Você está na página 1de 5

Saudi Aramco Engineering Procedures

(Index of Active SAEPs)


September 2006
Document
About SAEPs
SAEP-12
SAEP-13
SAEP-14
SAEP-15
SAEP-16
SAEP-20
SAEP-21
SAEP-22
SAEP-25
SAEP-31
SAEP-32
SAEP-50
SAEP-103
SAEP-110
SAEP-119
SAEP-120
SAEP-121
SAEP-122
SAEP-125
SAEP-127
SAEP-133
SAEP-134
SAEP-135
SAEP-136
SAEP-140
SAEP-201
SAEP-301
SAEP-302
SAEP-303
SAEP-305
SAEP-306

Title
Saudi Aramco Engineering Procedures
Project Execution Plan
Project Environmental Impact Assessments
Project Proposal
Preparation of Restricted Vendor Lists for Process Automation Systems
Project Execution Guide for Process Automation Systems
Equipment Inspection Schedule
Royalty/Custody Metering Facilities Execution Guide
Tank Calibration Requirements
Estimate Preparation Guidelines
Corporate Equipment and Spare Parts Data Requirements
Environmental Performance Assessment (EPA) Program
Project Execution Requirements for Third Party Royalty/Custody Metering Systems
Metric Units of Weights and Measures
Saudi Aramco Standard Drawings
Saudi Aramco Materials System Specifications
Saudi Aramco Security Drawings
Operating Instructions for New Facilities
Project Records
Preparation of Saudi Aramco Engineering Standards
Security and Control of Saudi Aramco Engineering Data
Instructions for the Development of "Regulated Vendors List" Engineering Standards
Saudi Aramco Engineering Procedure Preparations
Saudi Aramco Process Automation System (PAS) Obsolescence Program
Saudi Aramco Management of Electric Equipment Obsolescence Program
Project Training Impact Assessment
Saudi Aramco Engineering Reports
Instructions for Establishing and Maintaining Mandatory
Saudi Aramco Engineering Requirements
Instructions for Obtaining a Waiver of a Mandatory
Saudi Aramco Engineering Requirement
Engineering Reviews of Project Proposal and Detail Design Documentation
Saudi Aramco Library Drawings
Evaluating the Remaining Strength of Corroded Pipelines

Index of Active SAEPs

5/31/2003
8/31/2004
6/29/2005
9/20/2006
6/30/2003
5/31/2003
9/28/2005
5/3/12004
4/4/2006
8/15/2006
9/30/2003
6/30/2003
7/30/2003
4/30/2005
3/31/2004
4/30/2005
3/31/2004
8/31/2002
7/31/2005
5/31/2003
6/30/2004
1/4/2006
4/30/2003
7/30/2003
6/30/2004
5/31/2004
3/31/2004

2/26/2003
5/31/2000
6/30/2003
8/15/2006
4/28/1999
5/29/2002
1/29/2003
4/30/2003
New
New
8/31/1998
2/26/2003
12/1/1996
12/1/1996
6/30/2002
5/31/2003
11/30/1999
1/27/1998
2/29/2004
3/31/2003
12/31/2002
6/29/2005
New
New
New
New
1/31/2001

Next
Planned
Update
3/1/2008
9/1/2009
7/1/2010
8/15/2011
71/2008
6/1/2008
10/1/2010
6/1/2009
4/4/2011
8/15/2011
10/1/2008
3/1/2008
8/1/2008
5/1/2010
4/1/2009
6/1/2008
4/1/2009
9/1/2007
3/1/2009
4/1/2008
1/1/2008
7/1/2010
5/1/2008
8/1/2006
7/1/2009
6/1/2009
4/1/2009

11/13/2005

6/29/2005

5/1/2007

10/12/2005

01/31/05

7/1/2007

7/31/2002
3/31/2004
6/29/2005

12/31/1996
11/30/1999
3/29/2000

8/1/2007
4/1/2009
7/1/2010

Current
Issue

Previous
Issue

page 1 of 5

Saudi Aramco Engineering Procedures


(Index of Active SAEPs)
September 2006
Document
SAEP-308
SAEP-309
SAEP-310
SAEP-311
SAEP-312
SAEP-313
SAEP-314
SAEP-316
SAEP-317
SAEP-318
SAEP-319
SAEP-321
SAEP-322
SAEP-323
SAEP-324
SAEP-325
SAEP-327
SAEP-329
SAEP-332
SAEP-333
SAEP-334
SAEP-335
SAEP-339
SAEP-340
SAEP-341
SAEP-342
SAEP-343
SAEP-347
SAEP-348
SAEP-349
SAEP-350
SAEP-351
SAEP-352

