Escolar Documentos
Profissional Documentos
Cultura Documentos
CENTRE
GOTRI-390 021
CONTENTS
SR NO.
1
1.1
1.2
1.3
1.4
1.5
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
PARTICULARAS
SALIENT FEATURES OF GUJARAT GRID
INSTALLED CAPACITY
PEAK DEMAND
ENERGY EXCHANGE FROM C/S
GUJARAT GENERATION
ANNUAL PLANNINIG OF UNIT OUTAGES
POWER SUPPLY POSITION
BIFURCATION OF CAPACITY
GENERATING UNIT COMMISSIONED DURING 2010
201010-11
TRANSMISSION LINE COMMISSIONED DURING 20102010-11
ACTUAL ENE
ENERGY DURING 2010
201010-11
DEMAND PARTICULARS FOR THE YEAR 2010
201010-11
UNITWISE ENERGY FOR YEAR 2010
201010-11
IMPORTANT 400KV SUB STATIONS VOLTAGE PROFILE
FREQUENCY PARTICULARS
MONTHLY DISCOMWISE ENERGY BIFURCATION
WIND ENER
ENERGY
DETAILS OF RTU COMMISS
COMMISSIONED FOR YEAR 2010
201010-11
DETAILS
DETAILS OF ABT METERS
DETAILS OF OPEN ACCESS APLICATION FOR YEAR
2010
201010-11
DETAILS OF TRANSMISSION LOSSES FOR YEAR 2010
20101011
HYDRO RESERVOIR DATA
HYDRO GENERATION DATA
POWER SUPPLY HOUR
SEASONAL LOAD CURVE
ANNUAL
ANNUAL ACCOUNT FOR THE YEAR 20102010-11
PAGE NO
3
3
3
4
4
5
6
7
7
8
9
10
11 to 13
14
15
16
17
17 to 18
18
19
19
20 to 21
22
22
23
24
STATE
SECTOR
5215.57
4995.57
PRIVATE
SECTOR(With
APL)
3818.5
5324.50
CENTRAL
SECTOR
2793.45
2820.00
WIND
FARM
1782.00
2094.31
SOLAR
0.00
5.00
BIOMASS
0.00
10.00
TOTAL
GUVNL
13609.52
15249.38
THERMAL
GAS
HYDRO
NUCLEAR
SOLAR
WIND FARM
2009-10
6655.20
3821.07
779.00
572.25
0.00
1782.00
BIOMASS
0.00
13609.52
2010-11
7975.00
3821.07
785.00
559.00
5.00
2094.31
10.00
15249.38
20092009-10
10848
9883
-965
20102010-11
11296
10461
-835
11500
11000
10500
10000
9500
9000
2009-10
2010-11
MAX UNRESTRICTED
10848
11296
MAX CATERED
9883
10461
1.3
Year
Energy Exchange
20092009-10
13334
20102010-11
7709
2009-10
5855
5907
5634
4787
5923
6276
6184
5949
5994
5816
5327
6231
69883
2010-11
6336
6503
5859
5159
5049
5175
6985
5311
6108
6279
5820
6672
71256
6000
5816
6279
JAN
6231
6672
5994
6108
DEC
5327
5820
5949
5311
6276
5175
SEP
NOV
5923
5049
AUG
5634
5859
JUN
2000
4787
5159
5907
6503
MAY
3000
5855
6336
4000
6184
6985
5000
APR
1000
MAR
FEB
OCT
0
JUL
CATERED-Mus
7000
2009-10
MONTH
2010-11
Nos.
95
83
4
2.
rain. Both the lines were put back into service after carrying
out necessary repairing work on dt.8.9.10.
3.
3. INSTALLED CAPACITY
CAPACITY (MW)
(MW) OF THE STATE INCLUDING
SHARE FROM C/S AS ON 31.3
31.3.201
.2011.
