DO NOT SCALE - IF IN DOUBT ASK

Status:

FOR INFORMATION
Keyplan:
N

Advertising screen

Trees behind shown notionally

Screening building Falconbrook Pumping Station

Planter bed

Dis-used public WC Substation Venturi building beyond

Metal fencing

THIS DRAWING

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

YORK ROAD

EXISTING LANDSCAPING AND DISUSED PUBLIC WC

FALCONBROOK PUMPING STATION

As Existing: South Elevation

Ventilation column

Falconbrook Pumping Station New brick wall to match existing

Venturi building

Planter box to raise shaft cover above the required level. Planter box to incorporate public seating

Substation

Proposed trees New planting and vegetation

PLANTER BEDS/ SHAFT

NEW OPEN SPACE

1m
F I AR C I HL D

10 m

C O L S E

Thames Water Utilities


B RD IG E S
C O U R T

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Project Name:

THAMES TUNNEL
S u Ee ot l a h vtn i o
Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:

Y O

Y O R K

NE WC O

ME NR O

P L A C E

WANDSWORTH - CS09X - FALCONBROOK PS PWH8X - FALCONBROOK PS


Drawing Title:

YO

AD

AD

NS O RT A G

Y WA

AS EXISTING AND PROPOSED SOUTH ELEVATION BOOK OF PLANS


WI N S T A N LY E R O A D

Y O

P LA C

Drawing No.:

Scale:

G A R T O N S

Trading Estate

A Y

110-DA-ARC-PWH8X-000387
c Thames Water Utilities Ltd 2008

1:200@ A3 1:100@ A1

5 0

P LA C

1 0 0

1 0 5

Proposed: South Elevation

2 0 m 0 m

DO NOT SCALE - IF IN DOUBT ASK


Status:

FOR INFORMATION
Keyplan:
N

Venturi building

Existing access

Existing access

Metal railings

Dis-used public toilet block

Advertising screen

THIS DRAWING

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

YORK GARDENS ADVENTURE PLAYGROUND

VENTURI STRUCTURE

DISUSED PUBLIC WC

As Existing: West Elevation

Venturi building

New brick wall to match existing

Pumping Station

Proposed trees and vegetation

Ventilation column Proposed trees and vegetation Removable bollards Low height Brick wall Partial railing within wall to keep visual connection with the compound and the CSO shaft during maintenance

NEW PUBLIC ENTRANCE

1m

10 m

Proposed: West Elevation


F I AR C I HL D

C O L S E

Thames Water Utilities


York Gardens
M HW

The Point, 7th Floor,


B RD IG E S

37 North Wharf Road,


C O U R T

Paddington, London W2 1AF

Playground

Project Name:

THAMES TUNNEL
Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:
York Gardens

WANDSWORTH - CS09X - FALCONBROOK PS PWH8X - FALCONBROOK PS


P LA C

Y O

Y O R K

Drawing Title:
ME NR O

P L A C E

AD

P LA C

YO

AS EXISTING AND PROPOSED WEST ELEVATION BOOK OF PLANS


Drawing No.: Scale:

AD

NE WC O

110-DA-ARC-PWH8X-000388
WI N S T A N LY E

c Thames Water Utilities Ltd 2008

1:200@ A3 1:100@ A1

Y O

5 0

1 0 0

1 0 5

2 0 m 0 m

We t l s Ee a v t n i o

N
Status:

DO NOT SCALE - IF IN DOUBT ASK

FOR INFORMATION
Keyplan:
N

HW

Garage

THIS DRAWING

York Gardens

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING

Bi rg de s C or ut C aP r ak r

MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

Pe n e n t h r on e Ho u e s

Bt at es re aC hp ae l

KEY:
THAMES WATER ACCESS DRAFT LIMITS OF LAND TO BE ACQUIRED OR USED (LLAU)

Car Park

104.60

EXISTING LEVELS (ABOVE TUNNEL DATUM)

s ok ad n Y r G re ud y on u te l r n r Pa g de Av

THAMES WATER BUILDINGS/ STRUCTURES

THAMES WATER LAND

BUILDINGS/TREES TO BE DEMOLISHED/REMOVED

EXISTING TREES WITHIN SURVEYED AREA Access to Venturi building

Venturi building

Falconbrook Pumping Station

Advertising screen

Gated Access

Work/ Industrial Building

000388
West Elevation

Gated Access

Work/ Industrial Building

Yo k r R o d a

Su s a b tt n i o

Dis-used public toilet block

000387
South Elevation

Lv ae ne dr Ra od

Work/ Industrial Building


Bus stop

York Gardens Public Library and Community Centre

103.65

10 m

40 m

Y o r k P l a c e

103.93

103.97

York Gardens

Pl ac e

Thames Water Utilities


o d a

Yo r k

c m o e nR

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Ne w

Project Name:

