992 where third crop of paddy was
practiced. After 1992, cultivation is confined only in the lower part of reservoir bund and is
still continuing.
The main outlet canal Kannukalichal originates from the lake and joins Karamana river. This
is about 2.50 km long and 13 m wide. This water way is heavily silted up with thick growth of
vegetation, making smooth flow of water virtually impossible. The side bunds have been
eroded at many places and as the thodu flows at a higher level than the fields, it causes
flood and damage during rainy season. Similarly there are many canals for flood discharge,
which are also in a state of disrepair for the last several years. The de-watering process is
being carried out for cultivation around the kayal. There are at present four 50 H.P. motors
with petty and para for smooth operation. These are housed in four pump houses located in
both banks of Kannukalichal thodu.
D. Aakulam lake
Aakulam lake is one of the important tourist centres in the capital city and it attracts tourists
very much. Amayizhinjan thodu the major discharge canal drains into the Aakulam lake and
a heavy mass of silt and debris is deposited in this lake .Other main problems faced by the
lake are the weeds and erosion.
E. Kochar thodu
This is an artificial thodu constructed by the erstwhile Maharaja of Travancore.This drain
conveys fresh water from Maruthankuzy weir towards Padmatheertham of Sree
Padmanabha Swamy Temple. It is an artificial river diversion system used for cleaning and
refilling the holy temple tank at East Fort. During summer and rainy season it was used to
divert water from Maruthankuzhy river regulator. This artificial thodu has a length of 6.32km
and is flowing under gravity through a pipe line. Now it is damaged and no water is now
flowing through it. If it is maintained it will help to clean Padmanabha Swamy Temple tank
which is situated in the heart of the city and can keep the city cool and clean.
89
Thiruvananthapuram Municipal Corporation City Development Plan
About 60 % of the storm water drains in the city are uncovered. These drains are
more prone to discharge of solid wastes and growth of vegetation resulting in
reduction/ stagnation of normal flow;
Missing links in the existing drainage network;
Lack of awareness and public responsibility regarding disposal of wastes;
Lack of co-ordination and maintenance of the existing canals and storm water drains
by the responsible agencies; and
Non separation of city wastes (both liquid and solid) from the storm water.
Goals
Achieve efficient storm water drainage for the city, avoid regional flooding;
Increase the life of the road network by providing adequate drains;
Assist and promote Inland Navigation wherever possible to match with our National
Inland Water Transport Policy;
Preservation of water bodies, environmental regeneration of water bodies,
protection of coastal belt; and
To achieve 100 % drainage coverage in the city.
90
Thiruvananthapuram Municipal Corporation City Development Plan
Cost Estimate:
1. River Training works (20 km) Rs.1500 lakhs
2. Construction of flood bunds (14 km) Rs.200 lakhs
3. Construction of Cross structures Rs.130 lakhs
4. Construction of bridges Rs.600 lakhs
5. Construction of foot bridge (25 nos) Rs.650 lakhs
6. Construction of Cross Weirs (2 nos) Rs.200 lakhs
7. Plantation of soil retaining plants Rs.20 lakhs
8. Construction of parks on river banks Rs.50 lakhs
9. Maintenance of damaged retaining walls Rs.200 lakhs
10. Easing of curve and removal of islands Rs.100 lakhs
11. Construction of cross drains Rs.150 lakhs
12. Detailed investigation Rs.20 lakhs
Total Rs.3820 lakhs
2. Killi River
The proposals for the upkeep of the river portion inside the city are as hereunder:
I. The river retaining structures for a length of 5 km has to be raised in order to protect the
bund at different locations;
II. Lack of sufficient leading drains to take storm water to the river constantly erodes the
river bunds. To tackle this issue, surface drains are to be constructed along the bund on
the land side to take the storm water for a length 5 km on either side at the required
locations along with inlet structures;
III. In order to reduce the velocity of flow and to retain water for retention and storage
construction of (10 Nos) cross bars are required in the river portion. This may act as silt
traps also;
IV. Crossing the bridge at three places are required to be provided to meet the increasing
demand of traffic. Also the provision of 15 foot bridges at different locations within the
city is included for public convenience; and
V. To curb dumping of waste in to the river at crossing portions like bridges fencings are to
be provided. Also lamp posts and benches are proposed at the bathing ghats to make
better ambience.
The civic sense among the people and the feeling of ownership of public property are to be
inculcated through constant awareness programmes and media. The implementation of
these proposals can yield sustainable benefits only if participation of its beneficiaries is
assured.
Cost Estimate:
1. Raising retaining structures for a length of 5 km : Rs.100 lakhs
2. Surface drains for a length 5 km on either side : Rs.25 lakhs
3. Construction of cross bar, 10 nos at various points : Rs.65 lakhs
4. Construction of 3 bridges across the river : Rs.200 lakhs
5. 15 foot bridges to make conveyance easier : Rs. 20 lakhs
6. Fencing at bridges to prevent dumping of waste : Rs.35 lakhs
7. Providing Lamp post toilets and benches at the bathing ghats : Rs.50 lakhs
8. Awareness program : Rs.5 lakhs
Total amount required for the project : Rs 500 lakhs
91
Thiruvananthapuram Municipal Corporation City Development Plan
Cost Estimate:
Desilting from observatory to Kannanmoola Rs.60.00 Lakhs
Construction of retaining wa ll Rs.43.00 Lakhs
Dismantling and reconstruction of damaged portion of Rs.23.00 Lakhs
retaining wall
Construction of silt pit (4 nos ) Rs.6.00 Lakhs
Providing fencing Rs.19.20 Lakhs
92
Thiruvananthapuram Municipal Corporation City Development Plan
93
Thiruvananthapuram Municipal Corporation City Development Plan
Cost Estimate:
1. Desilting canal, Karimadom pond and adjoining canals : Rs.54.00 Lakhs
2. Construction of retaining wall for 4 km length : Rs. 14.28 Lakhs
3. Construction of retaining wall of average height 2.30m on : Rs 40.50 Lakhs
the sides of canal 1500m
4. Providing fencing on the sides of canal 1.8km : Rs 21.60 Lakhs
5. Construction of leading drains
a. Thampanoor thodu to Thekkenekara Canal & : Rs 34.65 Lakhs
manacaud area to canal 550m
b. Leading branch canal at other places 1000m : Rs 21.00 Lakhs
6. Construction of foot bridges ( 4 nos ) : Rs.8.00 Lakhs
7. Planting trees and other beautification works at : Rs. 50.00Lakhs
Karimadom
Total : Rs.244.03 Lakhs
4. Parvathy Puthanar
Protection works are required at Kovalam to Panathura, Moonnattumukku to SM lock,
Vazhavila to Akkulam, fencing the canal to prevent pollution and Renovation of Poonthura to
Akkulam reach of Parvathy Puthanar is proposed.
94
Thiruvananthapuram Municipal Corporation City Development Plan
Cost Estimate:
Protection works from Kovalam to Panathura Rs.205.00Lakhs
Protection works from Moonnattumukku to SM lock Rs.82.00Lakhs
Protection works from Vazhavila to Akkulam Rs.150.00Lakhs
Fencing the canal to prevent pollution Rs.500.00Lakhs
Renovation of Poonthura - Akkulam reach of Parvathy
Puthanar Rs. 100 Lakhs
Construction of a walkway and beautification of canal bank Rs 600 lakhs
Total Rs.1637.00lakhs
5. Edayar Island
A proposal to improve the conditions of the island, its stabilization has been proposed in
detail costing nearly 400 lakhs.
6. Lanka Island
Urgent protective works would cost an amount of Rs.100.00Lakhs
Abstract of Cost estimate for drainage and flood control in the City:
1. Karamana River : Rs.3820.00 Lakhs
2. Killi River : Rs. 500.00 Lakhs
3. Pazhavangadi Thodu : Rs. 597.00 Lakhs
4. Ulloor Thodu : Rs. 326.50 Lakhs
5. Pattom Thodu : Rs. 120.00 Lakhs
6. Kannanmoola Thodu : Rs. 670.00 Lakhs
7. Thekkenenkara Thodu : Rs. 244.03 Lakhs
8. Kariyil Thodu : Rs. 115.00 Lakhs
9. Thettiyar : Rs. 300.00 Lakhs
10. Pangappara : Rs. 200.00 Lakhs
11. Kaimanam-Azhamkal thodu : Rs. 20.00 Lakhs
12. Amathara : Rs. 20.00 Lakhs
13. Koori thodu : Rs. 50.00 Lakhs
14. Vattakkayal : Rs. 20.00 Lakhs
15. Construction of additional drains : Rs. 500.00 Lakhs
16. Parvathy Puthanar : Rs 1637.00 lakhs
17. Edayar Island : Rs. 400.00 Lakhs
18. Lanka Island : Rs. 100.00 Lakhs
Total : Rs.9639.53 Lakhs
95
Thiruvananthapuram Municipal Corporation City Development Plan
B. Water Conservation
The projects on water conservation include:
1. Conservation of ponds (tanks) in the city area: Out of the 350 tanks present, 212
tanks up to 0.5 ha area within the city need to be revamped to conserve water. (112 Tanks
@ Rs.5lakhs and 100 tanks @ Rs.10 lakhs amounting to Rs.1560 Lakhs). Ponds in the city
which have heritage significance is not considered under this.
3. Water harvesting:
Water harvesting in the coastal areas & Rain water harvesting in public & Semi public
buildings @ Rs 1 lakh per building. = Rs 1500 lakhs
The major threat to the Vellayanin kayal is encroachments. To avoid it in future, construction
of boundary in pucca form and proper fencing to safegaurd against dumping of solid wastes
is required. A walkway on its outer periphery to enjoy its beauty and for enabling
maintenance in future is also required.
Contamination of water is yet another problem faced by the lake. The fertilisers and
pesticides used for agricultural activities in the nearby area get intruded into the lake, for
which necessary barriers need to be constructed. Desiltation of the lake is also necessary for
increasing its capacity. Desiltation and removal of age old wastes & rubbish thrown into it
will reduce the BOD level of water, thus helping to enhance the aquatic life in it. Fish
cultivation may also be started along with this, which inturn will be an added benefit to the
society.
The pump houses located on both banks of Kunnukalichal thodu need urgent Civil,
Mechanical and Electrical works for its proper functioning. In the present context the
cultivated area should be kept as such separated from the kayal for the effective
conservation of the Kayal.
The most important requirement is to dredge and deepen the lake, as it has been silted up
heavily. Silt traps and drains should be constructed wherever required along the periphery.
The main bund running East-West on the eastern side of the lake is about 980 m long. This
is the vital structure separating the lake and submerged fields from Pandarakari
padasekharam. This bund resists very high water pressure on one side which is about 3.65
T/m. During rainy season water level in the lake and submerged portions rise sharply
resulting in overflow. To prevent these, the sides have to be protected suitably. The
damaged bridge is also to be replaced by a two-span bridge for vehicle traffic 4 m. wide.
96
Thiruvananthapuram Municipal Corporation City Development Plan
The worn out mechanical and electrical parts of the pumping systems is to be replaced
urgently for effective de-watering. There are 7 pump sets of 50 H.P. capacities installed near
Madhu Bridge to pump out excess water from the lake. The shutter arrangements are
meant to prevent the intrusion of salt water from the sea. For smooth functioning the pumps
and motor should be in an operational condition through out the year. The conservation of
Vellayani Lake including restoration and regeneration works out to Rs 2000 lakhs.
5. Aakulam Lake:
Proposal is given in this to desilt the lake, construction of walk way and planting of trees
Cost Estimate:
Providing walk way along the periphery of the lake : Rs.400.00 lakhs
Desilting the lake by dredging : Rs.1400.00 lakhs
Beautification & Landscaping : Rs.200.00 Lakhs
Total : Rs.2000.00 Lakhs
6. KocharThodu:
The approximate cost for maintenance of this artificial thodu comes to Rs.75 lakhs.
Cost Part for Water Conservation
1. Conservation of 212 ponds in the city : Rs.1560 lakhs
2. Conservation of ponds in the adjacent panchayats
in the UA : Rs.800 lakhs
2. Rain water harvesting : Rs.1500 lakhs
3. Vellayani kayal conservation : Rs.2000 lakhs
4. Akkulam lake conservation : Rs.2000 Lakhs
5. Kochar drain : Rs.75 Lakhs
Total : Rs.7935.00 lakhs
97
Thiruvananthapuram Municipal Corporation City Development Plan
98
Thiruvananthapuram Municipal Corporation City Development Plan
Sl. Name of Works 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 Total
No.
17 Edayar island 1.00 2.50 0.50 4.00
18 Lanka island 0.25 0.50 0.25 1.00
Total 15.00 25.52 2454.03 18.00 8.54 4.80 96.4
2. Water Conservation
1 Repairs of 212 ponds (tanks) inside city 1.60 4.00 4.00 4.00 2.00 15.60
Repairs of ponds (tanks) in the adjacent 2.00 3.00 3.00 8.00
2
Panchayats in the UA
3 Rain water harvesting 3.00 5.00 5.00 2.00 15.00
Vellayani kayal conservation including 1.00 5.00 9.00 3.00 2.00 20.00
4
restoration and regeneration
5 Restoration and regeneration of Akkulam lake 2.00 6.00 6.00 3.00 3.00 20.00
6 Kochar drain 0.50 0.25 0.75
Total 10.10 23.75 27.00 12.00 7.00 79.35
Grand Total 25.10 48.77 51.54 30.00 15.54 4.80 175.75
99
Thiruvananthapuram Municipal Corporation City Development Plan
8.0 ENVIRONMENT
100
Thiruvananthapuram Municipal Corporation City Development Plan
from the southern part of the city. Kannamoola thodu, Thekkenakara canal, Kariyil thodu
and Karamana river are the major feeders of Parvathy Puthanar main canal. Now this canal
is the most polluted one seriously affecting the health and sanitation of the local inhabitants.
Even the untreated sewage from the Kuriathy sewage treatment plant finds its way to
Parvathy Puthanar canal through Karimadom tank. The untreated effluents from the local
households and the discharge of canals like highly polluted Thekkenekkara make the
situation far more worse. Added to this pathetic plight of the canal, solid wastes dumped in to
the canal like hotel and hospital wastes in sacs obstruct the flow and tend to be stagnant.
There are openings from this canal to the sea at Poonthura and Veli, which facilitate flushing
of the canal. But these openings will be closed most of the time adding concentration of the
pollutants. The Akkulam Veli lake is now a pool of grimy and mucky water due to the
stagnation of water behind the Veli sand bars. Veli and Akkulam lakes are potential tourist
centres and hence it is imperative to make them presentable by restoring their regime
condition and making them environmentally sound.
Problems identified
1. The living conditions of the local inhabitants are highly deplorable. It is estimated that
Akkulam Lake is degraded due to the ingress of 21 mld of sewage from the drains
inflowing in to the lake. The oxygen demand level of the water body is too high, indicating
unfair situation for the growth of biological and aquatic species. The only solution to the
dreadful condition is to improve the hygienic status of the canal and lake having an
approximate area of 64 ha, in all possible ways.
First and foremost is to treat the inflow in to the lake to have desired level of quality, and to
control the sewage inlet to the canal and inflow of domestic effluents. Badly damaged
reaches of the canal need to be protected. Certain reaches identified in Parvathy Puthanar
for improvement include Moonnattumukku to Vazhavila, Thekkenekara feeder canal, Kariyil
thodu, Panathura to Kovalam. Sewage treatment plants are to be energized. Processes of
supplementing the flushing system are to be ensured. Providing groynes at the mouth of the
inlets to the sea will be helpful in ensuring free flow of water from the stream to the sea.
Proper investigation and studies are to be carried out before designing the system. The lake
itself is to be desilted and cleaned. With the implementation of the above works, the
southern part of the city would have a direct benefit. The flood prone and waterlogged areas
that would be benefited are Ambalathura, Kamaleswaram, Muttathara, Srivaraham,
Poonthura and Edayar island affecting about 25% of the city population.
101
Thiruvananthapuram Municipal Corporation City Development Plan
2. Coir Wretting activities in large scale are carried out by few societies and individuals
in the TS canal reach near Kovalam. It can be seen that the activity of wretting is spread
over major portion of Kovalam lagoon. The decayed coconut husk along with the resultant
polluted atmosphere causes environmental degradation of the area. The industries provide
food for many and it is not advisable to stop them, but alternatives to be worked out which
will not be detrimental to the local environment. Dry wretting with modern machinery can be
resorted to tide over the situation. Such machinery can be procured and given to the
societies on proper agreement so that the present state of wretting and the resultant ill
effects can be controlled.
3. Sanitation of the local residents by the side of Parvathy Puthanar is to be improved
considerably. Most of the households have simply kept the outlets of their toilets and latrines
direct to the canal for economic reasons.
B. Coastal Pollution
The major activities that are responsible for coastal pollution are discharge and
dispersal of untreated domestic and industrial wastes, discharge of coolant waters, harbour
activities such as dredging, cargo handling, dumping of ship wastes, spilling of cargo
chemicals, oil transport, fishing activities etc. Domestic wastes are discharged mostly in
untreated conditions due to lack of treatment facilities.
102
Thiruvananthapuram Municipal Corporation City Development Plan
103
Thiruvananthapuram Municipal Corporation City Development Plan
104
Thiruvananthapuram Municipal Corporation City Development Plan
to birds, shades to the pedestrians and sets control for dust spreading. The species
suiting the location and environment are to be selected carefully. The maintenance
and upkeep of these trees shall be entrusted with some agency lest the very
purpose will be defeated. The roads where there are no trees on the sides also need
to be covered under this (Rs.50 lakhs).
Modern machinery for dry wretting, in places of coir wretting on the sides of T.S
canal, can be procured and given to the societies on proper agreement so that the
present state of wretting and the resultant ill effects can be controlled.
Cost Estimate:
1. Sanitation latrines/septic tank : Rs.200 lakhs
2. Planting trees along canal/river banks : Rs.50 lakhs
3. Purchase of Coir wretting machines : Rs.200 lakhs
Total : Rs.450.00 lakhs
C. Disaster Management:
Shelter belts can be constructed as complementary structures along the coastal line
to provide adequate safety to coastal erosion. The entire coast of Kerala should be
protected by coastal belt and appropriate mechanical structure whenever needed.
The present practice of sea wall construction is to be supplemented with the
plantation of Mangroves, and other suitable species of trees/vegetation to suit the
soil condition which is most suited for stabilizing the banks. Mangrooves and other
trees can be used wherever the conditions are congenial. Havoc due to tsunami can
be addressed thus.
An alternate method for preventing sea erosion using artificial offshore reefs is an
environment friendly practice, which is much more sophisticated than simple rock
walls and groynes. This is a multi purpose perspective that goes beyond the simple
aim of protecting a stretch of the coast. It is constructed with large sand filled geo-
textile bags having life up to 40 years. These reefs are safe and secure during
storms and dampen wave activity so that the beach grows out and lost land is
recovered. The reef acts as fish aggregation device and increases fish stock through
extra habitat. The reefs promote tourism as it supports recreation, water sports and
surfing. Such reefs can be introduced in some areas nearer to the tourist spots.
Detailed study and consultancy is recommended. This issue has been addressed
under the costing for the Basic Services for Urban Poor.
Kerala falls in the Zone III of seismic map. Hence safety devices like fire hydrants
need to be provided in the identified congested areas in the city centre. Also in
newly developing areas strict adherence to the Kerala Municipality Building Rules
1999 can ensure availability of recreational open spaces in sub divisions for
residential development.
D. Other Projects
1) Environmental upgradation of coastal belt: In the coastal belts of the city, density of
population is more and due to lack of proper sanitation facilities, the locals do make the
105
Thiruvananthapuram Municipal Corporation City Development Plan
beaches dirty and unhygienic. To avoid this, common sanitation facilities as well as
independent latrine facilities are proposed to be provided in all coastal wards. As this is
separately dealt with in the Basic Services to the Urban Poor, its cost is not included in this
section.
2) Construction of cut-off line Structures: To solve the problems like destruction of
houses built on encroachments to the beaches, arised due to roughness of sea, a
permenant gabion wall is proposed to be constructed along the beach. This will make a line
of cut off to future encroachments, leaving maximum wide beach thereafter towards sea.
This structure can also be used as a walkway, as an extension to the existing walkway at
Sankhumugham beach, towards both sides. Towards south, it can be extended upto
Valiyathura Kadalpalam and from there to Poonthura. Towards north, it is proposed to be
extended upto Kannanthura, Vettukad, Kochuveli and Veli. This will also help in to have a
direct link between the two tourist centres -Sankhumugham beach and Veli Tourist Village.
An amount of Rs.900 lakhs is estimated for this.
3) Fishermen Park: Three parks adjacent to the proposed walkway could be constructed for
the fishermen community in the coastal area. An amount of Rs 60 lakhs is estimated for this.
4) Bathing Ghats: Three bathing ghats with proper dressing rooms are also proposed to be
constructed along the shore. This will add facilities to the tourists as well. An amount of Rs
60 lakhs is estimated for this.
5) Coastal afforestation: Planting of trees is proposed along the entire 20 km stretch of
coastal belt. Rs 50 lakhs is estimated for afforestation.
6) Creating Artificial Forests in the City: Plants and trees control the ecological balance.
Forests are normally too far off from the city and young/ future generations of the city seldom
get any chance for acquaintance with forests. Hence artificial forests are proposed to be
created in the city. The surplus government land available in sewage farm & in Chitranjali
Studio Complex and Edayar island can be utilised for this. In Sewage farm alone, 75 acres
of land can be made available for this purpose. Besides ecological and environmental
upgradation, it also helps in conserving water. An amount of Rs 400 lakhs is estimated for
this project.
Cost estimate:
Mangroves : Rs.13 lakhs
Canal cut off line structure : Rs.900 lakhs
Fishermen Park : Rs.60 lakhs
Bathing ghats : Rs.60 lakhs
Afforestation : Rs.50 lakhs
Total : Rs.1070 lakhs
Creating artificial forests in the City
(Sewage farm, Chitranjali studio etc) : Rs.400 lakhs
Total : Rs.1483 lakhs
106
Thiruvananthapuram Municipal Corporation City Development Plan
6 Canal cut off line structure, 0.70 3.00 3.00 4.00 10.70
Fishermen Park, Bathing ghats &
afforestation
7 Creating artificial forests in the City 0.60 1.50 1.00 0.50 0.40 4.00
(Sewage farm, Chitranjali studio
etc)
107
Thiruvananthapuram Municipal Corporation City Development Plan
The major sources of solid waste generation are as given in table 9.1
Table 9.1: Source of solid waste generation
S Source Waste generated % to Total
No tons/day
1 Domestic 140.95 53.03
2 Commercial 20.59 7.75
3 Marriage & function halls 1.56 0.59
4 Restaurants 11.85 4.46
5 Hotels 4.85 1.82
6 Lodges 0.65 0.24
7 Markets 15.43 5.79
8 Slaughter houses 2.50 0.94
9 Schools & Institutions 3.50 1.32
10 Street sweepings 48.11 18.10
11 Temples 0.60 0.23
12 Museum & zoo 3.00 1.13
13 Domestic component of BMW 9.72 3.66
14 Construction 2.50 0.94
Total 265.81 100.00
108
Thiruvananthapuram Municipal Corporation City Development Plan
Domestic waste accounts for more than 50% of the municipal solid waste produced in
Thiruvananthapuram. Street sweeping accounts for 18% of the waste. Commercial waste
and waste from hotels and markets are also significant.
Classification of waste based on its components has not been done. The wastes generated
from the various sources are shown in the figure given below.
Domestic
Source of Solid Waste
1.1% 3.7% Commercial
0.9%
0.2% Marriage & function halls
Restaurants
18.1%
Hotels
Lodges
1.3%
Markets
0.9% Slaughter houses
5.8%
Schools & Institutions
53.0% Street sweepings
0.2%
T emples
1.8%
Museum & zoo
4.5%
0.6% Domestic component of BMW
7.8% Construction
109
Thiruvananthapuram Municipal Corporation City Development Plan
being practiced in 25 selected wards since June 2006. For this purpose the Corporation has
provided 2 types of buckets to each household – green bucket for biodegradable waste and
white bucket for non biodegradable waste. The waste is segregated and collected at source
in these buckets. A massive awareness programme has also been launched to make people
aware of the management of solid waste at household level. Initial feedbacks indicate that
the programme is well received by the people. The activities are to be streamlined and
sustained. The number of households covered in each ward is given in table 9.2.
Table 9.2: Households covered under Capital City Clean City project
Sl. Name of ward Total Households Households % of
No households surveyed supplied with households
buckets covered
1 Nanthancode 2343 1714 1211 59.06
2 Kuravankonam 2013 1846 1521 72.52
3 Sasthamangalam 2664 1812 1566 78.91
4 Kaudiar 1807 1595 1595 82.22
5 PTP Nagar 2343 1268 808 44.00
6 Vazhuthacaud 1830 1830 1350 57.37
7 Palayam 1966 1441 1362 70.25
8 Kunnukuzhi 1926 1161 913 53.82
9 Jagathy 2179 1856 1243 97.85
10 Poojapura 2217 1125 742 59.05
11 Vanchiyoor 1057 1752 1185 60.51
12 Sreekanteswaram 1892 1133 1323 77.68
13 Fort 1314 1219 1101 42.02
14 Chalai 1380 1100 825 66.87
15 Thycaud 1821 1104 832 50.95
16 Aranoor 2074 1465 1430 59.24
17 Karamana 2015 1957 1725 42.96
18 Secretariat 1759 395 331 74.45
19 Thampanoor 1465 1007 901 65.81
20 Valiyasala 1721 1321 806 47.41
21 Medical College 2020 1920 1140 64.92
22 Kannamoola 2218 2100 2144 62.47
23 Kesavadasapuram 2158 1890 1545 15.87
24 Pattom 1181 2130 1660 52.64
25 Gowreesapattom 2478 2300 965 67.19
TOTAL 47410 38441 30224 63.75
110
Thiruvananthapuram Municipal Corporation City Development Plan
111
Thiruvananthapuram Municipal Corporation City Development Plan
2. Disposable items like i.v. Red coloured bags Autoclaving / Chemical treatment, cut
sets, blood & urine bags into small pieces & disposal
etc
112
Thiruvananthapuram Municipal Corporation City Development Plan
hospitals appears to be a more viable option. In a 5,000 bedded hospital, 7.5 tons of waste
is generated per day. Out of this 1.25 tons would be bio-medical waste. The estimated
capital cost for establishing a common treatment facility for biomedical waste generated from
5,000 hospital beds comes to Rs 130 lakhs. The annual O& M cost will come to Rs 30 lakhs
per year.
