Plant Production Line // Location Location Line Storage Description 0020

Material PL-8794700DXG05 PL-8794700DXG05

KLI01-1

Rate capacity Planing for KSM05-1

34-8794704HGG01 34-8794704HGG01

KLI01-1 KLI03-1

kLI03-1 Rate capacity Planing

36-8794704KJG04 36-8794704KJG04 36-8794704KJG10 36-8794704KJG10 36-8794704KJG11

kLI03-1 Rate capacity Planing

kLI03-1 Rate capacity Planing kLI03-1 Rate capacity Planing

kLI03-1 Rate capacity Planing

36-8794704KJG11 36-8794704NSG18 36-8794704NSG18 A-8794720BLP47 A-8794720BLP47 A-8794723NCPR33J A-8794723NCPR33J

kLI03-1 Rate capacity Planing

kLI03-1 Rate capacity Planing

KLI03-1 KLI07-1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

34-8794704HGG01

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

34-8794704HGG01 34-8794704HGG03

KLI07-1 RUN SCHEDULE VERSION

34-8794704HGG03 34-8794704HGG05 34-8794704HGG05 34-8794704KKG01 34-8794704KKG01 36-8794704KJG04

KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION 36-8794704KJG04 36-8794704KJG10

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

36-8794704KJG10 36-8794704KJG11

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

36-8794704KJG11 36-8794704KXG01

KLI07-1 RUN SCHEDULE VERSION

36-8794704KXG01 36-8794704KXG04 36-8794704KXG04 36-8794704NSG17

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

36-8794704NSG17 36-8794704NSG18

KLI07-1 RUN SCHEDULE VERSION

36-8794704NSG18 A-8794712CGP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794712CGP1 A-8794719BWP01

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794719BWP01 A-8794719CAP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794719CAP1 A-8794719CGP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794719CGP1 A-8794719CHP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794719CHP1 A-8794720CWP2

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794720CWP2 A-8794720EJP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720EJP1 A-8794720FTP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720FTP1 A-8794720FTP6

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720FTP6 A-8794720HCP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794720HCP1 A-8794720JJP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720JJP1 A-8794720TWP05

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720TWP05 A-8794720TXP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 A-8794720TYP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720TYP1 A-8794720YYP22

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720YYP22 A-8794723EMP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723EMP1 A-8794723FFP16D

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794723FFP16D A-8794723FGP05B

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723FGP05B A-8794723GDP1

KLI07-1 RUN SCHEDULE VERSION

A-8794723GDP1 A-8794723GDP4 A-8794723GDP4 A-8794723GDP5

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION

A-8794723GDP5 A-8794723JAP1 A-8794723JAP1 A-8794723JLP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 A-8794723JMP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION

A-8794723JMP1 A-8794723JXP1 A-8794723JXP1 A-8794723PEP224

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723PEP224 A-8794723PEP334

KLI07-1 RUN SCHEDULE VERSION A-8794723PEP334 A-8794723PEP474A

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION

A-8794723PEP474A A-8794723PMP224 A-8794723PMP224 A-8794723PNP103

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723PNP103 A-8794723RKP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723RKP1 A-8794723THP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723THP1 A-8794723TLP06

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794723TLP06 A-8794723WXP02

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723WXP02 A-8794723XHP1

KLI07-1 RUN SCHEDULE VERSION

A-8794723XHP1 A-8794723XLP2 A-8794723XLP2 A-8794723XTP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION

A-8794723XTP1 A-8794723YMP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723YMP1 A-8794726AWP2

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794726AWP2 A-8794727BNP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794727BNP1 A-8794732ABP103

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794732ABP103 A-8794732ABP472

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794732ABP472 A-8794740ENP01

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794740ENP01 A-8794740HAP01

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794740HAP01 A-8794740LCP10

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794740LCP10 A8794720YYP07

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A8794720YYP07 A8794720YYP3

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A8794720YYP3 A8794721DBP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A8794721DBP1 A8794721DBP2

A8794721DBP2

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

B-8794719BNP1

KLI07-1 RUN SCHEDULE VERSION

B-8794719BNP1 B-8794719BXP1 B-8794719BXP1 B23W2C2-BLK

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

B23W2C2-BLK B23W2C2-BLUE

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

B23W2C2-BLUE B23W2C2-RED

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED C-8794712CFP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

C-8794712CFP1 C-8794715DLP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

C-8794715DLP1 N238P9B

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

N238P9B N30P9006B

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION N30P9006B N402P35B

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

N402P35B KLI07-1 0020

Material description ECM142 ODF 230V ASM, RBC

Reason for Movement Description 51 Customer Owned Scrap 51

SUB ASM, AXIAL POWER BOARD G01

43 Dropped unit 43

SUB ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH

4 4 4 4 4 4 8 8 4 4

Off Location

SUB ASM, AUTO INS CONTROL 1HP (G10,G12)

Off Location

SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13)

Off Location Lifted Circuit

X-MOTOR SUB ASM

Off Location

DIODE, ZENER 1N5261B DO35

30 Mach drop/equip fail 30 30 Mach drop/equip fail 30

RES, .33 OHM 1/2W 5% TH

SUB ASM, AXIAL POWER BOARD G01 SUB ASM, AXIAL POWER BOARD G01

9 Chip/broken/crack 9 15 Failed Elec Test 15 8 8 9 9 15 15 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Dropped unit

SUB ASM, AXIAL POWER BOARD G03 SUB ASM, AXIAL POWER BOARD G03 SUB ASM, AXIAL POWER BOARD G03 SUB ASM, AXIAL POWER BOARD G03

SUB ASM, AXIAL POWER BOARD G05

15 Failed Elec Test 15 9 9 Chip/broken/crack

SUB ASM, AXIAL KKG01

SUB ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH 15 Failed Elec Test 15

SUB ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH 38 Operator error 38 SUB ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH 43 Dropped unit 43 SUB ASM, AUTO INS CONTROL 1HP (G10,G12) SUB ASM, AUTO INS CONTROL 1HP (G10,G12) SUB ASM, AUTO INS CONTROL 1HP (G10,G12) SUB ASM, AUTO INS CONTROL 1HP (G10,G12) SUB ASM, AUTO INS CONTROL 1HP (G10,G12) 2 2 8 8 15 15 38 38 43 43 2 2 8 8 9 9 10 10 15 15 24 24 38 38 Scratch Lifted Circuit Failed Elec Test Operator error Dropped unit

SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13)

Scratch Lifted Circuit Chip/broken/crack Nick/cut/tear Failed Elec Test Damaged Operator error

SUB ASM, AXIAL KXG01 SUB ASM, AXIAL KXG01

8 Lifted Circuit 8 15 Failed Elec Test 15 15 Failed Elec Test 15 8 Lifted Circuit 8 20 Solderability 20 8 Lifted Circuit 8 9 Chip/broken/crack 9 15 Failed Elec Test 15 8 Lifted Circuit

SUB ASM, CONTROL 1.0HP CE MAR

X-MOTOR 1HP 230VAC SUB ASM X-MOTOR 1HP 230VAC SUB ASM

X-MOTOR SUB ASM X-MOTOR SUB ASM X-MOTOR SUB ASM

HEATSINK, POWER

HEATSINK, POWER HEATSINK, POWER HEATSINK, POWER HEATSINK, POWER

8 9 9 15 15 35 35 43 43 2 2 10 10 24 24 38 38 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43

Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

INSULATOR, BOLT INSULATOR, BOLT INSULATOR, BOLT INSULATOR, BOLT

Scratch Nick/cut/tear Damaged Operator error

INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

INSULATOR, CLAMP BAR INSULATOR, CLAMP BAR

8 Lifted Circuit 8 15 Failed Elec Test 15 8 Lifted Circuit 8 15 Failed Elec Test 15 35 Repair Scrap 35 8 8 9 9 Lifted Circuit Chip/broken/crack

INSULATOR, HEATSINK INSULATOR, HEATSINK INSULATOR, HEATSINK

INDUCTOR, 3MH INDUCTOR, 3MH

INDUCTOR, 3MH INDUCTOR, 3MH INDUCTOR, 3MH

15 Failed Elec Test 15 35 Repair Scrap 35 43 Dropped unit 43 2 2 7 7 8 8 10 10 15 15 24 24 33 33 35 35 38 38 43 43 9 9 15 15 24 24 35 35 43 43 8 8 9 9 15 15 43 43 8 8 9 9 Scratch Delamination Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit

IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH

THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP

Chip/broken/crack Failed Elec Test Damaged Repair Scrap Dropped unit

THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP

Lifted Circuit Chip/broken/crack Failed Elec Test Dropped unit

TERMINAL, SN TERMINAL, SN

Lifted Circuit Chip/broken/crack

TERMINAL, SN TERMINAL, SN TERMINAL, SN

15 Failed Elec Test 15 38 Operator error 38 43 Dropped unit 43 2 2 8 8 10 10 15 15 24 24 33 33 35 35 38 38 43 43 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 2 2 8 8 10 10 15 15 24 Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit

IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH

IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged

IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16

24 33 33 35 35 38 38 43 43 2 2 8 8 10 10 15 15 24 24 33 33 35 35 38 38 43 43

Eng scrap Repair Scrap Operator error Dropped unit

IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit

RTV, 748 RTV, 748 RTV, 748

9 Chip/broken/crack 9 15 Failed Elec Test 15 43 Dropped unit 43 8 8 9 9 15 15 35 35 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

RIVET, PLASTIC RIVET, PLASTIC RIVET, PLASTIC RIVET, PLASTIC RIVET, PLASTIC

HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH

2 Scratch 2 8 Lifted Circuit 8 10 Nick/cut/tear

HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH

10 15 15 24 24 35 35 38 38 43 43 8 8 9 9 15 15 35 35 43 43 8 8 9 9 15 15 35 35 43 43 9 9

Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

HEADER, 5P RA TH HEADER, 5P RA TH HEADER, 5P RA TH HEADER, 5P RA TH HEADER, 5P RA TH

Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

CAP, 1000UF 200V 20% TH CAP, 1000UF 200V 20% TH CAP, 1000UF 200V 20% TH CAP, 1000UF 200V 20% TH CAP, 1000UF 200V 20% TH

Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

CAP, 680UF 200V 20% TH

Chip/broken/crack

CAP, 680UF 250V 20% TH CAP, 680UF 250V 20% TH

15 Failed Elec Test 15 35 Repair Scrap 35 9 9 2 2 8 8 10 10 15 Chip/broken/crack

INDUCTOR, COMMON MODE 2A

INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test

INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH

15 24 24 35 35 38 38 43 43 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43

Damaged Repair Scrap Operator error Dropped unit

INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

TRANSFORMER, WIDE BAND

35 Repair Scrap 35 8 8 9 9 15 15 35 35 38 38 43 43 1 1 8 8 9 9 15 15 35 Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Operator error Dropped unit

CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH

CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH

Dents Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap

CAP, .33UF 250V 20% TH

35 43 Dropped unit 43 9 Chip/broken/crack 9 35 Repair Scrap 35 15 Failed Elec Test 15 8 8 15 15 35 35 38 38 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 2 2 10 10 24 24 35 35 38 38 Lifted Circuit Failed Elec Test Repair Scrap Operator error

CAP, .47UF 275V 20% TH CAP, .47UF 275V 20% TH

CAP, .22UF 300V 20% TH

CAP, .01UF 300V 20% Y5U TH CAP, .01UF 300V 20% Y5U TH CAP, .01UF 300V 20% Y5U TH CAP, .01UF 300V 20% Y5U TH

IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

HARDWARE, SUPPORT POST HARDWARE, SUPPORT POST HARDWARE, SUPPORT POST HARDWARE, SUPPORT POST HARDWARE, SUPPORT POST

Scratch Nick/cut/tear Damaged Repair Scrap Operator error

SCREW, PAN HD PHI 6-20X.375 THRD RO SCREW, PAN HD PHI 6-20X.375 THRD RO

2 Scratch 2 10 Nick/cut/tear

SCREW, PAN HD PHI 6-20X.375 THRD RO SCREW, PAN HD PHI 6-20X.375 THRD RO SCREW, PAN HD PHI 6-20X.375 THRD RO

10 24 Damaged 24 38 Operator error 38 44 Screw Torque 44 8 8 9 9 15 15 35 35 43 43 8 8 15 15 35 35 38 38 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL

TRANS, IGBT 600V 10A TO220AB TRANS, IGBT 600V 10A TO220AB TRANS, IGBT 600V 10A TO220AB TRANS, IGBT 600V 10A TO220AB TRANS, IGBT 600V 10A TO220AB

Lifted Circuit Failed Elec Test Repair Scrap Operator error Dropped unit

TRANS, IRF840 TO220

35 Repair Scrap 35 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 9 9 Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED

HARDWARE, TAB SN - Terminal Tyco

Chip/broken/crack

CLAMP, BAR CLAMP, BAR CLAMP, BAR CLAMP, BAR CLAMP, BAR

2 2 10 10 24 24 38 38 44 44 2 2 10 10 24 24 38 38

Scratch Nick/cut/tear Damaged Operator error Screw Torque

LABEL, WARNING HIGH VOLTAGE LABEL, WARNING HIGH VOLTAGE LABEL, WARNING HIGH VOLTAGE LABEL, WARNING HIGH VOLTAGE

Scratch Nick/cut/tear Damaged Operator error

CAP, .01UF 250V 20% TH CAP, .01UF 250V 20% TH

9 Chip/broken/crack 9 35 Repair Scrap 35 9 Chip/broken/crack 9 35 Repair Scrap 35 15 Failed Elec Test 15 35 Repair Scrap 35 38 Operator error 38 2 2 8 8 9 9 10 10 15 15 20 20 24 24 Scratch Lifted Circuit Chip/broken/crack Nick/cut/tear Failed Elec Test Solderability Damaged

CAP, .0047UF 400V 20% TH CAP, .0047UF 400V 20% TH

TRANS, IGBT 600V 10A INSULATED TRANS, IGBT 600V 10A INSULATED TRANS, IGBT 600V 10A INSULATED

HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH

HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH

33 Eng scrap 33 38 Operator error 38 43 Dropped unit 43 Scratch Nick/cut/tear Damaged Operator error Screw Torque

SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 2 2 SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 10 10 SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 24 24 SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 38 38 SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 44 44 CONFORMAL, COATING CONFORMAL, COATING CONFORMAL, COATING

9 Chip/broken/crack 9 15 Failed Elec Test 15 43 Dropped unit 43 2 2 10 10 24 24 38 38 2 2 10 10 24 24 38 38 2 2 10 10 24 24 38 38 Scratch Nick/cut/tear Damaged Operator error

