Escolar Documentos
Profissional Documentos
Cultura Documentos
La posicin de ambos diques es tal que el centro de empuje combinado coincida con el centro de
masa del Miranda.
T/m
T/m
T/m
T/m
T/m
T/m
T/m
Tm
Weight
Bouyancy Bouyancy Bouyancy Weight Weight Miranda
1
2
total
dique Miranda
ER
Total W Net Load Shear Moment
Seccion
1
2
3
4
5
6
7 8.0000
9.0000
10.0
11
-6 36.909
0 36.9091
0 22.537
0 22.5370 -14.3722
64.6
98
3 36.909
0 36.9091
0 22.537 36.4752 59.0122 22.1031
42.9
256
12 36.909
0 36.9091
0 22.537
0 22.5370 -14.3722
207.2
1,521
21 36.909
0 36.9091
0 22.537
0 22.5370 -14.3722
77.8
2,804
30 36.909
0 36.9091
0 22.537
0 22.5370 -14.3722 - 51.5
2,922
39 36.909
0 36.9091
0 22.537
0 22.5370 -14.3722 - 180.9
1,876
48 36.909
0 36.9091
0 22.537
0 22.5370 -14.3722 - 310.2 334
57
0
0
0
0 22.537
0 22.5370 22.5370 - 135.1 - 2,452
66
0
0
0
0 22.537
0 22.5370 22.5370
67.8 - 2,755
75
0 36.909 36.9091
0 22.537
0 22.5370 -14.3722
202.3 - 1,296
84
0 36.909 36.9091
0 22.537
0 22.5370 -14.3722
73.0 57
93
0
0
0
0 22.537
0 22.5370 22.5370
0.8
62
Minimos
Maximos
320 228
Los esfuerzos a los que estaria sometido el Miranda estan por debajo de los admisibles. El
momento admisible para el cuerpo paralelo del Miranda es superior a 4,000 T.m, y estaria
sometido a 3,014, o sea un 33% de margen sobre la tensin admisible.
A continuacin los diagramas de momento y corte.
2,857
3,014
300.0
20
200.0
15
100.0
10
-
88.9
84
79.1
74.2
69.3
64.4
59.5
54.6
49.7
44.8
39.9
35
30.1
25.2
20.3
15.4
10.5
5.6
0.7
-4.2
-9.1
-100.0
Net Load
Shear
Total W
-5
-200.0
-10
-300.0
-15
-20
-400.0
300.0
3,000.00
200.0
2,000.00
100.0
1,000.00
Moment
Shear
89.9
84.4
78.9
73.4
67.9
62.4
56.9
51.4
45.9
40.4
34.9
29.4
23.9
18.4
12.9
7.4
1.9
-3.6
-9.1
-100.0
-1,000.00
-200.0
-2,000.00
-3,000.00
-4,000.00
-300.0
-400.0
T/m
T/m
T/m
T/m
T/m
Weight
Weight Weight Miranda
dique Miranda
ER
Total W
5
6
7 8.0000
15.584 22.537
0 38.1210
15.584 22.537 36.4752 74.5962
15.584 22.537
0 38.1210
15.584 22.537
0 38.1210
15.584 22.537
0 38.1210
15.584 22.537
0 38.1210
15.584 22.537
0 38.1210
Minimos
Maximos
T/m
Net Load
9.0000
-14.3710
22.1042
-14.3710
-14.3710
-14.3710 -14.3710 -66.8630 -
Tm
Shear Moment
10.0
11
64.6
98
42.9
256
207.2
1,521
77.8
2,804
51.5
2,923
180.8
1,877
407.3 422
454 220
El dique estaria sometido a un momento mximo de 3,015 T.m, contra un momento admisible
de 7.440 T.m, o sea un margen de 147% sobre el momento admisible.
A continuacin diagramas de momento y corte para el dique:
724
3,015
Diagrama Pesos, fuerza neta y corte (considerar que estan en distinto eje Y de referencia):
100
300.0
80
200.0
60
100.0
40
Net Load
20
-100.0
Shear
48.1
45.5
42.9
40.3
37.7
35.1
32.5
29.9
27.3
24.7
22.1
19.5
16.9
14.3
9.1
11.7
6.5
3.9
1.3
-1.3
-3.9
-6.5
-9.1
0
-20
Total W
-200.0
-300.0
-40
-60
-400.0
-80
-500.0
3,500.00
300.0
3,000.00
200.0
2,500.00
100.0
2,000.00
1,500.00
-100.0
1,000.00
Moment
Shear
-200.0
500.00
-300.0
-1,000.00
46
43.1
37.3
40.2
34.4
28.6
31.5
25.7
19.9
22.8
17
11.2
14.1
8.3
2.5
5.4
-0.4
-6.2
-3.3
-500.00
-9.1
-400.0
-500.0
El momento mximo es de 3.015 T.m, muy por debajo del momento admisible de 10,000 T.m.
Los esfuerzos que soportaria el dique de proa son muy inferiores a los admisibles.
F max = 227 T.
Mmax = 1.700 T m (admisible 7.400 T. m)
Costos
En cualquier caso hay que fabricar una seccion de dique de 18 mts, un peso estimado de 281
tons:
-
construccin de una seccion de dique de 281 T, @ 3,5 usd/kg (inc. Steel) = 983.500 usd
Ingenieria para la construccin: 5,000 usd (estimado)
Continuar los 4 paredones 1,5 mts hacia arriba, por una extensin de 63 mts. Peso
estimado: 37, 000 kg. Precio estimado: 147.000 usd. Tiempo estimado de ejecucin: 24
dias
Completar la soldadura en la union de los 3 pedazos de dique existente. Precio estimado:
14.000 usd. Tiempo estimado de ejecucin: 4 dias, incluidos en los 24 dias de arriba
Unir el 4to pedazo de dique con el dique existente. Precio estimado 17.000 usd. Tiempo
estimado de ejecucin: 3 4 dias.
Terminado el dique, separar el 4to pedazo: Precio estimado: 3,000 usd. Tiempo
estimado: 1 2 dias.