Strategies
To achieve these goals the following strategies are planned:
113
Thiruvananthapuram Municipal Corporation City Development Plan
1. Training
One of the areas which have not gained attention except in very recent period is the training
of all involved in SWM. There are any number of instances where a person has joined
service worked in SWM for 25 to 30 years and left service without having any training on
SWM. There is an urgent need to start training the personal involved in SWM. A beginning
has been made in Capital City Clean City project but this has to be institutionalized with
provision for regular training of persons directly involved in SWM.
2. Awareness Campaign
A sustained regular periodic (pulse like) awareness campaign is needed to bring about
significant change in the attitude of the people towards SWM. Reduction, Reuse, Recycle,
Recover concepts have to be emphasized so that the quantity of SWM coming for
processing is kept stable. Moreover segregated storage at source also requires sustained
campaign
3. Storage of Waste at Source
Storage of waste at source is the most important pre-requisite of a successful solid waste
management system. Segregated storage at source was not practiced in
Thiruvananthapuram city till recently. But under the Capital City Clean City project the same
has been introduced in about 40,000 households at present. It is suggested that it should be
made 100% at the earliest. Two bin system of Solid Waste storage already established in
about 40,000 households is expected to be extended to about 150000 households by the
end of the current financial year.
4. Collection
Waste is deposited by households and other waste generators at various open collection
points in the city except in 25 wards where Capital City Clean City project has been
launched. In these wards door to door collection through community organizations is
implemented. The community door to door collection has to be strengthened and extended
to cover the entire city in the coming years. The door to door collection is to be implemented
in households were there is no chance of treatment at source. In case of larger land holdings
especially in the peripheral parts of the city at source management of waste is to be
encouraged so as to reduce the quantity of waste to be collected and transported. In low
income areas and slums community storage bins are to be introduced within the area (slum).
It has been generally decided not to put storage bins in the streets. Sufficient number of
dumper containers is to be placed in the markets also wherever localized treatment as
biogas plant is not possible. Debris service for collection of building waste and system for
collection of garden waste on payment basis is to be introduced. In order to facilitate easy
primary collection autos and push carts are envisaged. All existing wheel barrows are to be
replaced by containerized push carts or autos
5. Transportation
Transportation is a very critical area in SWM. This is more important in areas where door to
door collection is implemented as waste collected by community groups are to be handed
over to the vehicles at a specified transfer point at a specified time. The success will depend
114
Thiruvananthapuram Municipal Corporation City Development Plan
on precise co-ordination between the door to door collector and the vehicle. For this it is
absolutely necessary to have a vehicle tracking cum communication system.
There is shortage of vehicles and the same has to be rectified with purchase of vehicles and
replacement of old vehicles. 30% additional vehicles are to be made available to meet break
downs as waste collected on door to door basis cannot be carried away even if one vehicle
does not operate leading to collapse of the system. Additional vehicles are needed for debris
services as well as for removal of garden waste as per demand on payment basis. The O &
M cost of vehicles used for debris collection and garden waste collection are to be met from
the payment collected. A separate system can be considered for operating the paid services
to avoid bottlenecks and speed up service delivery
Dumper containers are necessary in slums, markets and institutions producing bulk waste.
Dumper placers to lift the dumper containers are also needed and the same has to be
procured. There is also an urgent need to establish few transfer stations where the contents
of dumper containers can be transferred to bigger vehicles for optimum utilization of
resources. These transfer stations can also receive waste from door to door collection teams
if needed.
A workshop for maintenance of the vehicles is also proposed.
6. Processing & Disposal
Thiruvananthapuram is fortunate to have a state of the art compost production unit at
Vilappilsala which can process Solid Waste Management. The plant is expected to process
300 tons/day. At present it is processing the entire waste collected by the Corporation which
varies from 190 to 220 tons/ day. There has been a drastic increase in quantity of waste
collected in areas where door to door collection is implemented. The compost produced is
about 30% of the waste collected. Thus there is a substantial non compostible component in
the waste which is being dumped at present leading to environmental problems. With the
introduction of segregated collection and transportation the production efficiency of the plant
is expected to improve.
Yet there is an urgent need to scientifically cap the existing waste dump to overcome the
environmental problems. The process of capping has been already planned and initiated. A
scientifically designed engineered sanitary landfill is also absolutely essential for the rejects
of the compost plant. In order to reduce the quantity of waste being used for land fill thereby
prolonging its life it is proposed to have a plastic recycling unit as well as a secondary sale
market where rejects which can be reused can be sold off at an acceptable minimum cost.
Establishment of a sorting and storage facility for recyclable waste is also essential. As far
as possible all recoverable materials should be used. Other recycling units can also be
promoted. Community initiatives are to be encouraged in this field also.
7. Framing of byelaws
There is a need for a comprehensive byelaw with regard to management of solid waste. This
will be prepared as part of the project taking into consideration the relevant provisions of the
Municipal Solid Waste Management and Handling Rules and finalized by due process of law
as per the Kerala Municipality Act 1999.
115
Thiruvananthapuram Municipal Corporation City Development Plan
8. Decentralised SWM
The compost treatment plant was planned for 300 MT of waste every day. There has been a
drastic increase in the quantity of waste collected and reaching the compost facility during
the last few years increasing from 111 MT reaching the plant in 2002 to an average of 210
MT now (2006). It is not desirable to increase the quantity of waste reaching the streets.
Hence a concerted effort to reduce the waste at source should be planned. Decentralised
treatment of waste should also be given priority so as to save on cost and to mitigate the ill
effects of big plants. Various options are available for household process of biodegradable
solid waste. This includes household burial, aerobic / anaerobic composting, vermi
composting, bio-gas production etc. Ward level decentralised vermi composting or biogas
production can also be considered. Biogas plants (waste to energy plants) can be
considered in markets, slaughter house, schools and other such institutions based on
quantity & nature of waste. Decentralised SWM requires massive awareness campaign to
bring about a change in behaviour of the public.
9. SWM in surrounding panchayats- Kazhakuttam, Sreekariyam,
Kudappanakunnu, Vattiyoorkavu and Vizhinjam
The Solid waste from the surrounding panchayats which are part of the urban agglomeration
is simply being dumped on the streets at present and there is no collection system. The
decentralised approach is to be adopted in these panchayats wherein a massive awareness
programme for treatment of waste at source is to be launched. The principles of 4 R’s -
Reduce, Reuse, Recycle & Resource recovery shall be an integral part of the awareness
programme. Household vermi composting, biogas, aerobic / anaerobic composting is to be
encouraged. Necessary training and equipments may be provided. One or more market
based integrated SWM plants can also be set up. Each integrated SWM plant shall have a
biogas plant, vermi composting unit and a waste segregation facility. Each panchayat will
also set up a collection facility for non biodegradable waste which is to be sorted out and
sold off for recycling. This work can be entrusted to CBOs or NGOs. Payment may be
collected from each household for removal of such waste.
116
Thiruvananthapuram Municipal Corporation City Development Plan
IEC
PRIMARY COLLECTION
STREET SWEEPING
4 Equipments for SWM (brooms, gum boots, plate etc) 0.06 0.12 0.12 0.13 0.13 0.14 0.70
10 Cutting machine for cutting of heavy pieces of wood etc - 0.03 - - 0.03 - 0.06
117
Thiruvananthapuram Municipal Corporation City Development Plan
12 Tipper lorries for removal of sand & debris 0.24 0.60 - 0.36 - - 1.20
MONITORING
21 Vehicle for SWM monitoring 0.10 0.05 0.05 0.05 0.05 0.05 0.35
23 Establishment of complaint redressel mechanism - 0.10 0.03 0.04 0.04 0.05 0.26
24 Development of Computerised monitoring system & MIS - 0.40 0.01 0.01 0.02 0.02 0.46
25 Vehicle tracking cum communication system & GIS 0.25 0.50 0.20 0.20 0.15 0.10 1.40
RESOURCE RECOVERY
118
Thiruvananthapuram Municipal Corporation City Development Plan
30 Common facility for hospital waste management - 1.60 0.30 0.30 0.30 0.30 2.80
(including O & M cost)
31 Health surveillance of sanitation & community workers 0.10 0.20 0.25 0.30 0.30 0.35 1.50
32 Support ot community initiatives 0.25 1.00 1.00 1.00 1.00 1.00 5.25
33 Decentralised waste management in extended area 1.00 3.00 2.00 2.00 1.00 1.00 10.00
34 Vector control activities 0.05 0.05 0.07 0.07 0.10 0.10 0.44
119
Thiruvananthapuram Municipal Corporation City Development Plan
120
Thiruvananthapuram Municipal Corporation City Development Plan
Development Plan for Trivandrum (2001), Department of Town Planning, Government of Kerala.
121
Thiruvananthapuram Municipal Corporation City Development Plan
122
Thiruvananthapuram Municipal Corporation City Development Plan
As per the studies under the Kerala Sustainable Urban Development Project (ADB assisted
project) - City Report for Thiruvananthapuram, most of the road sections have reached their
maximum capacity and need widening. The details of some of the road stretches are
mentioned below.
123
Thiruvananthapuram Municipal Corporation City Development Plan
The average annual traffic growth rate for the city roads during the period 2000-04 is 5.2%.
This growth rate is only indicative as it is based on a few road sections.
Table 10.5: Traffic Growth Rate during 2000-04
Sl. Location Peak hour traffic
No PCU (2000)* PCU (2004)** Annual Growth Rate
during 2000-04 (%)
1 Manacaud Junction 2,918 3,187 2.23
2 Vazhuthacaud-Pangode Road 1,184 1,570 7.31
Sasthamangalam-Vattiyoorkavu 1,730 2,105 5.03
3
Road
4 Pettah-Aanayara Road 588 1,007 14.40
* - CES Study Traffic Survey in 2000
** - Primary Survey under ADB PPTA in 2004
Various issues like on-street parking, street vendors, etc. result in speed reduction during
peak-hours on city roads. The average peak-hour speed at the outer city road sections is
only in the range of 16 to 23 km per hour against a desired peak-hour speed of about 30 to
35 km per hour.
124
Thiruvananthapuram Municipal Corporation City Development Plan
125
Thiruvananthapuram Municipal Corporation City Development Plan
2
Traffic Engineering and Management Study – Trivandrum, December 1991, KUDP (CES, New Delhi).
126
Thiruvananthapuram Municipal Corporation City Development Plan
The overall share of mass transport, including institutional vehicles does not appeal in the
modal distribution. This result in a high share of personalized vehicles which makes the
roads congested and indicates the operational problems of public transport.
3
Motor Vehicles Department, Government of Kerala
127
Thiruvananthapuram Municipal Corporation City Development Plan
(average trip length of 16 km)4 and private buses operate 103 buses (1714 trips per day)
with a total route length of 1770 km (average route length of 16.2 km)5.
As an effort to improve the quality of services, KSRTC is in the process of reducing the
average age of buses put to operation. Thiruvananthapuram district was among the three
districts that showed the highest General Accident Proneness (GAP) index. Studies
available reveal that majority of the bus accidents are linked with road conditions and driver
behaviour.
Performance of KSRTC was also studied by NATPAC. (Source: “Performance Analysis of
Kerala State Road Transport Corporation”, NATPAC, Thiruvananthapuram, April 1994).
Compared to the operation of KSRTC at state level, performance of Thiruvananthapuram
city bus operations were poorer. The study brought out issues like high level average load
factor, low fleet/ vehicle utilisation, high staff ratio and low punctuality for corrective actions.
Some of the areas that need development of bus depots or construction of new ones have
been identified in consultation with various stakeholders. They are listed as below.
Redevelopment of KSRTC bus terminal at Thampanoor for city and district level
services
Shifting the city bus terminal from East Fort to KSRTC bus terminal at Thampanoor
and maintaining a sub-operating terminal at East Fort.
Development of inter-district and inter-State bus terminal at Eanchakkal, by the side
of the NH bypass.
Development of city-level sub-operating terminals at Kochuveli, Medical College /
Ulloor, Thirumala, Nalanchira, Kudappanakunnu, Ponnumangalam and near the
proposed international airport terminal, by the side of NH bypass.
4
Economic Review 2003, State Planning Board, Govt. of Kerala
5
Compiled by National Transportation Planning and Research Centre (NATPAC), Thiruvananthapuram
128
Thiruvananthapuram Municipal Corporation City Development Plan
Six rail-over-bridges (ROBs) provide uninterrupted access between the two parts of the city.
Three level crossings at Melarannur, Pettah and Kochuveli in the city obstructs road traffic
due to frequent gate closures. Traffic at Pettah level crossing is about 0.63 million train
vehicle unit (TVU) per day, whereas Kochuveli and Melarannur level crossings will reach 0.1
million TVU soon. This justifies the requirement of ROBs at these locations.
Development proposals with regards to Railways to improve rail travel facilities to
Thiruvananthapuram include the following:
(a) Double laning of Thiruvananthapuram-Nagercoil route;
(b) Running of commuter trains between Thiruvananthapuram & Kollam and
Thiruvananthapuram & Parassala (perhaps Nagercoild-Kollam EMUs based on traffic
surveys);
(c) To encourage further inter-relationships between Thiruvananthapuram and Kochi, as
the two prime activity nodes of the state, fast train connections, with less than three
hour travel time and better comforts, need to be established between these two
cities;
(d) Establishment of Thiruvananthapuram-Vizhinjam rail link to serve ICTT at Vizhinjam
Port; and
(e) Establishment of Thiruvananthapuram-Nedumangad-Palode-Thenmala rail link to
serve the north-eastern corridor and to link with Kollam-Shencottah rail line, which is
undergoing gauge conversion (in the second phase, this link can be connected to
Kollam-Kottayam railway line).
Terminal facilities
(a) Redevelopment of Thiruvananthapuram Central Railway Station with the following
features:
Construction of a multi-level vehicle parking facility, separate areas for four-wheeler
and two-wheeler parking, and separate areas for long duration and short duration
parking with computerized parking ticket facility and also monthly parking fee
arrangement;
Lift and ramp facilities to link all the platforms (PPP);
Free service luggage trolleys which can be operated by the passengers;
Better traffic management in the front yard with taxi parking area shifted from front
yard to the old Arya Bhayan – C.P. Sathram area; and
Pedestrian over bridge to be extended up to KSRTC bus terminal.
(b) Development of Kochuveli (Veli) second terminal with good passenger facilities and
also with facilities for overnight stay;
(c) Rail coach and engine serving facility at Nemom;
(d) Kochuveli-Kazhakuttom transport facility along the NH bypass; and
(e) Goods terminal at Kochuveli and at Vizhinjam.
129
Thiruvananthapuram Municipal Corporation City Development Plan
130
Thiruvananthapuram Municipal Corporation City Development Plan
6
Parking Management Plan for MG Road, prepared by National Transportation Planning and Research Centre
(NATPAC), Kerala State Science, Technology and Environment Council, Government of Kerala
131
Thiruvananthapuram Municipal Corporation City Development Plan
The inability to supply parking spaces to meet the parking demand on the arterial roads
within the city, in areas like Medical College, East Fort, the markets in Palayam, Chalai,
Manakkadu and Edappazhanji have resulted in the use of scarce road space for parking
thus reducing the effective road width for moving traffic.
Major parking demand corridors in the city are at:
East Fort,
Thampanoor,
Statue,
Vellayambalam,
Sasthamangalam,
Vazhuthacaud,
Palayam,
Pulimoodu,
Over bridge,
Power House Road,
Museum,
Medical College,
Pattom,
Peroorkada,
Kesavadasapuram,
Pazhavangadi and,
Fort area
The concentration of commercial and institutional activities along the MG Road between
Palayam and East Fort has generated heavy on-street parking demand on this section and
its connector roads.
TMC has identified three locations along the MG Road and one at Pattom for providing multi-
level off-street parking facilities. The three locations identified along MG Road are:
Statue area;
Near G.P.O. junction; and
Near Overbridge junction.
132
Thiruvananthapuram Municipal Corporation City Development Plan
km area). During the period 1991-2003, the average annual growth of vehicle population
was 11%. From 2001 to 2003 a declining trend is seen (9.30%)7.
Table 10.13: Details of Road Accidents in Thiruvananthapuram District
Sl Year / Annual Growth Rate Annual Growth Rate
No. Accidents (%) Persons Persons killed
injured (%) (%)
1 2001-02 -0.71 -0.79 5.68
2 2002-03 14.63 29.83 3.58
Average Annual Growth Rate
1 2001-03 6.96 14.52 4.63
Source: Economic Review 2002 and 2003, State Planning Board, Govt. of Kerala.
Growth of motor vehicles and its pressure on the road network is significant, resulting in over
utilization of road network in the region with frequent traffic problems like congestion and
accidents. Available statistics indicate that road accidents are a major concern in
Thiruvananthapuram District with 7% average annual growth rate during 2001-03.
7000 6326
4929 6037
No. of persons affected
6000 4951
4687 4650
5000
4000
3000
2000
264 279 289
1000
0
Source: Economic Review 2002 and 2003, State Planning Board, Govt. of Kerala.
7
Compiled from Economic Review 2002 and 2003, State Planning Board, Govt. of Kerala.
8
Hand Book on Road Accident Statistics, (2004), NATPAC.
133
Thiruvananthapuram Municipal Corporation City Development Plan
(38.45%) and cyclists (10.19%) are the most affected persons in Thiruvananthapuram and
together constitute 49% of the total road accident victims.
A few intersections and major road corridors, including the NH Bypass portion, are
insufficiently lit. The existing maintenance system needs improvement as 20% of the street
lights do not work or they lack maintenance. The Capital Region Road Development lays
emphasis on providing adequate streetlights. The 42 km of city roads are proposed for
widening and improvement under Thiruvananthapuram City Road Development Project,
which is now under implementation.
134
Thiruvananthapuram Municipal Corporation City Development Plan
135
Thiruvananthapuram Municipal Corporation City Development Plan
136
Thiruvananthapuram Municipal Corporation City Development Plan
This would not only reduce traffic volume on the city roads, but would also reduce
accident rate and reduce expenditure on road development and maintenance.
High accident rate at the road intersections (junctions) – need for signalization of
intersections where traffic volumes are high.
‘Status hazard’ of being a capital city – attracting frequent demonstrations and road
blocks- always leading to ad hoc traffic diversion measures – lack of ‘intelligent
transport systems’.
Increasing road accidents.
Poor road lighting.
Inadequate pedestrian facilities.
Need for greater coordination of agencies / departments.
137
Thiruvananthapuram Municipal Corporation City Development Plan
138
Thiruvananthapuram Municipal Corporation City Development Plan
139
Thiruvananthapuram Municipal Corporation City Development Plan
140
Thiruvananthapuram Municipal Corporation City Development Plan
of vehicles especially at peak hours, disruption of traffic flow and resulting in increase in
accidents.
Possible solution to this (apart from better mass transport facilities) is to construct grade
separators (flyovers or underpasses). Road junctions identified are:
Pattom, PMG Jn., Medical College Jn., Vellayambalam, Sreekariam, Ulloor Jn., Widening &
improvements to Thampanoor flyover, Pettah – Anayara road, Peroorkada etc.
I. Parking Facilities
Absence of off street parking facilities have caused traffic obstructions on many a road in the
city by on street haphazard vehicle parking. Off street parking facilities are proposed as
ground level facility, underground facility and/or multilevel facility.
A few critical locations are identified below.
Palayam, Statue – Secretariat area, Vazhuthcaud, near Museum & Zoo, Ulloor – Medical
College Hospital area, Peroorkada, East Fort – Chalai area, Thampanoor area &
Vellayambalam – Sasthamangalam road.
J. Pedestrian facilities
Improvements to pedestrian facilities include footpaths along the roads (for the road
corridors included in the widening / rehabilitation and improvement programme, provision of
footpaths is a component), foot over bridges, subways, at grade pedestrian road crossing
facilities, exclusive pedestrian pathways etc.
About 12 locations have been identified for providing pedestrian road crossing facilities.
They are Thampanoor, East Fort, SMV School, Statue, Medical College, Pattom,
Kesavadasapuram, Cotton Hill, General Hospital Jn., Karamana, Vazhuthcaud and
Manacaud.
K. Public Transport System Improvement
Proposed project components include improvement to existing bus transport facilities (fleet
strengthening, construction of bus terminals, improvements to depots/workshops,
computerization of organizational management & operational management etc.), introduction
of HCBS (high capacity bus system) in selected corridors, reservation of selected road
corridors only for mass transport system with improved level of service etc.
Construction of bus operating centres for private long distance omni buses - It is proposed
to construct such a facility by the side of N H By-pass near Enchakkal with bus parking
facilities, booking offices, passenger amenities and crew facilities.
Introduction of LRTS (Light Rail Transit System) or Electric Multiple Units (EMU) along
selected high density traffic corridors. Preferred stretch in the first phase is Kazhakuttam (I.T.
Centre) – along NH bypass – Veli – Akkulam (tourism centre, water transport terminal &
second railway terminal) – Airport – (Kovalam – Vizhinjam in the second phase) – Manacaud
– Chalai bypass – Killipalam.
This Mass Transport System can be extended from the Airport to Vizhinjam ICTT, when the
ICTT is commissioned. The MTS can also be extended from Kazhakuttam to Ulloor so as to
141
Thiruvananthapuram Municipal Corporation City Development Plan
enable linking with High Capacity Bus System (HCBS), proposed to be operated from Ulloor
to Palayam – East Fort – Peroorkada.
Thiruvananthapuram Capital City region Mass Transport System shall have the following
components:
The present bus system – with improvements
HCBS in selected corridors
City region rail transport system in selected stretches
Water transport system
In order to propose an integrated approach in planning, development and management of all
these mass public transport systems, it is proposed to constitute a single Transport Agency,
perhaps as ‘Thiruvananthapuram City Region Transport Authority’, suitably delinking with the
all Kerala single agency set up, but retaining interrelationships with KSTRC in certain
aspects.
Development of water transport facilities utilising the existing canal systems in the city, and
also taking into account the fact that the National Waterway (NW3) now terminating at
Kollam may in future be extended to Thiruvananthapuram, with a Water Transport Terminal
at Veli and further extending upto Kovalam via T.S.canal, now considered for improvement.
Improved rail connectivity and passenger facilities at Thiruvananthapuram Central Railway
Terminal, the second Terminal at Veli and Servicing Terminal at Nemom.
L. Projects for road rehabilitation and maintenance
Within Thiruvananthapuram City region, the major roads including highways, MDRs & ODRs
are with the State PWD for improvements and maintenance. Feeder roads, collector roads
and neighbourhood levels, which can grouped under secondary rooads are under the City
Corporation. Whenever new housing developments take place, those newly formed atreets
are also surrendered to the TMC for maintenance and upkeep.
The TMC now has about 2000 km length of roads for maintenance and management. About
450 km of these streets are concreted. Financial resources now available with the TMC do
not permit even resurfacing of the roads once in 5/7 years. Regular maintenance programme
has to be devised for these roads. Many of the roads require removal of obstructions,
construction of drains, adequate street lighting etc.
The project component identified under JNNURM envisages rehabilitation of 400 km of
roads and maintenence of 600 km of roads, now under the City Corporation.
M. Traffic Management and Environmental Management
The National Urban Transport Policy aims to introduce Intelligent Transport System for traffic
management. The policy is meant to improve safety, efficiency and economic productivity of
transport system in an urban area. Though the full adaptation of the ITS available today is
yet to get implemented in India, Area Traffic Control System (ATCS) which is one of the
components of ITS, is applied to manage traffic here. NATPAC has carried out a studyon the
various technologies which can be implemented in India in the Immediate future (Source:
“Intelligent Transport System”, NATPAC, Thiruvananthapuram, 2005). ATCS is implemented
in 63 intersections in Delhi. The same is under implementation in Mumbai. While both these
142
Thiruvananthapuram Municipal Corporation City Development Plan
systems rely on imported know how, CDAC, Thiruvananthapuram has already developed an
ATCS for Indian conditions and implemented in Pune. The system is in place for the last six
months and cover 38 intersections in the first phase. A similar traffic control system is
proposed in Thiruvananthapuram. Other specific projects required for traffic enforcement
and management, which become essential part of the Road Development & Transport
Improvement Programme are included are the following.
Capacity building by setting up a training institute under NATPAC, the R & D Centre
of Kerala State Council for Science, Technology and Environment, Government of
Kerala. The training institute is meant to cater to all categories of road users and its
managers, including planners, engineers and police;
Traffic enforcement and monitoring with the help of camera stations and centralised
traffic regulation;
Planting suitable trees on and off the street with public transportation;
Ornamental and information gates to the city at Kazhakkuttam, Kovalam, Pallichal,
Malayinkeezhu, Karakulam, Vembayam and Pothencode. These gates will have an
information centre, police aid post and a camera system for surveillance;
Phased CNG conversion for public utility vehicles, signages etc.; and
Public utilities near high density pedestrian streets. Each unit of the proposed public
utilities will have two closets and two urinals, drinking water facilities, space for a
service person and an information centre.