THERMAL JOINT COMPOUND THERMAL JOINT COMPOUND THERMAL JOINT COMPOUND THERMAL JOINT COMPOUND

RESIN RESIN RESIN RESIN

Scratch Nick/cut/tear Damaged Operator error

HARDENER HARDENER HARDENER HARDENER

Scratch Nick/cut/tear Damaged Operator error

INSULATOR, MYLAR INSULATOR, MYLAR INSULATOR, MYLAR INSULATOR, MYLAR

2 2 10 10 24 24 38 38

Scratch Nick/cut/tear Damaged Operator error

ENCLOSURE, INSULATOR

24 Damaged 24 8 8 9 9 15 15 20 20 33 33 38 38 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Operator error Dropped unit

WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK

WIRE, 18 AWG 600V 125 GRADES CENTIGRATES8 8 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES9 9 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 15 15 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 20 20 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 33 33 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 38 38 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 43 43 WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED 8 8 9 9 15 15 20 20 33 33

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Operator error Dropped unit

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap

WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED

38 Operator error 38 43 Dropped unit 43 2 2 10 10 24 24 35 35 38 38 2 2 10 10 24 24 38 38 8 8 9 9 15 15 20 20 33 33 35 35 38 38 43 43 44 44 8 8 9 9 15 15 20 20 Scratch Nick/cut/tear Damaged Repair Scrap Operator error

HEATSINK, CONTROL HEATSINK, CONTROL HEATSINK, CONTROL HEATSINK, CONTROL HEATSINK, CONTROL

ENCLOSURE ENCLOSURE ENCLOSURE ENCLOSURE

Scratch Nick/cut/tear Damaged Operator error

KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Repair Scrap Operator error Dropped unit Screw Torque

SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability

SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG

33 33 35 35 38 38 43 43 44 44 8 8 9 9 15 15 20 20 33 33 35 35 38 38 43 43 44 44

Eng scrap Repair Scrap Operator error Dropped unit Screw Torque

WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Repair Scrap Operator error Dropped unit Screw Torque

Quantity 5 5 5 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 3 3 3 8 8 8 118 118 118 133 5 5 29 29 34 1 1 5 5 9 9 1 1 16 3 3 3 2 2 2 13 13

Total Scrap Value 158.75 158.75 158.75 158.75 1.21 1.21 1.21 1.21 4.66 4.66 4.66 4.83 4.83 4.83 4.83 4.83 4.83 4.83 9.66 16.32 16.32 16.32 0.08 0.08 0.08 2.23 2.23 2.23 37.78 6.05 6.05 35.09 35.09 41.14 1.14 1.14 5.7 5.7 10.26 10.26 1.14 1.14 18.24 3.48 3.48 3.48 2.18 2.18 2.18 60.58 60.58

Material Cost 158.75 158.75 158.75 158.75 1.21 1.21 1.21 1.21 4.66 4.66 4.66 4.83 4.83 4.83 4.83 4.83 4.83 4.83 9.66 16.32 16.32 16.32 0.08 0.08 0.08 2.23 2.23 2.23 37.78 6.05 6.05 35.09 35.09 41.14 1.14 1.14 5.7 5.7 10.26 10.26 1.14 1.14 18.24 3.48 3.48 3.48 2.18 2.18 2.18 60.58 60.58

Labor Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Overhead Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2 1 1 16 1 1 1 1 7 7 7 7 1 1 17 5 5 2 2 2 2 1 1 15 15 1 1 6 6 32 1 1 1 1 2 1 1 1 2 2 4 4 6 1 1 1 1 2 2 4 1

9.32 9.32 4.66 4.66 74.56 4.83 4.83 4.83 4.83 33.81 33.81 33.81 33.81 4.83 4.83 82.11 24.15 24.15 9.66 9.66 9.66 9.66 4.83 4.83 72.45 72.45 4.83 4.83 28.98 28.98 154.56 5.53 5.53 5.53 5.53 11.06 5.71 5.71 5.71 10.9 10.9 21.8 21.8 32.7 5.44 5.44 5.44 5.44 10.88 10.88 21.76 0.09

9.32 9.32 4.66 4.66 74.56 4.83 4.83 4.83 4.83 33.81 33.81 33.81 33.81 4.83 4.83 82.11 24.15 24.15 9.66 9.66 9.66 9.66 4.83 4.83 72.45 72.45 4.83 4.83 28.98 28.98 154.56 5.53 5.53 5.53 5.53 11.06 5.71 5.71 5.71 10.9 10.9 21.8 21.8 32.7 5.44 5.44 5.44 5.44 10.88 10.88 21.76 0.09

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 10 10 41 41 14 14 2 2 68 12 12 2 2 2 2 24 24 40 36 36 24 24 6 6 234 234 197 197 112 112 72 72 12 12 693 3 3 6 6 9 1 1 2 2 5 5 8 1 1 10 10

0.09 0.85 0.85 3.5 3.5 1.19 1.19 0.17 0.17 5.8 0.48 0.48 0.08 0.08 0.08 0.08 0.96 0.96 1.6 2.7 2.7 1.8 1.8 0.45 0.45 17.55 17.55 14.78 14.78 8.4 8.4 5.4 5.4 0.9 0.9 51.98 0.21 0.21 0.42 0.42 0.63 0.08 0.08 0.16 0.16 0.39 0.39 0.63 0.62 0.62 6.2 6.2

0.09 0.85 0.85 3.5 3.5 1.19 1.19 0.17 0.17 5.8 0.48 0.48 0.08 0.08 0.08 0.08 0.96 0.96 1.6 2.7 2.7 1.8 1.8 0.45 0.45 17.55 17.55 14.78 14.78 8.4 8.4 5.4 5.4 0.9 0.9 51.98 0.21 0.21 0.42 0.42 0.63 0.08 0.08 0.16 0.16 0.39 0.39 0.63 0.62 0.62 6.2 6.2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

41 41 2 2 2 2 56 6 6 7 7 4 4 1 1 37 37 1 1 88 88 6 6 12 12 2 2 164 5 5 32 32 8 8 6 6 1 1 52 1 1 5 5 9 9 1 1 16 4 4 49 49

25.42 25.42 1.24 1.24 1.24 1.24 34.72 0.57 0.57 0.66 0.66 0.38 0.38 0.1 0.1 3.52 3.52 0.1 0.1 8.36 8.36 0.57 0.57 1.13 1.13 0.19 0.19 15.58 1.85 1.85 11.84 11.84 2.96 2.96 2.22 2.22 0.37 0.37 19.24 0.98 0.98 4.92 4.92 8.85 8.85 0.98 0.98 15.73 0.04 0.04 0.49 0.49

25.42 25.42 1.24 1.24 1.24 1.24 34.72 0.57 0.57 0.66 0.66 0.38 0.38 0.1 0.1 3.52 3.52 0.1 0.1 8.36 8.36 0.57 0.57 1.13 1.13 0.19 0.19 15.58 1.85 1.85 11.84 11.84 2.96 2.96 2.22 2.22 0.37 0.37 19.24 0.98 0.98 4.92 4.92 8.85 8.85 0.98 0.98 15.73 0.04 0.04 0.49 0.49

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

162 162 303 303 8 8 526 6 6 4 4 1 1 37 37 1 1 19 19 8 8 12 12 2 2 90 6 6 4 4 1 1 37 37 1 1 12 12 14 14 2 2 77 12 12 8 8 2 2 74 74 2

1.62 1.62 3.03 3.03 0.08 0.08 5.26 0.4 0.4 0.27 0.27 0.07 0.07 2.46 2.46 0.07 0.07 1.26 1.26 0.54 0.54 0.8 0.8 0.13 0.13 6 11.46 11.46 7.64 7.64 1.91 1.91 70.67 70.67 1.91 1.91 22.92 22.92 26.74 26.74 3.82 3.82 147.07 3.06 3.06 2.04 2.04 0.51 0.51 18.87 18.87 0.51

1.62 1.62 3.03 3.03 0.08 0.08 5.26 0.4 0.4 0.27 0.27 0.07 0.07 2.46 2.46 0.07 0.07 1.26 1.26 0.54 0.54 0.8 0.8 0.13 0.13 6 11.46 11.46 7.64 7.64 1.91 1.91 70.67 70.67 1.91 1.91 22.92 22.92 26.74 26.74 3.82 3.82 147.07 3.06 3.06 2.04 2.04 0.51 0.51 18.87 18.87 0.51

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 36 36 7 7 24 24 4 4 169 6 6 4 4 1 1 37 37 1 1 38 38 11 11 16 16 2 2 116 92 92 738 738 36 36 866 2 2 20 20 80 80 80 80 4 4 186 6 6 4 4 1

0.51 9.18 9.18 1.78 1.78 6.12 6.12 1.02 1.02 43.09 0.66 0.66 0.44 0.44 0.11 0.11 4.07 4.07 0.11 0.11 4.18 4.18 1.21 1.21 1.76 1.76 0.22 0.22 12.76 1.35 1.35 10.78 10.78 0.53 0.53 12.66 0.04 0.04 0.42 0.42 1.68 1.68 1.68 1.68 0.08 0.08 3.9 2.92 2.92 1.95 1.95 0.49

0.51 9.18 9.18 1.78 1.78 6.12 6.12 1.02 1.02 43.09 0.66 0.66 0.44 0.44 0.11 0.11 4.07 4.07 0.11 0.11 4.18 4.18 1.21 1.21 1.76 1.76 0.22 0.22 12.76 1.35 1.35 10.78 10.78 0.53 0.53 12.66 0.04 0.04 0.42 0.42 1.68 1.68 1.68 1.68 0.08 0.08 3.9 2.92 2.92 1.95 1.95 0.49

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 37 37 1 1 48 48 12 12 2 2 111 1 1 10 10 41 41 55 55 2 2 109 4 4 30 30 96 96 55 55 6 6 191 4 4 4 4 4 6 6 10 2 2 2 18 18 12 12 3 3 111

0.49 17.98 17.98 0.49 0.49 23.33 23.33 5.83 5.83 0.97 0.97 53.96 0.29 0.29 2.92 2.92 11.96 11.96 16.06 16.06 0.58 0.58 31.81 3.52 3.52 26.37 26.37 84.39 84.39 48.35 48.35 5.27 5.27 167.9 3.46 3.46 3.46 4.88 4.88 7.32 7.32 12.2 1.7 1.7 1.7 3.24 3.24 2.16 2.16 0.54 0.54 19.98

0.49 17.98 17.98 0.49 0.49 23.33 23.33 5.83 5.83 0.97 0.97 53.96 0.29 0.29 2.92 2.92 11.96 11.96 16.06 16.06 0.58 0.58 31.81 3.52 3.52 26.37 26.37 84.39 84.39 48.35 48.35 5.27 5.27 167.9 3.46 3.46 3.46 4.88 4.88 7.32 7.32 12.2 1.7 1.7 1.7 3.24 3.24 2.16 2.16 0.54 0.54 19.98

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

111 3 3 38 38 36 36 6 6 227 6 6 4 4 1 1 37 37 14 14 9 9 12 12 2 2 85 1 1 1 1 1 15 15 69 69 2 2 2 2 3 3 92 4 4 1 1 5 5 6 6 10

19.98 0.54 0.54 6.84 6.84 6.48 6.48 1.08 1.08 40.86 2.28 2.28 1.52 1.52 0.38 0.38 14.06 14.06 5.32 5.32 3.42 3.42 4.56 4.56 0.76 0.76 32.3 0.34 0.34 0.34 0.12 0.12 1.76 1.76 8.08 8.08 0.23 0.23 0.24 0.24 0.35 0.35 10.78 0.3 0.3 0.07 0.07 0.37 0.37 0.44 0.44 0.74

19.98 0.54 0.54 6.84 6.84 6.48 6.48 1.08 1.08 40.86 2.28 2.28 1.52 1.52 0.38 0.38 14.06 14.06 5.32 5.32 3.42 3.42 4.56 4.56 0.76 0.76 32.3 0.34 0.34 0.34 0.12 0.12 1.76 1.76 8.08 8.08 0.23 0.23 0.24 0.24 0.35 0.35 10.78 0.3 0.3 0.07 0.07 0.37 0.37 0.44 0.44 0.74

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 1 1 27 4 4 1 1 5 4 4 4 3 3 6 6 10 10 2 2 21 6 6 4 4 1 1 37 37 1 1 21 21 15 15 2 2 87 6 6 1 1 1 1 2 2 12 12 22 12 12 2

0.74 0.07 0.07 1.99 0.46 0.46 0.12 0.12 0.58 0.88 0.88 0.88 1.49 1.49 2.98 2.98 4.96 4.96 0.99 0.99 10.42 10.5 10.5 7 7 1.75 1.75 64.75 64.75 1.75 1.75 36.75 36.75 26.25 26.25 3.5 3.5 152.25 0.19 0.19 0.03 0.03 0.03 0.03 0.07 0.07 0.39 0.39 0.71 0.05 0.05 0.01

0.74 0.07 0.07 1.99 0.46 0.46 0.12 0.12 0.58 0.88 0.88 0.88 1.49 1.49 2.98 2.98 4.96 4.96 0.99 0.99 10.42 10.5 10.5 7 7 1.75 1.75 64.75 64.75 1.75 1.75 36.75 36.75 26.25 26.25 3.5 3.5 152.25 0.19 0.19 0.03 0.03 0.03 0.03 0.07 0.07 0.39 0.39 0.71 0.05 0.05 0.01

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2 2 24 24 71 71 111 1 1 12 12 35 35 17 17 2 2 67 6 6 84 84 5 5 22 22 6 6 123 7 7 7 36 36 18 18 6 6 126 126 6 6 14 14 60 60 6 6 272 6 6

0.01 0.01 0.01 0.09 0.09 0.26 0.26 0.42 0.02 0.02 0.25 0.25 0.76 0.76 0.37 0.37 0.04 0.04 1.44 1.62 1.62 22.68 22.68 1.35 1.35 5.94 5.94 1.62 1.62 33.21 2.24 2.24 2.24 9.72 9.72 4.86 4.86 1.62 1.62 34.02 34.02 1.62 1.62 3.78 3.78 16.2 16.2 1.62 1.62 73.44 0.14 0.14