THERMAL
GAS
HYDRO
NUCLEAR
SOLAR
WIND
MILL
BIOMASS
TOTAL
3720
728.57
547
4995.57
PRIVATE
C/S(Share of
GUVNL)
2650.00
2668.50
6.00
0.00
5.00
2094.31
10.00
7433.81
1605.00
424.0
232
559.00
0.00
2820.00
TOTAL
7975.00
3821.07
785.0
559.00
5.00
2094.31
10.00
15249.38
OWNERSHIP
GSECL
BIO-MASS, 10, 0%
GSECL, 4995,
33%
GSECL
PVT
C/S SHARE
WIND FARM
SOLAR
BIO-MASS
2009
2009-10(As
10(As on
31/03/2010)
31/03/2010)
UTRANUTRAN-II
KLTPS
KLTPSPS-4
ADANI -1
ADANI -2
KAHELGOANKAHELGOAN-7
SUGEN
SLPP 3
SLPP 4
ADANI -3
ADANI -4
ADANI -5
KorbaKorba-7
SolarSolar-Lanco
BioBio-Mass
375MW
75 MW
330 MW
330 MW
47 MW
1147.5 MW
2010
201010-11(As
11(As on
31/03/2011)
31/03/2011)
125MW
125MW
330 MW
330 MW
660 MW
500 MW
5MW
10MW
25
26
27
Particulars
220KV Viramgam Bhat Line 1 & 2
220KV Kasor - Vartej LILO at Botad
220KV Salejada Bhat Line 1 & 2
220kv Kansari Tharad line-1 lilo at Agathala
220KV Tapar Varsana Line-3 & 4
400KV Hadala Varsana line
220Kv GSEG KIM line-1 lilo at Mora(L&T)
66kv Lanko Solar line no.1
220kv Wanakbori Ranasan line is Lilo at
220Kv Kapadvanj S/s Dt.18.12.10
66kv Lanko Solar line no.2
400KV APL Varsana line
400KV APL Hadala line
400/132KV, 315MVA ICT-1 Pirana(T)
400/132KV, 315MVA ICT-2 Pirana(T)
400KV Sugen Pirana(T) line-1
400KV Sugen Pirana(T) line-2
400KV Dehgam Pirana(PG) line-1
400KV Dehgam Pirana(PG) line-2
400/220V, 315MVA ICT-1 Pirana(PG)
220Kv Pirana(T) Pirana(PG) line-1
220Kv Pirana(T) Pirana(PG) line-2
220Kv Kosamba BUS-A
220Kv Kosamba BUS-B
220kV Zagadiya Kim Line-2 lilo at
Kosamba. Hence the new lines are : 220kv
Kim-Kosamba line & 220kv Zagadiya
Kosamba
220Kv Utran Kosamba line-1
220/66Kv Transformer-1 at Kangasiyali near
Rajkot back charged.
220kv Bus at Kangasiyali
Date of
commissioning
29.05.10
10.06.10
19.06.10
01.10.10
23.10.10
02.11.10
20.11.10
29.11.10
18.12.10
27.12.10
13.01.11
13.01.11
26.02.11
26.02.11
26.02.11
26.02.11
28.02.11
28.02.11
28.02.11
18.03.11
18.03.11
29.03.11
29.03.11
29.03.11
30.03.11
31.03.11
31.03.11
ENERGY-MUS
GSECL
PRIVATE
CENTRAL SECTOR
WIND
SOLAR
BIO-MASS
TOTAL
27762
32965
7709
2815
3
3
71256
WIND , 2815,
4%
SOLAR, 3, 0%
BIO-MASS, 3, 0%
GSECL,
27762
39%
PVT, 32965
46%
GSECL PVT
SOLAR BIO-MASS
MONTH
Apr-10
May-10
Jun-10
Jul-10
Aug-10
Sep-10
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
MAX. UN RES.