143
Thiruvananthapuram Municipal Corporation City Development Plan
ii LRTS / EMU train / additional link to Ulloor 369.25 DPR 50 100 100 100 19.25
iii Introduction of HCBS (High Capacity Bus System) along selected 100.00 DPR 50 25 25 - -
corridors and regulation to discourage personal vehicles along these
road corridors (Feasibility studies & Implementation through PPP)
144
Thiruvananthapuram Municipal Corporation City Development Plan
Sl. Components Cost (in Rs. 2006- 2007- 2008- 2009- 2010- 2011-
No Crores) 07 08 09 10 11 12
iv Quality up gradation of KSRTC services
HR training 5.00
Improvement of existing infrastructure like bus depots, workshops 40.00 10 30 50 50 50 40.60
Computerisation of depots and corporate office 5.60
Augmentation and replacement of old buses 180.00
v Bus terminals (for KSRTC & Private Buses)
Upgradation of Thampanoor bus stand & new bus stand at Enchakkal 30.00
Kochu Veli, Kodappanakkunnu, Kovalam, Thirumala, Medical College 10.00 5 10 10 10 10 -
Construction of Operating Terminals for private long distance omni 5.00
buses
vi Development of Railway stations
Pettah IR
Kochu Veli IR
Augmentation of infrastructure facilities at Trivandrum Central Railway IR
Station
vii New rail link to Vizhinjam from Balaramapuram 16.00 DPR 10 6
viii Commuter trains between Neyyattinkara and Varkala IR
ix Inland Water Transport Sector
a Improvement of Kovalam to Veli section of WCC for navigation 7.26 3 3.26 - - - -
b Waterway development from Kovalam to Kolachal 142.00 DPR 2 40 50 50 -
c Waterway connection to airport 5.00 - 5 - - - -
Total (Public Transport System Improvement) 1325.86 18 170.26 295 441 510 259.253
M Projects for road rehabilitation & maintenance
i Mobile road repair units (Private participation) 5.00
ii Rehabilitation of TMC roads - secondary roads (400 km) @ Rs.50 lakhs 200.00
per km
iii Heavy maintenance of TMC roads - secondary roads (600 km) @ Rs.30 180.00
lakhs per km
145
Thiruvananthapuram Municipal Corporation City Development Plan
Sl. Components Cost (in Rs. 2006- 2007- 2008- 2009- 2010- 2011-
No Crores) 07 08 09 10 11 12
iv Rehabilitation of PWD roads (150 km) 210.00
v New footpaths by covering drains with RCC slabs, and providing service 20.00
ducts for all major roads for cables and pipes
Total (Projects for road rehabilitation & maintenance) 615.00 15 100 150 150 100 100
N Traffic Management
i Bus bays with shelter (100 nos) 3.00
ii Signal system in identified intersections (50 nos) 6.00
iii Intelligent transport system for the project area 135.00
Seed Capital for establishing Capital Region Transport Authority
iv Capacity Building: Training Institute for Road Users (under NATPAC) 30.00
v Enforcement & monitoring, Camera Stations, Centralised traffic 10.00
regulation
Total (Traffic Management) 184.00 14 50 50 50 20 -
O Projects for Environmental Management
i Erosion protection cum road (15 km) 37.5
ii Green Corridors
Planting of suitable trees on and off the streets 1.00
iii Ornamental and information gates to the city at 7 locations 0.28
iv Pollution control
CNG conversion of public transport vehicles 55.00
Providing public utilities near high density pedestrian areas (25 nos) 0.65
Total (Projects for Environmental Management) 94.43 5 20 20 20 20 9.43
Grand Total 3786.54
146
Thiruvananthapuram Municipal Corporation City Development Plan
The central areas of any city undergo a process of gradual decay and incompetence to cope
with the changing land use and space requirements. The central areas often referred to as
the CBD (central business district) is the most sought after space for commercial interests.
Being the oldest area of the city, the CBD might have received the highest attention in
provision of infrastructure. Moreover the CBD area fetches the highest land value. In spite of
all these, very minimum redevelopment and reconstruction takes place in the central areas
of the city due to many factors. A few of them are noted below:
The land owners are scared to reconstruct the buildings since the existing Building
Byelaws may not permit the same plot coverage that they enjoy now and also that
during reconstruction they may have to provide vehicle parking facilities as required
under the rules.
Buildings belonging to different owners are joined together by common walls or
boundaries and demolition of one building may endanger the other building.
The land or shop owners might have leased the space to a tenant a few decades
ago and now the premises may fetch only low rent compared to the present rental
rates in the central area. With the liability of allotting the space to the same tenant at
a much lower rent than the market rent even after reconstruction, the land and
building owners consider it not a worthwhile exercise to take all the pains for
reconstruction.
Legal complications deter any owner from reconstruction. The tenant, who rented in
the space many years ago, might have sub let the premises to another and there
are cases where third or fourth successive tenants now occupy. The rightful tenants
in many cases are not alive leaving a host of inheritors. Land owners find it difficult
to resolve these legal complications.
During the process of road widening and development, as observed in the Pattom –
Kesavadasapuram stretch or in the Killipalam – Karamana stretch of the NH, new land
developers step in and reconstruct one plot depth of properties abutting the widened road,
leaving the vacant land or properties with old buildings and poor accesses in their old
conditions. This does not help wholesome regeneration of the central area properties.
The age old alternative was for a governmental agency like the municipal government or
Development Authority to step, acquire the entire land, reconstruct based on a Town
Planning Scheme and sell or lease the built spaces. This often results in area specific
development process and not people friendly development, since the old land owners,
tenants, sub tenants and persons who have been doing business in the area are thrown out
or considered on par with the new traders or business establishments.
Alternatively, a method of central city area regeneration can be evolved enabling all the land
owners, tenants and subtenants in a particular block to join together, under a mutually
agreed platform, and develop the area with due apportioning of rebuilt space. However, it is
seen that such an understanding and cooperative movement cannot originate from within,
due to the following factors:
147
Thiruvananthapuram Municipal Corporation City Development Plan
148
Thiruvananthapuram Municipal Corporation City Development Plan
12.1 Heritage
12.1.1 Introduction
Thiruvananthapuram the capital city of Kerala State, has a continuous cultural heritage of
more than thousand years. It was an important town during the period of the kingdom of
Venad (between the 12th century and 18th century) and later it became the capital of
Travancore state from 1800 AD. The genesis of the town was around Sri Padmanabha
Swamy temple which had been referred to in an inscription of the 11th century AD. Even
before that the Aryasala temple, also known as Kanthallur Sala Mahadevar temple, had
been referred to in an inscription of the 9th century AD. The region in between these temples
and the surrounding area of these temples gradually developed as a town from 12th century
AD. The rulers of Venad patronized all these temples and allowed the growth of markets like
Pazhayangadi (Old market) and Chalai Bazaar. They constructed palaces and offices inside
the mud fort, which they built around the Padmanabha Swamy temple. At the same time
there were also settlements in coastal areas and interior regions. After the shifting of the
capital of Venad or Travancore around 1800 the town began to grow in all directions making
the temple and the fort (which had been converted as a granite – cum – burnt brick – cum –
mud fort) almost in the middle. The first step to the development of the town was the
construction of the Public Office Buildings or Hajur Kachery, which later became popular as
Secretariat after the Independence. Gradually the then rulers planned and constructed other
buildings to boost up public administration, education and health. Though the first public
building constructed by the then government with the direction of the British engineers was
in Western style all the subsequent buildings were built in a blended style of Eastern and
Western style of architecture – as a result of the advice given by the then Madras Governor
Lord Napier who attended the inaugural function of the Public Office Buildings in 1865. Thus
we inherit a number of beautiful buildings some of which were given a peculiar brick red
colour like the Napier Museum and its two entrance gates, University College, Fine Arts
College, Govt Arts College, Old S.M.V School Building (Present District Court Buildings at
Vanchiyoor), and the traditional style buildings like General Hospital, Ayurveda College
Hospital, Malayalam Department of University College etc.
Along with the construction of office buildings residential areas were also developed in the
surrounding area of the above public buildings. Simultaneously Temples, Churches and
Mosques also have been constructed in the suburban areas of the temple town of
Thiruvananthapuram, which gradually developed as a cosmopolitan township.
149
Thiruvananthapuram Municipal Corporation City Development Plan
cantonment. An inventory on this has already been made and documented by the Art &
Heritage Commission of Government of Kerala during 2004-06.
The areas which require conservation of precincts including restoration and preservation of
heritage buildings and natural heritage in Thiruvananthapuram, can be broadly classified as
follows:
Fort Area Heritage Zone’
Palayam Area
Shanghumughom Area
Thycaud Area
Of the above Fort area is of prime importance.
Heritage Significance of Fort Area:
The significance of the settlement in the Fort area region reached its pinnacle, since the
capital of Travancore kingdom was shifted from Padmanabhapuram to Fort Area here during
the reign of Dharma Raja (1758-98 AD).
Inside of fort was a well-planned settlement surrounding
Padmanabha Swamy temple. This includes numerous
other temples, teertha (sacred tanks), centres of learning
& religious institution, places of food storage &
distribution, buildings to accommodate Tanthris, scholars
etc, palaces of the royal families & other aristocratic
families, row houses of Tamil & Tulu Brahmins and other
upper caste Hindu population. Cleanliness of public
places featured high priority during that period.
Sree Padmanabha Swamy temple, standing in the elevated
focal point of Kottakkakom (inside of the fort), is the best
specimen of the Dravidian architecture in Kerala State. At the
same time, it is also recognised as the splendid monument for
the fusion of Dravidian and Kerala architectural features.
Thiruvananthapuram was the spiritual capital of Venad
kingdom, being the seat of Sree Padmanabha, the family deity
of the rulers of Venad. The temple spreads in a compound
measuring 570 ft x 510 ft (around 7 acres) known as
Mathilakom. The 100 ft high, seven-storied gopuram on the
eastern entrance to the temple (built in granite and brick with
elaborate sculptures and ornamental works) dominates the
skyline of the Fort area and is the premier landmark of the capital.
The Fort Wall, originally constructed by H. H. Marthanda Varma the great in 1749 AD, was
partly demolished by the British after the uprising of Velu Thampi Dalawa so as to lessen the
security in an act of retribution and was reconstructed with mud. However, a good portion of
this historic mud wall portion was demolished in the post-independence period due to lack of
awareness on the importance of preserving such historic structure. Each of the seven gates
of the Fort depicts different architectural styles. The fort wall is a notified protected
150
Thiruvananthapuram Municipal Corporation City Development Plan
monument by the state Archaeology Department and Stage I of its conservation was done
with the financial assistance of 11th Finance Commission.
The main Palace Complex in the Fort Area is located at the southeastern side of the Sree
Padmanabha Swamy temple. Palaces of royal family and their relatives are also located at
different locales within and outside the Fort. The layout and decoration of older palaces such
as those of H.H. Marthanda Varma the great and H.H. Swathi Thirunal; illustrate the
Padmanabhapuram style, though later buildings show influence of western style.
Being the capital of the erstwhile Travancore kingdom, the Fort area had to accommodate
various office buildings, most of which; including that of Peshkar
(Minister); are located on the south-eastern corner of the palace
complex. Though the Nithya Chelavu bungalow [office for daily
money transactions] is located in this area to the north of Thekke
Theruvu, the Chellamvaka [royal treasury] is located within the
palace complex precinct, closer to the street towards the main
entry to the temple of Sree Padmanabha Swamy; the absolute
ruler of the kingdom.
In addition to palaces, Madhoms especially those of Thantris of Sree Padmanabha Swamy
temple at Mithranandapuram, Agraharams of Thulu Brahmins, and residences of other upper
caste Hindu population often accompanied with individual temples dominate the rest of Fort
area and its immediate environs. Many other places of great heritage significance other than
residences adorn west and north-west areas such as the Vilwamangalm samadhi, Nelpura
(granary), Mithranandapuram pond, Fort School, Fort Hospital, old jail, Ramanamadhom
complex, Saraswathi Vilasom palace, Valiya Koyikkal Palace etc. These structures are not
only specimens of architectural practices, but also reflect the cultural traditions, festivities
and life styles during different periods.
Arat Road to the west of Fort, is characterised by residential buildings –Ammaveedu, on
both sides giving the street a unique character. Annually, festivals are held twice at the
temple and on the concluding day, the deity of Sree Padmanabha Swamy will be carried in
procession (lead by the Maharaja) through this road to Sanghumughom beach for bathing
and worshipping the deity.
Governmental Interventions for Conservation of Fort Area
The Government feels that immediate interventions are needed for the revitalisation of Fort
Area, as this is the premier heritage area in the state, which declares the ancient history,
culture and tradition of the state. The following are the governmental interventions in
conservation of heritage in the Fort Area and its environs:
1. The Department of Archaeology, Government of Kerala has declared 27
buildings/monuments within and around Fort Area as Protected Monuments under
Archaeological Sites and Remains Act.
2. First draft list of heritage buildings in Fort Area and environs were made and graded by
the Art & Heritage Commission, through the Department of Town & Country Planning,
Government of Kerala.
151
Thiruvananthapuram Municipal Corporation City Development Plan
3 The First Stage of Conservation Project was formulated by the Art & Heritage
Commission and has availed the 11th Finance commission grant for Rs. 200 lakhs. The
project, which focussed on restoration of portions of historic buildings, which required
immediate interventions, was successfully executed by the Department of
Archaeology, Government of Kerala. The portions of the main palace complex covered
under this conservation project include roof of Karuvelappura Malika, Portions on the
eastern side of main palace, part of the passage to the Neerazhi (pond), bath building,
padipuura towers, the outhouse abutting Thekke theruvu and portions of Nithya
Chelavu building. In addition, portions of Sreepadam palace and a few structures near
Ramana madom in the Vadakke Nada environs were restored under this project.
Portions of fort wall and all fort gates were also restored.
4. The Department of Archaeology has also executed restoration works using various
state government funds in the Fort area. This include parts of the historic palace
complex ( portions of Rangavilasom Palace, Bhajanappura Malika, Nithyachelavu
building), Portions of Old jail (Central Archives Building), Saraswathi vilasom palace,
Sundara vilasom palace, old Peshkar office, , Taluk office, excise office, KSRTC
buildings, revenue office buildings, and a few buildings adjoining Padma theertha
(including mandapams) in addition to portions of the fort wall. Works carried out to
promote heritage tourism include 'Paithruka Veedhi’ and paved pathway (partly) to
facilitate walking tour.
5. The Art and Heritage Commission for Kerala constituted by the state government treat
the Fort area as a Heritage Zone. Under provisions in the Kerala Municipal Building
Rules 1999, a committee constituted by the commission renders advice on individual
applications for building constructions in this area, regarding the architectural character
and façade treatment in addition to advice on protection of heritage buildings.
6. The restoration works in Fort Area, Thiruvananthapuram have already won many
national and international awards and recognition.
Conservation of Heritage: Strengths & Opportunities
1. Kerala is already recognized as an internationally reputed Tourist destination.
Thiruvananthapuram is the Gateway to South Kerala, with highest tourist inflow in the
region. Conservation of heritage will improve the imageability of the city and contribute
to sustainable tourism development of the region.
152
Thiruvananthapuram Municipal Corporation City Development Plan
2. Increased tourism activity can be effectively channeled to pave way for value addition
of heritage buildings, there by ensuring their better upkeep by the owners. Culture
Tourism in Thiruvananthapuram shall be given emphasis. The good number of heritage
buildings in this region can thus find out adaptive reuses, remunerative enough to
ensure their maintenance and upkeep.
3. In addition to conserving the rich historic, architectural and cultural heritage, the
economic base of the region can be improved considerably by way of sustainable
tourism.
4. The first phase of the Conservation Projects in Fort Area at Thiruvananthapuram was
successfully carried out by the Government of Kerala in the first half of this decade.
Many awards and recognitions at National and International level won for this project
point to the capability of the Government to undertake such a delicate task.
In general, investment in conservation of heritage in this region will have a
considerable positive impact on the economic development of the city.
Attempts On Conservation Of Heritage
A. Legislative Measures:
1. The Parasurama temple complex at Thiruvallom in the city corporation area is a
centrally protected monument. The buildings and precincts of archaeologically
significant areas (other than those notified by ASI) are notified as protected under the
Archaeological Sites and Remains Act The state also declared some buildings as
protected, most of which (27nos) are concentrated in and around the Old Fort area.
2. The Art & Heritage Commission was constituted in 2000 by the Government of
Kerala. The Commission has done listing of heritage in the district. Construction in
the Fort Area heritage zone in the city is being regulated with the advice of the
Commission under the provisions in the Kerala Municipality Building Rules, 1999.
3 A draft of regulation for ensuring and promoting conservation of heritage buildings,
heritage precincts and natural heritage’ was prepared by the Commission and is
under the consideration of Government. The Draft regulations once brought into
force, will pave way for listing and grading of heritage, regulatory and promotive
measures to conserve heritage. The first list for notification of heritage (once the
regulations come into force) has already been prepared by the Art & Heritage
Commission.
4. Town Planning Act 1108 ME has provisions to prepare Town Planning Schemes with
due consideration to conservation of heritage. Detailed Town Planning Schemes for
Fort area and Museum-Kaudiar Avenue are examples of such schemes prepared for
heritage significant areas.
B. Conservation Projects:
1. The First phase of the project for Conservation of Fort Area Heritage Zone was
carried out with the financial assistance (Rs. 200 lakhs) from the 11th Finance
Commission.
153
Thiruvananthapuram Municipal Corporation City Development Plan
Sanghumughom beach area assumes both historic, cultural and architectural heritage of the
city. This beachfront area is the place where the idols of the Sree Padmanabha temple are
carried in procession and ritually bathed (arat) twice annually. The rituals originally led by the
Maharajas themselves are practiced even today. The mandapams, palaces and
Sakratheertha Kulam and Devi temple are of historic, cultural and architectural significance.
At present the Airport road cuts across the middle part of the precinct. Hence, it is essential
to realign the road close to the airport boundary so as to make the larger part of the precinct
into a contiguous area. In order to sustain the present recreational use of the precinct, it is
154
Thiruvananthapuram Municipal Corporation City Development Plan
also proposed to develop infrastructure facilities for the visitors, without spoiling the heritage
value and in harmony with the precincts visual characteristics.
(iii). Thycaud Area
Residency Hills at Thycaud was the seat of the British resident. The precinct has the
Residents palace, Old flagpole used to hoist the British flag, an ancillary building currently
used as Stamp House are the major heritage structures within the compound. Many
buildings constructed during the rule of Travancore Kings and presently housing Model
school, Arts College, Swathi Thirunal Music College, Womens’ college, City Police
Commissioner’s office, PWD rest house, residences etc are a blend of native and colonial
architecture. The said buildings require restoration efforts, with due consideration to their
heritage value.
(iv). Other Buildings & Open Spaces
Considering the historic, architectural and cultural value of some of the public buildings built
by Travancore rulers or in their period but falling outside the areas mentioned above, are
also included in the conservation project; namely:
(1) Poojappura Mandapam and premises;
(2) Vanchiyoor Court (Old Buildings & its premises);
(3) Women and Childern Hospital, Thycaud (old building);
(4) General Hospital main old building, GH Jn.;
(5) Vellayambalam palace;
(6) Old main building of Police HQ;
(7) Bank House Building;
(8) TRIDA main building;
(9) Parasurama Temple, Thiruvallam (Centrally Protected Monument);
(10) A Grade Heritage Buildings in Private Sector in Thiruvananthapuram city;
(11) Churches in Thiruvananthapuram City including Palayam CSI Church, LMS Church
etc. and Palayam Mosque;
(12). Mandapams – wayside rest places – wooden as well as granite; wooden mandapam
at Mankattukadavu, madapam at Kaimanam, Karamana etc.;
155
Thiruvananthapuram Municipal Corporation City Development Plan
(13) Different heritage structures like railings and lamp posts around the statue of Sir T.
Madhava Rao, the Rama Rao Lamp at LMS Junciton, Chumatuthangis at Poojapura,
Pappanamkode etc, the Vallakkadavus at Karamana, Killippalam, Vallaakkadavu on
the way to Sankummukham, at Thiruvallam etc to be conserved scientifically.;
(14) The city of Thiruvananthapuram is replete with ancient temples, which may have
existence for more than thousand years. The temples of Mitranandapuram,
Padmanabhaswamy temples, Aryasala temple, Pazhaya Sreekanteswaram temple,
Karakanteswaram temple, Chenthitta Devi Temple, Neeramankara temple,
Chirakkara Vishnu temple etc are to be conserved scientifically;
(15) Putharikandam Maidan: Putharikandom Maidan is the open ground having an extent
of 8.5 acres adjacent to the CBD (Chalai area), opposite to East Fort wall. This area
is presently used for conducting conventions, exhibitions, trade fairs and other
meetings. This open area has to be preserved as such, without any constructions in
the future. Parking facilities, multi-purpose stage for conducting meetings and
conventions etc can be thought of as the revenue collected from these can be made
use of for maintaining the above maidan; and
(16) Creating Heritage Awareness & Preserving Our Cultural Remains:
The strength of a society lies in the depth of awareness the people have on their own
heritage. The evidences of the past culture like historic monuments and cultural
precincts can be preserved for the coming generations only with active support of
general public. Thiruvananthapuram is city of temples has numerous temples,
churches and mosques, which organize different rituals and festivals. Every aspect of
cultural heritage should be studied and preserved with the help of awareness
programmes which can be held by different institutions in the city. Educational
institutions like schools and colleges, residence associations and voluntary
organizations can donate to the cause. Heritage clubs can be formed in these
selected institutions and the project can be successfully implemented through them.
The functions of the heritage clubs should centralize the following areas.
Organising heritage awareness programmes in their respective areas, conducting
discussions and seminars on related matters, listing of heritage objects and
monuments in their area and organising detailed study of the same, collection of
material as well as verbal heritage materials (Folklore), small scale documentations
and preparing printed materials, preparing a volunteer force for the follow up etc.
Archaeology department can act as a nodal agency in this project. It is a long term
project in which heritage awareness programmes for different age groups have to be
carried out in different heritage aspects and the outcome should be assessed
properly. A well awared society will always be a strong back force for the protection
and preservation of our cultural and historic monuments and precincts.
12.1.3 Key Issues, Challenges and Vision
Lack of adequate regulatory mechanism to conserve heritage structures and
precincts and to notify them as protected.
156
Thiruvananthapuram Municipal Corporation City Development Plan
Making available the traditional building materials for the maintenance of heritage
structures and also services of skilled traditional craftsmen.
Threat due to climatic variation, termite attack, fire etc..
In order to maintain the heritage value of the city, owners of private heritage
buildings are often not permitted to build and earn in tune with the development
trend in that area which calls for incentives as compensatory measures.
Sensitisation on the need for conservation of Heritage buildings and precincts.
Vision
“Conserve heritage for us and the generations to come, tapping the potential for
sustainable tourism.”
Strategies
1. Most of the heritage buildings are located in the CBD and in areas with high
development potential under both public and private ownership. Due to the
commercial potential of such land parcels, the heritage structures are always under
the threat of demolition for maximum remunerative use of prime land. Since
economic factors are major players in deciding the sustainability and the very
existence of heritage buildings and precincts, proper regulatory mechanisms to
conserve heritage structures/precincts is essential, in addition to well-planned
approach towards tourism promotion. Besides, the buildings with archaeological
significance conserved in the project shall be notified as protected monuments under
the existing statutes.
2. Wood is a major structural as well as decorative element in all these heritage
buildings. The basic reason for deterioration of buildings is the heavy rains, coupled
with absence of timely repairs. This becomes significant, as there are two monsoon
seasons, with heavy seasons. Broken/missing tiles, gutters etc lead to leakage of
rainwater, affecting the strength of the wooden structural members. Hence, to over
come this issue, the new concept of providing aluminium sheet coats between the
reapers and rafters will be done in all buildings taken up for restoration. Wherever
necessary, the false ceiling will also be provided in missing areas to hide the
protective aluminium sheets.
3. In order to extend the life of masonry works in lime mortar/lime plastering,
inappropriate materials (such as cement mortar/ plaster) if any used will be replaced
with appropriate materials. In addition, removal/dismantling of recent/later
additions/constructions, which are not in harmony with the heritage structures or their
premises, will also form part of the project.
4. The climate also poses additional threats to the heritage structures. The showers are
accompanied by lightning, which calls for provisions for lightning arresters to safe
guard the buildings, which are rich in combustible materials such as wood.
Appropriate protective coatings for wooden members also have to be made, with due
regard to the climate. Another major issue in this area is termite attack. Wood is
highly prone to termite attack. Hence anti termite treatment to the buildings have to
be ensured.
157
Thiruvananthapuram Municipal Corporation City Development Plan
The buildings/items which are not included in any of the above zones are grouped under
‘others’.
The proposed conservation works of buildings/area generally includes the following
components;
Replacement of decayed/ missing structural wooden members;
Restoration of laterite/brick masonry works in lime mortar;
Lime plastering;
Restoration of storm water drainage works;
Restoration of decorative works in wood;
Repairs of doors & windows and providing suitable fixtures;
Repairs & restoration of ceiling;
Aluminum sheet protective cover for roof; roof tiling;
Paving with appropriate flooring materials;
Electrification works;
158
Thiruvananthapuram Municipal Corporation City Development Plan
Removal of recent additions and alterations and surface coatings to/on the historic
structures & premises and corrections if any required with appropriate material;
Protective coatings on wood;
Correcting sunken basements;
Providing smoke detecting & fire extinguishment arrangements;
Protective mesh to prevent entry of bats;
Lightning arresters and anti-termite treatment;
Clearing away debris by lorry load far away from the vicinity of heritage zone;
Lighting & illuminating the buildings & premises;
Landscaping;
Restoration of water bodies;
Construction of protective retaining walls; and
Site clearance and removal of destructive vegetation; paving pathways etc.
159
Thiruvananthapuram Municipal Corporation City Development Plan
4. THYCAUD AREA
Table 12.4: Heritage Projects for Thycaud Area
Sl. Proposed Conservation Work App. Cost
No (Rs. in crores)
1 Residency Bunglow (KITT’s building) 2.00
2 Government Art’s College Building and Model School 2.00
3 Bakthivilasam Bungalow, Vazhuthakad and precincts 1.00
4 City Police Commissioner’s Office 0.50
5 Bank House Building (Police H/Q) 2.00
6 Mudavan Mughal Kottaram, Poojappura (Sree Chitra Research Institute) 1.00
7 Swathi Tirunal Music College 2.00
8 Ayurveda maternity Hospital, Poojappura 0.50
9 Rose House 0.50
10 TRIDA Building 0.50
11 Xanadu, Vazhuthakad 0.50
12 Women’s College 2.00
13 W&C Hospital Thycaud 2.00
Total 16.50
160
Thiruvananthapuram Municipal Corporation City Development Plan
5. OTHER BUILDINGS
Table 12.5: Heritage Projects for other buildings
Sl. Proposed Conservation Work App. Cost
No (Rs. in crores)
1 Cliff House 1.00
2 Manmohan Bunglow 0.50
3 Vizhinjam cave temple and Bhagavathi temple 0.50
4 Parasurama Temple Thiruvallam 1.00
5 Golf Club and precincts 1.00
6 Restorations of kavus and kovils in and around Thiruvananthapuram 1.00
7 Restoration of village ponds 5.00
8 Restoration and up-keeping of various monuments and statues 2.00
9 Dynamic/heritage lighting of important heritage building and monuments 10.00
10 Heritage lighting in heritage streets and areas 5.00
11 Creating Heritage Awareness & Preserving Our Cultural Remains 1.00
12 Beautification of Putharikandam Maidan 5.40
Total 33.40
Phasing of Projects
Table 12.6: Phasing of Heritage Projects
Sl. Name of Project 2007- 2008- 2009- 2010- 2011- Total Cost
No: 08 09 10 11 12 (Rs. Crores)
1 Fort Area Heritage Zone 5.00 10.00 10.00 10.00 5.00 40.00
2 Palayam Heritage Zone 5.00 10.00 7.50 5.00 3.00 30.50
3 Sanghumughom Area 1.00 3.00 1.00 0.00 0.00 5.00
4 Thycaud Area 2.00 3.00 4.00 3.00 4.50 16.50
5 Others 6.00 7.40 9.00 7.00 4.00 33.40
Total 19.00 33.4 31.50 25.00 16.50 125.40
12.2 Tourism
12.2.1 Present Status
a. Tourism in the State of Kerala
Government of Kerala consider ‘Tourism’ as one of the few economic alternatives to develop
the State economy on account of its potential for generating income, creating employment
opportunities and helping regional development. In the context of poor prospects of the
manufacturing sector and the severe threats facing agricultural and traditional sectors,
161
Thiruvananthapuram Municipal Corporation City Development Plan
tourism is considered as one of the sectors, which can drive Kerala economy to take the
State to the pinnacle of socio-economic development.