0.01 0.01 0.01 0.09 0.09 0.26 0.26 0.42 0.02 0.02 0.25 0.25 0.76 0.76 0.37 0.37 0.04 0.04 1.44 1.62 1.62 22.68 22.68 1.35 1.35 5.94 5.94 1.62 1.62 33.21 2.24 2.24 2.24 9.72 9.72 4.86 4.86 1.62 1.62 34.02 34.02 1.62 1.62 3.78 3.78 16.2 16.2 1.62 1.62 73.44 0.14 0.14

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 18 18 3 3 3 3 33 33 91 91 148 6 6 1 1 22 22 12 12 41 4 4 3 3 7 2 2 1 1 3 12 12 7 7 12 12 31 6 6 15 15 17 17 1 1 40 40 7 7 1 1

0.14 0.84 0.84 0.14 0.14 0.14 0.14 1.54 1.54 4.26 4.26 6.92 0.1 0.1 0.02 0.02 0.35 0.35 0.19 0.19 0.66 0.32 0.32 0.24 0.24 0.56 0.36 0.36 0.18 0.18 0.54 3.24 3.24 1.89 1.89 3.24 3.24 8.37 1.32 1.32 3.3 3.3 3.74 3.74 0.22 0.22 8.8 8.8 1.54 1.54 0.22 0.22

0.14 0.84 0.84 0.14 0.14 0.14 0.14 1.54 1.54 4.26 4.26 6.92 0.1 0.1 0.02 0.02 0.35 0.35 0.19 0.19 0.66 0.32 0.32 0.24 0.24 0.56 0.36 0.36 0.18 0.18 0.54 3.24 3.24 1.89 1.89 3.24 3.24 8.37 1.32 1.32 3.3 3.3 3.74 3.74 0.22 0.22 8.8 8.8 1.54 1.54 0.22 0.22

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2 12 12 2 2 103 18 18 3 3 3 3 36 36 155 155 215 6 6 78 78 4 4 88 2 2 0 0 0 0 5 5 7 1,052 1,052 175 175 175 175 2,104 2,104 3,506 215 215 36 36 36 36 430 430 717

0.44 0.44 2.64 2.64 0.44 0.44 22.66 0.32 0.32 0.05 0.05 0.05 0.05 0.65 0.65 2.83 2.83 3.9 0.11 0.11 1.56 1.56 0.08 0.08 1.75 0.13 0.13 0.02 0.02 0.02 0.02 0.27 0.27 0.44 4.68 4.68 0.78 0.78 0.78 0.78 9.36 9.36 15.6 0.85 0.85 0.14 0.14 0.14 0.14 1.7 1.7 2.83

0.44 0.44 2.64 2.64 0.44 0.44 22.66 0.32 0.32 0.05 0.05 0.05 0.05 0.65 0.65 2.83 2.83 3.9 0.11 0.11 1.56 1.56 0.08 0.08 1.75 0.13 0.13 0.02 0.02 0.02 0.02 0.27 0.27 0.44 4.68 4.68 0.78 0.78 0.78 0.78 9.36 9.36 15.6 0.85 0.85 0.14 0.14 0.14 0.14 1.7 1.7 2.83

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 6 1 1 5 5 9 9 21 2 2 2 5 5 6 6 18 18 1 1 0 0 148 148 1 1 179 3 3 4 4 14 14 0 0 0 0 86 86 1 1 108 3 3 1 1 8 8 1 1 0 0

0.47 0.47 0.08 0.08 0.4 0.4 0.72 0.72 1.67 0.17 0.17 0.17 0.29 0.29 0.38 0.38 1.26 1.26 0.09 0.09 0.02 0.02 10.26 10.26 0.06 0.06 12.36 0.14 0.14 0.34 0.34 1.01 1.01 0.02 0.02 0.02 0.02 6.63 6.63 0.04 0.04 8.2 0.23 0.23 0.11 0.11 0.65 0.65 0.09 0.09 0.02 0.02

0.47 0.47 0.08 0.08 0.4 0.4 0.72 0.72 1.67 0.17 0.17 0.17 0.29 0.29 0.38 0.38 1.26 1.26 0.09 0.09 0.02 0.02 10.26 10.26 0.06 0.06 12.36 0.14 0.14 0.34 0.34 1.01 1.01 0.02 0.02 0.02 0.02 6.63 6.63 0.04 0.04 8.2 0.23 0.23 0.11 0.11 0.65 0.65 0.09 0.09 0.02 0.02

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

111 111 0 0 124 6 6 1 1 1 1 14 14 12 12 34 6 6 1 1 1 1 13 13 21 9 9 11 11 43 43 5 5 1 1 14 14 8 8 2 2 62 62 155 9 9 11 11 43 43 5 5

8.52 8.52 0.04 0.04 9.66 5.28 5.28 0.88 0.88 0.88 0.88 12.32 12.32 10.56 10.56 29.92 7.67 7.67 1.28 1.28 1.28 1.28 16.63 16.63 26.86 0.18 0.18 0.22 0.22 0.86 0.86 0.1 0.1 0.02 0.02 0.28 0.28 0.16 0.16 0.04 0.04 1.24 1.24 3.1 0.12 0.12 0.15 0.15 0.6 0.6 0.07 0.07

8.52 8.52 0.04 0.04 9.66 5.28 5.28 0.88 0.88 0.88 0.88 12.32 12.32 10.56 10.56 29.92 7.67 7.67 1.28 1.28 1.28 1.28 16.63 16.63 26.86 0.18 0.18 0.22 0.22 0.86 0.86 0.1 0.1 0.02 0.02 0.28 0.28 0.16 0.16 0.04 0.04 1.24 1.24 3.1 0.12 0.12 0.15 0.15 0.6 0.6 0.07 0.07

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 14 14 8 8 2 2 46 46 139 9 9 11 11 43 43 5 5 1 1 14 14 8 8 2 2 30 30 123 10,625 10,764 10,764

0.01 0.01 0.2 0.2 0.11 0.11 0.03 0.03 0.64 0.64 1.93 0.03 0.03 0.04 0.04 0.18 0.18 0.02 0.02 0 0 0.06 0.06 0.03 0.03 0.01 0.01 0.13 0.13 0.5 1,615.78 1,813.52 1,813.52

0.01 0.01 0.2 0.2 0.11 0.11 0.03 0.03 0.64 0.64 1.93 0.03 0.03 0.04 0.04 0.18 0.18 0.02 0.02 0 0 0.06 0.06 0.03 0.03 0.01 0.01 0.13 0.13 0.5 1,615.78 1,813.52 1,813.52

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

KEG Combined Scrap Report


Kimball International(Kimball Electronics Group) Program: ZEMR_COMBINED_SCRAP System: P10 Client: 010 Date: 08/25/2009 Time: 08:27:15 EST Local Date: 08/25/2009 Local Time: 07:27:15 CST Currency: USD Exch.rate type : M Plant Production Line // Location Location Line Storage Description 0020

Material PL-8794700DXG05 PL-8794700DXG05

KLI01-1

Rate capacity Planing for KSM05-1

34-8794704HGG01 34-8794704HGG01

KLI01-1 KLI03-1

kLI03-1 Rate capacity Planing

36-8794704KJG04 36-8794704KJG04 36-8794704KJG10 36-8794704KJG10 36-8794704KJG11

kLI03-1 Rate capacity Planing

kLI03-1 Rate capacity Planing kLI03-1 Rate capacity Planing

kLI03-1 Rate capacity Planing

36-8794704KJG11 36-8794704NSG18 36-8794704NSG18 A-8794720BLP47 A-8794720BLP47 A-8794723NCPR33J A-8794723NCPR33J

kLI03-1 Rate capacity Planing

kLI03-1 Rate capacity Planing

KLI03-1 KLI07-1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

34-8794704HGG01

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

34-8794704HGG01 34-8794704HGG03

KLI07-1 RUN SCHEDULE VERSION

34-8794704HGG03 34-8794704HGG05 34-8794704HGG05 34-8794704KKG01 34-8794704KKG01 36-8794704KJG04

KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

36-8794704KJG04 36-8794704KJG10

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

36-8794704KJG10 36-8794704KJG11

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

36-8794704KJG11 36-8794704KXG01

KLI07-1 RUN SCHEDULE VERSION

36-8794704KXG01 36-8794704KXG04 36-8794704KXG04 36-8794704NSG17

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

36-8794704NSG17 36-8794704NSG18

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

36-8794704NSG18 A-8794712CGP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794712CGP1 A-8794719BWP01

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794719BWP01 A-8794719CAP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794719CAP1 A-8794719CGP1

KLI07-1 RUN SCHEDULE VERSION

A-8794719CGP1 A-8794719CHP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794719CHP1 A-8794720CWP2

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720CWP2 A-8794720EJP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720EJP1 A-8794720FTP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720FTP1 A-8794720FTP6

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794720FTP6 A-8794720HCP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720HCP1 A-8794720JJP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720JJP1 A-8794720TWP05

A-8794720TWP05

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720TXP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720TXP1 A-8794720TYP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720TYP1 A-8794720YYP22

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794720YYP22 A-8794723EMP1

KLI07-1 RUN SCHEDULE VERSION A-8794723EMP1 A-8794723FFP16D

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723FFP16D A-8794723FGP05B

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723FGP05B A-8794723GDP1

KLI07-1 RUN SCHEDULE VERSION

A-8794723GDP1 A-8794723GDP4 A-8794723GDP4 A-8794723GDP5

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION

A-8794723GDP5 A-8794723JAP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723JAP1 A-8794723JLP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723JLP1 A-8794723JMP1

KLI07-1 RUN SCHEDULE VERSION

A-8794723JMP1 A-8794723JXP1 A-8794723JXP1 A-8794723PEP224

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723PEP224

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723PEP334

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723PEP334 A-8794723PEP474A

KLI07-1 RUN SCHEDULE VERSION

A-8794723PEP474A A-8794723PMP224 A-8794723PMP224 A-8794723PNP103

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723PNP103 A-8794723RKP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723RKP1 A-8794723THP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794723THP1 A-8794723TLP06

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723TLP06 A-8794723WXP02

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794723WXP02 A-8794723XHP1

KLI07-1 RUN SCHEDULE VERSION

A-8794723XHP1 A-8794723XLP2 A-8794723XLP2 A-8794723XTP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794723XTP1 A-8794723YMP1 A-8794723YMP1 A-8794726AWP2

KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794726AWP2 A-8794727BNP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794727BNP1 A-8794732ABP103

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794732ABP103 A-8794732ABP472

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794732ABP472 A-8794740ENP01

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794740ENP01 A-8794740HAP01

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION A-8794740HAP01 A-8794740LCP10

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A-8794740LCP10 A8794720YYP07

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A8794720YYP07 A8794720YYP3

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A8794720YYP3 A8794721DBP1

A8794721DBP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A8794721DBP2

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

A8794721DBP2 B-8794719BNP1

KLI07-1 RUN SCHEDULE VERSION

B-8794719BNP1 B-8794719BXP1 B-8794719BXP1 B23W2C2-BLK

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

B23W2C2-BLK B23W2C2-BLUE

KLI07-1 RUN SCHEDULE VERSION

B23W2C2-BLUE B23W2C2-RED

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED C-8794712CFP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

C-8794712CFP1 C-8794715DLP1

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

C-8794715DLP1 N238P9B

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

N238P9B N30P9006B

KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION KLI07-1 RUN SCHEDULE VERSION

N30P9006B N402P35B

N402P35B KLI07-1 0020

Material description ECM142 ODF 230V ASM, RBC

Reason for Movement Description 51 Customer Owned Scrap 51

SUB ASM, AXIAL POWER BOARD G01

43 Dropped unit 43

SUB ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH

4 4 4 4 4 4 8 8 4 4

Off Location

SUB ASM, AUTO INS CONTROL 1HP (G10,G12)

Off Location

SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13)

Off Location Lifted Circuit

X-MOTOR SUB ASM

Off Location

DIODE, ZENER 1N5261B DO35

30 Mach drop/equip fail 30 30 Mach drop/equip fail 30

RES, .33 OHM 1/2W 5% TH

SUB ASM, AXIAL POWER BOARD G01 SUB ASM, AXIAL POWER BOARD G01

9 Chip/broken/crack 9 15 Failed Elec Test 15 8 8 9 9 15 15 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Dropped unit

SUB ASM, AXIAL POWER BOARD G03 SUB ASM, AXIAL POWER BOARD G03 SUB ASM, AXIAL POWER BOARD G03 SUB ASM, AXIAL POWER BOARD G03

SUB ASM, AXIAL POWER BOARD G05

15 Failed Elec Test 15 9 9 Chip/broken/crack

SUB ASM, AXIAL KKG01

SUB ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH 15 Failed Elec Test 15 SUB ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH 38 Operator error 38 SUB ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH 43 Dropped unit 43 SUB ASM, AUTO INS CONTROL 1HP (G10,G12) SUB ASM, AUTO INS CONTROL 1HP (G10,G12) SUB ASM, AUTO INS CONTROL 1HP (G10,G12) SUB ASM, AUTO INS CONTROL 1HP (G10,G12) SUB ASM, AUTO INS CONTROL 1HP (G10,G12) 2 2 8 8 15 15 38 38 43 43 2 2 8 8 9 9 10 10 15 15 24 24 38 38 Scratch Lifted Circuit Failed Elec Test Operator error Dropped unit

SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13) SUB ASM, AUTO INS CNTRL 3/4HP (G11,G13)

Scratch Lifted Circuit Chip/broken/crack Nick/cut/tear Failed Elec Test Damaged Operator error

SUB ASM, AXIAL KXG01 SUB ASM, AXIAL KXG01

8 Lifted Circuit 8 15 Failed Elec Test 15 15 Failed Elec Test 15 8 Lifted Circuit 8 20 Solderability 20

SUB ASM, CONTROL 1.0HP CE MAR

X-MOTOR 1HP 230VAC SUB ASM X-MOTOR 1HP 230VAC SUB ASM

X-MOTOR SUB ASM X-MOTOR SUB ASM X-MOTOR SUB ASM

8 Lifted Circuit 8 9 Chip/broken/crack 9 15 Failed Elec Test 15 8 8 9 9 15 15 35 35 43 43 2 2 10 10 24 24 38 38 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

HEATSINK, POWER HEATSINK, POWER HEATSINK, POWER HEATSINK, POWER HEATSINK, POWER

INSULATOR, BOLT INSULATOR, BOLT INSULATOR, BOLT INSULATOR, BOLT

Scratch Nick/cut/tear Damaged Operator error

INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS INSULATOR, BOOTS

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

INSULATOR, CLAMP BAR INSULATOR, CLAMP BAR

8 Lifted Circuit 8 15 Failed Elec Test 15 8 8 Lifted Circuit

INSULATOR, HEATSINK

INSULATOR, HEATSINK INSULATOR, HEATSINK

15 Failed Elec Test 15 35 Repair Scrap 35 8 8 9 9 15 15 35 35 43 43 2 2 7 7 8 8 10 10 15 15 24 24 33 33 35 35 38 38 43 43 9 9 15 15 24 24 35 35 43 43 8 8 9 9 Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