DEMAND(MW)
10613
10416
10130
10090
8585
9994
11296
10726
10367
10504
10165
10237
CATERED(MW)
9632
9725
9395
9360
8220
9563
10461
9751
9518
9620
9525
10004
DEFICIT(MW)
-981
-691
-735
-730
-365
-431
-835
-975
-849
-884
-640
-233
MAX. CATERED
MAX. UN RES. DEMAND
12000
10000
8000
6000
4000
2000
Mar-11
Feb-11
Jan-11
Dec-10
Nov-10
Oct-10
Sep-10
Aug-10
Jul-10
Jun-10
May-10
Apr-10
10
UNIT
GTPS 1
GTPS 2
GANDHINAGAR GTPS 3
GTPS 4
GTPS 5
WTPS 1
WTPS 2
WTPS 3
WANAKBORI
WTPS 4
WTPS 5
WTPS 6
WTPS 7
UTPS 1
UTPS 2
UKAI(TH)
UTPS 3
UTPS 4
UTPS 5
STPS 1
SIKKA
STPS 2
KLTPS 1
KLTPS 2
PANENDHRO
KLTPS 3
KLTPS 4
AECO C
TORRENT
AECO D
POWER
AECO E
AECO F
SURAT
LIGNITE
AKRIMO
AKRIMOTA
APL
TOTAL THERMAL
SLPP 1
SLPP 2
SLPP 3
SLPP 4
ALPP 1
ALPP 2
APL-1
APL-2
APL-3
APL-4
APL-5
125
125
125
125
125
125
330
330
330
330
660
Derated
capacity
(MW)
120
120
210
210
210
210
210
210
210
210
210
210
120
120
200
200
210
120
120
70
70
75
75
60
120
110
110
125
125
125
125
125
125
250
250
250
250
500
6850
6370.00
Installed capacity
(MW)
120
120
210
210
210
210
210
210
210
210
210
210
120
120
200
200
210
120
120
70
70
75
75
60
120
110
110
Generation
(Mus)
497
592
1321
1381
1603
1314
1460
1468
1341
1434
1460
1525
694
670
1348
1091
1577
532
643
417
460
366
133
332
912
856
845
870
873
497
394
609
563
2455
2500
1585
718
541
37876
11
GAS
UNIT
DTPS GT1
DTPS STG1
DHUVARAN DTPS-GT2
GAS
DTPS-STG2
UGPP GT1
UGPP GT2
UGPP GT3
UGPP ST1
UGPP GT-4
UTRAN
UGPP ST2
GIPCL GT1
GIPCL GT2
GIPCL GT3
GIPCLGIPCL-I
GIPCL ST1
GIPCL GT4
GIPCL
GIPCLPCL-II
GIPCL ST2
AECO GT1
TORRENT AECO GT2
POWER GAS AECO STG
ESSAR GT1
ESSAR GT2
ESSAR GT3
*ESSAR
ESSAR
POWER
SGT
GPEC GT1
GPEC GT2
GPEC GT3
GPEC
GPEC STG
GSEG 1
GSEG 2
GSEG
GSEG ST
SUGEN
GT1
SUGEN
GT2
SUGEN
SUGEN
GT3
TOTAL GAS
GAS
Installed capacity
Derated
capacity
Generation
(MW)
(MW)
(Mus)
68
68
171
39
72
40
33
33
33
46
229
146
32
32
32
49
111
54
32.5
32.5
35
110
110
110
39
72
40
30
30
30
45
228.57
146
32
32
32
49
111
54
32.5
32.5
35
110
110
110
93
408
220
160
146
136
255
1354
898
212
223
230
353
549
295
230
214
226
542
641
568
185
138
138
138
241
52
52
52
185
138
138
138
241
52
52
52
1002
608
842
821
1397
320
322
380
383
382.5
2769
383
382.5
2815
383
3623
382.5
3397.07
2633
22029
12
HYDRO
UKAI(HY)
UKAI LBCH
KADANA
PANAM
MADHUBAN
DAM
PVT HY.
TOTAL
HYDRO
Installed capacity
(MW)
Derated
capacity
(MW)
Generation
(Mus)
UHPS 1
UHPS 2
UHPS 3
UHPS 4
ULBC 1
ULBC 2
KHPS 1
KHPS 2
KHPS 3
KHPS 4
PANAM
75
75
75
75
2.5
2.5
60
60
60
60
2
75
75
75
75
2.5
2.5
60
60
60
60
2
162
103
82
110
7
11
12
54
18
34
3
MADHUBAN
DAM-1
1.5
1.5
1.5
1.5
1.03
553
553
553
553
613
UNIT
MADHUBAN
DAM-2
Karjan Dam
THERMAL
GAS
HYDRO
CPP
WIND FARM
SOLAR
BOIMASS
C/S ACTUAL
GRAND TOTAL
Installed capacity(MW)
6370.00
3397.07
553.00
2094.31
5.00
10.00
2820.00
15249
15249.38
Generation (Mus)
37876
22029
613
208
2815
3
3
7709
71256
13
MONTH
Apr-10
May-10
Jun-10
Jul-10
Aug-10
Sep-10
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
MONTH
Apr-10
May-10
Jun-10
Jul-10
Aug-10
Sep-10
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
ASOJ
MAX
MIN
423
407
426
409
426
406
428
408
428
411
427
405
427
404
429
404
427
406
428
404
426
408
427
413
KASOR
MAX
MIN
424
405
426
405
429
406
429
406
430
413
429
405
432
405
429
409
430
408
433
404
432
413
431
414
CHORANIA
MAX
MIN
413
390
416
389
423
425
423
423
414
422
419
421
425
422
AMRELI
MAX
MIN
412
384
414
388
SOJA
MAX
MIN
415
400
418
399
KANSARI
MAX
MIN
416
390
414
386
421
422
422
422
410
420
419
415
418
416
421
436
436
435
432
437
433
432
421
423
425
428
423
426
423
428
422
421
421
420
389
396
394
371
355
372
376
383
396
395
397
399
415
411
411
411
409
411
402
408
383
391
392
394
389
391
385
383
388
397
392
394
398
385
381
389
387
389
402
405
JETPUR
MAX
MIN
416
388
421
395
426
394
426
395
425
393
426
376
416
359
427
375
422
377
422
388
427
401
425
397
VADAVI
MAX MIN
422
399
425
405
431
405
434
403
430
404
431
402
430
407
432
399
428
406
427
404
425
405
429
412
HADALA
MAX MIN
417
387
418
392
427
392
427
397
427
400
424
380
416
368
426
383
420
385
428
390
428
410
429
402
14
10.