Title
Plant Inspection Unit Reviews
Inspection of Community and Operations Support Facilities
Pipeline Repair and Maintenance
Installation of Hot Tapped and Stopple Connections
PLIDCO Weld+Ends Couplings
PLIDCO Split Sleeves
Use of PLIDCO Smith Pipeline Repair Clamps
Performance Qualification of Coating Personnel
Testing and Inspection (T&I) of Shell and Tube Heat Exchangers
Pressure Relief Valve Program Authorization for Installation, Deletion and Changes
Pressure Relief Valves Routine Test, Inspection, Quality Assurance and Regulation
Performance Qualification Testing and Certification of Saudi Aramco Welders
Performance Qualification Testing and Certification of Saudi Aramco Brazers
Performance Qualification Testing of Contract Welders and Brazers
Certification Review and Registration of Project Welders and Brazers
Inspection Requirements for Pressurized Equipment
Disposal of Wastewater from Cleaning, Flushing, and Dewatering Pipelines and Vessels
Project Close-Out Report
Cathodic Protection Commissioning
Cathodic Protection Monitoring
Retrieval, Certification and Submittal of Saudi Aramco Engineering & Vendor Drawings
Boiler Condition Assessment
Marine Dredging and Landfilling Approval and Permitting
Air Quality Impact Analysis and Assessment
Equipment Life Cycle Cost Procedure
Engineering Drawings Emergency Delivery Plan
Risk-Based Inspection (RBI) for In-Plant Static Equipment
Supplying Material from Stockists
Chemical Cleaning, Disinfection, Post Treatment
and Storage of Reverse Osmosis Membranes
Advanced Process Control (APC) Systems
Regular Maintenance and Testing for Industrial Stationary Batteries
Bolted Flange Joints Assembly
Welding Procedures Review and Approval

Index of Active SAEPs

Current
Issue

Previous
Issue

5/31/2004
6/30/2004
11/30/2005
12/28/2005
01/31/05
01/31/05
01/31/05
11/13/2010
7/30/2003
10/31/2004
10/31/2004
6/30/2003
6/30/2003
6/30/2003
6/30/2003
6/30/2004
5/31/2003
11/23/2005
5/31/2005
7/31/2004
1/4/2006
2/28/2005
12/29/2004
12/21/2005
3/15/2006
3/31/2004
12/14/2005
10/31/2004

7/30/2003
4/30/2000
1/29/2003
11/13/2005
1/29/2003
1/29/2003
1/29/2003
7/30/2003
3/29/2000
3/31/2003
10/30/2002
1/31/2000
1/31/2000
1/31/2000
1/31/2000
3/31/2001
8/30/2000
3/31/2001
9/30/2002
11/28/2001
9/29/2004
1/28/2004
12/31/2000
1/30/2002
6/30/2001
1/29/2003
2/28/2005
7/31/2004

Next
Planned
Update
6/1/2009
7/1/2009
4/1/2006
12/1/2010
2/1/2010
2/1/2010
2/1/2010
8/1/2008
8/1/2008
11/1/2009
11/1/2009
7/1/2008
7/1/2008
7/1/2008
7/1/2008
7/1/2009
6/1/2006
12/1/2010
6/1/2010
8/1/2009
1/1/2009
6/1/2009
1/1/2008
1/1/2011
3/15/2009
2/1/2008
1/1/2007
8/1/2006