INDUCTOR, 3MH INDUCTOR, 3MH INDUCTOR, 3MH INDUCTOR, 3MH INDUCTOR, 3MH

IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH IC, OPTOCOUPLER 6P TH

Scratch Delamination Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit

THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP

Chip/broken/crack Failed Elec Test Damaged Repair Scrap Dropped unit

THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP

Lifted Circuit Chip/broken/crack

THERM, 1 OHM 20 DISP THERM, 1 OHM 20 DISP

15 Failed Elec Test 15 43 Dropped unit 43 8 8 9 9 15 15 38 38 43 43 2 2 8 8 10 10 15 15 24 24 33 33 35 35 38 38 43 43 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Operator error Dropped unit

TERMINAL, SN TERMINAL, SN TERMINAL, SN TERMINAL, SN TERMINAL, SN

IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH IC, 339 14P TH

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit

IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL IC, COP881CL

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16 IC, OPTOCOUPLER DIP16

2 2 8 8 10 10 15 15 24 24 33 33 35 35 38 38 43 43 2 2 8 8 10 10 15 15 24 24 33 33 35 35 38 38 43 43

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit

IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH IC, 93C46 8P TH

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit

RTV, 748 RTV, 748 RTV, 748

9 Chip/broken/crack 9 15 Failed Elec Test 15 43 Dropped unit 43 8 8 9 9 15 15 35 Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap

RIVET, PLASTIC RIVET, PLASTIC RIVET, PLASTIC RIVET, PLASTIC

RIVET, PLASTIC

35 43 Dropped unit 43 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 8 8 9 9 15 15 35 35 43 43 8 8 9 9 15 15 35 35 43 43 9 9 Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH HEADER, 16P RA TH

HEADER, 5P RA TH HEADER, 5P RA TH HEADER, 5P RA TH HEADER, 5P RA TH HEADER, 5P RA TH

Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

CAP, 1000UF 200V 20% TH CAP, 1000UF 200V 20% TH CAP, 1000UF 200V 20% TH CAP, 1000UF 200V 20% TH CAP, 1000UF 200V 20% TH

Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

CAP, 680UF 200V 20% TH

Chip/broken/crack

CAP, 680UF 250V 20% TH CAP, 680UF 250V 20% TH

15 Failed Elec Test 15 35 Repair Scrap 35 9 Chip/broken/crack

INDUCTOR, COMMON MODE 2A

9 INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH INDUCTOR, COMMON MODE 1MH TH 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH INDUCTOR, 2.5MH +/-20% @ 100KH

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

TRANSFORMER, WIDE BAND

35 Repair Scrap 35 8 8 9 9 15 15 35 35 38 38 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Operator error Dropped unit

CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH CAP, .22UF 275V 20% TH

CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH CAP, .33UF 250V 20% TH

1 1 8 8 9 9 15 15 35 35 43 43

Dents Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

CAP, .47UF 275V 20% TH CAP, .47UF 275V 20% TH

9 Chip/broken/crack 9 35 Repair Scrap 35 15 Failed Elec Test 15 8 8 15 15 35 35 38 38 2 2 8 8 10 10 15 15 24 24 35 35 38 38 43 43 Lifted Circuit Failed Elec Test Repair Scrap Operator error

CAP, .22UF 300V 20% TH

CAP, .01UF 300V 20% Y5U TH CAP, .01UF 300V 20% Y5U TH CAP, .01UF 300V 20% Y5U TH CAP, .01UF 300V 20% Y5U TH

IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH IC, 8794723RKP1 TH

Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit

HARDWARE, SUPPORT POST HARDWARE, SUPPORT POST HARDWARE, SUPPORT POST

2 Scratch 2 10 Nick/cut/tear 10 24 Damaged

HARDWARE, SUPPORT POST HARDWARE, SUPPORT POST

24 35 Repair Scrap 35 38 Operator error 38 2 2 10 10 24 24 38 38 44 44 8 8 9 9 15 15 35 35 43 43 8 8 15 15 35 35 38 38 43 43 Scratch Nick/cut/tear Damaged Operator error Screw Torque

SCREW, PAN HD PHI 6-20X.375 THRD RO SCREW, PAN HD PHI 6-20X.375 THRD RO SCREW, PAN HD PHI 6-20X.375 THRD RO SCREW, PAN HD PHI 6-20X.375 THRD RO SCREW, PAN HD PHI 6-20X.375 THRD RO

TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL

Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit

TRANS, IGBT 600V 10A TO220AB TRANS, IGBT 600V 10A TO220AB TRANS, IGBT 600V 10A TO220AB TRANS, IGBT 600V 10A TO220AB TRANS, IGBT 600V 10A TO220AB

Lifted Circuit Failed Elec Test Repair Scrap Operator error Dropped unit

TRANS, IRF840 TO220

35 Repair Scrap 35 2 2 8 8 10 10 15 15 24 24 Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged

TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED

TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED TRANS, IGBT 600V 13A INSULATED

35 Repair Scrap 35 38 Operator error 38 43 Dropped unit 43 9 9 2 2 10 10 24 24 38 38 44 44 2 2 10 10 24 24 38 38 Chip/broken/crack

HARDWARE, TAB SN - Terminal Tyco

CLAMP, BAR CLAMP, BAR CLAMP, BAR CLAMP, BAR CLAMP, BAR

Scratch Nick/cut/tear Damaged Operator error Screw Torque

LABEL, WARNING HIGH VOLTAGE LABEL, WARNING HIGH VOLTAGE LABEL, WARNING HIGH VOLTAGE LABEL, WARNING HIGH VOLTAGE

Scratch Nick/cut/tear Damaged Operator error

CAP, .01UF 250V 20% TH CAP, .01UF 250V 20% TH

9 Chip/broken/crack 9 35 Repair Scrap 35 9 Chip/broken/crack 9 35 Repair Scrap 35 15 Failed Elec Test 15 35 Repair Scrap 35 38 Operator error 38 2 2 8 8 9 Scratch Lifted Circuit Chip/broken/crack

CAP, .0047UF 400V 20% TH CAP, .0047UF 400V 20% TH

TRANS, IGBT 600V 10A INSULATED TRANS, IGBT 600V 10A INSULATED TRANS, IGBT 600V 10A INSULATED

HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH

HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH HEADER, 3P TH

9 10 10 15 15 20 20 24 24 33 33 38 38 43 43

Nick/cut/tear Failed Elec Test Solderability Damaged Eng scrap Operator error Dropped unit

SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 2 2 SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 10 10 SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 24 24 SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 38 38 SCREW, SERRATED HEX WASH HD M4X0.7X10MM" 44 44 CONFORMAL, COATING CONFORMAL, COATING CONFORMAL, COATING

Scratch Nick/cut/tear Damaged Operator error Screw Torque

9 Chip/broken/crack 9 15 Failed Elec Test 15 43 Dropped unit 43 2 2 10 10 24 24 38 38 2 2 10 10 24 24 38 38 Scratch Nick/cut/tear Damaged Operator error

THERMAL JOINT COMPOUND THERMAL JOINT COMPOUND THERMAL JOINT COMPOUND THERMAL JOINT COMPOUND

RESIN RESIN RESIN RESIN

Scratch Nick/cut/tear Damaged Operator error

HARDENER HARDENER HARDENER HARDENER

2 2 10 10 24 24 38 38 2 2 10 10 24 24 38 38

Scratch Nick/cut/tear Damaged Operator error

INSULATOR, MYLAR INSULATOR, MYLAR INSULATOR, MYLAR INSULATOR, MYLAR

Scratch Nick/cut/tear Damaged Operator error

ENCLOSURE, INSULATOR

24 Damaged 24 8 8 9 9 15 15 20 20 33 33 38 38 43 43 Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Operator error Dropped unit

WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK WIRE, 18AWG 600V 125C XLPE BLACK

WIRE, 18 AWG 600V 125 GRADES CENTIGRATES8 8 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES9 9 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 15 15 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 20 20 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 33 33 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 38 38 WIRE, 18 AWG 600V 125 GRADES CENTIGRATES 43 43 WIRE, 18AWG 600V 125C XLPE RED 8

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Operator error Dropped unit

Lifted Circuit

WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED WIRE, 18AWG 600V 125C XLPE RED

8 9 9 15 15 20 20 33 33 38 38 43 43 2 2 10 10 24 24 35 35 38 38 2 2 10 10 24 24 38 38 8 8 9 9 15 15 20 20 33 33 35 35 38 38 43 43 44 44

Chip/broken/crack Failed Elec Test Solderability Eng scrap Operator error Dropped unit

HEATSINK, CONTROL HEATSINK, CONTROL HEATSINK, CONTROL HEATSINK, CONTROL HEATSINK, CONTROL

Scratch Nick/cut/tear Damaged Repair Scrap Operator error

ENCLOSURE ENCLOSURE ENCLOSURE ENCLOSURE

Scratch Nick/cut/tear Damaged Operator error

KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC KEPSNUT, 4-40 UNC

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Repair Scrap Operator error Dropped unit Screw Torque

SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG SCREW, MATCH 4-40 UNC X.375LG

8 8 9 9 15 15 20 20 33 33 35 35 38 38 43 43 44 44 8 8 9 9 15 15 20 20 33 33 35 35 38 38 43 43 44 44

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Repair Scrap Operator error Dropped unit Screw Torque

WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR WASHER, FLAT NO 4 REGULAR

Lifted Circuit Chip/broken/crack Failed Elec Test Solderability Eng scrap Repair Scrap Operator error Dropped unit Screw Torque

Quantity 5 5 5 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 3 3 3 8 8 8 118 118 118 133 5 5 29 29 34 1 1 5 5 9 9 1 1

Total Scrap Value 158.75 158.75 158.75 158.75 1.21 1.21 1.21 1.21 4.66 4.66 4.66 4.83 4.83 4.83 4.83 4.83 4.83 4.83 9.66 16.32 16.32 16.32 0.08 0.08 0.08 2.23 2.23 2.23 37.78 6.05 6.05 35.09 35.09 41.14 1.14 1.14 5.7 5.7 10.26 10.26 1.14 1.14

Material Cost 158.75 158.75 158.75 158.75 1.21 1.21 1.21 1.21 4.66 4.66 4.66 4.83 4.83 4.83 4.83 4.83 4.83 4.83 9.66 16.32 16.32 16.32 0.08 0.08 0.08 2.23 2.23 2.23 37.78 6.05 6.05 35.09 35.09 41.14 1.14 1.14 5.7 5.7 10.26 10.26 1.14 1.14

Labor Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Overhead Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

16 3 3 3 2 2 2 13 13 2 2 1 1 16 1 1 1 1 7 7 7 7 1 1 17 5 5 2 2 2 2 1 1 15 15 1 1 6 6 32 1 1 1 1 2 1 1 1 2 2 4 4

18.24 3.48 3.48 3.48 2.18 2.18 2.18 60.58 60.58 9.32 9.32 4.66 4.66 74.56 4.83 4.83 4.83 4.83 33.81 33.81 33.81 33.81 4.83 4.83 82.11 24.15 24.15 9.66 9.66 9.66 9.66 4.83 4.83 72.45 72.45 4.83 4.83 28.98 28.98 154.56 5.53 5.53 5.53 5.53 11.06 5.71 5.71 5.71 10.9 10.9 21.8 21.8

18.24 3.48 3.48 3.48 2.18 2.18 2.18 60.58 60.58 9.32 9.32 4.66 4.66 74.56 4.83 4.83 4.83 4.83 33.81 33.81 33.81 33.81 4.83 4.83 82.11 24.15 24.15 9.66 9.66 9.66 9.66 4.83 4.83 72.45 72.45 4.83 4.83 28.98 28.98 154.56 5.53 5.53 5.53 5.53 11.06 5.71 5.71 5.71 10.9 10.9 21.8 21.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 1 1 1 1 2 2 4 1 1 10 10 41 41 14 14 2 2 68 12 12 2 2 2 2 24 24 40 36 36 24 24 6 6 234 234 197 197 112 112 72 72 12 12 693 3 3 6 6 9 1 1

32.7 5.44 5.44 5.44 5.44 10.88 10.88 21.76 0.09 0.09 0.85 0.85 3.5 3.5 1.19 1.19 0.17 0.17 5.8 0.48 0.48 0.08 0.08 0.08 0.08 0.96 0.96 1.6 2.7 2.7 1.8 1.8 0.45 0.45 17.55 17.55 14.78 14.78 8.4 8.4 5.4 5.4 0.9 0.9 51.98 0.21 0.21 0.42 0.42 0.63 0.08 0.08

32.7 5.44 5.44 5.44 5.44 10.88 10.88 21.76 0.09 0.09 0.85 0.85 3.5 3.5 1.19 1.19 0.17 0.17 5.8 0.48 0.48 0.08 0.08 0.08 0.08 0.96 0.96 1.6 2.7 2.7 1.8 1.8 0.45 0.45 17.55 17.55 14.78 14.78 8.4 8.4 5.4 5.4 0.9 0.9 51.98 0.21 0.21 0.42 0.42 0.63 0.08 0.08

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2 5 5 8 1 1 10 10 41 41 2 2 2 2 56 6 6 7 7 4 4 1 1 37 37 1 1 88 88 6 6 12 12 2 2 164 5 5 32 32 8 8 6 6 1 1 52 1 1 5 5

0.16 0.16 0.39 0.39 0.63 0.62 0.62 6.2 6.2 25.42 25.42 1.24 1.24 1.24 1.24 34.72 0.57 0.57 0.66 0.66 0.38 0.38 0.1 0.1 3.52 3.52 0.1 0.1 8.36 8.36 0.57 0.57 1.13 1.13 0.19 0.19 15.58 1.85 1.85 11.84 11.84 2.96 2.96 2.22 2.22 0.37 0.37 19.24 0.98 0.98 4.92 4.92

0.16 0.16 0.39 0.39 0.63 0.62 0.62 6.2 6.2 25.42 25.42 1.24 1.24 1.24 1.24 34.72 0.57 0.57 0.66 0.66 0.38 0.38 0.1 0.1 3.52 3.52 0.1 0.1 8.36 8.36 0.57 0.57 1.13 1.13 0.19 0.19 15.58 1.85 1.85 11.84 11.84 2.96 2.96 2.22 2.22 0.37 0.37 19.24 0.98 0.98 4.92 4.92