10. FREQUENCY PARTICULARS:
PARTICULARS:Frequency %
2009
2009-10
ABOVE
BELOW
49.20
49.20
49.20Hz
20Hz.
Hz.
49.20Hz
20Hz.
Hz.
81.26
18.74
93.56
6.45
80.8
19.19
95.31
4.69
74.11
25.88
83.82
16.17
94.98
5.02
99.61
0.38
99.51
0.49
96.35
3.64
99.64
0.35
90.32
9.68
MONTH
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
2010
201010-11
ABOVE
BELOW
49.20Hz
49.20
49.20Hz.
Hz.
49.20 Hz.
59.47
40.53
97.87
2.13
99.46
0.54
97.53
2.47
98.32
1.68
99.63
0.37
99.98
0.02
99.98
0.02
99.92
0.08
99.66
0.34
99.83
0.17
99.85
0.15
MONTHLY AVERAGE
AVERAGE FREQUENCY IN Hz.:Hz.:MONTH
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
2009
2009-10
49.45
49.68
49.51
49.67
49.42
49.58
49.65
49.87
49.78
49.71
49.82
49.58
2010
201010-11
49.26
49.72
49.82
49.81
49.85
49.98
49.94
50.00
49.91
49.85
49.88
49.85
2009-10
2010-11
50.00
FREQ.-Hz.
50.00
49.87
49.80
49.60
49.40
49.20
49.42
49.26
49.00
48.80
Apr-10 May-10
Jun-10
Jul-10
Mar-11
2009-10
49.45
49.68
49.51
49.67
49.42
49.58
49.65
49.87
49.78
49.71
49.82
49.58
2010-11
49.26
49.72
49.82
49.81
49.85
49.98
49.94
50.00
49.91
49.85
49.88
49.85
MONTH
15
11.
11. DISCOMWISE ENERGY CATERED FOR GUVNL IN MUs FOR YEAR
2010
201010-11
MONTH
PGVCL
UGVCL
MGVCL
DGVCL
TOTAL
AprApr-10
to
MarMar-11
JGY
3445
1971
1457
1924
8798
URB/TWN
4437
1332
2834
2256
10860
AGR
6772
7576
985
569
15902
IND
4730
4006
3286
6668
18690
MONTH
JGY
URB/TWN
AGR
IND
TOTAL
Apr-10
May-10
Jun-10
Jul-10
Aug-10
Sep-10
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
TOTAL
763
799
730
745
764
760
831
695
648
642
631
789
8798
943
1014
957
962
954
920
1025
801
801
779
770
932
10860
1640
1572
1175
518
365
600
1799
1139
1665
1897
1704
1829
15902
1566
1610
1530
1549
1543
1456
1665
1433
1599
1594
1474
1670
18690
4912
4995
4393
3774
3625
3735
5320
4068
4715
4913
4578
5220
54248
TOTAL
19384
14885
8563
11417
54248
IND, 18689.5923,
35%
URB/TWN,
10859.57, 20%
AGR, 15901.545,
29%
JGY
URB/TWN
AGR
IND
16
2009-10
200
338
332
355
356
150
120
146
188
179
157
208
2729
2010-11
257
442
369
319
219
112
122
166
179
236
171
222
2815
MOTH
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
2009-10
MAX
MAX
636
21
1022
4
1005
2
1113
5
1183
12
592
0
682
0
826
0
840
2
831
1
1092
1
1062
1
2010-11
MAX
MIN
1045
5
1350
17
1215
3
1320
0
1088
10
816
2
658
0
985
1
927
1
1126
0
1126
0
1040
3
1) Kosamba
2) 400kV Adani Power Ltd.