Kerala, the God’s own country, is continuing as the prime tourist destination of South Asia. In
2005, the foreign tourist arrival to the state has crossed 3.46 lakhs and domestic tourist
arrivals crossed 59.46 lakhs. During the last 5 years from 2001 to 2005 the foreign tourist
arrivals alone has increased from 2.09 lakhs to 3.47 lakhs showing an annual growth rate of
13.19%. The domestic tourist arrival has increased from 52.4 lakhs in 2001 to 59.5 lakhs
showing an annual growth rate of 2.7%. According to the study of World Travel and Tourism
Council (WTTC) on tourism sector in the State, Travel and Tourism generates as much as
7.7% of GSP and 6.2 % of total employment. Visitor export (tourism receipts) is worked out
as14.3% of the total export of the State.
The importance of Travel and Tourism to Kerala’s economy is indisputable and current
forecast by WTTC projects a very rosy future for this industry in the State. According to
WTTC, over the next 10 years, the average annual growth in visitor exports is forecast at
13.8%, and the growth in Travel and Tourism economy GSP and employment will be 10.7%
and 10.9% respectively.
The tourism sector in the state attracts about Rs.1000 crores of investment per year and
provides employment to lakhs of persons. The income to the state from tourism is in the
order of Rs.7700 crores during the year 2005 with a foreign exchange earning of Rs.1550
crores.
b. Tourism in Thiruvananthapuram district
Thiruvananthapuram district is bounded by the Arabian Sea in the west and Tamil Nadu in
the east. The wooded highlands in the Western Ghats in the eastern and northeastern
borders give Thiruvananthapuram some of the most enchanting picnic spots. A long
shoreline, with internationally renowned beaches (Kovalam, Varkala), historic monuments,
backwater stretches, Hill Stations (Ponmudi) and a rich cultural heritage make this district a
much sought-after tourist destination.
Thiruvananthapuram is one of the leading districts on the basis of tourist arrival to Kerala. It
is continuing as the second leading district in terms of foreign tourist arrivals and third
leading district in terms of domestic tourist arrival to the State. The following table gives the
number of foreign and domestic tourist arrivals to the district and its share in the state.
Table 12.7: Details of Tourists arrival
Year Foreign Tourist Arrivals Domestic Tourist Arrivals
Number % contribution in Number % contribution in
the state the state
2001 63197 30.26 749968 14.31
2002 65240 28.05 775225 13.92
2003 94835 32.19 865048 14.73
2004 103558 29.97 855787 14.33
2005 119940 34.61 837211 14.08
162
Thiruvananthapuram Municipal Corporation City Development Plan
The tourist arrival to this district is showing an increasing trend over the years. The foreign
tourist arrival has increased from 0.63 lakhs in 2001 to 1.2 lakhs in 2005, an increase of
89.78%. The Domestic tourist arrival has increased from 7.5 lakhs in 2001 to 8.37 lakhs in
2005, an increase of 11.63%. Also this district is contributing to more than 34% of the total
foreign tourist arrivals and more than 14% of the Domestic tourist arrivals to the State.
163
Thiruvananthapuram Municipal Corporation City Development Plan
164
Thiruvananthapuram Municipal Corporation City Development Plan
Strategies
The strategies in tourism development include the following;
Implementation of "Tourism Vision 2025" with focus on sustainable development
by conservation and preservation of heritage;
Development of selected tourist destination with proper planning for development so
as to retain high quality of aesthetic and environmental beauty and to develop the
destinations in a sustainable and eco-friendly manner;
Development of basic infrastructure and ensure cleanliness of tourist destinations;
Development of specialized tourism- eco-tourism, health tourism, rural tourism,
adventure tourism and plantation tourism besides back water tourism;
To develop Infrastructure through private sector and Public- Private Partnership with
Government acting as a facilitator and catalyst;
Continuation of extensive and aggressive marketing of Kerala at National and
International markets as a unique tourism destination for up-market clientele with
specific reference to Thiruvananthapuram;
Promotion of domestic tourism especially pilgrim tourism;
Strengthening local tourism initiated by local Governments;
Ensure quality in tourism services and facilities;
Human resource development;
To ensure the safety and security of tourists;
To develop and promote souvenir, handicrafts, artefacts & shopping industry; and
Formation of new tourism zones.
165
Thiruvananthapuram Municipal Corporation City Development Plan
166
Thiruvananthapuram Municipal Corporation City Development Plan
167
Thiruvananthapuram Municipal Corporation City Development Plan
168
Thiruvananthapuram Municipal Corporation City Development Plan
169
Thiruvananthapuram Municipal Corporation City Development Plan
It is roughly estimated that about 200 tons of vegetables & fruits are transacted in the city
everyday. The locally grown vegetables and fruits contribute to only 30% of the whole trade.
The market for rice and pulses are supported by FCI. However, the main player is the private
wholesale dealers who procure rice and other cereals and pulses from other states in the
country.
C. Earlier Market Development Activities
(a) The Department of Town Planning had prepared a Detailed Town Planning Scheme
for Chalai area. This DTP scheme approved by Government envisaged development
of a parallel road to Chalai bazar road (Chalai by-pass) and acquisition and
development of new markets by the side of this road.
The State PWD has since formed this road and the TRIDA has acquired land
received for market development. This land is low lying vacant; perhaps some
additional land required for market development is yet to be acquired. Steps are in
process for the acquisition of 1.50 acres. TRIDA has in possession 5.0 acres of
vacant land.
(b) The Department of Agriculture had in 1995 received assistance from the European
Economic Community (EEC) for agricultural market development. It was decided to
develop wholesale agricultural produces markets in Thiruvananthapuram, Kochi and
Kozhikode. Based on some studies, it was decided to construct a major market in the
above 3 cities and sub markets in one of the peripheral towns of the cities. In
Thiruvananthapuram, the main market was constructed at Anayara by the side of NH
by-pass and the sub market in Nedumangad town. The wholesale agricultural
produces market constructed at Anayara is only partially operating due to various
reasons.
(c) Thiruvananthapuram Municipal Corporation has taken steps to improve the zonal
markets at Thirumala, Pettah, Peroorkkada & Vattiyoorkavu. TMC has also carried
out improvements to sub-zone markets at Karamana, Kuravankonam, Anayara.
Projects Identified and Costing
The Chalai main market is far too congested without adequate pedestrian facilities, facilities
for petty vendors, carriageways blocked by
haphazard parking, loading and unloading
vehicles, encroachment by vendors and lack of
space for shops. The land behind this market
which was acquired by TRIDA has been opened
out with good road frontage from Chalai by-pass.
Chalai market is a nightmare for shop owners,
vendors, shoppers and traffic. The police is also
reluctant to bring about traffic discipline because
they are also aware of the physical constraints in
the area.
170
Thiruvananthapuram Municipal Corporation City Development Plan
171
Thiruvananthapuram Municipal Corporation City Development Plan
172
Thiruvananthapuram Municipal Corporation City Development Plan
and toilet. Single storied facilities are sufficient for these vendors. However in order to make
the projects viable, shop buildings are also proposed.
4). Wayside Markets
The lower level of marketing of vegetables, fish and fruits is to carry them in pushcarts to
specific locations by the side of important road margins. In most of the cases, it is seen that
these pushcarts do not move eventually and they are slowly made permanent stalls. Another
prevalent method is to bring baskets of vegetables, fish and fruits by small time vendors and
to squat on the road margins to do brisk business during the morning hours or in the evening
hours. Such morning / evening bazaars operate in a few locations on the road margins on a
daily basis. These informal markets affect the pedestrians and automobile traffic. However
these markets are looked upon as a facility by the people. Therefore, TMC has to provide
organized spaces for such informal markets in various locations within the city. (Informal
roadside markets at Vazhuthacaud, Kaithamukku, Kesavadasapuram, Manacaud, Pettah,
Secretariat (Chengalchoola) & Kumarapuram).
The cost estimate of this is considered under Basic Services to the Urban Poor.
5). Development of zonal markets
TMC has proposals to develop the following existing markets, which are managed by TMC.
Name of Market Project cost
Main Markets
1. Manacaud market Rs.1000 lakhs
2. Peroorkada market Rs.150. lakhs
3.Vattiyurkkavu market Rs.500 lakhs
4.Punnakkamughal market Rs.200 lakhs
5. Pettah market Rs. 200 lakhs
Total Rs.2050 lakhs
Small Markets
1. Ulloor Market
2. Sreevaraham Market
3. Kadakompally Market
4. Poonkulam Market
5. Kuravankonam Market
6. Pachalloor Market
7. Mannanthala Market
8. Pongumudu Market
9. Poonthura Market
10. Vallakkadavu Market
173
Thiruvananthapuram Municipal Corporation City Development Plan
174
Thiruvananthapuram Municipal Corporation City Development Plan
175
Thiruvananthapuram Municipal Corporation City Development Plan
acquired
TRIDA
Development
Land
by
2 Palayam Renewal - 5 5 5 - 15
Project
3 Zonal Markets – Main 1 5 6 6 3.5 20.5
Corporation
markets
available
Land
4 Zonal Markets- Small - 0.5 0.8 - - 1.3
with
Markets
5 Wholesale fish 1 2 3 3 3 12
market at Pangodu
6 Building Materials - 2 3 3 4 12 Land to be
Market mobilised
Total 2 24.5 37.8 37 23.5 123.8
176
Thiruvananthapuram Municipal Corporation City Development Plan
Government has a responsibility on the health of the people. The LSGI has the responsibility
for overseeing health affairs and ensuring that the food consumed in the city by the people
are not contaminated. If the citizens have to get hygienic meat produced under the
supervision of veterinarians, the TMC has to construct 5 more abattoirs at different locations
in the city.
Construction of partially mechanized modern abattoirs in the different identified zones in the
city may considerably reduce ‘unauthorised slaughtering’. Such modern abattoirs shall have
the following facilities:
Clean built space with regular washing and cleaning arrangements
Lairage where animal are kept waiting (it is stipulated in the guidelines that the
animals waiting should not see an animal being stunned and killed)
Stun gun
Bleeding chamber and arrangement for collecting blood
Hoisting equipment and rails, to ensure the animals are not dragged on the floor and
also to facilitate the workmen (butchers) to stand by the side of the carcass for
beheading, embowelling, dehiding, removal of horns and hoof, cleaning etc.
Collection arrangement for disembowelled waste, viscera, hides, horns & hoof
Segregated clean areas after the above unclean operations
Cleaning with warm water (boilers)
Cutting and collection of meat
Storage facility for meat
Delivery counters and office space
Veterinarians chamber with changing rooms and wash rooms
Staff changing and wash rooms and staff resting rooms
Sanitary waste disposal arrangements, including incinerators
Separate abattoir chamber have to be provided for small animals (goats) and large animals
(oxen).
The TMC proposes that the existing abattoir at Kunnukuzhy may be modernized. In addition
construction of new abattoirs at the following locations is proposed:
Ambalathara;
Kadakampally / Attinkuzhy;
Kunchalummoodu; and
Kudappanakunnu
Nemom
In all the above locations the TMC hopes to provide adequate land required for construction
of abattoirs. It is hoped that with the TMC effort in making available the facility of service
abattoir close to the places where unauthorized slaughtering is going on in a big way, it
should be possible to considerably reduce the problem of unauthorized slaughtering.
177
Thiruvananthapuram Municipal Corporation City Development Plan
Broad Costing
a. Modernisation of existing Abattoir at Kunnukuzhy: Rs.100 lakhs
b. Construction of 5 new abattoirs: Rs. 750 lakhs
c. Procurement of refrigerated Meat Vans
Five numbers @ Rs. 10 lakhs each Rs. 50 lakhs
Total Cost for six modern abattoirs Rs.900 lakhs
178
Thiruvananthapuram Municipal Corporation City Development Plan
13.4 Education
Kerala has achieved a high literacy rate of 90.92% (Census 2001) as against an all India
average of 65.38%. Literacy rate of Thiruvananthapuram district is 89.22%. 57% of primary
school students study in government schools, 21% primary students depend on aided
schools and the remaining 22% depend on unaided schools (Vikasana Rekha 2002-07 of
TMC).
Adult Literacy Programme is being effectively implemented. Findings from the baseline
survey reveal that of the total respondents, there are 12% illiterate women and 8% illiterate
men. Majority illiterates are from the poor category. Schools exhibit a healthy enrolment and
retention rate up to secondary education; however, from the higher secondary level the
dropout rate is high, especially among the poor.
The Grandhasala Movement had taken roots years back and has grown ever since. In every
village, in almost all the wards of panchayats, there is invariably at least one library and a
reading room. The State Central Library, which came into existence in 1829, has a sizable
collection of valuable books and periodicals. The British Council Library and the University
179
Thiruvananthapuram Municipal Corporation City Development Plan
Library are the other two important libraries helping in study and research notable for
reference, in the city.
Thiruvananthapuram is a major academic hub. The University of Kerala is located here. The
city also has several professional education institutions including 15 engineering colleges, 3
medical colleges, 2 ayurveda colleges, 2 law colleges, 1 homeopathic college, 2 nursing
colleges, 1 dental college, 2 MCA college, I music college, 3 teacher education college , 1
agricultural college and 5 poly technic colleges. Thiruvananthapuram Medical College, the
premier health institute of the state is also ranked as one of the finest in the country. The
College of Engineering, Thiruvananthapuram is one of the prominent engineering institutions
in the country. The Asian School of Business and IIITM-K are two of the other top class
institutions in the city, both situated inside Technopark. The number of Arts and Science
colleges in the district is 20 and the strength of students is estimated to be 15,926. The
University of Kerala has its research and higher education centres at Kariavattom, 20 km
north of the capital city. There are 41 teaching and research departments in the University.
Colleges from Thiruvananthapuram, Kollam, Alappuzha and Pathanamthitta districts
numbering 87, are affiliated to the University. The Sree Sankaracharya University of
Sanskrit with Kalady as headquarters, has its regional centre in Thiruvananthapuram and
offers courses at degree and post graduate levels.
There are about 900 schools in Thiruvananthapuram district. The public schools are run
directly by the state government and follow the syllabus prescribed by the state government.
In addition to this there are also four Kendriya Vidyalayas run directly by the central
government, which follow the CBSE syllabus and private schools run by educational trusts or
boards which follow CBSE and/or ICSE syllabus. An international school is also located in
the suburbs.
13.5 Health
Kerala has the most extensive medical infrastructure among all states in India. In
Thiruvananthapuram, apart from the major health institutions in the Government set up like
Medical College, Sree Chithra Thirunal Institute of Science and Technology, Regional
Cancer Centre, Ayurveda Medical College and Homeo Medical College,
Thiruvananthapuram there are a number of private health care institutions which cater to the
curative needs of a large number of people from the city and outside. The other health
institutions in public sector which are managed by the Municipal Corporation include the
following
5 Hospitals - Peroorkada taluk headquarters hospital , Fort hospital, Nemom
hospital, Iranimuttam hospital and Sidha hospital, Vallakadavu.
2 Government dispensaries of modern medicine – one at Valiyathura and one at
Karamana.
5 Primary Health Centres at Poonthura, Veli, Kadakampally, Ulloor and Thiruvallam.
20 Maternity & Child Welfare Centres (MCWs) at Palkulangara, Perunthanni,
Kalippankulam, Chackai, Pettah, Valiyathura, Sankumugham, Attukal, Vettucad,
180
Thiruvananthapuram Municipal Corporation City Development Plan
181
Thiruvananthapuram Municipal Corporation City Development Plan
Sports
The most popular sports are football and cricket. Basketball, badminton and volleyball are
also popular, mostly in schools. The Kerala Cricket Association (KCA) is Head Quartered
in Thiruvananthapuram. The HQ complex of KCA, has training facilities including two
practice turfs with nets, bowling machines, gymnasium with multi-gym and equipment for
aerobic training, lecture hall and library, an astro-turf indoor coaching facility, fully furnished
accommodation for coaches and players, a physiotherapy clinic, functional office facilities
and guest rooms. KCA has decided to establish an international cricket stadium in the city
suburbs. Chandrasekharan Nair Stadium is a prominent football stadium and has hosted
both national and international matches. The facilities available are inadequate to host
national events. The University stadium has hosted two international cricket matches. This
stadium is under University of Kerala and is equipped with synthetic tracks for athletics and
games.
The Jimmy George Sports Complex, the GV Raja Sports School and Lakshmi Bhai National
College for Physical Education (LNCPE) are the other major sports establishments in the
city. The city also has a Golf Club, one of the oldest in India, and a Tennis Club (Trivandrum
Tennis Club/TTC) both located at Kaudiar. The golf course is widely accepted as the oldest
course outside Great Britain.
The city fields two football clubs SBT-Trivandrum and Titanium, both in the second division
of the National Football League.
Key Issues and Challenges:
Eventhough the status of the sectors under social infrastructure such as education, health
etc are discussed in this chapter, detailed studies have to be conducted for identifying the
issues pertaining to each of these sectors. While preparing Development Plan for the City,
all these issues need to be addressed coming out with suitable suggestions in consultation
with the departments concerned. However, the glaring issues under sports sector have been
highlighted here.
Sports Sector
In Thiruvananthapuram the infrastructure available for development of sports sector is far
below the required standards. There is no stadium satisfying International standards to
conduct International events. This is a major lacuna which if addressed properly would not
only solve this problem in the sports sector but also lead to enhancement in the quality of
basic infrastructure including promoting of Tourism which would boost the economic base of
Kerala in general and Thiruvananthapuram in particular.
The following projects need to be taken up on priority basis with a view to elevate the status
of sports sector in Thiruvananthapuram.
1. Provision of standard 8 lane synthetic track for the Central Stadium and the
Chandrasekharan Nair Stadium
2. Pavilion to the Central stadium (including changing rooms, dormitories and hall
for indoor games)
182
Thiruvananthapuram Municipal Corporation City Development Plan
3. Board of Control for Cricket in India (BCCI) may be able to partly finance if land
required for the stadium can be made available for constructing International
Standard Cricket Stadium (25 to 30 acres of land is required).
4. Provision of playfields, volley ball, basket ball and Kabadi courts can be
considered in housing colonies.
5. Swimming pool under KWA premises may be improved and retained for district
and state level events and for trainers. The city shall have a major swimming
pool complex with practice pool, major event pools, ancillary facilities etc for
holding national and international events. Suitable site in the city suburbs can be
located for the purpose.
6. The indoor stadium at Sanghumugham housed in a prestigious building needs to
be improved with quality infrastructure.
7. The Kerala Olympic Association requires a training hostel.
8. Renovation of Jimmy George Stadium is necessary to make it fit for international
standard Table Tennis, Ball Badminton, Shuttle Badminton etc.
With in the frame work of the guidelines under JNNURM the following projects need to be
taken up on a priority basis for which costing has been incorporated.
1. Shankumugham Beach Development (Rs. 4 crores).
2. Development of selected school playgrounds as community open spaces (6
crores).
3. Development of selected neighbourhood level/zone level open spaces (5 crores).
Total = 15 crores
183
Thiruvananthapuram Municipal Corporation City Development Plan
PART - C
184
Thiruvananthapuram Municipal Corporation City Development Plan
• The population of urban poor in the City is 120367 (BPL Survey, 2001). This
accounts for 26.36 % of the total City population. Majority of the poor population
reside in slums and other squatter settlements, which are identified but un-notified
slums (Though Kerala has a Slum (Improvement & Clearance) Act issued in 1980,
slums have not been statutorily notified as per this Act due to the lack of adequate
Rules to enforce the same).
• Another major percentage of the remaining urban poor are in coastal areas in
scattered houses. Therefore, most of the programmes for the urban poor
addressed the issues of the coastal population, who are devoid of land ownership
rights, good houses, sanitation facilities, potable water & other basic amenities.
• In addition to these specific overcrowded slums and fisher folks scattered along
the long coastal area of the City, there are other groups of landless population,
who live in the City or make living in the City in abject poverty comprising of
vendors in the informal sector, pavement dwellers, wanderers, migrant workers,
beggars etc. They are not ‘space-specific’, but they depend on the City to make a
living and they depend on the City’s infrastructure. To address the problems of all
these categories of the urban poor population, the City needs a comprehensive
policy on urban poor with a mission mode approach.
A study published in 1995-96 by the Department of Town and Country Planning of the
State identified and officially recorded 37 slums in the City with a total population of
48,490. This study was based on the then City Corporation area of 74.93 sq. km. As per
the Census of India, 2001, the City area was expanded to 141.74 sq km with a total
population of 7.44 lakhs. This expansion of the City limits included 5 erstwhile adjacent
Panchayats to the City. It is roughly identified that now there are about 355 un-notified
slums and slum like housing areas within the city.
185
Thiruvananthapuram Municipal Corporation City Development Plan
Kerala has generally shown good achievement in coverage of basic minimum services for
the poor population. Its social security systems in the form of pensions to vulnerable
groups and welfare funds for various categories of labourers are reasonably well spread.
The well-established public distribution system provides food security. These measures
have prevented abject poverty to a great extent.
Other dimensions of urban poverty include lack of access to basic amenities and
services, unsanitary living conditions, over crowding and exposure to various risks of
disease. A sample household survey, in the matter of provision of urban services in
Thiruvananthapuram, reveals the status as in Table 14.1.
Human Development Report 2005 of Kerala shows that the generalized non-income
deprivation index is as high as 37 for Thiruvananthapuram. This index is formulated on
the basis of deprivation in four basic necessities viz. housing quality, access to drinking
water, good sanitation and availability of electric connection.
186
Thiruvananthapuram Municipal Corporation City Development Plan
The felt needs of the NHGs are converted into ‘micro plans’ and the micro plans of
particular ADS are consolidated into a 'mini plan'. The mini plan from the ADSs, are
consolidated and prioritised at CDS level to form the ‘City Plan’ for poverty reduction.
For the implementation of the Centrally sponsored and State sponsored programmes
action plans are being prepared annually by the Community. Identification and selection
of beneficiaries under various State sponsored and Thiruvananthapuram Municipal
Corporation sponsored programmes are done by the NHGs.
187
Thiruvananthapuram Municipal Corporation City Development Plan
In addition to the above, various State Government Departments and State sponsored
agencies undertake poverty reduction programmes within the territorial limits of
Thiruvananthapuram Municipal Corporation. The CBOs are involved in the selection of
beneficiaries, implementation of projects etc. in such programmes. However effective
linkage of these programmes with the CBO set up is yet to emerge.
Institutional Structure
The Community Development Society (CDS) is the umbrella organization for the
implementation of various poverty reduction programmes in the City Corporation. All
these programmes are being implemented under the overall supervision of the Secretary
of the City Corporation. The CDS has a member secretary and a senior official drawn
from the health division of the Corporation. Apart from the Project Officer, there are 10
Community Organizers in the CDS.
(1) Lack of authentic data: Lack of authentic and dependable data on the various
aspects of poverty including number and classification of slums, status of
infrastructure and access to services like water and sanitation, livelihood etc
(2) Notification of Slums: Though the Kerala Slum (Clearance & Improvement) Act,
1980 provide for notification of slums, the urban slums have not been notified till
188
Thiruvananthapuram Municipal Corporation City Development Plan
(3) Land Tenure: Land tenure is a critical issue in addressing the problems of the
poor. In the absence of tenure rights, the poor people living in slums are not in a
position to access social and economic benefits under poverty reduction
programmes. They also do not have freedom to upgrade their houses, as they do
not have title over the land on which they reside.
(5) Neglect of informal sector: Poverty alleviation programmes, projects for housing
for the poor and projects for provision of infrastructure for the poor generally
consider only the identified housing areas. The informal settlements and the
scattered poor population are rarely taken as beneficiaries.
(8) Lack of awareness among the poor on the opportunities for better living and
employment.
189
Thiruvananthapuram Municipal Corporation City Development Plan
14.4.1 Vision and Road Map for Basic Services to the Poor
(1) Vision
About one fourth of the city population is living in slums or slum-like conditions. Urban
poverty is a major challenge due to its multi-faceted nature. The vision of
Thiruvananthapuram Municipal Corporation is to transform the Capital City into a ‘Poverty
Free City by the Year 2031’.
14.4.2 Strategies
It is proposed to adopt a Mission mode strategy for the realization of goals through
effective implementation.
190
Thiruvananthapuram Municipal Corporation City Development Plan
191
Thiruvananthapuram Municipal Corporation City Development Plan
192
Thiruvananthapuram Municipal Corporation City Development Plan
There are ample opportunities for jobs like housemaids, nursing assistants, plumbers,
electricians, painters, gardeners etc in the State and their demand is on the increase.
The number of unemployed / under employed below the age of 40 in BPL families in the
Capital City comes to about 51,000 out of which 33,000 are women.