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

9 9 1 1 16 4 4 49 49 162 162 303 303 8 8 526 6 6 4 4 1 1 37 37 1 1 19 19 8 8 12 12 2 2 90 6 6 4 4 1 1 37 37 1 1 12 12 14 14 2 2 77

8.85 8.85 0.98 0.98 15.73 0.04 0.04 0.49 0.49 1.62 1.62 3.03 3.03 0.08 0.08 5.26 0.4 0.4 0.27 0.27 0.07 0.07 2.46 2.46 0.07 0.07 1.26 1.26 0.54 0.54 0.8 0.8 0.13 0.13 6 11.46 11.46 7.64 7.64 1.91 1.91 70.67 70.67 1.91 1.91 22.92 22.92 26.74 26.74 3.82 3.82 147.07

8.85 8.85 0.98 0.98 15.73 0.04 0.04 0.49 0.49 1.62 1.62 3.03 3.03 0.08 0.08 5.26 0.4 0.4 0.27 0.27 0.07 0.07 2.46 2.46 0.07 0.07 1.26 1.26 0.54 0.54 0.8 0.8 0.13 0.13 6 11.46 11.46 7.64 7.64 1.91 1.91 70.67 70.67 1.91 1.91 22.92 22.92 26.74 26.74 3.82 3.82 147.07

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

12 12 8 8 2 2 74 74 2 2 36 36 7 7 24 24 4 4 169 6 6 4 4 1 1 37 37 1 1 38 38 11 11 16 16 2 2 116 92 92 738 738 36 36 866 2 2 20 20 80 80 80

3.06 3.06 2.04 2.04 0.51 0.51 18.87 18.87 0.51 0.51 9.18 9.18 1.78 1.78 6.12 6.12 1.02 1.02 43.09 0.66 0.66 0.44 0.44 0.11 0.11 4.07 4.07 0.11 0.11 4.18 4.18 1.21 1.21 1.76 1.76 0.22 0.22 12.76 1.35 1.35 10.78 10.78 0.53 0.53 12.66 0.04 0.04 0.42 0.42 1.68 1.68 1.68

3.06 3.06 2.04 2.04 0.51 0.51 18.87 18.87 0.51 0.51 9.18 9.18 1.78 1.78 6.12 6.12 1.02 1.02 43.09 0.66 0.66 0.44 0.44 0.11 0.11 4.07 4.07 0.11 0.11 4.18 4.18 1.21 1.21 1.76 1.76 0.22 0.22 12.76 1.35 1.35 10.78 10.78 0.53 0.53 12.66 0.04 0.04 0.42 0.42 1.68 1.68 1.68

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

80 4 4 186 6 6 4 4 1 1 37 37 1 1 48 48 12 12 2 2 111 1 1 10 10 41 41 55 55 2 2 109 4 4 30 30 96 96 55 55 6 6 191 4 4 4 4 4 6 6 10 2

1.68 0.08 0.08 3.9 2.92 2.92 1.95 1.95 0.49 0.49 17.98 17.98 0.49 0.49 23.33 23.33 5.83 5.83 0.97 0.97 53.96 0.29 0.29 2.92 2.92 11.96 11.96 16.06 16.06 0.58 0.58 31.81 3.52 3.52 26.37 26.37 84.39 84.39 48.35 48.35 5.27 5.27 167.9 3.46 3.46 3.46 4.88 4.88 7.32 7.32 12.2 1.7

1.68 0.08 0.08 3.9 2.92 2.92 1.95 1.95 0.49 0.49 17.98 17.98 0.49 0.49 23.33 23.33 5.83 5.83 0.97 0.97 53.96 0.29 0.29 2.92 2.92 11.96 11.96 16.06 16.06 0.58 0.58 31.81 3.52 3.52 26.37 26.37 84.39 84.39 48.35 48.35 5.27 5.27 167.9 3.46 3.46 3.46 4.88 4.88 7.32 7.32 12.2 1.7

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2 18 18 12 12 3 3 111 111 3 3 38 38 36 36 6 6 227 6 6 4 4 1 1 37 37 14 14 9 9 12 12 2 2 85 1 1 1 1 1 15 15 69 69 2 2 2 2 3 3 92

1.7 1.7 3.24 3.24 2.16 2.16 0.54 0.54 19.98 19.98 0.54 0.54 6.84 6.84 6.48 6.48 1.08 1.08 40.86 2.28 2.28 1.52 1.52 0.38 0.38 14.06 14.06 5.32 5.32 3.42 3.42 4.56 4.56 0.76 0.76 32.3 0.34 0.34 0.34 0.12 0.12 1.76 1.76 8.08 8.08 0.23 0.23 0.24 0.24 0.35 0.35 10.78

1.7 1.7 3.24 3.24 2.16 2.16 0.54 0.54 19.98 19.98 0.54 0.54 6.84 6.84 6.48 6.48 1.08 1.08 40.86 2.28 2.28 1.52 1.52 0.38 0.38 14.06 14.06 5.32 5.32 3.42 3.42 4.56 4.56 0.76 0.76 32.3 0.34 0.34 0.34 0.12 0.12 1.76 1.76 8.08 8.08 0.23 0.23 0.24 0.24 0.35 0.35 10.78

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 4 1 1 5 5 6 6 10 10 1 1 27 4 4 1 1 5 4 4 4 3 3 6 6 10 10 2 2 21 6 6 4 4 1 1 37 37 1 1 21 21 15 15 2 2 87 6 6 1 1 1

0.3 0.3 0.07 0.07 0.37 0.37 0.44 0.44 0.74 0.74 0.07 0.07 1.99 0.46 0.46 0.12 0.12 0.58 0.88 0.88 0.88 1.49 1.49 2.98 2.98 4.96 4.96 0.99 0.99 10.42 10.5 10.5 7 7 1.75 1.75 64.75 64.75 1.75 1.75 36.75 36.75 26.25 26.25 3.5 3.5 152.25 0.19 0.19 0.03 0.03 0.03

0.3 0.3 0.07 0.07 0.37 0.37 0.44 0.44 0.74 0.74 0.07 0.07 1.99 0.46 0.46 0.12 0.12 0.58 0.88 0.88 0.88 1.49 1.49 2.98 2.98 4.96 4.96 0.99 0.99 10.42 10.5 10.5 7 7 1.75 1.75 64.75 64.75 1.75 1.75 36.75 36.75 26.25 26.25 3.5 3.5 152.25 0.19 0.19 0.03 0.03 0.03

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 2 2 12 12 22 12 12 2 2 2 2 24 24 71 71 111 1 1 12 12 35 35 17 17 2 2 67 6 6 84 84 5 5 22 22 6 6 123 7 7 7 36 36 18 18 6 6 126 126 6 6

0.03 0.07 0.07 0.39 0.39 0.71 0.05 0.05 0.01 0.01 0.01 0.01 0.09 0.09 0.26 0.26 0.42 0.02 0.02 0.25 0.25 0.76 0.76 0.37 0.37 0.04 0.04 1.44 1.62 1.62 22.68 22.68 1.35 1.35 5.94 5.94 1.62 1.62 33.21 2.24 2.24 2.24 9.72 9.72 4.86 4.86 1.62 1.62 34.02 34.02 1.62 1.62

0.03 0.07 0.07 0.39 0.39 0.71 0.05 0.05 0.01 0.01 0.01 0.01 0.09 0.09 0.26 0.26 0.42 0.02 0.02 0.25 0.25 0.76 0.76 0.37 0.37 0.04 0.04 1.44 1.62 1.62 22.68 22.68 1.35 1.35 5.94 5.94 1.62 1.62 33.21 2.24 2.24 2.24 9.72 9.72 4.86 4.86 1.62 1.62 34.02 34.02 1.62 1.62

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

14 14 60 60 6 6 272 6 6 6 18 18 3 3 3 3 33 33 91 91 148 6 6 1 1 22 22 12 12 41 4 4 3 3 7 2 2 1 1 3 12 12 7 7 12 12 31 6 6 15 15 17

3.78 3.78 16.2 16.2 1.62 1.62 73.44 0.14 0.14 0.14 0.84 0.84 0.14 0.14 0.14 0.14 1.54 1.54 4.26 4.26 6.92 0.1 0.1 0.02 0.02 0.35 0.35 0.19 0.19 0.66 0.32 0.32 0.24 0.24 0.56 0.36 0.36 0.18 0.18 0.54 3.24 3.24 1.89 1.89 3.24 3.24 8.37 1.32 1.32 3.3 3.3 3.74

3.78 3.78 16.2 16.2 1.62 1.62 73.44 0.14 0.14 0.14 0.84 0.84 0.14 0.14 0.14 0.14 1.54 1.54 4.26 4.26 6.92 0.1 0.1 0.02 0.02 0.35 0.35 0.19 0.19 0.66 0.32 0.32 0.24 0.24 0.56 0.36 0.36 0.18 0.18 0.54 3.24 3.24 1.89 1.89 3.24 3.24 8.37 1.32 1.32 3.3 3.3 3.74

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 1 1 40 40 7 7 1 1 2 2 12 12 2 2 103 18 18 3 3 3 3 36 36 155 155 215 6 6 78 78 4 4 88 2 2 0 0 0 0 5 5 7 1,052 1,052 175 175 175 175 2,104 2,104 3,506

3.74 0.22 0.22 8.8 8.8 1.54 1.54 0.22 0.22 0.44 0.44 2.64 2.64 0.44 0.44 22.66 0.32 0.32 0.05 0.05 0.05 0.05 0.65 0.65 2.83 2.83 3.9 0.11 0.11 1.56 1.56 0.08 0.08 1.75 0.13 0.13 0.02 0.02 0.02 0.02 0.27 0.27 0.44 4.68 4.68 0.78 0.78 0.78 0.78 9.36 9.36 15.6

3.74 0.22 0.22 8.8 8.8 1.54 1.54 0.22 0.22 0.44 0.44 2.64 2.64 0.44 0.44 22.66 0.32 0.32 0.05 0.05 0.05 0.05 0.65 0.65 2.83 2.83 3.9 0.11 0.11 1.56 1.56 0.08 0.08 1.75 0.13 0.13 0.02 0.02 0.02 0.02 0.27 0.27 0.44 4.68 4.68 0.78 0.78 0.78 0.78 9.36 9.36 15.6

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

215 215 36 36 36 36 430 430 717 6 6 1 1 5 5 9 9 21 2 2 2 5 5 6 6 18 18 1 1 0 0 148 148 1 1 179 3 3 4 4 14 14 0 0 0 0 86 86 1 1 108 3

0.85 0.85 0.14 0.14 0.14 0.14 1.7 1.7 2.83 0.47 0.47 0.08 0.08 0.4 0.4 0.72 0.72 1.67 0.17 0.17 0.17 0.29 0.29 0.38 0.38 1.26 1.26 0.09 0.09 0.02 0.02 10.26 10.26 0.06 0.06 12.36 0.14 0.14 0.34 0.34 1.01 1.01 0.02 0.02 0.02 0.02 6.63 6.63 0.04 0.04 8.2 0.23

0.85 0.85 0.14 0.14 0.14 0.14 1.7 1.7 2.83 0.47 0.47 0.08 0.08 0.4 0.4 0.72 0.72 1.67 0.17 0.17 0.17 0.29 0.29 0.38 0.38 1.26 1.26 0.09 0.09 0.02 0.02 10.26 10.26 0.06 0.06 12.36 0.14 0.14 0.34 0.34 1.01 1.01 0.02 0.02 0.02 0.02 6.63 6.63 0.04 0.04 8.2 0.23

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 1 1 8 8 1 1 0 0 111 111 0 0 124 6 6 1 1 1 1 14 14 12 12 34 6 6 1 1 1 1 13 13 21 9 9 11 11 43 43 5 5 1 1 14 14 8 8 2 2 62 62

0.23 0.11 0.11 0.65 0.65 0.09 0.09 0.02 0.02 8.52 8.52 0.04 0.04 9.66 5.28 5.28 0.88 0.88 0.88 0.88 12.32 12.32 10.56 10.56 29.92 7.67 7.67 1.28 1.28 1.28 1.28 16.63 16.63 26.86 0.18 0.18 0.22 0.22 0.86 0.86 0.1 0.1 0.02 0.02 0.28 0.28 0.16 0.16 0.04 0.04 1.24 1.24

0.23 0.11 0.11 0.65 0.65 0.09 0.09 0.02 0.02 8.52 8.52 0.04 0.04 9.66 5.28 5.28 0.88 0.88 0.88 0.88 12.32 12.32 10.56 10.56 29.92 7.67 7.67 1.28 1.28 1.28 1.28 16.63 16.63 26.86 0.18 0.18 0.22 0.22 0.86 0.86 0.1 0.1 0.02 0.02 0.28 0.28 0.16 0.16 0.04 0.04 1.24 1.24

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

155 9 9 11 11 43 43 5 5 1 1 14 14 8 8 2 2 46 46 139 9 9 11 11 43 43 5 5 1 1 14 14 8 8 2 2 30 30 123 10,625 10,764 10,764

3.1 0.12 0.12 0.15 0.15 0.6 0.6 0.07 0.07 0.01 0.01 0.2 0.2 0.11 0.11 0.03 0.03 0.64 0.64 1.93 0.03 0.03 0.04 0.04 0.18 0.18 0.02 0.02 0 0 0.06 0.06 0.03 0.03 0.01 0.01 0.13 0.13 0.5 1,615.78 1,813.52 1,813.52

3.1 0.12 0.12 0.15 0.15 0.6 0.6 0.07 0.07 0.01 0.01 0.2 0.2 0.11 0.11 0.03 0.03 0.64 0.64 1.93 0.03 0.03 0.04 0.04 0.18 0.18 0.02 0.02 0 0 0.06 0.06 0.03 0.03 0.01 0.01 0.13 0.13 0.5 1,615.78 1,813.52 1,813.52

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Plant 0020

Production Line / Storage Location

Material Reason for Movement PL-8794700DXG05 51

51 Sum of Quantity 51 Sum of Total Scrap Value 51 Sum of Material Cost 51 Sum of Labor Cost 51 Sum of Overhead Cost PL-8794700DXG05 Sum of Quantity PL-8794700DXG05 Sum of Total Scrap Value PL-8794700DXG05 Sum of Material Cost PL-8794700DXG05 Sum of Labor Cost PL-8794700DXG05 Sum of Overhead Cost Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost KLI01-1