THAMES TUNNEL
Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:

WANDSWORTH - CS09X - FALCONBROOK PS PWH8X - FALCONBROOK PS


Drawing Title:

AS EXISTING SITE FEATURES PLAN BOOK OF PLANS


Drawing No.: Scale:

110-DA-ARC-PWH8X-000385
Tr
c Thames Water Utilities Ltd 2008

1:1000@ A3 1:500@ A1

5 0

1 0 0

1 0 5

2 0 m 0 m

hR g u o Pl d a o

N
Status:

DO NOT SCALE - IF IN DOUBT ASK

FOR INFORMATION
Keyplan:
N

Car Park

York Gardens Adventure Playground

THIS DRAWING

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN. 103.69

KEY:
103.65 THAMES WATER ACCESS DRAFT LIMITS OF LAND TO BE ACQUIRED OR USED (LLAU) G01 REPLACEMENT/ NEW GATE REFERENCE

Work/ Industrial Building

+0. 14 2
103.70

Existing venturi structure 104.8

Falconbrook Pumping Station


104.20

104.60

EXISTING LEVELS (ABOVE TUNNEL DATUM)

000388
West Elevation

104.60

PROPOSED LEVELS (ABOVE TUNNEL DATUM)

Timber seating 103.94 Ventilation kiosk within Thames Water compound New public entrance 104.00 Removable bollards

EXISTING TREES WITHIN SURVEYED AREA

0 5 . 4 0 1
PROPOSED TREES 103.34 104.00

Ventilation column approximately 5m high

Access hatches over Passive filter chamber

Ventilation column 6m high

Fence to be reinstated to match existing 103.90 Access hatches over interception chamber Raised planter bed upstand. Existing fencing to be removed along the raised planter bed.

000389
Section AA

Valve chamber structure

Falconbrook Pumping Station compound wall to be demolished during construction and reinstated. Wall to this section to have openings to allow for visual connection during maintenance

104.80 103.83

104.25

103.10 103.80

Yo k r R o d a

G 1 0 G 2 0

Su s a i b tt n o

103.70

000387
South Elevation

103.19

10 m

10 m

Thames Water Utilities

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Existing bus stop to be reinstated

York Gardens Public Library and Community Centre

Paving to match existing


Project Name:

Herbaceous and shrub boarder Ground cover

THAMES TUNNEL
Purpose:

Grass (to be reinstated) Seating (timber)

FOR PHASE 2 CONSULTATION


Location / Site Name:

Wild Cherry trees Prunus species (Plum varieties and Damson) Corylus species (Common Hazel) Large specimens (Horse Chestnut) Lighitng- ground mounted uplights

WANDSWORTH - CS09X - FALCONBROOK PS PWH8X - FALCONBROOK PS


Drawing Title:

YORK GARDENS

PROPOSED LANDSCAPE PLAN BOOK OF PLANS


Drawing No.: Scale:

110-DA-ARC-PWH8X-000386
c Thames Water Utilities Ltd 2008

1:400@ A3 1:200@ A1

5 0

1 0 0

1 0 5

2 0 m 0 m

DO NOT SCALE - IF IN DOUBT ASK


Status:

FOR INFORMATION
Keyplan:
N

THIS DRAWING

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE Proposed trees and vegetation Ventilation Column approximately 5m high Raised planter incorporating the CSO shaft cover at +104.80 level to allow for ground cover Substation DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING Falconbrook Pumping Station MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION Ventilation column 6m high AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

Raised valve chamber

Section cut through retail outlet

LONG VEHICLE

LONG VEHICLE

YORK ROAD

Proposed: Section AA

Connection culvert to inteception chamber shown for illustrative purposes only

CSO drop shaft 9m internal diameter 32

Connection tunnel to main tunnel shown for illustrative purposes only

10 m

10 m

York Gardens

Thames Water Utilities


B RD IG E S
C O U R T

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

Project Name:

THAMES TUNNEL
Purpose:

York Gardens

FOR PHASE 2 CONSULTATION


Location / Site Name:
E
Y O R K

AD

NE WC O

ME NR OA D

P L A C E

WANDSWORTH - CS09X - FALCONBROOK PS PWH8X - FALCONBROOK PS


Drawing Title:

Y O

YO

El Sub Sta

PROPOSED SECTION AA BOOK OF PLANS


WI N S T A N LY E R O A D

Y O

P LA C

G A R T O N S

Drawing No.:

Scale:

A Y

110-DA-ARC-PWH8X-000389
c Thames Water Utilities Ltd 2008

1:400@ A3 1:200@ A1

5 0

P LA C

1 0 0

Playground

1 0 5

2 0 m 0 m