There is increasing demand for housemaids and helpers for invalids. Usually, the women
from the lower strata of the society go for such jobs both inside the state, outside and
abroad. The women from poor families have little exposure to the requirements of such
quality jobs especially in foreign countries. By providing suitable training in housekeeping,
table manners, etiquette, basic nursing training, spoken English, Arabic etc, we can make
them capable for availing of such job opportunities. This will also protect them from undue
exploitation from the middlemen as well as the employers. Apart from this awareness
building among the poor will lead to improvement in their personal hygiene, quality of life
etc and will reflect in all indicators of development. In order to impart training to the youth
to make them skilled and semi-skilled to avail such jobs, it is proposed to start special
training centres namely ‘Livelihood Oriented Business School - (LOBS)’.
Objectives:
Livelihood-oriented training for the poor at nominal cost /fee irrespective of any of
the categorization as coastal population, slum etc.;
Career guidance;
Providing assistance in placements; and
Facilitating to start low investment self-employment ventures.
Methodology:
1. Short-term courses of three months, six months and one year will be
introduced with hands on training, which can fetch trainees suitable
employment on the basis of the skills they develop.
193
Thiruvananthapuram Municipal Corporation City Development Plan
2. Courses will be designed keeping in mind the needs of young people as well
as preparing them to face the expectations from the world of work with an
appropriate mix of academics, life skills, technical skills, workplace
preparedness skills, service-learning activities and extra-curricular activities.
3. The training programs comprise both classroom training and apprenticeship
training.
4. Every course will be tailor-made to suit emerging industry requirements, and
will be administered in line with a constantly upgraded curriculum, developed
with feedback and inputs from industry professionals
5. LOBS provide multi-skill development training to trainees based on their
aptitude and potential
6. As communication is very essential at the work-readiness level, an intensive
spoken English course is a compulsory part of the training. This enables the
students to obtain and hold jobs with confidence.
7. LOBS would facilitate self exploration by the trainee of his / her potential
8. The work-readiness module teaches the students the structure and
requirements of the industry they are getting into
9. LOBS will act as a catalyst of change to foster, develop and promote
sustainable public-private partnership initiatives
10. A web site based virtual employment exchange will be developed to provide
Career Guidance/Counseling Centres. LOBS can also help in placement.
Cost:
1. Infrastructure:
i. Building consisting of lecture halls, Labs, office rooms, dormitory etc
Rs.100.00 lakhs
ii. Machinery & Equipments required for training: Rs.50.00 lakhs
4. Office expenditures & raw materials @ Rs.2 lakh p.m. – 5 years: Rs.120.00
lakhs
194
Thiruvananthapuram Municipal Corporation City Development Plan
use of for this purpose. The civic centre/ community centres under consideration of the
Corporation can also be utilised for this purpose clubbing the training activities therein.
Issues
• Lack of permanent marketing infrastructure in the city for the poor to market their
products;
• Difficulty in getting space in the prime locations of the city;
• Need for large amount as advance to the shop owners, which is beyond the
capacity of the entrepreneurs; and
• Quality Assurance
For handholding and escort service to the entrepreneurs from BPL families, permanent
marketing outlets in the prime parts of the City are proposed. The land for these
marketing outlets would be provided by the City Corporation.
Cost
20 marketing outlets @ Rs 10 lakhs per unit (20 x 10 lakhs) - Rs.200 lakhs
15.1.3 Anganwadis
The Integrated Child Development Services Scheme (ICDS) is implemented by State
Government all over Kerala through Anganwadis. There is one Anganwadi Centre for
every 1000 population in rural and urban projects and one for every 700 population in
Tribal area.
50 numbers of new anganwadis are required at various locations of the city for the urban
poor for which land is available.
195
Thiruvananthapuram Municipal Corporation City Development Plan
Primary Health centres are required for the urban poor at various locations in the city,
mainly to give first aid treatments in diarrhoea & respiratory diseases. 20 such PHCs are
proposed in the land available with the TMC.
The requirements in respect of infrastructure and other specific aspects are discussed
category wise as below:
A common feature of all the slums in Thiruvananthapuram city and the urban
agglomeration area is that all the slums are established on public land. There are no
slums on private properties.
Based on the location features and the general population characteristics a detailed
categorization of the Slums in the city can be attempted as follows:
196
Thiruvananthapuram Municipal Corporation City Development Plan
All these slums and slum like habitats do not have uniform characteristics. Broadly, these
areas can be classified as:-
• Those where in-situ developments are possible; and
• Those from where the squatters may have to be ultimately relocated, since
these locations are critical / vulnerable as they are canal / road / railway
margins or floodable areas.
Justification for the various interventions being suggested under slums is made taking the
following slums as case studies of these categories - Kanjirampara SC Colony in the
peripheral area of the city, Chengalchoola (Rajeev Nagar) slum located in the central city
area, Karimadom Colony in the central market area and by the side of a sewage pond
and Poonthura Pambur Colony, near the coastal area.
Case Studies:
(a) Kanjirampara SC Colony – This is an old colony of Scheduled Caste families,
assisted and built up during the fifties. The estimated number of households is around
600. About 10% households belong to other communities. Most of the houses are
kutcha. The number of kutcha houses requiring reconstruction is about 500. City
Corporation has built 20 houses recently through COSTFORD. Semi pucca houses
number about 50, of which there are a few terraced houses, though small in size.
Housing and Sanitation conditions are extremely poor. Common facilities include a
Community Hall which is rarely used, an Anganwadi recently constructed by the
Corporation through COSTFORD and a health centre which scarcely meets the
requirements of the people and an Industrial Training Centre. This is located on the road
side near Kanjirampara LP School and close to Killiar (Killi River). There are nine
neighbourhood groups under Kudumbasree. Under these NHGs one bamboo unit and
one ‘clean well’ unit are working giving employment to a few. Unemployment of the
school dropouts is a serious issue.
(b) Chengalchoola (Rajaji Nagar) – The total area is 12 acres. There are 1042
households with a total population of about 5000. 700 dwelling units have been
constructed by the Kerala State Housing Board (KSHB) of which 200 require intensive
maintenance. Recently TMC, through COSTFORD, has constructed 90 dwelling units and
70 are scheduled for immediate construction. Nearly 182 shacks still remain to be taken
up. The total number of houses to be built in the colony is 382. There are some clubs for
young men and 3 Anganwadis.
197
Thiruvananthapuram Municipal Corporation City Development Plan
Being a low lying area located by the side of drainage canal the colony is flooded during
monsoons. The overspill water often carries sewage and solid wastes. An informal daily
market is operated in the area where the vendors are mostly the elderly. This market is
located by the roadside and is operated in very unhygienic conditions. A space can be
made available for the relocation of this market. All the pucca houses have toilets and
water supply. The wide drain which runs through the colony needs to be considered while
effecting improvements in Rajaji Nagar Slum area.
(c) Karimadom Colony – It is 6 acres in area. Only 3.50 acres is relatively usable for
habitation, the remaining being drainage and sewage ponds. Excess water from the
nearby sewage pump house is occasionally let off into the pond. The colony area gets
water logged during rains. There are 685 households and only 72 of the houses are
pucca in nature. The number of houses
requiring reconstruction is 613. None of the
other houses/shacks have toilets or water
supply. A revised subdivision layout plan
has to be prepared for the whole slum area
with adequately planned provision of
infrastructure, measures to award
ownership rights on land, phased manner of
construction of dwelling units and
community oriented employment guidance
programmes.
(d) Poonthura Pambur Colony – The total area of this slum is 1.20 acres. There are
214 households. Only 47 are of pucca construction, each dwelling unit with a built up area
20 sq m. Remaining 167 require immediate reconstruction. There are pay-use toilets for
ladies. The men use the seashore as toilets. Water supply is only through street taps. The
T.S. canal (Parvathi Puthenar) runs alongside and regularly overflows during the rains.
Intensive efforts are required to plan and implement improvement measures in this
colony. This colony may need a different approach from the other slums in the city due to
the different lifestyle and culture of the inhabitants, since the colony is near the coastal
area.
198
Thiruvananthapuram Municipal Corporation City Development Plan
Needs to be addressed
Following the guidelines and in conformity with the requirement suggested by the
beneficiary stake holders in some of the slums, the programmes suitable for the revival of
normal life and leading to a path of sustainable development ensuring a life of dignity and
of equal opportunity are suggested. The PRA exercise held with the neighbourhood
groups of Kanjirampara Colony and discussions with a few stake holders in
Chenkalchoola Colony helped in evolving suggestions for improvement. Since each slum
had its own peculiarities in terms of location, composition of population, socio-political
situation and other factors, improvement programmes have to be evolved after due
interactions with the occupants and the NGOs who work for the slum dwellers. It is
reported that in some slums the able bodied men are trapped into nefarious activities as
stooges of a few powerful groups. It is necessary to relieve them of these hold and
provide them opportunities to lead normal lives. This may be a time taking laborious
process needing special institutions at least in the major colonies. Two major components
of the improvement measures are noted below.
199
Thiruvananthapuram Municipal Corporation City Development Plan
Sewerage –
The pollution of the settlements from the overflowing sewage is a serious problem in
many settlements like Chenkalchoola and Karimadom. In the core city areas sewer lines
are to be constructed from within the settlements to the main sewers. Estimates are
made for both constructions of sewer lines for settlements, which are in the central areas
of the city and for construction of community septic tanks for the slum settlements, in the
peripheral areas of the city. The estimate amount is Rs.466 lakhs assuming a rate of
Rs 5000/- per septic tank and providing a lumpsum for sewerage extension.
Environmental Improvement –
Most of the settlements have very poor environment, puddles of water, heaps of dirt and
litters and garbage thrown around. Provision for improving this is to be given for each
settlement. An amount of Rs.485 lakhs is provided for this. This provision is for
clearing the unwanted structures and dirt around and for creating parks and improving the
landscapes.
Roads –
In all the colonies proper internal roads are absent. Connectivity to each house is
necessary. Construction of new roads, improvement of existing roads and provision of
walk ways have to be provided for. The proposal is for Rs.1,668 lakhs.
200
Thiruvananthapuram Municipal Corporation City Development Plan
Bio-gas plants –
To effectively utilize the garbage and other bio-degradable materials into useful energy,
bio-gas plants are proposed for each settlement. The gas generated from this is to be
utilized as alternative cooking fuel. A lump sum provision of Rs.540 lakhs is provided.
The development and training of teams from within the slum itself, capable of planning,
implementing, monitoring and maintaining the infrastructure should be provided for.
Emphasis should be given to site specific and micro level infrastructural provisions.
The strategy should be to empower the beneficiary population and enable them to catch
up with the rest of the population. This will need very special attention and facilities of a
high order closely supervised by dedicated teams composed of members of various
disciplines to empower the beneficiaries and handle the development programmes
themselves without allowing the funds to fritter away through intermediaries. Therefore,
facilities are to be provided for the growing generation and for the grownup separately.
The support services proposed to be provided are:
201
Thiruvananthapuram Municipal Corporation City Development Plan
HH Kutcha - 500 HH Kutcha - 382 HH Kutcha - 613 HH Kutcha - 167 HH Kutcha - 5000
A. Home & Units Cost (in Units Cost (in Units Cost (in Units Cost (in Units Cost (in
Environment lakhs of lakhs of lakhs of lakhs of lakhs of
Rs) Rs) Rs) Rs) Rs)
1) Houses @ Rs.2.00 500 1000 382 764 613 1226 167 334 5000 10000 13324
lakhs
2) Relocation of Slum 2000 8000 8000
households in critical
locations
2) Drainage / Channel
a) Storm Water Drain (in 3 Km 45 6 Km 90 4 km 60 1km 15 40 km 600 810
Kms.)
b) Sewerage 600 30 LS 150 LS 100 214(S.T) 11 3500 175 466
(S.T) (SEW) (SEW) (ST)
c) Environmental LS 25 LS 50 LS 40 LS 20 LS 350 485
Improvement Lump sum
d) Drinking water 600 30 382 19.1 613 30.65 214 10.7 5000 250 340.45
connection to about
6809 households @ Rs
5000 per connection
3) Roads LS 24 LS 24 LS 12 LS 8 LS 1600 1668
4) Bio-gas plant LS 10 LS 10 LS 10 LS 10 LS 500 540
Total (Table A) 25633.45
202
Thiruvananthapuram Municipal Corporation City Development Plan
HH Kutcha - 500 HH Kutcha - 382 HH Kutcha - 613 HH Kutcha - 167 HH Kutcha - 5000
3) Support Services for No.of Cost (in No.of Cost (in No.of Cost (in No.of Cost (in No.of Cost (in
total growth and Units lakhs of Units lakhs of Units lakhs of Units lakhs of Units lakhs of
sustainability Rs) Rs) Rs) Rs) Rs)
a) Daycare Centre (0 – 4 20 6 30 4 20 3 158 60 300
5), Play School/ 385
b) Remedial educationc 2 30 4 60 2 30 2 30 60 900
entre for schoolgoing
children and dropouts
from the school
1050
c) Elders House - 1 30 2 60 1 20 1 20 50 1000
Community Building 1130
d) Centre for counselling 1 50 1 50 1 50 1 50 60 3000
/ preventive health clinic 3200
f) Community Hall 1 40 1 40 1 40 1 40 40 1600 1760
h) Development of open LS 50 LS 50 LS 40 LS 20 LS 900
spaces 1060
Total (Table B) 8585
Total (Table A+B) 34218.45
203
Thiruvananthapuram Municipal Corporation City Development Plan
13 of the 86 divisions of the City Corporation are in the coastal area. The total population in
the coastal area is 48313 (2001). Fishing settlement wise population distribution is as
follows:
Project Components
a. Seashore Protection
The coastal areas are frequently subjected to sea erosion due to high tidal waves. Heavy
sea erosion leads to serious damages to the dwelling units, fishing implements and
infrastructure facilities. To prevent this, seashores should be protected scientifically. Sea
204
Thiruvananthapuram Municipal Corporation City Development Plan
erosion can be minimised by using geo-textiles and vegetation (indigenous species for
example: Thespesia).
Costing for 18 km coastline protection using Geo-textiles, creation of sand dunes, covered
with red earth and geo-textile includes carpet grassing.
a. For side protection of 18 km coastline @ Rs 50 lakhs per km = Rs 900.00 lakhs
b. Planting of local species of trees on both sides of the protected sand dunes including
watering for the initial days, along the coast line @ Rs 4 lakhs per km = Rs 72.00
lakhs
Total: Rs.972.00 lakhs
b. Housing
The coastal area in the city is thickly populated. The density of population in the coastal
areas in the State is 2168 persons per sq km as against the State average of 819 persons
per sq km. Normally, the fisher folk live along the coastal areas and their settlements are
confined to the coastal stretches along the beaches. This has resulted in the high density of
population in the coastal areas.
The recent survey by Department of Fisheries, GoK (2004) reveals that 69.70 percent of the
houses of the fisher folk are in dilapidated conditions. Nearly 10 percent of the fishermen
population does not have their own houses.
Since the coastal area is overcrowded, two types of housing developments are proposed to
solve the acute housing problems faced by the fisher folk (1) in-situ development and (2)
relocation.
Total 5200
c. Sanitation
It is estimated that nearly 20 percent of the households in the coastal areas have no
sanitation facilities. The open seashore where the fish landings take place is used by the
fisher folk for their toilet purposes. As an improvement to basic facilities, sanitary latrines &
bathing cubicles should be provided for all in the coastal areas. Priority needs to be given
both for household latrines as well as community toilets.
205
Thiruvananthapuram Municipal Corporation City Development Plan
Cost:
Household latrines for 3000 households @ Rs 10,000/each- Rs. 300 lakhs
Community toilets including bio-gas plants – 13 (one in each Fishing Village) @ Rs 10 lakh
each for 13 units - Rs. 130 lakhs.
Cost:
Replacement of 8,000 household water connections @ Rs 5,000/- per HH connection
Rs.400 lakhs
e. Health Intervention
The increased morbidity is a cause of concern in the coastal areas. The common diseases
that occur include diarrhoea and respiratory diseases. Primary Health Centres (PHCs) and
Maternity & Child Welfare Centres (MCWCs) are the major health care centres in the coastal
area. The health problems in the coastal areas of the city are much more than that seen in
other parts of the city. At present, there is only one government dispensary at Valiathura,
two PHCs in Poonthura and Veli and 5 MCWCs. With these very limited facilities it is very
difficult to cater to the health needs of the coastal population in the city. Hence one PHC in
each coastal ward is proposed:
Cost:
11 Primary Health Centres (PHCs) @ Rs 30 lakhs per unit Rs.330 lakhs
206
Thiruvananthapuram Municipal Corporation City Development Plan
g. Pre-primary Education
Literacy movements in Kerala resulted in an increase in literacy rate of the fisher folk too.
Nearly 87.06% of the male and 84.53% of the females are literates. The State has the lowest
school drop out rate among all States in India. In 2002, the drop out rate in the State was
only 1.36%. However among the fishermen families, the drop out in the age group 5 to18 is
14.6%. This is alarming compared to the State average. To provide better education
facilities, it is required to strengthen pre-primary education. Hence it is proposed to establish
minimum of 2 Anganwadis in each fishing village in the city.
Cost
207
Thiruvananthapuram Municipal Corporation City Development Plan
Cost
13 centres @ Rs 30 lakhs per centre - Rs.390 lakhs
Cost
13 centres @ Rs.50 lakhs - Rs 650 lakhs
k. Transportation facilities
In Thiruvananthapuram, the fisherwomen in the coastal areas are normally engaged in fish
vending. A serious problem faced by the women fish vendors is transportation from beach to
city markets and back. Introduction of a special transport system exclusively for the women
fish vendors would facilitate easy transport to the market place. Hence, a fleet of 10
minibuses for the transportation of the women fish vendors is proposed.
Cost
10 Mini Buses @ Rs.10 lakh - Rs 100 lakhs
208
Thiruvananthapuram Municipal Corporation City Development Plan
The important locations where street vendors mainly operate in the TMC area are given
below (The figure in the bracket gives a broad estimate of the number of vendors): East Fort
(500), Chalai (750), Manacaud (300), Thampanoor (250), Statue (300), Palayam (250),
Karamana (400), Kesavadasapuram (250), Vazhuthacaud (200) and in the roads that lead to
the out skirts of the city such as Medical College, Ulloor and Sasthamangalam (500) etc. It is
estimated that approximately 3700 street vendors are operating in the city. Detailed surveys
and studies need to be conducted to identify the status correctly.
209
Thiruvananthapuram Municipal Corporation City Development Plan
6. To provide better facilities to the urban population for hassle free purchases of
goods and services.
210
Thiruvananthapuram Municipal Corporation City Development Plan
Necessary steps will be taken to provide legal status to the street vendors and to bring in
regulatory processes. Adequate amendments shall be brought in the Kerala Municipalities
Act, 1994.
Monitoring Mechanism
Thiruvananthapuram Corporation will develop an appropriate monitoring mechanism with the
participation of all stakeholders ensuring public private partnership.
211
Thiruvananthapuram Municipal Corporation City Development Plan
212
Thiruvananthapuram Municipal Corporation City Development Plan
Are they ever been equated with the children of the better offs in society? Are they not
discriminated in respect of education, shelter, food, parenting and even the guaranteed child
rights?
The children come to the street mainly for their physical survival. While majority of them have
severed their contacts with family a good number of them live with their family either in
streets of the city or at suburbs. These children have experienced conflicts, anguish and
abuse. They are forced to live under oppressive environments because of their inability to
muster the courage to fight or revolt against such oppressions. It must be noted that these
children are not deviant or delinquent; in fact they are intrinsically more gifted than the
mainstream ones.
Rehabilitation Package
The rehabilitation package of the children at risk has to follow multi pronged approaches,
which are listed below:
The Don Bosco, a renowned Non Governmental Organisation working for the cause of street
children is operating one rehabilitation center in the city. A child line is also operated in the
center. The experience of this center is that over the past five years they were able to cater
213
Thiruvananthapuram Municipal Corporation City Development Plan
1000 children from the street. Also it is observed that every week an average 15 children are
newly coming to the street from different parts of the state and even from other states. Those
children who have safe homes to return are sent back and others are settled in the
rehabilitation center. Experience shows that at least 2 to 3 have no safe homes to return. To
streamline this sector and to ensure proper rehabilitation 3 new rehabilitation centers in
different regions of the city are proposed. In addition to this the existing rehabilitation centers/
juvenile homes have to be upgraded with State of the Art facilities. To address the needs of
the working children 4 bridge schools are also proposed.
214
Thiruvananthapuram Municipal Corporation City Development Plan
The rehabilitation process of the physically and mentally challenged persons has to be done
with the involvement of the community. Therefore it is proposed to bring out community plans
for their rehabilitation and to create State of the Art infrastructure for the Special schools of
differently abled persons.
The census data shows that 20837 persons in the urban area of Thiruvananthapuram district
are disabled. Out of this it is observed that 80% of them are living in Thiruvananthapuram
city. A table showing the disability pattern with statistics of Thiruvananthapuram district
(Urban) is given below:
215
Thiruvananthapuram Municipal Corporation City Development Plan
d. Geriatric
One of the inevitable consequences of the demographic transition is population ageing.
Being ahead in the demographic transition, Kerala is expected to see an increase in the
number of elderly and their proportion in the total population of the state during the years to
come. Defining the elderly population as those above 60 years of age, according to the 1961
census, the number of elderly was just 1.0 million; by the time of the 1991 census their
number is increased to 2.6 million. According to projections, the number of elderly is
expected to exceed 6.6 million by 2021 and 11.7 million by 2051.
Now a days in Kerala, the family unit is breaking apart as youngsters travel widely in search
of better jobs. This results in an increase in chance of negligence towards old flocks. In
order to facilitate the senior citizens, day care geriatric clubs are planned in cities.
With regard to the family struck by poverty the problem takes a different dimension. The
aged in the poor families face the following specific problems.
In Kerala unlike other states of the Country another important aspect that come to the
forefront is that of the aged women. In the State the sex ratio of male and female is better
than that of other States (1000:1059) and the life expectancy of women is on the higher side.
The average life span of male is 74 and woman is 77. Around 15 % of the aged women are
widows. Taking all these aspects a serious intervention is required.
e. Women in distress
In the poverty alleviation segment it was brought out that the women in the poor households
are extremely vulnerable to poverty. It is the women in the poor house holds who suffer most
in the poverty conditions due to lack of nutritious food, lack of sanitation and over work. They
also are at the receiving end when the head of the household falls sick or gets addicted to
liquor or takes to crime. Poverty has a different bearing on the women when we consider the
216
Thiruvananthapuram Municipal Corporation City Development Plan
women headed households, women subjected to atrocities, widows, sex workers etc. The
lack of capabilities, initiatives, poor livelihood opportunities, rude and crude exploitation, lack
of accessibility to assets, land tenure etc have forced them to live in utter despair and
dismay. The constitutional safeguards to equality of opportunity, freedom of expression and
the right to take decisions are denied or deprived. Severity of poverty by unfavourable
physical, gender or caste status is a reality in the society and has to be tackled by giving
added importance.
The women headed household, women subjected to atrocities, widows, sex workers etc who
forms the bottom most segment in the society needs special attention and care service to live
with dignity. For each category a series of projects can be drawn up recognising their actual
needs.
f. Pavement Dwellers
Thiruvananthapuram city has not shown noticeable migration in the past decades. However,
the growing capital city has been attracting many people from the neighbouring districts and
from Tamil Nadu in the service sector. With the increasing percentage of people engaged in
the service sectors, the size of the informal sector also increases correspondingly.
Petty traders from not only the neighbouring State of Tamilnadu, but also from some north
Indian states converge to the city to trade their wares along the city streets. Such
convergence of population increases during festival seasons, especially during Onam festival
in the months of August-September and during Sabarimala pilgrimage season in November
to January every year. It is often observed that such wandering population of petty traders /
street vendors not only sell their wares on the street margins and foot paths, but also make
these road margins their temporary night shelters.
217
Thiruvananthapuram Municipal Corporation City Development Plan
It is roughly estimated that at any point of time there is about 200 to 300 people wandering
along the roads of the capital city as petty traders. Usually, most of them travel in groups
and with families. Therefore they put up make shift tents in some cases, but most of them
resort to ‘open to sky-pavement night shelters' (and also day shelter).
A large number of families of beggars also reach Thiruvananthapuram City. They roam
around the busy parts of the city during the day hours and settle down on the footpaths near
the parks and on vacant lands during the night. It is estimated that about 150 of such
beggars, most of whom from Tamilnadu and Andhra Pradesh, are roaming around the
streets of Thiruvananthapuram City.
Issues
Almost all of them with very poor income are unable to rent a room or bed in the commercial
lodging available in the City
Some of the city streets, where such people converge are strewn with waste which
is either thrown on the carriage way or dumped in the storm water drains.
Without adequate toilet facilities, the city drains are converted into sewers
This population which settle down on the foot paths pose a criminal threat to the
night time users of the roads, especially the working community population who
return to the city through bus and trains late in the night.
Projects
1. Construction of eight night shelters at eight different locations. Night shelters with
dormitory facilities separately for men and women with toilet facilities.
218
Thiruvananthapuram Municipal Corporation City Development Plan
Approximate cost Rs 75 lakhs each excluding land cost. The land will be provided by
Thiruvananthapuram Corporation at suitable locations
2. Constructions of pay - use toilets at 50 different locations in the city. Each toilet unit
to have 8 cubicles – 5 for men and 3 for women.
Approximate cost Rs 6.00 lakhs per unit
3. Organized informal sector marketing open spaces at 8 zones of the city
Approximate cost Rs 80 lakhs at Rs 10.00 lakhs per market yard excluding land cost.