34-8794704HGG01 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost 34-8794704HGG01 Sum of Quantity 34-8794704HGG01 Sum of Total Scrap Value 34-8794704HGG01 Sum of Material Cost 34-8794704HGG01 Sum of Labor Cost 34-8794704HGG01 Sum of Overhead Cost KLI01-1 Sum of Quantity KLI01-1 Sum of Total Scrap Value KLI01-1 Sum of Material Cost KLI01-1 Sum of Labor Cost KLI01-1 Sum of Overhead Cost KLI03-1

36-8794704KJG04 4

4 Sum of Quantity 4 Sum of Total Scrap Value 4 Sum of Material Cost 4 Sum of Labor Cost 4 Sum of Overhead Cost 36-8794704KJG04 Sum of Quantity

0020

KLI03-1

36-8794704KJG04 Sum of Total Scrap Value 36-8794704KJG04 Sum of Material Cost 36-8794704KJG04 Sum of Labor Cost 36-8794704KJG04 Sum of Overhead Cost 36-8794704KJG10 4

4 Sum of Quantity 4 Sum of Total Scrap Value 4 Sum of Material Cost 4 Sum of Labor Cost 4 Sum of Overhead Cost 36-8794704KJG10 Sum of Quantity 36-8794704KJG10 Sum of Total Scrap Value 36-8794704KJG10 Sum of Material Cost 36-8794704KJG10 Sum of Labor Cost 36-8794704KJG10 Sum of Overhead Cost 36-8794704KJG11 4

4 Sum of Quantity 4 Sum of Total Scrap Value 4 Sum of Material Cost 4 Sum of Labor Cost 4 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 36-8794704KJG11 Sum of Quantity 36-8794704KJG11 Sum of Total Scrap Value 36-8794704KJG11 Sum of Material Cost 36-8794704KJG11 Sum of Labor Cost 36-8794704KJG11 Sum of Overhead Cost 36-8794704NSG18 4

4 Sum of Quantity 4 Sum of Total Scrap Value 4 Sum of Material Cost

0020

KLI03-1

36-8794704NSG18 of Labor Cost 4 Sum 4 Sum of Overhead Cost 36-8794704NSG18 Sum of Quantity 36-8794704NSG18 Sum of Total Scrap Value 36-8794704NSG18 Sum of Material Cost 36-8794704NSG18 Sum of Labor Cost 36-8794704NSG18 Sum of Overhead Cost A-8794720BLP47 30

30 Sum of Quantity 30 Sum of Total Scrap Value 30 Sum of Material Cost 30 Sum of Labor Cost 30 Sum of Overhead Cost A-8794720BLP47 Sum of Quantity A-8794720BLP47 Sum of Total Scrap Value A-8794720BLP47 Sum of Material Cost A-8794720BLP47 Sum of Labor Cost A-8794720BLP47 Sum of Overhead Cost A-8794723NCPR33J 30

30 Sum of Quantity 30 Sum of Total Scrap Value 30 Sum of Material Cost 30 Sum of Labor Cost 30 Sum of Overhead Cost A-8794723NCPR33J Sum of Quantity A-8794723NCPR33J Sum of Total Scrap Value A-8794723NCPR33J Sum of Material Cost A-8794723NCPR33J Sum of Labor Cost A-8794723NCPR33J Sum of Overhead Cost KLI03-1 Sum of Quantity KLI03-1 Sum of Total Scrap Value KLI03-1 Sum of Material Cost KLI03-1 Sum of Labor Cost KLI03-1 Sum of Overhead Cost KLI07-1

34-8794704HGG01 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost

0020

KLI07-1

34-8794704HGG01 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 34-8794704HGG01 Sum of Quantity 34-8794704HGG01 Sum of Total Scrap Value 34-8794704HGG01 Sum of Material Cost 34-8794704HGG01 Sum of Labor Cost 34-8794704HGG01 Sum of Overhead Cost 34-8794704HGG03 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value

0020

KLI07-1

34-8794704HGG03 of Material Cost 43 Sum 43 Sum of Labor Cost 43 Sum of Overhead Cost 34-8794704HGG03 Sum of Quantity 34-8794704HGG03 Sum of Total Scrap Value 34-8794704HGG03 Sum of Material Cost 34-8794704HGG03 Sum of Labor Cost 34-8794704HGG03 Sum of Overhead Cost 34-8794704HGG05 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 34-8794704HGG05 Sum of Quantity 34-8794704HGG05 Sum of Total Scrap Value 34-8794704HGG05 Sum of Material Cost 34-8794704HGG05 Sum of Labor Cost 34-8794704HGG05 Sum of Overhead Cost 34-8794704KKG01 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 34-8794704KKG01 Sum of Quantity 34-8794704KKG01 Sum of Total Scrap Value 34-8794704KKG01 Sum of Material Cost 34-8794704KKG01 Sum of Labor Cost 34-8794704KKG01 Sum of Overhead Cost 36-8794704KJG04 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 38

0020

KLI07-1

36-8794704KJG04 38 38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost 36-8794704KJG04 Sum of Quantity 36-8794704KJG04 Sum of Total Scrap Value 36-8794704KJG04 Sum of Material Cost 36-8794704KJG04 Sum of Labor Cost 36-8794704KJG04 Sum of Overhead Cost 36-8794704KJG10 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 38

0020

KLI07-1

36-8794704KJG10 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost 36-8794704KJG10 Sum of Quantity 36-8794704KJG10 Sum of Total Scrap Value 36-8794704KJG10 Sum of Material Cost 36-8794704KJG10 Sum of Labor Cost 36-8794704KJG10 Sum of Overhead Cost 36-8794704KJG11 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost

0020

KLI07-1

36-8794704KJG11 of Labor Cost 9 Sum 9 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 36-8794704KJG11 Sum of Quantity 36-8794704KJG11 Sum of Total Scrap Value 36-8794704KJG11 Sum of Material Cost 36-8794704KJG11 Sum of Labor Cost 36-8794704KJG11 Sum of Overhead Cost 36-8794704KXG01 8

0020

KLI07-1

36-8794704KXG01 of Quantity 8 Sum 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 36-8794704KXG01 Sum of Quantity 36-8794704KXG01 Sum of Total Scrap Value 36-8794704KXG01 Sum of Material Cost 36-8794704KXG01 Sum of Labor Cost 36-8794704KXG01 Sum of Overhead Cost 36-8794704KXG04 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 36-8794704KXG04 Sum of Quantity 36-8794704KXG04 Sum of Total Scrap Value 36-8794704KXG04 Sum of Material Cost 36-8794704KXG04 Sum of Labor Cost 36-8794704KXG04 Sum of Overhead Cost 36-8794704NSG17 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 20

20 Sum of Quantity 20 Sum of Total Scrap Value

0020

KLI07-1

36-8794704NSG17 of Material Cost 20 Sum 20 Sum of Labor Cost 20 Sum of Overhead Cost 36-8794704NSG17 Sum of Quantity 36-8794704NSG17 Sum of Total Scrap Value 36-8794704NSG17 Sum of Material Cost 36-8794704NSG17 Sum of Labor Cost 36-8794704NSG17 Sum of Overhead Cost 36-8794704NSG18 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 36-8794704NSG18 Sum of Quantity 36-8794704NSG18 Sum of Total Scrap Value 36-8794704NSG18 Sum of Material Cost 36-8794704NSG18 Sum of Labor Cost 36-8794704NSG18 Sum of Overhead Cost A-8794712CGP1 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost

0020

KLI07-1

A-8794712CGP1 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794712CGP1 Sum of Quantity A-8794712CGP1 Sum of Total Scrap Value A-8794712CGP1 Sum of Material Cost A-8794712CGP1 Sum of Labor Cost A-8794712CGP1 Sum of Overhead Cost A-8794719BWP01 2

2 Sum of Quantity

0020

KLI07-1

A-8794719BWP01 of Total Scrap Value 2 Sum 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost A-8794719BWP01 Sum of Quantity A-8794719BWP01 Sum of Total Scrap Value A-8794719BWP01 Sum of Material Cost A-8794719BWP01 Sum of Labor Cost A-8794719BWP01 Sum of Overhead Cost A-8794719CAP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

0020

KLI07-1

A-8794719CAP1 8 8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

0020

KLI07-1

A-8794719CAP1Sum of Quantity 38 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794719CAP1 Sum of Quantity A-8794719CAP1 Sum of Total Scrap Value A-8794719CAP1 Sum of Material Cost A-8794719CAP1 Sum of Labor Cost A-8794719CAP1 Sum of Overhead Cost A-8794719CGP1 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost A-8794719CGP1 Sum of Quantity A-8794719CGP1 Sum of Total Scrap Value A-8794719CGP1 Sum of Material Cost A-8794719CGP1 Sum of Labor Cost A-8794719CGP1 Sum of Overhead Cost A-8794719CHP1 8

8 Sum of Quantity 8 Sum of Total Scrap Value

0020

KLI07-1

A-8794719CHP1 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost A-8794719CHP1 Sum of Quantity A-8794719CHP1 Sum of Total Scrap Value A-8794719CHP1 Sum of Material Cost A-8794719CHP1 Sum of Labor Cost A-8794719CHP1 Sum of Overhead Cost A-8794720CWP2 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

0020

KLI07-1

A-8794720CWP2 15 15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720CWP2 Sum of Quantity A-8794720CWP2 Sum of Total Scrap Value A-8794720CWP2 Sum of Material Cost A-8794720CWP2 Sum of Labor Cost A-8794720CWP2 Sum of Overhead Cost A-8794720EJP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 7

7 Sum of Quantity 7 Sum of Total Scrap Value 7 Sum of Material Cost 7 Sum of Labor Cost 7 Sum of Overhead Cost 8

0020

KLI07-1

A-8794720EJP1 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 35

0020

KLI07-1

A-8794720EJP1 35 35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720EJP1 Sum of Quantity A-8794720EJP1 Sum of Total Scrap Value A-8794720EJP1 Sum of Material Cost A-8794720EJP1 Sum of Labor Cost A-8794720EJP1 Sum of Overhead Cost A-8794720FTP1 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost

0020

KLI07-1

A-8794720FTP1 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720FTP1 Sum of Quantity A-8794720FTP1 Sum of Total Scrap Value A-8794720FTP1 Sum of Material Cost A-8794720FTP1 Sum of Labor Cost A-8794720FTP1 Sum of Overhead Cost A-8794720FTP6 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value

0020

KLI07-1

A-8794720FTP6 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720FTP6 Sum of Quantity A-8794720FTP6 Sum of Total Scrap Value A-8794720FTP6 Sum of Material Cost A-8794720FTP6 Sum of Labor Cost A-8794720FTP6 Sum of Overhead Cost A-8794720HCP1 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

0020

KLI07-1

A-8794720HCP1 15 15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720HCP1 Sum of Quantity A-8794720HCP1 Sum of Total Scrap Value A-8794720HCP1 Sum of Material Cost A-8794720HCP1 Sum of Labor Cost A-8794720HCP1 Sum of Overhead Cost A-8794720JJP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

0020

KLI07-1

A-8794720JJP1 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

0020

KLI07-1

A-8794720JJP1 38 38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720JJP1 Sum of Quantity A-8794720JJP1 Sum of Total Scrap Value A-8794720JJP1 Sum of Material Cost A-8794720JJP1 Sum of Labor Cost A-8794720JJP1 Sum of Overhead Cost A-8794720TWP05 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost

0020

KLI07-1

A-8794720TWP05 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720TWP05 Sum of Quantity A-8794720TWP05 Sum of Total Scrap Value

0020

KLI07-1

A-8794720TWP05 Sum of Material Cost A-8794720TWP05 Sum of Labor Cost A-8794720TWP05 Sum of Overhead Cost A-8794720TXP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost

0020

KLI07-1

A-8794720TXP1Sum of Overhead Cost 24 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720TXP1 Sum of Quantity A-8794720TXP1 Sum of Total Scrap Value A-8794720TXP1 Sum of Material Cost A-8794720TXP1 Sum of Labor Cost A-8794720TXP1 Sum of Overhead Cost A-8794720TYP1 2

2 Sum of Quantity

0020

KLI07-1

A-8794720TYP1 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost

0020

KLI07-1

A-8794720TYP1Sum of Labor Cost 33 33 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720TYP1 Sum of Quantity A-8794720TYP1 Sum of Total Scrap Value A-8794720TYP1 Sum of Material Cost A-8794720TYP1 Sum of Labor Cost A-8794720TYP1 Sum of Overhead Cost A8794720YYP07 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

0020

KLI07-1

A8794720YYP07 15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A8794720YYP07 Sum of Quantity A8794720YYP07 Sum of Total Scrap Value A8794720YYP07 Sum of Material Cost A8794720YYP07 Sum of Labor Cost A8794720YYP07 Sum of Overhead Cost A-8794720YYP22 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794720YYP22 Sum of Quantity A-8794720YYP22 Sum of Total Scrap Value

0020

KLI07-1

A-8794720YYP22 Sum of Material Cost A-8794720YYP22 Sum of Labor Cost A-8794720YYP22 Sum of Overhead Cost A8794720YYP3 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost A8794720YYP3 Sum of Quantity A8794720YYP3 Sum of Total Scrap Value A8794720YYP3 Sum of Material Cost A8794720YYP3 Sum of Labor Cost A8794720YYP3 Sum of Overhead Cost A8794721DBP1 2

0020

KLI07-1

A8794721DBP1 2 2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost A8794721DBP1 Sum of Quantity A8794721DBP1 Sum of Total Scrap Value A8794721DBP1 Sum of Material Cost A8794721DBP1 Sum of Labor Cost A8794721DBP1 Sum of Overhead Cost A8794721DBP2 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

0020

KLI07-1

A8794721DBP2 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost A8794721DBP2 Sum of Quantity A8794721DBP2 Sum of Total Scrap Value A8794721DBP2 Sum of Material Cost A8794721DBP2 Sum of Labor Cost A8794721DBP2 Sum of Overhead Cost A-8794723EMP1 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost

0020

KLI07-1

A-8794723EMP1 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723EMP1 Sum of Quantity A-8794723EMP1 Sum of Total Scrap Value A-8794723EMP1 Sum of Material Cost A-8794723EMP1 Sum of Labor Cost A-8794723EMP1 Sum of Overhead Cost A-8794723FFP16D 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

0020

KLI07-1

A-8794723FFP16D of Quantity 8 Sum 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value