7/31/2004

New

8/1/2009

11/30/2004
5/31/2004
4/30/2003
5/31/2003

New
New
New
New

12/1/2007
6/1/2009
5/1/2006
6/1/2008
page 2 of 5

Saudi Aramco Engineering Procedures


(Index of Active SAEPs)
September 2006
Document
SAEP-354
SAEP-355
SAEP-357
SAEP-358
SAEP-360
SAEP-361
SAEP-362
SAEP-363
SAEP-364
SAEP-1020
SAEP-1021
SAEP-1024
SAEP-1025
SAEP-1026
SAEP-1027
SAEP-1028
SAEP-1050
SAEP-1101
SAEP-1102
SAEP-1103
SAEP-1104
SAEP-1105
SAEP-1106
SAEP-1107
SAEP-1108
SAEP-1109
SAEP-1110
SAEP-1111
SAEP-1112
SAEP-1113
SAEP-1114
SAEP-1115
SAEP-1116

Title
High Integrity Protective Systems Design Requirements
Field Metallography and Hardness Testing
Fiber Reinforced Plastic Grating Installation Guide
Management of Technologically Enhanced Naturally Occurring Radioactive Material
(NORM)
Project Planning Guidelines
Storage, Handling and Installation of Weight-Coated Pipe
Hand-Applied Tape Wrapping of Buried Pipe
Pipeline Simulation Model Development and Support
Process Simulation Model Development and Support
Capital Program Planning
Surveying Services Division Project Control
Chemical Cleaning of New Steam Generating Equipment1
Chemical Cleaning of Boilers
Boilers Lay-Up Procedures
Pressure Relief Valve Conventional and Balanced Types
Chemical Cleaning and Flushing of Lube/Seal Oil and Fluid Power Systems
Guideline for Disaster Recovery Plan Development for Decision Support System
Welding Test Supplement S01 SMAW, Carbon and Low Alloy Steel Pipe, Uphill
Welding Test Supplement S02 for SMAW, Carbon and Low Alloy Steel Pipe, Downhill
Welding Test Supplement S03 for SMAW, Stainless Steel, Single Sided
Welding Test Supplement S04 for SMAW, Stainless Steel/Nickel, Backing
Welding Test Supplement S05 for SMAW, Nickel, Single Sided
Welding Test Supplement S06 for GTAW, Aluminum with Backing
Welding Test Supplement S07 for GTAW, Carbon, Low Alloy and Stainless Steel Pipe
Welding Test Supplement S08 for GTAW, Nickel
Welding Test Supplement S09 for GTAW, Aluminum, Single Sided
Welding Test Supplement S10 for SAW, Carbon and Low Alloy Steel Pipe
Welding Test Supplement S11 for SAW, Overlay, Carbon and Low Alloy Steel Pipe
Welding Test Supplement S12 for SMAW, Carbon Steel, Small Diameter
Welding Test Supplement S13 for FCAW, Carbon Steel
Welding Test Supplement S14 for SMAW, Carbon and Low Alloy Steel Plate
Welding Test Supplement S15 for SMAW, Stainless Steel Lap
Welding Test Supplement S16 for SMAW Nickel Lap

Index of Active SAEPs

10/29/2003
2/29/2003
2/28/2005
3/30/2005

8/31/2003
New
New
New

Next
Planned
Update
9/1/2008
3/1/2009
3/1/2010
5/1/2010

1/31/2006
5/31/2005
5/31/2005
1/25/2006
1/25/2006
6/30/2004
11/23/2005
7/31/2005
2/28/2005
2/28/2005
7/31/2002
1/28/2004
10/26/2005
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003

New
New
New
New
New
2/28/2001
12/31/2002
1/28/2004
1/28/2004
1/28/2004
1/31/2001
3/31/2003
7/31/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
8/31/2002
4/30/2000
4/30/2000
8/31/2002

1/31/2011
6/1/2010
6/1/2010
1/25/2009
1/25/2009
7/1/2009
12/1/2006
8/1/2010
11/1/2009
3/1/2010
8/1/2007
4/1/2008
11/1/2010
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008

Current
Issue

Previous
Issue

page 3 of 5

Saudi Aramco Engineering Procedures


(Index of Active SAEPs)
September 2006
Document
SAEP-1117
SAEP-1125
SAEP-1131
SAEP-1132
SAEP-1133
SAEP-1134
SAEP-1135
SAEP-1140
SAEP-1141
SAEP-1142
SAEP-1143
SAEP-1144
SAEP-1145
SAEP-1146
SAEP-1150
SAEP-1152
SAEP-1154
SAEP-1160
SAEP-1350
SAEP-1510
SAEP-1610
SAEP-1622
SAEP-1624
SAEP-1626
SAEP-1628
SAEP-1630
SAEP-1634
SAEP-1636
SAEP-1638
SAEP-1640
SAEP-1642
SAEP-1661
SAEP-1662
SAEP-3101