219
Thiruvananthapuram Municipal Corporation City Development Plan
Table 15.11: Broad Costing and Phasing for Basic Services to the Urban Poor
Rs. in Crores
Sl. Component Sub Component Cost (In Rs 2006- 2007- 2008- 2009- 2010- 2011-
No. Crores) 07 08 09 10 11 12
A General Projects
1 Livelihood Oriented Business Infrastructure development & 34.00 3.40 6.8 10.2 6.8 3.40 3.40
School maintenance of 8 centres
2 Marketing Support for Urban Support for 20 market outlets 2.00 0.20 0.4 0.60 0.4 0.20 0.20
Poor
3 Anganwadis 50 nos @ Rs 4 lakhs each 2.00 0.20 0.4 0.60 0.4 0.20 0.20
4 Primary Health centres 20 nos @ Rs 5 lakhs each 1.00 0.10 0.2 0.30 0.2 0.10 0.10
5 Maternity- Child welfare 20 nos @ Rs 5 lakhs each 1.00 0.10 0.2 0.30 0.2 0.10 0.10
centre
Total 40.00 4.00 8.0 12.00 8.0 4.00 4.00
B Other Projects
2 Slum Improvement Home & Environment 256.33 25.63 51.26 76.89 51.26 25.63 25.63
Support Services for total 85.85 8.59 17.18 25.77 17.18 8.59 8.59
Growth and Sustainability
Total 342.18 34.22 68.44 102.66 68.44 34.22 34.22
3 Development Projects for Sea Shore Protection 9.72 0.97 1.94 2.91 1.94 0.97 0.97
Coastal Population Housing 52.00 5.20 10.4 15.60 10.4 5.20 5.20
Sanitation 4.30 0.43 0.86 1.29 0.86 0.43 0.43
Drinking Water Facility 4.00 0.40 0.80 1.20 0.80 0.40 0.40
Health intervention 3.30 0.33 0.66 0.99 0.66 0.33 0.33
Infrastructure development 5.20 0.52 1.04 1.56 1.04 0.52 0.52
Pre-primary education 6.20 0.62 1.24 1.86 1.24 0.62 0.62
Micro-fishing Harbour 46.00 4.60 9.20 13.80 9.20 4.60 4.60
Fish Auction centre cum 3.90 0.39 0.78 1.17 0.78 0.39 0.39
drying yard
220
Thiruvananthapuram Municipal Corporation City Development Plan
Sl. Component Sub Component Cost (In Rs 2006- 2007- 2008- 2009- 2010- 2011-
No. Crores) 07 08 09 10 11 12
Multi-purpose community 6.50 0.65 1.30 1.95 1.30 0.65 0.65
centre cum disaster shelter
Transportation facility 1.00 0.10 0.20 0.30 0.20 0.10 0.10
Total 142.12 14.21 28.42 42.63 28.42 14.21 14.21
4 Projects for Informal Sector Re-location of Street Vendors 16.15 1.62 3.24 4.86 3.24 1.62 1.62
Total 16.15 1.62 3.24 4.86 3.24 1.62 1.62
5 Projects for other Vulnerable Rehabilitation of destitute 12.57 1.26 2.52 3.78 2.52 1.26 1.26
sections families
Rehabilitation of children at 3.25 0.33 0.66 0.99 0.66 0.33 0.33
risk
Rehabilitation of Physically & 3.03 0.30 0.6 0.90 0.6 0.30 0.30
Mentally Challenged
Geriatric Care 3.10 0.31 0.62 0.93 0.62 0.31 0.31
Women in Distress 4.20 0.42 0.84 1.26 0.84 0.42 0.42
Pavement Dwellers 10.60 1.06 2.12 3.18 2.12 1.06 1.06
Total 36.75 3.68 7.36 11.04 7.36 3.68 3.68
577.20 57.72 115.44 173.16 115.44 57.72 57.72
Grand Total
221
Thiruvananthapuram Municipal Corporation City Development Plan
PART D
222
Thiruvananthapuram Municipal Corporation City Development Plan
Consequent to the 74th CAA, the Urban Local Bodies (ULBs) in the State of Kerala have had
a paradigm shift in their role and functions. Kerala is one of the first states to initiate statutory
legislations to empower the ULBs and to enable them to become local governments, in the
true sense of the word, under the three tier government structure. The empowerment of the
ULBs was also strengthened by devolution of plan funds to enable better administration of
transferred institutions and to lead to better urban governance. Another strength in this
process of devolution of powers, responsibilities and funds has been a shift from the top
down approach in administration, planning and development to a bottom up approach in
participatory planning & development. The Councillors and the Mayor / Chairman now have a
positive role in the management of urban affairs, with the decision making process entrusted
to them.
The state government and the Thiruvananthapuram Municipal Corporation (TMC) have
initiated a large number of actions to improve urban management. The vision of such reforms
is “effective and efficient urban management with improved urban governance leading to
overall development of the city and improved delivery of services, rising to the aspirations of
the citizens.”
Subsequent to the 74th Constitution Amendment Act, the following reforms have been
initiated at the State level:
Enactment of Kerala Municipality Act, 1994
Issue of Government Orders transferring functions and functionaries to the ULBs in 1995.
Elections are being held to the Local Self Government Institutions once in five years.
State Election Commission has been constituted to conduct elections to the Local Self
Government Institutions.
There had been three general elections to Local Self Government Institutions since the
enforcement of Constitution Amendment .The latest election was held in September
2005.
Devolution of Plan Funds to ULBs (one-third of the State Plan Funds were devolved to
the ULBs and Panchayats with specific guidelines on the proper utilisation of funds).
223
Thiruvananthapuram Municipal Corporation City Development Plan
Devolution of State Plan Funds to the ULBs and the Panchayats were brought within the
State budget mechanism with a separate division of the State Budget.
As per KMA 1994, city planning function has been entrusted to ULBs.
- Government instituted a major program of People’s Plan Campaign during 1997-98 to
ensure participation of people in planning and development. This was taken up with a
missionary zeal by the State Planning Board, State Government and voluntary
organizations. A number of training programmes were held for elected members of
ULBs, municipal officers, officials of transferred institutions and voluntary
organizations.
- Constitution of State Finance Commission for developing norms for transfer of funds
to LSGIs and for evolving recommendations for improvement of finances of LSGIs.
The recommendations of the first and second SFCs were accepted by the state
government and devolution of funds is in accordance with it. The report of the third
SFC has also been submitted to government recently.
- Constitution of State Development Council as envisaged in the KMA, 1994.
- Constitution of the District Planning Committee to oversee Plan Preparation by the
ULBs and the three tier Panchayat Raj Institutions, to accord approval for the Annual
Plans / Five Year Plans and to prepare consolidated District Development Plans. The
DPC has the District Panchayat President as Chairman. Inspite of this, mechanism
has been created in the DPC to scrutinize and approve Plans of the ULBs.
- Constitution of Kudumbashree as an umbrella institution to coordinate and implement
all programmes for the poor and to work with ULBs in the pro poor programmes.
- Social capitalisation through Kudumbashree and ensuring gender justice
(with the active involvement of NHGs, ADS, CDS, etc.. )
- Earmarking funds for Special Component Plan and Tribal Sub Plan
224
Thiruvananthapuram Municipal Corporation City Development Plan
All state level reforms have been adopted and are being enforced by the TMC. In addition to
that the following reforms have been undertaken by the TMC.
Constitution of seven Standing Committees within the TMC as a powerful decision
making bodies of the TMC for each of the sectors enabling every Councillor to become a
member of one or the other of the Standing Committee.
Constitution of Ward Committees under the Chairmanship of the Ward Councillors for
effective decentralized administration and for effective planning.
Establishment of Information Centre to give out information on any aspect pertaining to
the delivery of services to the citizens.
Establishment of Jana Sevana Kendra to simplify the process of payment of taxes, issue
of certificates/ permissions, etc.
225
Thiruvananthapuram Municipal Corporation City Development Plan
Computerisation in all the divisions of the TMC for effective data management and
retrieval and also to expedite the process of decision making.
Establishment of a 24 hours call centre to attend to complaints and grievances of urgent
nature
Institution of one day permit system for single storied residential buildings.
Streamlining the system for issue of birth and death certificates by providing single
window kiosks at the hospitals.
Improvements in solid waste management system
a. Establishment of waste treatment plant at Vilappilsala with private sector participation.
b. Establishment of segregated house to house collection system in 25 wards.
Institution of a continuous training program for the municipal officers
Processing for double entry system of accounting expected to be implemented from
2007-08.
TMC has declared and published Citizen’s Charter.
Erection of Information Boards in various parts of the city to inform the public of the
formalities to obtain the services from TMC.
TMC has prepared Asset Registers to enable effective urban asset management
TMC has taken steps for effective utilization of unused and underutilized landed
properties of TMC.
Establishment of a computer training centre and reprographic centre under the TMC to
impart vocational training to poor.
Establishment of a vocational training centre for ladies.
Erection of way side bus shelters and pay & use toilets with private participation.
Utilisation of services of urban poor under Kudumbashree units for collection of waste
from households and establishments.
Establishment of sales outlets for the products of the ADS units of the Kudumbashree
system.
Property tax reforms: Property tax details are proposed to be transferred on to the GIS
platform. Till now property tax was assessed based on the system of assessed Annual
Rental Value (ARV). To remove arbitrariness in such ARV based system and to make the
assessment system more transparent, the Kerala Municipality Act, 1994 proposed
226
Thiruvananthapuram Municipal Corporation City Development Plan
change of the ARV based assessment to built up area based assessment system. GOK
appointed a committee to recommend norms for built up area based assessment. The
recommendations are getting implemented. It is hoped that in the year 2007, the new
system will be effective. The new system may remove subjective assessment, remove
corruption, bring in transparency, allow self assessment, broaden tax base and increase
tax revenue.
Profession tax mapping for enlarging tax net and increasing tax revenue.
The water and sewerage revenues prima facie seem sustainable and provide a surplus
cash flow for undertaking capital works program. However, this may not be adequate to
comfortably absorb debt servicing requirements. The user charges in respect of water
supply and sewerage projects would therefore require periodic revision. The
responsibility for priority water supply and sewerage services now rests with KWA.
GIS for Urban Management including-
- enforcing land use regulations and monitoring
- asset management
- road maintenance
- improvement in building licence system
- enforcement of building rules
- mapping of urban infrastructure and monitoring for maintenance and improvement
- development administration and implementation of urban development plans with
prioritisation of urban projects
- assessment and monitoring of property tax, profession tax, entertainment tax etc.
Rationalisation of advertisement tax to broaden tax base and revise and rationalise tax
rate
Levy of user charges and service charges
Utilising the services of accredited NGOs improving quality in service delivery system and
for implementation of programmes for urban poor
Bringing financial reforms / efficiency - accrual based double entry accounting system
Exploring possibilities of Public Private Partnership in urban asset management and
urban services.
227
Thiruvananthapuram Municipal Corporation City Development Plan
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
I Mandatory Reforms at ULB level
1 Adoption of modern accrual-based double entry system of Initiated. Staff training to acquaint with the system is
accounting ongoing and by 2008-09 the system will be
operationalised in full.
2 Introduction of a system of e-governance using IT Service delivery and revenue collection by the TMC
applications, such as GIS & MIS for various services has been computerised. GIS has been initiated.
provided by ULBs (Mapping of all wards completed).
3 Reform of property tax with GIS Pilot project is being undertaken in one ward in the
Corporation. GIS Mapping of all the wards have
been completed. Will be scaled up subsequently.
5 Internal earmarking, within local bodies, budgets for basic Implemented fully as part of enforcement of
services to the urban poor Constitutional Amendment. Separate division of
State budget is made as part of devolution of Plan
funds to LSGI.
228
Thiruvananthapuram Municipal Corporation City Development Plan
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
3 *Reforms of Rent Control Laws balancing the interests of
landlords and tenants
4 Rationalisation of Stamp Duty to bring it down to not more Action to notify fair value for land has been initiated.
than 5 per cent within next seven years After issuing the notification Stamp Duty shall be
brought down from 13.5 % to 5%
5 Enactment of Public Disclosure Law to ensure The State Government and the TMC are
preparation of medium- term fiscal plan of ULBs and implementing the Right to Information Act and the
release of quarterly performance information to all Citizens Charter.
stakeholders
6 Enactment of Community Participation Law to Already implemented in the State and ULBs. The
institutionalise citizen’s participation and introduce the activities of Neighbour Hood Groups, Area
concept of the Area Sabha in urban areas. Development Societies, Community Development
Societies and Social Capitalisation through
Kudumbasree in Kerala are worth mentioning.
7 Assigning or associating elected ULBs with “city planning * As part of enforcement of Constitutional
function”. Over a period of seven years, transferring all Amendment, City planning function at present vests
special agencies that deliver civic services in the urban with the TMC. The annual and five year plans of
areas to the ULBs and creating accountability platforms to TMC are being vetted by the District Planning
all urban civic service providers in transition. Committee. *All stand alone projects can be
transferred to TMC. However, transferring all
special agencies delivering civic services to
TMCwhich transcends the TMC boundary shall be
taken up partly by TMC on a shared basis during
the six year period.
1 Revision of bye-laws to stream line the approval process Kerala Municipality Building Rules 1999 has been
for construction of buildings, development of site etc. framed within the purview of KMA 1994 (enacted as
per 74th CAA)
2 Simplification of legal and procedural frameworks for Action being taken on the basis of the Land
conversion of land from agricultural to non- agricultural Conservancy Act/ Land Utilisation Order.
purposes
229
Thiruvananthapuram Municipal Corporation City Development Plan
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
3 Introduction of Property Title Certification System in ULBs
4 Earmarking at least 20-25 per cent of developed land in Amendments to the existing Kerala Municipality
all housing projects (both public and private agencies) for Building Rules 1999 are necessitated to this effect.
EWS and LIG category with a system of cross
subsidisation.
6 Revision of byelaws to make rain-water harvesting Kerala Municipality Building Rules 1999 has been
mandatory in all buildings and adoption of water amended incorporating provision for rain water
conservation measures harvesting in new buildings.
7 Bye-laws for reuse of recycled water
8 Administrative reforms i.e. reduction in establishment *Feasibility study shall be conducted from 2008-09
costs by adopting the Voluntary Retirement Scheme to 2010-11 and action shall be taken accordingly.
(VRS), not filling posts falling vacant due to retirement
etc., and achieving specific milestone in this regard
9 Structural reforms As part of Constitution Amendment reforms in the
organisation structure as well as the system of
functioning of the TMC have been introduced.
10 Encouraging PPP Framework has been issued by G.O.K for taking up
projects on BOT basis and for solid waste
management already. Projects that can be taken up
under PPP shall be identified further and
implemented accordingly.
230
Thiruvananthapuram Municipal Corporation City Development Plan
The Kerala Municipalities Act, 1994, enacted subsequent to the 74th Constitutional
Amendment empowers the Municipal Corporation of Thiruvananthapuram (TMC) to act
as the local government of the city. The city of 141.74 sq. km is divided into 86 wards,
each ward being represented by an elected Councillor. The Corporation Council is the
ultimate decision making body of the local government.
The duties and responsibilities of the City Corporation have increased manifold
subsequent to the devolution of powers as envisaged in the 74th Constitution
Amendment Act and the Kerala Municipalities Act, 1994. Government of Kerala has
transferred the management of a number of government institutions to
Thiruvananthapuram Municipal Corporation. Perhaps Kerala is the only State where
about one third of the State’s Plan Funds has been devolved to the Local Self
Government Institutions (LSGI).The Decentralised Planning Campaigns commenced
from 1997 onwards under ‘Peoples Planning” have evoked interest in the common man
in urban management affairs.
The Mayor (elected from among the councillors) chairs the Council meetings, and is
responsible for the overall supervision and control of the administrative functions of the
Municipal Corporation. The Council is composed of all elected councillors and is subject
to the provisions of the KM Act. The administration of the TMC vests in the Council. The
term of office of the Council is five years. The TMC through the Council has all the
powers, authority and responsibilities of the Government, to enable it to function as an
institution of self government in respect of the matters entrusted to it. The Council,
subject to the provisions of the KM Act, constitutes Standing Committees for exercising
its powers, discharging such duties or performing such functions, as is provided for in the
KM Act. The Deputy Mayor is the Chairman of the Finance Standing Committee and also
presides over the Council meetings during the absence of the Mayor. The Mayor
devolves his/her functions to the Deputy Mayor when he/she is indisposed or out of the
State. The Secretary of the TMC is an officer appointed by the Government.
Standing Committees
As provided for in the KM Act, 1994 seven Standing Committees are constituted on the
following subject areas:
Finance:
To prepare the Annual Budget and to supervise the utilization of budget grants and
oversee the timely assessment and collection of taxes, fees, rents, etc.
231
Thiruvananthapuram Municipal Corporation City Development Plan
Development:
To deal with dairy development cooperation, small-scale industries, institutional
finance, etc. and to prepare development plans
Welfare:
To deal with matters of welfare of women and children, development of SC/ST, social
welfare, etc.
Health & Education:
To deal with matters of public health, education, etc.
Works:
To deal with matters of public works, housing, etc.
Town Planning & Heritage:
To bring about preparation of Master Plans and to deal with matters regarding town
planning, heritage etc.; and
Appeals Relating to Tax:
To dispose of appeals on taxation, etc.
Steering Committee:
As laid down in the KM Act, TMC has a Steering Committee consisting of the Mayor,
Deputy Mayor and Chairmen of the Standing Committees. The Mayor shall chair the
Steering Committee. The Steering Committee coordinates and monitors the functioning
of all the Standing Committees and has the powers as delegated by the Council.
Ward Committees:
The Ward Committee consists of ward councillor as Chairperson and the members are
drawn from the Residents Associations, registered Neighbourhood Groups, educational
institutions in the ward, registered trade unions, etc. The Ward Committee disseminates
information at the ward level regarding development and welfare activities. The KM Act
lays down that even the Council shall not alter the priority of the development works
prepared by the Ward Committee.
B. Administrative Wing
The Secretary is the administrative head of the TMC and implements the Council
decisions based on the resolutions adopted by the Council. He reports compliance to the
Council and exercises powers and discharges duties conferred under the KM Act. The
Secretary implements all the decisions/directions of the Mayor, ensures safe custody of
the Municipal Fund and attends to all litigations for or against the TMC. (Refer Flow
Chart, Figure 16.1 for organization set-up).
In addition to the Central Office, six Zonal Offices of the TMC manage decentralized
functions of the Municipal Corporation. These zonal offices include Fort, Kadakampally,
Nemom, Ulloor, Attipara and Thiruvallom.
232
Thiruvananthapuram Municipal Corporation City Development Plan
The following seven departments manage the functions of the Municipal Corporation.
b) Accounts Department:
The Accounts Department (AD), a key department of the TMC, manages TMC finances
and monitors the use of allocated funds for different schemes. It plays a major role in the
formulation of the budget. The Accounts Officer is responsible for supervising all the
financial transactions related to the TMC, advising the Secretary on all internal financial
matters, maintaining records of financial receipts and expenditure in accordance with the
purpose and utilization of funds, reporting deviations in utilization of funds in any of the
approved schemes, assisting the MC in budget preparation, maintaining accounts
regarding stamp duty surcharge and State grants, maintaining petty cash book and
general cash book and attending to audit requirements and other such accounts-related
duties. The Accounts Department is also responsible for internal audit of all bills for
payment, audit clearances, preparation of annual financial statements and the Demand,
Collection and Balance statement (DCB).
233
Figure 17.1: ORGANISATION STRUCTURE OF THIRUVANANTHAPURAM CORPORATION
Municipal Corporation
Council
Municipal Corporation
Secretary
Deputy Secretary
c) Engineering Department:
A Superintending Engineer (SE) heads the Engineering Department and is assisted by
two Assistant Executive Engineers (AEE) and four Assistant Engineers (AE). The major
duties and responsibilities of the Engineering Department include construction and
maintenance of roads, drains and other public works. An AE in the Drawing Section
supports the Engineering Department in preparing requisite detailed engineering
drawings for undertaking works
An Executive Engineer (EE) in-charge of projects handles the major projects of the
Municipal Corporation. The EE is supported by an AEE and an AE in overseeing
construction of major projects like shopping complexes, bus terminals, etc.
d) Revenue Department:
The Revenue Department (RD) is another key department of the Municipal Corporation,
consisting of a Revenue Officer (RO), nine Revenue Inspectors and 43 Bill Collectors.
Some of the major responsibilities of the Revenue Officer include responsibility for
collecting taxes such as, property tax, advertisement tax, and entertainment tax; issuing
notices for recovery of tax; and monitoring revenue collections of the Municipal
Corporation.
e) Health Department:
A Corporation Health Officer (CHO) heads the Municipal Corporation’s Health
Department (HD). The HD is responsible for conservancy services, sanitation facilities,
solid waste management and other public health duties. The CHO is assisted by an
Assistant Health Officer, 19 Health Inspectors and 45 Junior Health Inspectors (JHI). The
JHIs are in-charge of works at the field level, which include monitoring and supervising
the work of sanitary labourers in the wards under their charge and attending to specific
local complaints.
235
Thiruvananthapuram Municipal Corporation City Development Plan
g) Council Department:
A Council Secretary/PA to Secretary heads the Council Department (CD), which
manages records relating to Council meetings and records all resolutions undertaken by
the Council.
C. Transferred Institutions:
Health Institutions (except Medical Colleges, General Hospitals and other Specialized
Hospitals) are now under the direct control of the Municipal Corporation. Routine
management and maintenance of facilities is under TMC’s control. However, staff
salaries, recruitment and transfers are managed by Government of Kerala. General
Education (comprising High Schools, Higher Secondary and Vocational Higher
Secondary, Primary and Upper Primary Schools) is also under TMC’s direct control.
Government of Kerala is responsible for the management of the institutions, staff
salaries, etc.
A similar division of responsibility is observed for other transferred institutions like social
welfare, agriculture, animal husbandry, dairy, fisheries and SC/ST. Under social welfare,
most social security schemes are transferred to the TMC; social security pension
payment for eligible persons (under the following categories and based on stipulated
norms: old age, widow, agriculture workers, physically handicapped) and unemployment
wages is in accordance with Government of Kerala fund transfer to the TMC. The TMC’s
workload has increased due to the additional responsibility, though TMC tries to cope
with this without staff addition.
D. Zonal Operations:
Zones in the city were created for newly added areas through merging of grama
panchayats with the TMC jurisdiction. Officials at the TMC Central Office are currently in
charge of zones. The Zonal Offices are mainly responsible for tax assessment and
collection, licensing of trades, issue of building permits and sanitation.
E. Capacity Building:
As a service organization, capacity building of the TMC is critical for planning, efficient
service delivery, asset creation and asset management.
Planning:
According to the State’s Urban Policy and Action Plan (2002) and the KM Act 1994, the
TMC requires:
236
Thiruvananthapuram Municipal Corporation City Development Plan
Undertaking responsibility of urban planning, where the TMC requires building staff
capacity to undertake preparation of the Municipal Development Plan including urban
planning to reduce State agency involvement in urban planning and implementation;
Undertaking preparation of Development Vision and Citywide Development Plans,
which the TMC is currently undertaking but the planning mechanism does not provide
for a holistic approach; TMC staff capacity should be built to ensure integration of
plan works and adoption of a holistic approach to citywide infrastructure provision;
and
Establishing a Planning Department within the TMC, which should undertake all
planning responsibilities for the preparation of the Municipal Development Plan
including spatial planning and land use management for the identification of land for
specific projects such as solid waste treatment / disposal plants.
The TMC’s Planning Department will ensure works implementation, while monitoring and
asset management by the Engineering and Health Department respectively. Immediate
focus is required to address requirements under the Kerala Development Program,
where no specific post was sanctioned or department created within the Municipal
Corporation to carry out decentralized planning.
In formulating local-level plans, Ward Committees play an active role supported by the
TMC’s Engineering Department. However, procurement is carried out on the basis of the
Stores Purchase Manual and PWD Manual; the TMC lacks access to a comprehensive
Works Manual comprising procedure from planning through implementation. Besides
proving to be a pressure on the TMC’s resources, works are disjointed and do not adopt
a holistic view to planning and implementation.
Improving urban drainage, where it is imperative for the TMC to develop Storm Water
Master Plans that should be part of integrated planning within the Municipal
Development Plan;
Undertaking solid waste management and sewerage system, where GoI guidelines
suggest waste disposal should be under the direction of a Municipal Environmental
Engineering Department instead of the present Health Department;
237
Thiruvananthapuram Municipal Corporation City Development Plan
Undertaking water and sewerage services, where Section 315 of the KM Act, 1994,
provides the Municipal Corporation with a mandate to provide water supply and
sewerage services within its jurisdiction;
Preparation of annual maintenance plans; and
Implementing urban poverty alleviation programs, where TMC is undertaking steps to
ensure increase in fund utilization with assistance from Kudumbashree.
Institutional Development:
Primarily the State Finance Commission recommendations and the KM Act govern
institutional development in the TMC, which focus on:
238
Thiruvananthapuram Municipal Corporation City Development Plan
These resources can be further classified under four categories, as shown in the chart
below.
Loans
In the year 2005-06, TMC’s own resources was Rs.30.60 crores, out of which Rs.24.23
crores was from taxes and Rs.6.37 crores was from TMC properties and non-tax
revenue. Rs.33.25 crores was received as Category ‘C’ funds.
Category ‘A’ funds contribute to the major source under Capital Receipts with Rs.25.29
crores received from GOK under Plan Schemes and Rs.3.00 crores received under UPA
Schemes.
239
Thiruvananthapuram Municipal Corporation City Development Plan
Revenue Account
Revenue account includes all recurring items of receipts and payments such as taxes,
fees, salary, pension, maintenance etc.
a) Revenue Income:
The revenue income of the Corporation can be classified under own sources, assigned /
shared revenue and Government grants. Figure 1 presents share of the various
components of revenue receipts.
a. Municipal taxes
b. Income from buildings, markets Assigned / Shared Ow n sources
and other properties of Revenue, 17% (Taxes), 54%
Corporation
c. Building permit fee, fees for D&O
Ow n Sources
trade, license for lodge etc. (Non Taxes), 13%
d. Fines imposed under municipal
and other laws
e. Income from miscellaneous Figure 1
sources
Property tax is the major component of own source revenue. Property tax contributes
about 27% of the revenue receipts. Other major taxes namely, professional tax and
entertainment tax, contribute about 17% and 10% respectively of the revenue receipts.
Assigned and shared taxes comprise of transfers from state government. Transfers are
in the form of Corporation’s share of taxes levied and collected by the state government
from the establishments / operations within the Corporation limits. Surcharge on stamp
duty and vehicle tax compensation are the major items under this head.
Government grants classified under revenue consists of non plan grant for general and
specific purpose, maintenance grant and grants for running institutions transferred from
government.
Table 1 shows summary of revenue account of the Corporation for the fiscal years 2000-
01 to 2005-06. During these years the Corporation had revenue surplus each year and it
was increasing from year to year. The revenue surplus for the year 2005-06 is
Rs.306.36 million which is about 15 times more that the revenue surplus for the year
2000-01.