0020

KLI07-1

A-8794723FFP16D of Material Cost 38 Sum 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723FFP16D Sum of Quantity A-8794723FFP16D Sum of Total Scrap Value A-8794723FFP16D Sum of Material Cost A-8794723FFP16D Sum of Labor Cost A-8794723FFP16D Sum of Overhead Cost A-8794723FGP05B 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

0020

KLI07-1

A-8794723FGP05B 35 35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723FGP05B Sum of Quantity A-8794723FGP05B Sum of Total Scrap Value A-8794723FGP05B Sum of Material Cost A-8794723FGP05B Sum of Labor Cost A-8794723FGP05B Sum of Overhead Cost A-8794723GDP1 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

0020

KLI07-1

A-8794723GDP1 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723GDP1 Sum of Quantity A-8794723GDP1 Sum of Total Scrap Value A-8794723GDP1 Sum of Material Cost A-8794723GDP1 Sum of Labor Cost A-8794723GDP1 Sum of Overhead Cost A-8794723GDP4 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost A-8794723GDP4 Sum of Quantity A-8794723GDP4 Sum of Total Scrap Value A-8794723GDP4 Sum of Material Cost A-8794723GDP4 Sum of Labor Cost A-8794723GDP4 Sum of Overhead Cost A-8794723GDP5 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

0020

KLI07-1

A-8794723GDP5 35 35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost A-8794723GDP5 Sum of Quantity A-8794723GDP5 Sum of Total Scrap Value A-8794723GDP5 Sum of Material Cost A-8794723GDP5 Sum of Labor Cost A-8794723GDP5 Sum of Overhead Cost A-8794723JAP1 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost A-8794723JAP1 Sum of Quantity A-8794723JAP1 Sum of Total Scrap Value A-8794723JAP1 Sum of Material Cost A-8794723JAP1 Sum of Labor Cost A-8794723JAP1 Sum of Overhead Cost A-8794723JLP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

0020

KLI07-1

A-8794723JLP1 Sum of Quantity 10 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value

0020

KLI07-1

A-8794723JLP1 Sum of Material Cost 43 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723JLP1 Sum of Quantity A-8794723JLP1 Sum of Total Scrap Value A-8794723JLP1 Sum of Material Cost A-8794723JLP1 Sum of Labor Cost A-8794723JLP1 Sum of Overhead Cost A-8794723JMP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

0020

KLI07-1

A-8794723JMP1 24 24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723JMP1 Sum of Quantity A-8794723JMP1 Sum of Total Scrap Value A-8794723JMP1 Sum of Material Cost A-8794723JMP1 Sum of Labor Cost A-8794723JMP1 Sum of Overhead Cost A-8794723JXP1 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost A-8794723JXP1 Sum of Quantity

0020

KLI07-1

A-8794723JXP1 Sum of Total Scrap Value A-8794723JXP1 Sum of Material Cost A-8794723JXP1 Sum of Labor Cost A-8794723JXP1 Sum of Overhead Cost A-8794723PEP224 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost

0020

KLI07-1

A-8794723PEP224 of Labor Cost 38 Sum 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723PEP224 Sum of Quantity A-8794723PEP224 Sum of Total Scrap Value A-8794723PEP224 Sum of Material Cost A-8794723PEP224 Sum of Labor Cost A-8794723PEP224 Sum of Overhead Cost A-8794723PEP334 1

1 Sum of Quantity 1 Sum of Total Scrap Value 1 Sum of Material Cost 1 Sum of Labor Cost 1 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

0020

KLI07-1

A-8794723PEP334 of Quantity 15 Sum 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723PEP334 Sum of Quantity A-8794723PEP334 Sum of Total Scrap Value A-8794723PEP334 Sum of Material Cost A-8794723PEP334 Sum of Labor Cost A-8794723PEP334 Sum of Overhead Cost A-8794723PEP474A 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost A-8794723PEP474A Sum of Quantity A-8794723PEP474A Sum of Total Scrap Value

0020

KLI07-1

A-8794723PEP474A Sum of Material Cost A-8794723PEP474A Sum of Labor Cost A-8794723PEP474A Sum of Overhead Cost A-8794723PMP224 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost A-8794723PMP224 Sum of Quantity A-8794723PMP224 Sum of Total Scrap Value A-8794723PMP224 Sum of Material Cost A-8794723PMP224 Sum of Labor Cost A-8794723PMP224 Sum of Overhead Cost A-8794723PNP103 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

0020

KLI07-1

A-8794723PNP103 38 38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost A-8794723PNP103 Sum of Quantity A-8794723PNP103 Sum of Total Scrap Value A-8794723PNP103 Sum of Material Cost A-8794723PNP103 Sum of Labor Cost A-8794723PNP103 Sum of Overhead Cost A-8794723RKP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

0020

KLI07-1

A-8794723RKP1 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723RKP1 Sum of Quantity A-8794723RKP1 Sum of Total Scrap Value A-8794723RKP1 Sum of Material Cost A-8794723RKP1 Sum of Labor Cost A-8794723RKP1 Sum of Overhead Cost A-8794723THP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost

0020

KLI07-1

A-8794723THP1 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost A-8794723THP1 Sum of Quantity A-8794723THP1 Sum of Total Scrap Value A-8794723THP1 Sum of Material Cost A-8794723THP1 Sum of Labor Cost A-8794723THP1 Sum of Overhead Cost A-8794723TLP06 2

0020

KLI07-1

A-8794723TLP06 2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 44

44 Sum of Quantity 44 Sum of Total Scrap Value 44 Sum of Material Cost 44 Sum of Labor Cost 44 Sum of Overhead Cost A-8794723TLP06 Sum of Quantity A-8794723TLP06 Sum of Total Scrap Value A-8794723TLP06 Sum of Material Cost A-8794723TLP06 Sum of Labor Cost A-8794723TLP06 Sum of Overhead Cost A-8794723WXP02 8

0020

KLI07-1

A-8794723WXP02 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723WXP02 Sum of Quantity A-8794723WXP02 Sum of Total Scrap Value A-8794723WXP02 Sum of Material Cost A-8794723WXP02 Sum of Labor Cost

0020

KLI07-1

A-8794723WXP02 Sum of Overhead Cost A-8794723XHP1 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723XHP1 Sum of Quantity

0020

KLI07-1

A-8794723XHP1 Sum of Total Scrap Value A-8794723XHP1 Sum of Material Cost A-8794723XHP1 Sum of Labor Cost A-8794723XHP1 Sum of Overhead Cost A-8794723XLP2 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost A-8794723XLP2 Sum of Quantity A-8794723XLP2 Sum of Total Scrap Value A-8794723XLP2 Sum of Material Cost A-8794723XLP2 Sum of Labor Cost A-8794723XLP2 Sum of Overhead Cost A-8794723XTP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

0020

KLI07-1

A-8794723XTP1 15 15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794723XTP1 Sum of Quantity A-8794723XTP1 Sum of Total Scrap Value A-8794723XTP1 Sum of Material Cost A-8794723XTP1 Sum of Labor Cost A-8794723XTP1 Sum of Overhead Cost

0020

KLI07-1

A-8794723YMP1 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost A-8794723YMP1 Sum of Quantity A-8794723YMP1 Sum of Total Scrap Value A-8794723YMP1 Sum of Material Cost A-8794723YMP1 Sum of Labor Cost A-8794723YMP1 Sum of Overhead Cost A-8794726AWP2 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value

0020

KLI07-1

A-8794726AWP2 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 44

44 Sum of Quantity 44 Sum of Total Scrap Value 44 Sum of Material Cost 44 Sum of Labor Cost 44 Sum of Overhead Cost A-8794726AWP2 Sum of Quantity A-8794726AWP2 Sum of Total Scrap Value A-8794726AWP2 Sum of Material Cost A-8794726AWP2 Sum of Labor Cost A-8794726AWP2 Sum of Overhead Cost A-8794727BNP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

0020

KLI07-1

A-8794727BNP1 38 38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost A-8794727BNP1 Sum of Quantity A-8794727BNP1 Sum of Total Scrap Value A-8794727BNP1 Sum of Material Cost A-8794727BNP1 Sum of Labor Cost A-8794727BNP1 Sum of Overhead Cost A-8794732ABP103 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost A-8794732ABP103 Sum of Quantity A-8794732ABP103 Sum of Total Scrap Value A-8794732ABP103 Sum of Material Cost A-8794732ABP103 Sum of Labor Cost A-8794732ABP103 Sum of Overhead Cost A-8794732ABP472 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 35

35 Sum of Quantity

0020

KLI07-1

A-8794732ABP472 of Total Scrap Value 35 Sum 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost A-8794732ABP472 Sum of Quantity A-8794732ABP472 Sum of Total Scrap Value A-8794732ABP472 Sum of Material Cost A-8794732ABP472 Sum of Labor Cost A-8794732ABP472 Sum of Overhead Cost A-8794740ENP01 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost A-8794740ENP01 Sum of Quantity A-8794740ENP01 Sum of Total Scrap Value A-8794740ENP01 Sum of Material Cost A-8794740ENP01 Sum of Labor Cost A-8794740ENP01 Sum of Overhead Cost A-8794740HAP01 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost

0020

KLI07-1

A-8794740HAP01 of Labor Cost 2 Sum 2 Sum of Overhead Cost 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 20

20 Sum of Quantity 20 Sum of Total Scrap Value 20 Sum of Material Cost 20 Sum of Labor Cost 20 Sum of Overhead Cost

0020

KLI07-1

A-8794740HAP01 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost A-8794740HAP01 Sum of Quantity A-8794740HAP01 Sum of Total Scrap Value A-8794740HAP01 Sum of Material Cost A-8794740HAP01 Sum of Labor Cost A-8794740HAP01 Sum of Overhead Cost A-8794740LCP10 2

2 Sum of Quantity 2 Sum of Total Scrap Value

0020

KLI07-1

A-8794740LCP10 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 44

44 Sum of Quantity 44 Sum of Total Scrap Value 44 Sum of Material Cost 44 Sum of Labor Cost 44 Sum of Overhead Cost A-8794740LCP10 Sum of Quantity A-8794740LCP10 Sum of Total Scrap Value A-8794740LCP10 Sum of Material Cost A-8794740LCP10 Sum of Labor Cost A-8794740LCP10 Sum of Overhead Cost B23W2C2-BLK 8

0020

KLI07-1

B23W2C2-BLK 8 8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 20

20 Sum of Quantity 20 Sum of Total Scrap Value 20 Sum of Material Cost 20 Sum of Labor Cost 20 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 38

38 Sum of Quantity

0020

KLI07-1

B23W2C2-BLK Sum of Total Scrap Value 38 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost B23W2C2-BLK Sum of Quantity B23W2C2-BLK Sum of Total Scrap Value B23W2C2-BLK Sum of Material Cost B23W2C2-BLK Sum of Labor Cost B23W2C2-BLK Sum of Overhead Cost B23W2C2-BLUE 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 20

0020

KLI07-1

B23W2C2-BLUE 20 20 Sum of Quantity 20 Sum of Total Scrap Value 20 Sum of Material Cost 20 Sum of Labor Cost 20 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost B23W2C2-BLUE Sum of Quantity B23W2C2-BLUE Sum of Total Scrap Value B23W2C2-BLUE Sum of Material Cost B23W2C2-BLUE Sum of Labor Cost B23W2C2-BLUE Sum of Overhead Cost B23W2C2-RED 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost

0020

KLI07-1

B23W2C2-RED 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 20

20 Sum of Quantity 20 Sum of Total Scrap Value 20 Sum of Material Cost 20 Sum of Labor Cost 20 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

0020

KLI07-1

B23W2C2-RED 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost B23W2C2-RED Sum of Quantity B23W2C2-RED Sum of Total Scrap Value B23W2C2-RED Sum of Material Cost B23W2C2-RED Sum of Labor Cost B23W2C2-RED Sum of Overhead Cost B-8794719BNP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost

0020

KLI07-1

B-8794719BNP1Sum of Overhead Cost 38 B-8794719BNP1 Sum of Quantity B-8794719BNP1 Sum of Total Scrap Value B-8794719BNP1 Sum of Material Cost B-8794719BNP1 Sum of Labor Cost B-8794719BNP1 Sum of Overhead Cost B-8794719BXP1 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost B-8794719BXP1 Sum of Quantity B-8794719BXP1 Sum of Total Scrap Value B-8794719BXP1 Sum of Material Cost B-8794719BXP1 Sum of Labor Cost B-8794719BXP1 Sum of Overhead Cost C-8794712CFP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost 24 Sum of Labor Cost 24 Sum of Overhead Cost 35

0020

KLI07-1

C-8794712CFP1 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost C-8794712CFP1 Sum of Quantity C-8794712CFP1 Sum of Total Scrap Value C-8794712CFP1 Sum of Material Cost C-8794712CFP1 Sum of Labor Cost C-8794712CFP1 Sum of Overhead Cost C-8794715DLP1 2

2 Sum of Quantity 2 Sum of Total Scrap Value 2 Sum of Material Cost 2 Sum of Labor Cost 2 Sum of Overhead Cost 10

10 Sum of Quantity 10 Sum of Total Scrap Value 10 Sum of Material Cost 10 Sum of Labor Cost 10 Sum of Overhead Cost 24

24 Sum of Quantity 24 Sum of Total Scrap Value 24 Sum of Material Cost

0020

KLI07-1

C-8794715DLP1Sum of Labor Cost 24 24 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost C-8794715DLP1 Sum of Quantity C-8794715DLP1 Sum of Total Scrap Value C-8794715DLP1 Sum of Material Cost C-8794715DLP1 Sum of Labor Cost C-8794715DLP1 Sum of Overhead Cost N238P9B 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 20

0020

KLI07-1

N238P9B

20 Sum of Quantity 20 Sum of Total Scrap Value 20 Sum of Material Cost 20 Sum of Labor Cost 20 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost 44

44 Sum of Quantity 44 Sum of Total Scrap Value

0020

KLI07-1

N238P9B

44 Sum of Material Cost 44 Sum of Labor Cost 44 Sum of Overhead Cost N238P9B Sum of Quantity N238P9B Sum of Total Scrap Value N238P9B Sum of Material Cost N238P9B Sum of Labor Cost N238P9B Sum of Overhead Cost N30P9006B 8