Title
Welding Test Supplement S17 for SMAW, Wet Welding
Brazing Test Supplement S25 with TB, Copper and Copper Alloy Tubing
Pressure Relief Valve Program Use of Form 3099A-ENG, RV Authorization
Instructions for Using the Relief Valve Test Stand
Form 3750-ENG, Pressure Relieving Device Test Report
Relief Valve Technician Certification
On-Stream Inspection Administration
Qualification of Saudi Aramco NDT Personnel
Radiation Protection for Industrial Radiography
Qualification of Non-Saudi Aramco NDT Personnel
Radiographic Examination
Magnetic Particle Examination
Liquid Penetrant Examination
Manual Ultrasonic Thickness Testing
Inspection Coverage on Projects
Approval Procedure for Ready-Mixed Concrete Mix Design
Guidelines for Contractor's Quality Plan
Process Controls for Capital Projects
Design Basis Scoping Paper (DBSP) Preparation and Revision Procedure
RVL Products Management Procedure
Preparation of Functional Specification Documents
Preparation of Technical Bid Evaluation Plan Document for Process Automation Systems
Preparation of System Design Documents
Configuration and Graphics Guidelines
Preparation of Integration Specifications Document
Preparation of Integration Test Procedure Document
Factory Acceptance Test
Installation and Checkout Plan
Site Acceptance Test Plan
Operating Instructions for Process Automation Systems
Maintenance Manual for Process Automation Systems
Waste Minimization Opportunity Assessments
Cleaning of Heat Exchangers and Unfired Plant Equipment
Equipment and Spare Parts Data Requirements for Contractor Procured Equipment

Index of Active SAEPs

Current
Issue

Previous
Issue

10/29/2003
10/29/2003
10/31/2004
8/31/2002
11/13/2005
7/31/2004
2/29/2004
2/15/2006
6/29/2005
2/29/2004
5/29/2002
10/12/2005
10/12/2005
8/31/2004
6/30/2004
3/30/2005
3/31/2004
6/7/2006
3/20/2006
4/30/2003
2/28/2005
4/11/2006
2/28/2005
2/28/2005
2/28/2005
2/28/2005
2/28/2005
2/28/2005
4/30/2002
2/28/2005
2/28/2005
1/31/05
1/31/05
9/30/2003

12/31/2000
4/30/2000
6/30/2002
4/30/2000
7/31/2002
4/30/2000
8/31/1999
7/31/2004
12/31/1996
9/30/2000
9/30/1998
9/30/2001
9/30/2001
5/30/2001
5/31/2004
3/31/2002
New
New
11/30/2005
3/31/1999
1/30/2002
2/28/2005
1/30/2002
1/30/2002
1/30/2002
4/30/2002
4/30/2002
1/30/2002
6/28/2000
1/30/2002
1/30/2002
11/30/2002
1/28/2004
8/31/1998

Next
Planned
Update
11/1/2008
11/1/2008
11/1/2009
9/1/2007
12/1/2008
8/1/2007
3/1/2009
2/15/2011
7/1/2010
3/1/2009
6/1/2007
11/1/2010
11/1/2010
9/1/2007
6/1/2007
4/1/2008
4/1/2005
6/7/2011
4/1/2010
5/1/2006
2/1/2007
4/11/2011
2/1/2007
2/1/2007
2/1/2007
2/1/2007
2/1/2007
2/1/2007
5/1/2007
2/1/2007
2/1/2007
2/1/2010
2/1/2010
10/1/2008
page 4 of 5

Saudi Aramco Engineering Procedures


(Index of Active SAEPs)
September 2006
Document
SAEP-3102
SAEP-3103

Title
Equipment and Spare Parts Data Requirements for SAPMT Originated Requisitions
Equipment and Spare Parts Data Requirements
for Proponent/MRO Originated Requisitions

Index of Active SAEPs

Current
Issue

Previous
Issue

9/30/2003

8/31/1998

Next
Planned
Update
10/1/2008

9/30/2003

8/31/1998

10/1/2008

page 5 of 5

Você também pode gostar