240
Thiruvananthapuram Municipal Corporation City Development Plan
Revenue Expenditure
241
Thiruvananthapuram Municipal Corporation City Development Plan
Revenue expenditure of the City Corporation is broadly classified under the following
heads:
Other Expenses,
a. General management and
2.47%
collection of taxes Transferred
b. Public works Institutions, 0.15% Management &
Collection of
c. Town planning Street Lights, Taxes, 24.77%
d. Education 11.52%
e. Water supply and drainage
Public Health & Public Works,
f. Public health and sanitation 23.60%
Sanitation, 36.03%
g. Street lights
Town Planning,
h. Municipal properties
1.45%
i. Running expenses of transferred
institutions Figure 2
j. Miscellaneous expenses.
Figure 2: presents the break up of expenditure under the major heads for the year 2005-
06.
Figure 3
700
Comparison of revenue
600
receipts with revenue
Rs. in Million
500
expenditure is given in
400
Figure 3.
300
- Revenue receipts of
200
the City Corporation
100
shows an increasing
0
trend. Also, the 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06
revenue expenditure Year
is reducing from Revenue Receipts Revenue Expenditure
2002-03 to 2004-05.
- Own source revenue shows steady trend from year 2002-03 to 2004-05 and has
increased in year 2005-06 as shown in Figure 4.
Figure 4
350
300
Rs. in Million
250
200
150
100
50
0
2000-01 2001-02 2002-03 2003-04 2004-05 2005-06
242
Thiruvananthapuram Municipal Corporation City Development Plan
Capital Account
The capital account deals with the non-recurring receipts and payments of the
Corporation. Table 2 presents capital account of the Corporation from 2000-01 to 2005-
06. The Corporation had capital surplus in 2001-02, 2002-03 and 2005-06 and capital
deficit in 2000-01, 2003-04 and 2004-05. The deficit in 2000-01 was met by the revenue
surplus for that year. The deficits in 2003-04 and 2004-05 were compensated by capital
surplus in the years 2001-02 and 2002-03. Over the six year period the capital surplus
was Rs. 163.62 million. Figure 5 gives an idea about the capital receipts and payments
from 2000-01 to 2005-06.
243
Thiruvananthapuram Municipal Corporation City Development Plan
Capital receipts come mainly in the form of grants released by Government for
implementation of specific schemes and projects. If there is any shortfall in the capital
account, the same is compensated by transferring surplus from the revenue account as
happened in the year 2000-01.
Figure 5
500
Rs. in million
400
300
200
100
-
2000- 2001- 2002- 2003- 2004- 2005-
01 02 03 04 05 06
Year
Total Capital Receipts Total Capital Expenditure
Figure 6 presents share of the above heads in the total capital expenditure in the year
2004-05.
244
Thiruvananthapuram Municipal Corporation City Development Plan
Management,
0.5%
Others, 2.7%
Municipal
Development,
32.1%
Kerala
Development
Project, 64.7%
Figure 6
Debt Account
Debt account includes receipt and payment of deposits and advances, collection and
payment of library cess, pension and PF allotment from Government, contribution paid to
pension and PF etc.
Revenue Realisation
Property tax is the major item contributing to the own source revenue. From the figure 7
it can be seen that the Corporation is collecting only about 58% of property tax demand.
F igu r e 7
140
120
Rs. in Million
100
61% 59%
80 59% P r oper t y Ta x
59%
60 53% Dem a n d
40 P r oper t y Ta x
20 Collect ion
0
2000-01 2001-02 2002-03 2003-04 2004-05
F isca l Yea r
The past trend in collection of property tax shows a very dismal picture of 59% compared
to the demand generated by the TMC. This is mainly due to the redeployment of the
entire staff for organizing ward level meetings, preparation of project plans and
compilation of annual plans as stipulated in the guidelines issued by government under
the decentralized planning process. The staff untrained to take up this task under the
People’s Planning Campaign and preparation of participatory plans were regularly
trained for the purpose. In view of this their services could not be effectively utilized for
normal functions like collection of taxes etc. Now that the system of decentralized
245
Thiruvananthapuram Municipal Corporation City Development Plan
planning process has been regularized. the TMC is now in a position to strengthen its
regular functions. It is expected that with energized tax collection process the TMC would
be able to collect 80% of there demanded tax.
There are certain other features with regard to property tax, which need to be
highlighted.
Till now property tax was assessed based on Annual Rental Value (ARV). The Kerala
Municipality Act, 1994 envisages change of the method of assessment from ARV
basis to plinth area basis. Government have now taken steps to change the
assessment to plinth area basis.
It is roughly estimated that around 10 – 12 thousand buildings have escaped
assessment. These buildings will be brought under assessment.
The earlier Municipality Act envisaged revision of tax every 5 years. Such a revision
is based on physical verification of building was carried out in 1988. At the next
revision in 1993 due to various reasons the physical verifications could not be carried
out and what is generally termed as ‘table revision’ was carried out with just 25%
increase for the earlier assessment. Such a process helped a number of properties,
which had undergone area and structural changes, escape taxation. It is hoped that
with the present proposed revision in 2006 all the buildings within the city would be
physically verified and assessed. This would not only broaden the tax base but will
also substantially increase the tax demand.
The present law envisages a revision every four years and therefore after 2006 the
next revision is expected in 2010. In the present revision in 2006 the total amount
collected would increase by 75%, which would increase by 1% by number of
properties every year and by the next revision in 2010 another increase of 20% is
expected.
The overall collection efficiency will be increased by about 80% which will be
achieved gradually with improved systems and procedures.
The TMC also proposes broadening of the base in the levy of user charges and service
charges for the services rendered by the TMC. The rates of licence fee for the various
permissions granted by the TMC is also proposed to be modified through a system of
graduated automatic increases linked to indices reflecting value of money.
The government also proposes to link devolution of a portion of the Development Fund
to increased revenue efforts on the part of the local governments. With the reforms
envisaged, the TMC hopes to benefit from this policy. The TMC is also taking efforts for
Tax Mapping and updation of tax registers with computerised system of assessment,
collection and monitoring.
246
Thiruvananthapuram Municipal Corporation City Development Plan
Budgeting
The present budgeting system of the Corporation does not achieve its desired targets.
Budget for receipts and payments for each fiscal year have to be prepared based on
previous year results and anticipated events in the coming year. The results of the
current year have to be compared with the budget figures. The shortcomings, if any,
should be studied carefully and corrective action should be taken eventually. A
separate trained team set up for budgeting can prepare budgets, compare actual figures
with budgets and suggest remedial actions.
The present system of control on bank and treasury accounts is not sufficient to prevent
possible losses, if any, to the Corporation. Timely reconciliation of bank and treasury
accounts with books maintained by the Corporation will help to monitor the receipts and
payments from the bank and treasury accounts of the Corporation. This will help to
rectify errors and mistakes which may occur in the bank and treasury accounts.
247
Thiruvananthapuram Municipal Corporation City Development Plan
Table 17.3: Estimated Financial Plan of Thiruvananthapuram Municipal Corporation for Year 2006-12
GOK TMC PFI Total GOK TMC PFI Total GOK TMC PFI Total GOK TMC PFI Total GOK TMC PFI Total GOK TMC PFI Total
YEAR 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12
REVENUE INCOME
379.8
Taxes - - - - - - 326.80 - - - -
- 255.90 - 255.90 277.61 277.61 301.18 301.18 326.80 352.23 352.23 379.84 4
Income
from - - - - - - 33.25 - - - -
30.16 30.16 31.67 31.67 33.25 34.91 34.91 36.66
Propertie - 28.72 - 28.72 36.66
Fees &
- 23.57 - 23.57 - 25.93 - 25.93 - 28.52 - 28.52 - 31.37 - 31.37 - 34.51 - 34.51 - 37.96 - 37.96
Charges
GoK 102.4
80.29 - - 80.29 84.30 - - 84.30 88.52 - - 88.52 92.95 - - 92.95 97.60 - 97.60 102.48 - -
Grants 8
556.9
TOTAL 80.29 308.19 - 388.48 84.30 333.70 - 418.00 88.52 361.37 - 449.89 92.95 391.42 - 484.37 97.60 421.65 - 519.25 102.48 454.46 -
4
REVENUE EXPENDITURE
Establish 309.1
80.29 161.90 - 242.19 84.30 170.00 254.30 88.52 178.50 - 267.02 92.95 187.42 - 280.37 97.60 196.79 - 294.39 -
ment - 102.48 206.63 1
Operatio 101.2
- 62.87 - 62.87 - 69.16 - 76.08 - 76.08 - 83.69 - 83.69 - 92.06 - 92.06 - 101.27 -
n 69.16 - 7
Transpor
- 18.30 - 18.30 - 20.13 - 22.14 - 22.14 - 24.35 - 24.35 - 26.79 - 26.79 - 29.47 - 29.47
t 20.13 -
Interest - 2.28 - 2.28 - 2.51 2.51 - 2.76 - 2.76 - 3.04 - 3.04 - 3.34 - 3.34 - 3.67 - 3.67
-
Water
Supply & - 3.03 - 3.03 - 3.33 3.33 - 3.66 - 3.66 - 4.03 - 4.03 - 4.43 - 4.43 - 4.87 - 4.87
-
Drainage
Others - 6.96 - 6.96 - 7.66 7.66 - 8.43 - 8.43 - 9.27 - 9.27 - 10.20 - 10.20 - 11.22 - 11.22
-
459.6
TOTAL 80.29 255.34 - 335.63 84.30 272.79 357.09 88.52 291.57 - 380.09 92.95 311.80 - 404.75 97.60 333.61 - 431.21 102.48 357.13 -
- 1
SUR -
- 52.85 - 52.85 - 60.91 - 60.91 - 69.80 - 69.80 - 79.62 - 79.62 - 88.04 - 88.04 - 97.33 - 97.33
PLUS
Note:
Reforms including tax reforms are expected to generate progressively increasing revenue in the next decade
Improvements in financial discipline may bring in better control over the municipal finances
The expected surplus progressively increasing over the years may enable the TMC to support its contribution in JNNURM
248
Thiruvananthapuram Municipal Corporation City Development Plan
249
Thiruvananthapuram Municipal Corporation City Development Plan
Panchayat Committee
Standing Committees
Secretary
Supporting Staff
17.2.2 Finances
Panchayat Fund
All cash received by the Panchayat constitute the Panchayat Fund (Fund). The items of
income credited to the Fund consist of the following:
Own source revenue which includes taxes, duties, cess and surcharge, fees from
licenses and permissions, income from properties and income from other
miscellaneous items;
Share of the taxes levied by the Government and transferred to the Panchayat;
Grants released to the Panchayat by the Government for implementation of
schemes, projects and plans formulated by the Panchayat.
Grants released to the Panchayat by the Government for implementation of
schemes, projects and plans assigned or entrusted to the Panchayat; and
Money raised through donations and contributions from the public and non-
governmental agencies
The Panchayat keeps its books of accounts under the cash-based system rather than
the accrual method of accounting. Revenues are recorded when received and
expenditure recorded when paid.
Revenue Account
Revenue Account deals with the recurring Revenue Receipts and Expenditure of the
Panchayat.
250
Thiruvananthapuram Municipal Corporation City Development Plan
of the Government of Kerala. The ordinance was replaced by the Kerala Water Supply
and Sewerage (KWSS) Act 1986. Section 15 of the Act has given KWA the following
mandate:
To obtain periodic or specific information from any local body;
To prepare and carry out schemes for water supply and sewerage;
To abstract water for drinking purposes from any natural source and disposal of
wastewater;
To lay down schedule of fees for all services rendered to government, local bodies,
institutions or individuals;
To fix and amend tariffs and charges for water supply and sewerage services and
collect all such fees;
To borrow money, issue debentures, obtain subventions, capital contributions, loans
and grants, to incur expenditure and manage its own funds; and
To grant loans and advances to such persons or authorities as the KWA may deem
fit.
KWA has a monopoly over the planning, designing, execution, operation and
maintenance of water supply and sewerage schemes across the entire State. After the
73rd and 74th Constitutional Amendments, the responsibility of supplying drinking water
was vested with local bodies. But this transition has not been effected till date in Kerala.
The process of handing over of identified 1050 single panchayat Water Supply Scheme
to local bodies is going on. At present, KWA continues to be responsible for all the big
WSS, majority of the small WSS and all the large underground sewerage & sanitation
schemes.
In line with its mandate, the sources of finance for KWA are water and related charges
collected from its customers, grants and loans from the Government of Kerala, grants
from the Government of India, and loans from financial institutions like Housing and
Urban Development Corporation (HUDCO) and Life Insurance Corporation of India (LIC).
Cost Recovery
The State Government’s policy on cost recovery for KWA operations is articulated in the
KWSS Act 1986. The Act states that KWA “shall not, as far as practicable and after
taking credit for any grants or subventions or capital contributions or loans from
Government, carry on its operations at a loss and shall so fix and adjust its rates of taxes
and charges as to enable it to meet as soon as feasible the cost of its operations,
maintenance and debt service and where practicable to achieve an economic return on
its fixed assets.” The Authority, however, has to take prior approval from the State
Government for revision of its rates.
Water Supply
The existing water tariffs came into effect on 1st April 1999. Water connection fees are
Rs.500 for domestic and Rs.1,000 for non-domestic connections. The Local Bodies are
charged for the stand posts / street taps provided in their areas at the rate of Rs.2,628
251
Thiruvananthapuram Municipal Corporation City Development Plan
per street tap each year. Local bodies, however, are not charging any fee directly from
street tap users. Water charges are collected by KWA under the present bimonthly billing
system.
KWA had requested the State Government in January 2000 to increase the water tariff
by 30% effective from 1st April 2000 and to allow KWA to revise the water tariff from time
to time corresponding to the increase in power tariff. The State Government is yet to take
a decision on this request.
With the introduction of the bimonthly billing system and surcharges for non-working
meters, there is a marked increase in replacement of meters. Last year, it was estimated
that more than 50% of the water connections have defective meters. However, the
situation has now much improved with replacement of meters. The situation is now being
reviewed time to time and corrective actions taken.
Sewerage
At present, sewerage schemes are in operation only in two cities in the State, i.e.
Thiruvananthapuram and part of Kochi. Except for a sewer connection fee, see Table
17.4 monthly or annual sewerage service charges are not collected.
252
Thiruvananthapuram Municipal Corporation City Development Plan
Excluded in the above expenditure are the direct water production costs, depreciation of
Thiruvananthapuram fixed assets and indirect costs, which could be allocated like
interest and head office expenses.
If the water production costs were included, it is possible that Thiruvananthapuram
operations would continue to incur operating losses due to the extremely high
Unaccounted for Water (UFW) estimated at about 35.50% of water produced.
During the FY 1999-00 to FY 2001-02, operating income grew at an average of 33%
while expenditures decreased by 6%. This could be attributed to the increase in
consumer base and cost control measures undertaken by KWA. Non-operating income,
mostly late payment charges imposed and collected by KWA, grew incredibly at 66%.
Collection efficiency on Thiruvananthapuram accounts was about 26% which was slightly
higher than the state average efficiency of 22%.
253
Thiruvananthapuram Municipal Corporation City Development Plan
all. For proper operational management of the system, KWA should be responsible for
the provision and maintenance of consumer meters.
Collection Efficiency
Issue: Collection efficiency has been very low. Implementation of disconnection policy
on long overdue accounts has been lax. KWA’s cash flow has been hampered by the
chronic delay in payment by government local bodies and a large portion of outstanding
accounts belonging to them.
Action Recommended: Strict implementation of disconnection policy on long overdue
accounts should be carried out. Customers normally pay if disconnection policy is strictly
implemented. The State Government should assist KWA with regards to the collection of
pending dues. Government should devise an inter-government payment system that
facilitates account settlement among the different government institutions without
sacrificing proper recording and accounting of expenses and control procedures of the
concerned institutions.
Table 17.6: Project Component and Approximate Cost under Urban Infrastructure Sector
(Rs. Crores)
Sl. Sector Project cost (Rs.
No. crores)
1 Water Supply
Projects under JNNURM 730.50
JBIC Project 311.91
Total 1042.41
2 Sewerage 1081.00
3 Storm Water Drainage
Drainage & flood control 96.40
Water Conservation 79.35
Total 175.75
4 Environment 24.33
5 Solid Waste Management 51.00
6 Traffic and Transportation 3786.54
7 Urban Regeneration 200.00
8 Heritage & Tourism
Heritage 125.40
Tourism 197.00
Total 322.40
9 Social Infrastructure 156.30
10 Basic Services to Urban Poor 577.20
Grand Total 7416.93
254
Thiruvananthapuram Municipal Corporation City Development Plan
Table 17.7: Estimated Outlay of ADB Assisted KSUD Project for Thiruvananthapuram
Sl. No Name of the Sector Investment in Rs. Crores
1 Sewerage 86.90
2 Urban Drainage 7.20
3 Roads 27.50
4 Equipment (sanitation) 0.60
5 Community Upgrading 30.00
6 Others 18.53
Total estimates 170.73
It has been decided that the ADB assisted KSUD Project would be taken as part of
JNNURM and the investment plan amount of CDP would include ADB assisted KSDU
Project outlay.
17.4.1 Financial Plan under JNNURM for providing GOK & TMC share of contribution
The broad estimated cost for the project components envisaged under various sectors in
the CDP for JNNURM is Rs.7417 crores.
Assuming that the entire Project is approved by Government of India, the share expected
from GOI as grants is 80 percent of the total Project Cost: Rs. 5934 crores
The balance amount of project cost of 20 percent has to be shared by GOK and TMC
(10% each): Rs. 1483 crores (@ Rs.741.50 crores each)
JNNURM guidelines permit integration of other existing externally aided projects (JBIC &
KSUDP) with JNNURM and for considering such funds as the share of GOK and TMC.
255
Thiruvananthapuram Municipal Corporation City Development Plan
Apart from the above, to strengthen the financial position of the corporations
Government of Kerala provides grants in three streams – Development, Maintenance
and General purpose. Some of the important ongoing fiscal reforms emerging out of
State Finance Commissions would make available additional resources to the
Thiruvananthapuram Corporation as detailed in Chapter 2. The main reforms are:
i. Introduction of plinth area based Property Taxation to be effective from the second
half of 2006-07;
ii. It is envisaged that the number of taxable properties will increase by 1.0% annually;
iii. It is envisaged that in FY 2006-07 and FY 2011-12 increase in number of properties
5% by undertaking property survey and increasing tax coverage to all properties;
iv. Introduction of seating capacity-linked taxation for Entertainment Tax;
v. Introduction of presumptive taxes for certain categories of professions under
Profession Tax;
vi. Introduction of a new Service Tax to realize the cost of providing special services to
localities, as a kind of benefits tax;
vii. Linking general non-tax revenues like rents, license fees to the value of money
through a system of graduated automatic increases linked to indices reflecting value
of money;
viii. Linking devolution of a portion of the Development Fund to increased revenue efforts
on the part of the local governments;
ix. Tax mapping to reduce escaped tax; and
x. Updation of asset registers.
256
Thiruvananthapuram Municipal Corporation City Development Plan
Sl.No Sectors
Grand Total
GOK
GOK
GOK
GOK
GOK
GOK
TMC
TMC
TMC
TMC
Total
TMC
Total
TMC
Total
Total
Total
Total
GOI
GOI
GOI
GOI
GOI
GOI
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12
1 Water Supply
730.50
57.32 7.17 7.17 71.65 85.52 10.69 10.69 106.90 136.32 17.04 17.04 170.40 147.52 18.44 18.44 184.40 107.92 13.49 13.49 134.90 49.80 6.23 6.23 62.25
2 Sewerage
1,081.00
88.40 11.05 11.05 110.50 251.20 31.40 31.40 314.00 234.80 29.35 29.35 293.50 170.80 21.35 21.35 213.50 87.20 10.90 10.90 109.00 32.40 4.05 4.05 40.50
Storm Water
3 175.75
Drainage 20.08 2.51 2.51 25.10 39.02 4.88 4.88 48.77 41.23 5.15 5.15 51.54 24.00 3.00 3.00 30.00 12.43 1.55 1.55 15.54 3.84 0.48 0.48 4.80
24.33
4 Environment
1.92 0.24 0.24 2.40 6.90 0.86 0.86 8.63 4.56 0.57 0.57 5.70 4.80 0.60 0.60 6.00 1.28 0.16 0.16 1.60 - - - -
Solid Waste 51.00
5 Management 5.59 0.70 0.70 6.99 13.33 1.67 1.67 16.66 4.90 0.61 0.61 6.13 7.31 0.91 0.91 9.14 5.34 0.67 0.67 6.67 4.33 0.54 0.54 5.41
Traffic &
6 3,786.54
Transportation - - - - - -
Urban
7 - - - - - - - - - -
Regeneration 200.00
8 Heritage
125.40
15.20 1.90 1.90 19.00 26.72 3.34 3.34 33.40 25.20 3.15 3.15 31.50 20.00 2.50 2.50 25.00 13.20 1.65 1.65 16.50 - - -
9 Tourism
197.00
15.20 1.90 1.90 19.00 36.80 4.60 4.60 46.00 50.40 6.30 6.30 63.00 39.20 4.90 4.90 49.00 16.00 2.00 2.00 20.00 - - - -
Social
10
Infrastructure 156.30
257
Thiruvananthapuram Municipal Corporation City Development Plan
258
Thiruvananthapuram Municipal Corporation City Development Plan
259
Thiruvananthapuram Municipal Corporation City Development Plan
260
Thiruvananthapuram Municipal Corporation City Development Plan
(i) Carrying out detailed surveys, investigations and engineering designs of individual
components;
(ii) Tendering, evaluating bids and awarding works, contract administration, supervision
and quality control;
(iii) Measuring works carried out by the contractors and certifying payments;
(iv) Conducting public awareness campaigns and participation programs,
(v) Carrying out the Benefit Monitoring and Evaluation (BME) studies;
(vi) Carrying out inventory of environmental assessments;
(vii) Ensuring compliance with funding amount and loan covenants, if any; and
(viii) Preparing monthly reports.
The Design Supervision Consultant (DSC) supports the PIU in all the aforesaid activities.
A Project Manager will head the PIU and will be supported by sector specialists in
environmental and civil engineering, as appropriate. The PIU will also comprise of staff
involved in procurement, accounts and community development. Staff deputed from the
Revenue Department shall handle all land acquisition and resettlement and rehabilitation
issues, wherever required. The Project Manager at the PIU will report to the Secretary,
Thiruvananthapuram Municipal Corporation. All administrative and project co-ordination
related issues will be handled separately in TMC.
261
Thiruvananthapuram Municipal Corporation City Development Plan
Government of India
Thiruvananthapuram
Municipal Corporation
Project Implementation
Unit (PIU)
262
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure - 1
Thiruvananthapuram Municipal Corporation City Development Plan
ANNEXURE - 1
Members
1. Sri. C. Jayan Babu Mayor, Thiruvananthapuram Municipal Corporation
(Chairman)
2. Smt. T.M. Sudha Senior Town Planner, O/o. Chief Town Planner,
Thiruvananthapuram (Convenor)
3. Sri. V. Jayaprakash Deputy Mayor, Thiruvananthapuram Municipal Corporation
4. Sri. T.K. Raveendran Secretary, Thiruvananthapuram Municipal Corporation
5. Sri. A. Kasthurirangan Chief Town Planner (Retd.)
6. Adv. K.G. Prakash Addl. Secretary to Government of Kerala, LSGD (Retd.),
EDIT
7. Sri. Mohan Suptd. Engineer, Kerala Water Authority
8. Sri. K.G. Padmanabhan Nair Suptd. Engineer (Retd.), Kerala Water Authority
9. Sri. V.V. Krishnarajan Secretary, TRIDA
10. Smt. A. Komalavalli Amma Chief Engineer (Retd.), Irrigation Dept.
11. Sri. G. Chandramohan Dy. Chief Project Coordinator, NATPAC
12. Sri. K. Krishnakumar Program Officer, Kudumbashree
13. Sri. P. Kesavan Nair Program Officer, Kudumbashree
14. Sri. G. Sudev Exe. Engineer (Water Supply), Kerala Water Authority
15. Sri. Joseph Mathew Exe. Engineer (Sewerage), Kerala Water Authority
16. Sri. U.V. Jose Planning Officer, Dept. of Tourism
17. Sri. P.A. Eapen Asst. Exe. Engineer, Kerala Road Fund Board
Annexure – 1 1
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure – 1 2
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure - 2
Thiruvananthapuram Municipal Corporation City Development Plan
ANNEXURE – 2
GROUP CONSULTATIONS
MEETING 1
Group Consulted : SENIOR CITIZENS / EMINENT PERSONS
Date : 17 July 2006
Time : 10.30 a.m.
Venue : Conference Hall, Corporation
No. of Participants : 12
MEETING 2
Group Consulted : COUNCILLORS
Date : 19 July 2006
Time : 9.30 a.m.
Venue : Government Guest House, Thycaud
No. of Participants : 75
Annexure – 2 1
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure – 2 2
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 3
Group Consulted : NGOS, FRAT, EDIT, CHAMBER OF COMMERCE, BAR
ASSOCIATION
Date : 20 July 2006
Time : 10.00 a.m.
Venue : Conference Hall, Corporation
No. of Participants : 32
Annexure – 2 3
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 4
Group Consulted : OFFICIALS / HEADS OF DEPARTMENTS
Date : 17 July 2006
Time : 12.00 noon
Venue : Conference Hall, Corporation
No. of Participants : 23
Annexure – 2 4
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 5
Group Consulted : HEADS OF INSTITUTIONS (M.D., CHAIRMAN)
Date : 21 July 2006
Time : 10.00 a.m.
Venue : Conference Hall, Corporation
No. of Participants : 21
Annexure – 2 5
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 6
Group Consulted : ARCHITECTS, BUILDERS AND REPRESENTATIVES OF
ITPI, INTACH AND IMA
Date : 21 July 2006
Time : 12.00 noon
Venue : Conference Hall, Corporation
No. of Participants : 29
MEETING 7
Group Consulted : AREA DEVELOPMENT SOCIETIES, COMMUNITY
DEVELOPMENT SOCIETIES, COMMUNITY BASED
ORGANIZATIONS
Date : 21 July 2006
Time : 3.00 p.m.