3) Essar oil
4) Reliance
5) AECoAECo-Pirana
6) Botad
17
NAME OF
ENTITIES
GSECL
UGVCL
MGVCL
DGVCL
PGVCL
CPP
MPP
IPP
MINI HYDEL
WF
SOLAR
BIOMASS
SECO
AECO
KPT
TEL-SEZ
RIL-SEZ
MUNDRA-SEZ
TOTAL
NOS OF ABT
METER
INSTALLED
267
74
76
89
134
46
62
75
3
60
2
1
19
13
2
1
1
5
930
L&T
MAKE
95
0
3
0
119
5
62
8
0
58
0
1
6
0
2
1
1
5
366
SEMS
MAKE
172
74
73
89
15
41
0
67
3
2
2
0
13
13
0
0
0
0
564
Application
Received
Received
43
43
62
51
40
46
35
26
39
59
69
86
599
Application
Approved
Approved
43
39
60
51
36
44
34
26
35
56
67
86
577
Application
Rejected
0
4
2
0
4
2
1
0
4
3
3
0
23
18
2009-10
4.22
4.07
5.61
3.75
6.02
5.80
5.11
4.44
4.21
4.29
4.08
5.22
4.77
2010-11
4.81
4.57
4.32
4.30
3.47
4.65
3.90
3.38
3.78
4.07
3.88
4.15
4.12
2009-10
2010-11
LOSSES IN %
6
5
4
3
2
1
0
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
MONTH
19
17. HYDRO RESERVOIR DATA:DATA:1. UKAI DAM LEVEL IN ft.ON LAST DAY OF THE MONTH
MONTH
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
2009-10
305.33
297.27
288.97
321.11
314.44
324.55
323.34
322.35
319.16
316.36
311.77
306.27
2010-11
300.13
290.89
286.31
305.91
334.91
339.84
337.96
337.45
335.56
331.88
328.76
323.69
2009-10
2010-11
LEVEL IN Ft.
330
310
290
270
250
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
MONTH
20
MONTH
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
2009-10
403.00
400.09
397.03
406.06
404.09
411.04
407.03
407.03
407.02
405.05
403.10
402.05
2010-11
398.00
395.10
394.06
392.05
400.06
412.01
403.07
401.01
401.11
398.10
393.02
390.04
2009-10
2010-11
415
410
LEVEL IN Ft.
405
400
395
390
385
380
375
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
MONTH
21
UKAI
31
35
19
0
43
128
40
23
28
38
34
55
KADANA
7
2
1
9
11
9
32
0
13
16
16
6
PVT.HYDRO
1.617
2.283
2.390
2.387
2.034
2.106
1.913
2.117
2009-10
7:56
7:57
8:00
12:42
13:19
11:28
8:14
8:01
8:02
8:00
8:00
8:00
9:08
2010-11
7:55
8:04
8:00
8:11
8:01
8:00
8:00
8:00
8:02
8:01
8:00
8:07
8:02
22
20.
20. SEASONAL LOAD CURVE:
CATERED-MW
9725
9632
9479
8800
7673
7507
6796
5710
Feb-10
Mar-10
Apr-10
May-10
MAX.CAT
MONTH
MIN CAT
9395
9563
9360
CATERED-MW
9000
8220
8000
7000
6000
5000
5438
5015
5308
5423
4000
3000
2000
1000
Jun-10
Jul-10
Aug-10
Sep-10
MAX.CAT
M ONTH
MIN CAT
CATERED-MW
11000
10000
9000
8000
7000
6000
5000
4000
3000
2000
1000
10461
9751
9620
9518
8228
6671
6047
5038
Oct-10
Nov-10
Dec-10
Jan-11
MAX.CAT
MONTH
MIN CAT
23
DESCRIPTION
AMOUNT
Fixed Asset
68891766.75
INCOME
1 Scheduling Charges.
13447807.00
2 Application Charges.
2250936.00
19914162.00
166286713.00
5 Other Income.
TOTAL
C
1051119.95
202950737.95
EXPENDITURE
1 Repairs & maintenance Charges.
85716807.37
2 Employee Cost.
70372912.24
14115188.20
3657523.16
TOTAL
173862430.97
24