Venue : Conference Hall, Corporation
No. of Participants : 62
Annexure – 2 6
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 8
Group Consulted : WOMEN'S ORGANIZATIONS
Date : 21 July 2006
Time : 4.00 p.m.
Venue : Conference Hall, Corporation
No. of Participants : 13
MEETING 9
Group Consulted : TRANSFERRED DEPARTMENTS
Date : 22 July 2006
Time : 2.00 p.m.
Venue : Conference Hall, Corporation
No. of Participants :
Annexure – 2 7
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 10
Group Consulted : MPs, MLAs
Date : 25 July 2006
Time : 3.00 p.m
Venue : Government Guest House, Thycaud
No. of Participants : 18
Annexure – 2 8
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure – 2 9
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 11
Group Consulted : BANKS REPRESENTATIVES
Date : 27 July 2006
Time : 12.00 noon
Venue : Conference Hall, Corporation
No. of Participants : 11
MEETING 12
Group Consulted : REPRESENTATIVES OF INSTITUTES FOR PHYSICALLY &
MENTALLY CHALLENGED AND SOCIAL WELFARE
ORGANIZATIONS
Date : 28 July 2006
Time : 12.00 noon
Venue : Conference Hall, Corporation
No. of Participants : 10
Annexure – 2 10
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 13
Group Consulted : PANCHAYAT PRESIDENTS
Date : 28 July 2006
Time : 3.00 p.m.
Venue : Mayor's Chamber
No. of Participants : 17
Annexure – 2 11
Thiruvananthapuram Municipal Corporation City Development Plan
Kudappanakkunnu Panchayat
S. Areas Key Issues / Suggestions
No.
1 Transportation - Road development to connect Kudappanakunnu civil station
- Effective widening of Mannanthala – Peroorkada road and
approach road after land acquisition
2 Civic services - Water supply scheme near water tank
- Scheme for sea water treatment for drinking water
- Scheme for sewerage disposal
- Solid waste management – removal of waste from pig farm
- Building retaining wall around 30 ponds
3 Urban Poor - Water supply scheme for SC and ST colonies
4 Environment - Preservation of paddy field
- Utilization of wave energy
Sreekaryam Panchayat
S. Areas Key Issues / Suggestions
No.
1 Transportation - Road transport system to be developed between Ulloor –
Nalanchira – Maruthur upto Poudikonam
- Water transport systems on Parvathiputhanar and Akkullam lake
- Development of rail network connecting city and Panchayat area
2 Civic services - Arrangement for solid waste disposal in LNCP University
- Lack of facilities for disposal of slaughter waste
- Lack of sufficient water supply
3 Environment - Cleaning of Patturkannamula canal
Annexure – 2 12
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 14
Group Consulted : EMINENT PERSONS
Date : 28 July 2006
Time : 4.00 p.m.
Venue : Mayor's Chamber
No. of Participants : 16
Annexure – 2 13
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 15
Group Consulted : POLITICAL LEADERS
Date : 29 July 2006
Time : 10.30 a.m.
Venue : Conference Hall, Corporation
No. of Participants : 18
MEETING 16
Group Consulted : MEDIA REPRESENTATIVES
Date : 29 July 2006
Time : 12.00 noon.
Venue : Conference Hall, Corporation
No. of Participants :8
Annexure – 2 14
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 17
Group Consulted : RETIRED CHIEF SECRETARIES
Date : 29 July 2006
Time : 3.30 p.m.
Venue : Government Guest House, Thycaud
No. of Participants :8
Annexure – 2 15
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 19
Annexure – 2 16
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 18
Individual Consulted : MR. T. BALAKRISHNAN, PRINCIPAL SECRETARY,
INDUSTRIES & COMMERCE DEPARTMENT
Date : 31 July 2006
Time : 9.30 a.m.
Venue : Mayor's Chamber
No. of Participants :3
MEETING 20
Individual Consulted : MR. SOMARAJAN, MD, KSRTC
Date : 31 July 2006
Time : 12.00 noon
Venue : Mayor's Chamber
No. of Participants :2
Annexure – 2 17
Thiruvananthapuram Municipal Corporation City Development Plan
MEETING 21
Individual Consulted : MR. BABU JACOB, RTD. CHIEF SECRETARY, ADVISOR
TO GOVERNMENT FOR URBAN RENEWAL AND
EXTERNALY AIDED PROJECTS
Date : 31 July 2006
Time : 3.30 p.m.
Venue : Mayor's Chamber
No. of Participants :7
S. Areas Key Issues / Suggestions
No.
1. Heritage -
2 Transportation -
3 Civic services -
4 Urban Poor -
5 Social Infrastructure
6 Area Development
7 Miscellaneous
MEETING 22
Individual Consulted : Mr. Gyanesh Kumar, I.A.S., Secretary, PWD
Date : 11 August 2006
Time : 5.00 p.m.
Venue : Mascot Hotel
No. of Participants : 13
S. Areas Key Issues / Suggestions
No.
1. Heritage -
2 Transportation -
3 Civic services -
4 Urban Poor -
5 Social Infrastructure
6 Area Development
7 Miscellaneous
MEETING 23
Individual Consulted : District Collector, Thiruvananthapuram
Date : 13 August 2006
Time : 1.00 p.m.
Venue : Mayor's Chamber
No. of Participants :5
S. No. Areas Key Issues / Suggestions
1. Heritage -
2 Transportation -
3 Civic services -
4 Urban Poor -
5 Social Infrastructure
6 Area Development
7 Miscellaneous
Annexure – 2 18
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure – 2 19
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure – 2 20
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure – 2 21
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure – 2 22
Thiruvananthapuram Municipal Corporation City Development Plan
S. Ward Suggestions
No
1 Vellar - Providing New Streetlight & Electricity connection
- Renovation of various Roads in Vellar ward
2 Nemom - Vattavila – Pamamcode Thodu (600 m) Side wall constriction
- Thodu – Homeo college – Ammaveedu (800m)
- Alathara - Mannamvila Thodu (400m)
- Thevarpazhinji Thodu (400 m)
- Plankalamukku – Udavila Thodu (300 m)
- 6. Sidewall construction of Karaman River (250 m)
- Protection of Nemom – Vellayani – Kudatharavilakam –
Karakkamandapm Via Pappanmcodu – Melamcodu Irigation Kanal
- Construction of New Bridge in Vellayani, Kudatharavilakam,
Nemom
- Providing slab in Nemom – Kudatharavilam
- Sidewall & Drain construction (1200 m) in Nemom –
kudatharavilakam Kanal
- Nemom – Kattu pound Sidewall construction
- Sivancoil pound ,,
- Iykkara pound ,,
- Mullaseri pound ,,
- Alathara pound ,,
- Nambu pound ,,
- Parayil pound ,,
- Grant for constructing houses(BPL) in various colonies
- Constructing 2500 m Drain in various slums
- Constructing 1500 m Footpath in various slums
3 Kowdiar - Renovation of Tennis club Enclave Pound and Park (Boating)
Annexure – 2 23
Thiruvananthapuram Municipal Corporation City Development Plan
S. Ward Suggestions
No
10 Chackai - Drain construction in Govt:U.P.S. Chackai.
- Drain construction in Pully Lane
- Comstruction drain in Ganesh Garden Road
Natural Water Sources/Ponds
- Mytry colony ITI
- Manalil colony near Railway Bridge
- Puvathoor Lane-constrction of retaining wall&cleaning of
Vattakayal.
11 Pazanchira - Construction of drain in UPS Nagar,Vikas Nagar,Bilan Nagar,
Mitran Nagar.
12 Vanchiyoor - Removal of waste from Aamaezajan Thodu from Collectorate Jn: to
Pattoor Jn:
- Maintanance of concrete lane on either side of Aamaezajan Thodu.
- Reconstruction of hand rails of Valiya Palam on Vanchiyoor Pattoor
Road.
- Removal of waste from irrigation canal from Vanchiyoor Jn: to
Chirakulam Jn:
13 Ambalathara - Construction of drain in Surya Nagar, National Nagar, Green
Garden &connected to Kariyil Thodu.
- Cleaning of Kariyil Thodu.
14 Ulloor - Protection of Kakkanadu Pond, Neerazhy Pond,Dasy Nagar
Kannottu Konam Pond,Dasy Nagar parakkottu Konam pond.
- Construction of Drain in Ulloor Gardan’s to Temple.
- Construction of Drain in Ulloor Neerazhy Lane
15 Valiyathura - Drain in Valiyathura Govt: Hospital.
- Construction of Drain in west side of St: Xaviours Jn;
- Construction of Drain on back side of sewage bridge.
- Protection of existing drain in Valiyathura.
- Protection of Valiyathura Bridge & Valiyathura Park
15 Kuravankonam - Protection of Pandit Colony Pond.
- Providing covering slab over Aamathra Thodu.
- Providing Botting facility in Charachira Pond/
15 Cheruvakkal - Protection Muttam Parambathu Pond, Cheruvattikonam Pond,
Muttanadu Pond & Pond near Manvila Naagar Kavu Temple.
- Construction of Drain from Muttan Parambathu Pond to Akkulam
Lake.
- Protection of Akkulam Lake from Manvila Kanjakonam to Kattela.
- Protection of Kizhakkumkkara Valathechira Thodu.
- Protection of Thodu near Muttanadu Karattuvila Ambalathra Road.
16 Arannoor - Protection of irrigation canal by the side of CITU Road
17 Thrikkannapuram - Construction of Drain from Puthankkada Jn: to Mangattukkadavu.
- Construction of Drain from Kunnampuzha to Thrikkannapuram
- Protection of both side of Karamana River.
- Protection of Bathing Ghaths
- Providing Children’s Park & Swimming practices facilities on
Annur-Pazhavur Pond.
- Protection of Kaithakkonam Pond
18 Poojappura - Protection of Chengilampattu Pond, Chadiyar Pond, MSP Nagar
Pond, Vedan Nagar Pond.
Annexure – 2 24
Thiruvananthapuram Municipal Corporation City Development Plan
S. Ward Suggestions
No
19 Mannathala - Protection of 12 Ponds in Mannanthala Ward.
- Protection of Aamaezhanjan Thodu
20 Nalanchira - Protection of NCC Pond.
- Protection of Aamaezhanjan Thodu.
21 Aakkulam - Protection of Eithady Prasanth Nagar Thodu.
- Protection of Pazhayaruthuvila Thodu,Kannattukonam Thodu,
Aakkulam Poonthy Road, Kuruntharakonam
- Construction of Rain Water Harvesting in Aakkulam Colony,
Erichirakkunnil, I.T Konam Colony, Pullyil Colony, Edayilkkonam-
Thorottukkonam.
- Construction of Drain in Kannettil- Mangalathukkonam,Prasanth
Nagar Pulliyil Mulayilkkonam, I.T. konam, Aakkulam Colony.
- Protection of Thuruvakkal Pond, pulliyil Pond, Bombay Pond,
Madavankonam Pond, Priyadarshini Pond.
22 Muttathra - Cleaning of Karithodu & Ashan Nagar Thodu.
- Providing Rain Water Harvesting in Ponnara Colony, Ashan Nagar
Kunnil, Sivaji Lane, Perunelly, Vaduvathu, Marappalam Jn:,
Paruthykuzhy, Triveni, Aritheryvila.
- Construction of Drain in Ashan Nagar Road, Louly Road,near
Ponnara School, Vaduvathu.
23 Kadakampally - Construction of Drain from Kambikkakam to Lord’s Hospital.
- Cleaning of Maha Deva Temple Pond.
24 Karamana - Construction of Drain between Shastri Nagar East & West
- Construction of Drain from Shastri Nagar East to Shelsa Hospital.
- Protection of Thodu in Katamvila Thoppil.
- Removal of waste from drains in Elangam Portion.
- Protection of Elangam Chilanthyvala Pond & its neighboring Drains.
25 Perunthani - Providing Rain Water Harvesting in Enjakkal UPS, Palkulangara
NSS, Anganvady.No:2,
- Important Lanes- Ayanikkadu Lane, Manava Nagar, Sreevragam,
Subhash Nagar, Karali.
- Construction of Drain from Karali to Putanar.
26 Attipra - Protection of Thettiyar Thodu & Aamaezhanjan Thodu.
- Providing Pathway on either side of the Thodu & Providing
covering slab over the Drain.
- Protection of Kolummury Kulam, Kottur Melekonam,
Madathuvila, Vazhapana, Muthuttykkara Pond.
- Protection of Major Threepathapuram Temple under heritage sector.
27 Vallakkadavu - Construction of Drain in Priyadarshni Nagar, Puthan Road Jn:,
Pallam,Pathinarekal Mandapam, Bilan Nagar& NS Depto:
- Rehabilitation of Inhabitanese near Parvathy Puthanar.
Cleaning of the site near Parvathy Puthanar
28 Pettah - Construction of Drain from Munnammanakkal to Parvathy Puthanar.
- Construction of Drain in Kallummoodu Anayara Road,
Kambikkakam -Kallummudu Road.
- Connecting Drain front of the Pettah Market to the newly
constructed Drain.
- Maintenance of existing drain.
- Drainage –Kadakompally road to railway gate.,Sugathan road, bank
road,kallumoodu road,madhu muthu muslim road and bye lanes.
- Renovation of existing drainage at Munnam mankkal.
Annexure – 2 25
Thiruvananthapuram Municipal Corporation City Development Plan
S. Ward Suggestions
No
- Maintenance of Petta Market.
- Construction of laboratories in the existing building
- Public comfort station.
- maintenance of houses -200
- construction of houses-100
29 Karikkakom Construction of Drains
- Venpalavattom Plavilakathu.(300 m)
- Venpalavattom – Sivanantha Road.(600m)
- Karikkakom-Ambara Drain (300m)
- Renewal of Karikkakom-Ambara Drain (100m)
- Karikkakom- Arappura Residences Association Road (300m)
- Renewal of Karikkakom- Arappura Residences Association Road
Drain (200m)
- Near Lord’s Hospital (800m)
- Back side of Karikkakom Temple Stage (200m)
- Karikkakom- Arappura road (600m)
- Karikkakom- Javahar Colony (50m)
Side Wall Construction
- Karikkakom- Javahar Colony Drain (1000m)
- Thamarakulam (120m).
- Valiyakulam (150m)
- Providing Rain Water Harvesting in Karikkakom (300 no)
- Protection of Well in Charummudu.
30 Manikkavilakam - Construction of Drain from Poonthura Police Station back side to
Parvathy Puthanar.
- Construction of Drain from Main road –S.M.Lock jn: to Parvathy
Puthanar
- Construction of side wall from S.M.Lock jn: to Cheriyamuttam.
- Cleaning of Coir Society pond in Poonthura.
31 Poonthura Covered Drain
- Poonthura jn: to-school-Moonnattumukku Bridge (1 Km)
- Opposite side of St: Thomas Community Hall to Sea Shore (200m)
Covered Drain (Renovation Work)
- From St: Thomas school-Market Road-Nadathura- IDP colony-T.S.
canal (600m)
- Poonthura (near tuition centre) to T.S. canal (1Km)
- For sub Drains (1Km)
Toilet Blocks(Renovation Work)
- Market-20 no
- Pallikkadavu -10 no
- Corporaton land -20 no
Septic Tank
- 2000 nos
Rain Water Harvesting System
- 2000 nos
Road Formation
- 11. 500 mts
32 Medical College - Renovation of Drain from MCH – NGO Quarters to
Amaezhanjanthodu.
- Construction of Shopping Complex & Fish Market at Kumarapuram.
Annexure – 2 26
Thiruvananthapuram Municipal Corporation City Development Plan
S. Ward Suggestions
No
33 Thiruvallam Construction of Drains
- Punchakkary to Thottinkkara (1.5 Km)
- Thiruvallam – Parashurama temple road (1.5 Km)
- Renovation of Bylines near Pandimammudu – Thottinkkara road
(1.5 Km)
- Side wall Construction in Aazhangal Thodu & Madathunada
Thiruvallam Thodu.
Renovation of Canals
- Pallathukadavu-Thiruvallam Bridge side wall construction.(1 Km).
- Side wall construction in Kaimanam- Azhankal Thoduv (0.5 Km)
- Sand Filling in Kaimanam Vivek Nagar & Providing facility to
flowing rain water.
- Cleaning & Side Wall construction of public pond in Karumam-
Anthyvilakku.
- Renovation of Puncakkary- Azhakkonam Pond
34 Kannammoola Canals Cleaning & Side Wall Construction
- Vadakkattu –Aiyyankali Road Thodu.
- Bandu Colony Thodu.
- Amaezhanjanthodu.
- Vanchiyoor – Kannammoola Thodu.
35 Pachalloor - Side Wall construction & Removing Sea Sand from Theriyamuttam
to Pozhy
- Protection the both side of Thods in Edayar Dewies.
- Various Drains (5000 m)
- Construction of new Well in Kumily
- Digging of new Pond
- Construction of new drain from Pachalloor to Thiruvallam (2km)
- Side wall Construction in Pachalloor Kulathinkara Temple
- 300 no: Individual Rain Water Harvesting System
- Renovation of Mondy Palam
- Providing P.V.C pipe up to 15000m
Construction of Drains
- Williamchira-1200m-20 slab
- Olippinkkara -16600m -30 slab
- Kalathavathukkal -800m -10 slab
- Pulayanvilakam -3000m -30 slab
- Kumaly Oorankkudy -2000m- 20 slab
- Kollanthara Road -1000m – 100m slab
36 Pongumoodu Slum Development
- Aalmkkodu Slum.
- Kozhuvankkara slum.
- Nedabally- Kunnil slum.
- Madavankonam slum.
- Thykkattukkonam slum.
- Aalappuram slum.
- Construction of Flat Complex in Pongumoodu.
- Construction of their own building for Aganvadies.
37 Karamana - Reconstruction of Comfort Station & Cleaning in Karamana River.
- Maintanance of Karamana H.S.L.P.S.
- Providing Drainage facilities for Shastri Nagar,
Kattanvila,Thamalam,Chullamukku etc……
Annexure – 2 27
Thiruvananthapuram Municipal Corporation City Development Plan
S. Ward Suggestions
No
38 Kannanthura - Providing Water& Electric Connection to fisherman’s colonies in
Vettukkadu Kannanthura Rajiv Nagar, All Saint’s, Shankumugham
etc..
- Improvements of road- All Saint’s, Eenthyvilakam,Balanagar,
Vettukkadu, LPS Church road, St: Sabastian road etc….
- Construction of drain in Muslim Pally road, Vishwabharathy road,
Church road, Rajeev Nagar etc…….
- Providing sewerage facility for the costal area.
- Providing Public Health Centre near Titanium.
- Rehabilitation of the people near the south of the Vettukkadu
Church & north of the Kannanthura Church.
- Providing green belt along the costal area.
- Constructing Sea wall
39 Chengalloor - Constructing Bus depot at Thirumala.
- Widening of the Threekkannapuram road.
40 Bemapally East - Improving Bus Root
41 Pangode - Renovation & Protection of 4 ponds in Pangode Ward
42 Beemapally Providing Houses, Water taps & Electric connection in Various
Colonies
- Fishermen Colonies of Velankanny, Veppinmmoodu, Cheriyathura,
Varvilakam
- Water connection & Electric connection in sea shore houses.
- Providing Electric connection & Constructing road from
Velankanny to Kaithavilakam.
- Renovation of ground in Cheriya Thura.
- Constructing Market near CRP Camp in Milku Colony.
- Providing Incinator in Beemapally Ward.
- Constructing Rest Places in Varvilakam,
NaduVilakam,Thakkiyappaly, Kaithavilakam.
- Providing Electric Posts in bylines of Cheriyathura & Beemapally.
- Providing street taps & Constructing Sea Wall.
- Constructing new building, garden & Providing computer in
- Beemapally UPS.
43 Manacaud - Karimadam colony House Maintanance
- Seawage pon cleaning and side wall construction.
- Childrens Park construction near Sastha Temple
44 Vazhuthacadu - Flyover/Footbridge or hanging bridge near Cotton hill School
- Flyover/Footbridge or hanging bridge near Women’s College
- All India road right side corporation building library construction
- Manaveeyam road Cultural Corner construction
- Chinmaya School outside working Women’s Hostal construction.
45 Jagathy - Corporation public place Civic Centre Construction
- Road Maintanance
- Water Facilities
- Mini Park Construction
- Bund colony river cleaning
- Flat construction
- Re-construction of drain from Kannettumukku junction to
Valiyasala
- Construct drain at kochar road from Easwaravilasom junction.
- Covering slab to the drain at C.S. road.
Annexure – 2 28
Thiruvananthapuram Municipal Corporation City Development Plan
S. Ward Suggestions
No
- Covering slab to the drain at Kannettumukku-Kuthiralayam road.
- Cleaning the drain from DPI jn. to CS road
- Cleaning the drain and providing covering slab to the drain from
Cotton hill to Pangodu.
- Re construction of drain and providing covering slab at Krishna
Vilasom Road.
46 Kowdiar - Construction of Convention centre, Heritage Musium
Annexure – 2 29
Thiruvananthapuram Municipal Corporation City Development Plan
S. Ward Suggestions
No
53 Secretariat - Construction of Drain
- Protection of Oottukuzhi water Resource
- Rehabitastion Rajaji Nager
- Streetlighjt, Water Supply
- Sevarage
54 Anamugham - construct drain from Kavuvila Pallipurayidom to
- Aamayizhanjan Thodu
- construct drain from the middle part of Kavuvila Road to old pipe
culvert at eastern part of kakkttu Palam
- Maintanance of Pazhavangadi Kulam
- Drain from Burma Road now ends at Pazhangachira pond.Connect
this drain to the thodu at southern side and then to Kannammoola
canal
- Construction of retaining wall around the Pazhavangadi pond.
- construct 5 m wide roads around Pazhavangadi pond
- Construct drain by the side of Friends Nagar
- Construct covering slab to the drain and cleaning the drain in front
of Samatha store at Kannammoola - arappura road.
- Connect drain from Arappura road near Thittamangalam Temple to
the thodu near Paingam kulam
- Construct drain from Alakkukulam to Samatha store to drain out the
seepage water.
- Deepening the drain from the eastern side of Pana to Amayiyanjan
canal
- Construct drain and covering slab in front of the houses of
Sri.Raghavan and Sri. Subhash at Oruvathilkotta Lakhamveedu
colony.
- Construct drain at Padinjattil Akkaravila
Annexure – 2 30
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure - 3
Thiruvananthapuram Municipal Corporation City Development Plan
ANNEXURE 3
S.
Date Time Venue Group / Individual Consulted
No.
Conference Hall,
1 17 July 2006 10.30 a.m. Senior citizens / Eminent persons
Corporation
C.J. Thampi, Natural Resource
Research & Development Centre
Government Guest
2 19 July 2006 9.30 a.m. Councillors
House, Thycaud
State Librarian
Annexure - 3 1
Thiruvananthapuram Municipal Corporation City Development Plan
S.
Date Time Venue Group / Individual Consulted
No.
Government Guest
10 25 July 2006 3.00 p.m. MPs, MLAs
House, Thycaud
V Sivankutty, MLA,
Thiruvananthapuram
Conference Hall,
11 27 July 2006 12.00 noon Banks representatives
Corporation
Representatives of Institutes for
Conference Hall,
12 28 July 2006 12.00 noon physically & mentally challenged
Corporation
and Social Welfare organizations
Divine Children's home
Trivandrum Social Service
Society
Central Institute on Mental
Retardation Murinjapalam
Centre for Rehabilitation of
Disabled
Bal Vikas Trust, (Mr. P.R.S.
Pillai)
13 28 July 2006 3.00 p.m. Mayor's Chamber Panchayat Presidents
14 28 July 2006 4.00 p.m. Mayor's Chamber Eminent Persons
M.N Prasad, Retd. Chairman,
Railway Board & Ex-officio
Principal Secretary, Ministry of
Railways
S Vijayakumaran, IRSE,
Divisional Railway Manager
A. D. Damodaran Phd (Leeds),
Former Director
Dr. Jayakumar, Chief Executive
Officer Vizhinjam International
Seaport Ltd.
G. Ramachandran, (Epigraphist)
M. N. Prasad, Retd. Chairman
Railway Board
Dr. P.K. Sivanand
Mr. Manmanthan Nair, Director
of Dept. of Archeology
Conference Hall,
15 29 July 2006 10.30 a.m. Political Leaders
Corporation
Mr. V.K. Venugopal, ex
Chairman, TRIDA
Conference Hall,
16 29 July 2006 12.00 noon Media representatives
Corporation
Annexure - 3 2
Thiruvananthapuram Municipal Corporation City Development Plan
S.
Date Time Venue Group / Individual Consulted
No.
Government Guest
17 29 July 2006 3.30 p.m. Retired Chief Secretaries
House, Thycaud
Mr. T. Balakrishnan, Principal
18 31 July 2006 9.30 a.m. Mayor's Chamber
Secretary, Industries Department
Theerapatham officials
19 31 July 2006 11.00 a.m. Mayor's Chamber
Special Officer, Theerapatham
20 31 July 2006 12.00 noon Mayor's Chamber Mr. Somarajan, MD, KSRTC
Mr. Babu Jacob, Rtd. I.A.S.,
Office of the Advisor
21 31 July 2006 3.30 p.m. Advisor to Government for Urban
to GoK
Renewal
11 August Mr. Gyanesh Kumar, I.A.S.,
22 5.00 p.m. Mascot Hotel
2006 Secretary, PWD
13 August District Collector,
23 1.00 p.m. Mayor's Chamber
2006 Thiruvananthapuram
OTHER CONSULTATIONS
Sumayya. K. E, Kuravankonam (citizen)
Ward Councillor, President, Secretary (Temple), Sree Vaduvoth Mahavishnu Temple Trust,
Vallakadavu (citizen)
R. Ramachandran Nair, Rtd. Chief Secretary
K. Thomas Poulose FIE, FITP, Chief Town Planner, Kerala State (Rtd.)
PANCHAYATS
President, Vizhinjam Grama Panchayat
Vattiyoorkavu Grama Panchayat
President, Kazhakootom Grama Panchayat
Kudappanakkunnu Panchayat
Sreekaryam Panchayat
COUNCILLOR MEETINGS
Tabulated Minutes of meetings
Councilor's Coastal Wards - 12.
Annexure - 3 3
Thiruvananthapuram Municipal Corporation City Development Plan
Annexure - 4