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 20

20 Sum of Quantity 20 Sum of Total Scrap Value 20 Sum of Material Cost 20 Sum of Labor Cost 20 Sum of Overhead Cost 33

0020

KLI07-1

N30P9006B 33 33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 35

35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost 44

44 Sum of Quantity 44 Sum of Total Scrap Value 44 Sum of Material Cost 44 Sum of Labor Cost 44 Sum of Overhead Cost N30P9006B Sum of Quantity N30P9006B Sum of Total Scrap Value N30P9006B Sum of Material Cost N30P9006B Sum of Labor Cost N30P9006B Sum of Overhead Cost N402P35B 8

0020

KLI07-1

N402P35B

8 Sum of Quantity 8 Sum of Total Scrap Value 8 Sum of Material Cost 8 Sum of Labor Cost 8 Sum of Overhead Cost 9

9 Sum of Quantity 9 Sum of Total Scrap Value 9 Sum of Material Cost 9 Sum of Labor Cost 9 Sum of Overhead Cost 15

15 Sum of Quantity 15 Sum of Total Scrap Value 15 Sum of Material Cost 15 Sum of Labor Cost 15 Sum of Overhead Cost 20

20 Sum of Quantity 20 Sum of Total Scrap Value 20 Sum of Material Cost 20 Sum of Labor Cost 20 Sum of Overhead Cost 33

33 Sum of Quantity 33 Sum of Total Scrap Value 33 Sum of Material Cost 33 Sum of Labor Cost 33 Sum of Overhead Cost 35

0020

KLI07-1

N402P35B

35 35 Sum of Quantity 35 Sum of Total Scrap Value 35 Sum of Material Cost 35 Sum of Labor Cost 35 Sum of Overhead Cost 38

38 Sum of Quantity 38 Sum of Total Scrap Value 38 Sum of Material Cost 38 Sum of Labor Cost 38 Sum of Overhead Cost 43

43 Sum of Quantity 43 Sum of Total Scrap Value 43 Sum of Material Cost 43 Sum of Labor Cost 43 Sum of Overhead Cost 44

44 Sum of Quantity 44 Sum of Total Scrap Value 44 Sum of Material Cost 44 Sum of Labor Cost 44 Sum of Overhead Cost N402P35B Sum of Quantity N402P35B Sum of Total Scrap Value N402P35B Sum of Material Cost N402P35B Sum of Labor Cost N402P35B Sum of Overhead Cost KLI07-1 Sum of Quantity KLI07-1 Sum of Total Scrap Value KLI07-1 Sum of Material Cost KLI07-1 Sum of Labor Cost KLI07-1 Sum of Overhead Cost 0020 Sum of Quantity 0020 Sum of Total Scrap Value 0020 Sum of Material Cost 0020 Sum of Labor Cost 0020 Sum of Overhead Cost

Total Sum of Quantity Total Sum of Total Scrap Value Total Sum of Material Cost Total Sum of Labor Cost Total Sum of Overhead Cost

Line / Location Description

Material description Description Data ECM142 ODF 230V ASM, RBC Owned Scrap Sum of Quantity Customer Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost

Rate capacity Planing for KSM05-1 ASM, AXIAL POWER BOARD G01 SUB Dropped unit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost

kLI03-1 Rate capacity Planing SUB ASM, AUTO INS Off Location CNTRL 1/2HP, IGBT 23XH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value f Material Cost

f Overhead Cost kLI03-1 Rate capacity Planing SUB ASM, AUTO INS Off Location1HP (G10,G12) CONTROL Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value f Material Cost

f Overhead Cost kLI03-1 Rate capacity Planing SUB ASM, AUTO INS Off Location (G11,G13) Sum of Quantity CNTRL 3/4HP Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost kLI03-1 Rate capacity Planing SUB ASM, AUTO INS Lifted Circuit (G11,G13) Sum of Quantity CNTRL 3/4HP Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value f Material Cost

f Overhead Cost kLI03-1 Rate capacity Planing X-MOTOR SUB ASM Off Location

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost kLI03-1 Rate capacity Planing DIODE, ZENER 1N5261B DO35 Mach drop/equip fail

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost kLI03-1 Rate capacity Planing RES, .33 OHM 1/2W 5% TH drop/equip fail Mach

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost

KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL POWER BOARD G01 SUB Chip/broken/crack

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL POWER BOARD G01 SUB Failed Elec Test

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL POWER BOARD G03 SUB Lifted Circuit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL POWER BOARD G03 SUB Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL POWER BOARD G03 SUB Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL POWER BOARD G03 SUB Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL POWER BOARD G05 SUB Failed Elec Test

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL KKG01 SUB Chip/broken/crack

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Failed Elec TestIGBT 23XH SUB CNTRL 1/2HP, Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Operator error IGBT 23XH SUB CNTRL 1/2HP, Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH SUB Operator error Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Dropped1/2HP, IGBT 23XH SUB CNTRL unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value f Material Cost

f Overhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Scratch SUB CONTROL 1HP (G10,G12) Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Lifted Circuit SUB CONTROL 1HP (G10,G12) Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Failed Elec Test (G10,G12) SUB CONTROL 1HP Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Operator error (G10,G12) SUB CONTROL 1HP Sum of Quantity

KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS CONTROL error (G10,G12) SUB Operator 1HP Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Dropped unit SUB CONTROL 1HP (G10,G12) Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value f Material Cost

f Overhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Scratch 3/4HP (G11,G13) Sum of Quantity SUB CNTRL Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Lifted Circuit (G11,G13) Sum of Quantity SUB CNTRL 3/4HP Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Chip/broken/crack SUB CNTRL 3/4HP (G11,G13) Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Nick/cut/tear (G11,G13) Sum of Quantity SUB CNTRL 3/4HP Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Failed Elec Test SUB CNTRL 3/4HP (G11,G13) Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Damaged SUB CNTRL 3/4HP (G11,G13) Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AUTO INS Operator error (G11,G13) Sum of Quantity SUB CNTRL 3/4HP Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value f Material Cost

f Overhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL KXG01 Circuit SUB Lifted

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, AXIAL KXG01 SUB Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION ASM, CONTROL Failed ElecMAR SUB 1.0HP CE Test

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION X-MOTOR 1HP 230VAC SUB ASM Lifted Circuit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION X-MOTOR 1HP 230VAC SUB ASM Solderability Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION X-MOTOR SUB ASM Lifted Circuit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION X-MOTOR SUB ASM Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION X-MOTOR SUB ASM Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, POWER Lifted Circuit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, POWER Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, POWER Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, POWER Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, POWER Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOLT Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOLT Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOLT Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOLT Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value f Material Cost

f Overhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS Scratch

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost

KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS

Lifted Circuit

Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, BOOTS Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, CLAMP BAR Circuit Lifted Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, CLAMP BAR Elec Test Failed Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, HEATSINK Circuit Lifted Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, HEATSINK Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, HEATSINK Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 3MH Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 3MH Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 3MH Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 3MH

Failed Elec Test

Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 3MH Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 3MH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Scratch

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Delamination Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Circuit Lifted Sum of Quantity

KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P Lifted Circuit TH

Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Elec Test Failed Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Eng scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Scrap Repair Sum of Quantity Sum of Total Scrap Value Sum of Material Cost

KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P Repair Scrap TH

Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER 6P TH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Damaged

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Circuit Lifted Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERM, 1 OHM 20 DISP Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL, SN Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL, SN Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL, SN Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION TERMINAL, SN

Failed Elec Test

Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL, SN Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL, SN Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Nick/cut/tear Sum of Quantity

KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339

Nick/cut/tear

Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Eng scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost

KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339

Operator error

Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 14P TH IC, 339 Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, COP881CL Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, COP881CL Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, COP881CL Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

KLI07-1 RUN SCHEDULE VERSION IC, COP881CL

Failed Elec Test

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, COP881CL Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, COP881CL Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, COP881CL Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, COP881CL Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value

f Material Cost

f Overhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Scratch

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Circuit Lifted Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Elec Test Failed Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Eng scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Scrap Repair Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, OPTOCOUPLER DIP16 Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Eng scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 93C46 8P TH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION CONFORMAL, COATING Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION CONFORMAL, COATING Elec Test Failed Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION CONFORMAL, COATING Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION 748 RTV, Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 748 RTV, Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 748 RTV, Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost Total Scrap Value

Material Cost Overhead Cost KLI07-1 RUN SCHEDULE VERSION THERMAL JOINT COMPOUND Scratch

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERMAL JOINT COMPOUND Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERMAL JOINT COMPOUND Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION THERMAL JOINT COMPOUND error Operator Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION RESIN Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION RESIN

Scratch

Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION RESIN Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION RESIN Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION RESIN Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HARDENER Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HARDENER Nick/cut/tear Sum of Quantity

KLI07-1 RUN SCHEDULE VERSION HARDENER

Nick/cut/tear

Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HARDENER Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HARDENER Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION PLASTIC RIVET, Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION PLASTIC RIVET, Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION PLASTIC RIVET, Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION PLASTIC RIVET, Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION PLASTIC RIVET, Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 16P RA TH Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 16P RA TH Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 16P RA TH Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 16P RA TH Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 16P RA TH Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 16P RA TH Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 16P RA TH Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 16P RA TH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 5P RA TH Lifted Circuit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 5P RA TH Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 5P RA TH Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 5P RA TH Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION HEADER, 5P RA TH

Repair Scrap

Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 5P RA TH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION 1000UF 200V 20% TH Circuit CAP, Lifted

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 1000UF 200V 20% TH CAP, Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 1000UF 200V 20% TH Elec Test CAP, Failed Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 1000UF 200V 20% TH Scrap CAP, Repair Sum of Quantity

KLI07-1 RUN SCHEDULE VERSION 1000UF 200V 20%Repair Scrap CAP, TH

Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 1000UF 200V 20% TH unit CAP, Dropped Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION 680UF 200V 20% TH CAP, Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION 680UF 250V 20% TH Elec Test CAP, Failed Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 680UF 250V 20% TH Scrap CAP, Repair Sum of Quantity Sum of Total Scrap Value Sum of Material Cost

KLI07-1 RUN SCHEDULE VERSION 680UF 250V 20% TH CAP, Repair Scrap

Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 2A Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 1MH TH Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 1MH TH Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 1MH TH Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 1MH TH Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 1MH TH Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 1MH TH Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 1MH TH Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, COMMON MODE 1MH TH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Damaged

Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INDUCTOR, 2.5MH +/-20% @ 100KH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION TRANSFORMER, WIDE BAND Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION .22UF 275V 20%Lifted Circuit CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .22UF 275V 20%Chip/broken/crack CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .22UF 275V 20%Failed Elec Test CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .22UF 275V 20%Repair Scrap CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .22UF 275V 20%Operator error CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .22UF 275V 20%Dropped unit CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION .33UF 250V 20%Dents CAP, TH

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .33UF 250V 20%Lifted Circuit CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .33UF 250V 20%Chip/broken/crack CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .33UF 250V 20%Failed Elec Test CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .33UF 250V 20%Repair Scrap CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .33UF 250V 20%Dropped unit CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION .47UF 275V 20%Chip/broken/crack CAP, TH

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .47UF 275V 20%Repair Scrap CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost of Total Scrap Value

of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION .22UF 300V 20%Failed Elec Test CAP, TH

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION .01UF 300V 20%Lifted TH CAP, Y5U Circuit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .01UF 300V 20%FailedTH Test CAP, Y5U Elec Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .01UF 300V 20%Repair Scrap CAP, Y5U TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .01UF 300V 20%Operator error CAP, Y5U TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION .01UF 300V 20% Y5U TH error CAP, Operator

Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH Scratch

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH Damaged Sum of Quantity

KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH

Damaged

Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION IC, 8794723RKP1 TH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION HARDWARE, SUPPORT POST Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HARDWARE, SUPPORT POST Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HARDWARE, SUPPORT POST Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HARDWARE, SUPPORT POST Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HARDWARE, SUPPORT POSTerror Operator Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, PAN HD PHIScratch 6-20X.375 THRD RO Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, PAN HD PHINick/cut/tear 6-20X.375 THRD RO Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, PAN HD PHIDamaged THRD RO 6-20X.375 Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, PAN HD PHIOperator error 6-20X.375 THRD RO Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, PAN HD PHIScrew Torque 6-20X.375 THRD RO Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL

Lifted Circuit

Sum of Quantity Sum of Total Scrap Value

KLI07-1 RUN SCHEDULE VERSION TERMINAL

Lifted Circuit

Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TERMINAL Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

f Total Scrap Value f Material Cost

f Overhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 10A TO220AB Lifted Circuit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 10A TO220AB Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 10A TO220AB Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 10A TO220AB Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 10A TO220AB Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IRF840 TO220 epair Scrap R Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13A INSULATED Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13A INSULATED Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13A INSULATED Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13A INSULATED Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost

KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13AFailed Elec Test INSULATED

Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13A INSULATED Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13A INSULATED Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13A INSULATED Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 13A INSULATED Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost

KLI07-1 RUN SCHEDULE VERSION HARDWARE, TAB SNChip/broken/crack - Terminal Tyco

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION CLAMP, BAR Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION CLAMP, BAR Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION CLAMP, BAR Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION CLAMP, BAR Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION CLAMP, BAR Screw Torque Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION WARNING HIGH VOLTAGE LABEL, Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WARNING HIGH VOLTAGE LABEL, Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WARNING HIGH VOLTAGE LABEL, Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WARNING HIGH VOLTAGE LABEL, Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION WARNING HIGH VOLTAGE LABEL, Operator error

Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION .01UF 250V 20%Chip/broken/crack CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .01UF 250V 20%Repair Scrap CAP, TH Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION .0047UF 400V 20% TH CAP, Chip/broken/crack

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION .0047UF 400V 20% TH Scrap CAP, Repair Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

of Total Scrap Value of Material Cost of Labor Cost of Overhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 10A INSULATED Failed Elec Test

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 10A INSULATED Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION TRANS, IGBT 600V 10A INSULATED Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost Total Scrap Value Material Cost Overhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH

Scratch

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH Solderability Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH

Damaged

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH Eng scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEADER, 3P TH Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost Total Scrap Value Material Cost Overhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, SERRATED Scratch HEX WASH HD M4X0.7X10MM" Quantity Sum of Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, SERRATED Nick/cut/tear HD M4X0.7X10MM" Quantity HEX WASH Sum of Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, SERRATED Damaged HD M4X0.7X10MM" Quantity HEX WASH Sum of Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, SERRATED Operator error M4X0.7X10MM" Quantity HEX WASH HD Sum of Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, SERRATED Screw Torque M4X0.7X10MM" Quantity HEX WASH HD Sum of Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE BLACK WIRE, Lifted Circuit

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE BLACK WIRE, Lifted Circuit

Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE BLACK WIRE, Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE BLACK WIRE, Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE BLACK WIRE, Solderability Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C scrap BLACK WIRE, Eng XLPE Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE BLACK WIRE, Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE BLACK WIRE, Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18 AWG 600V 125 GRADES CENTIGRATES of Quantity WIRE, Lifted Circuit Sum Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18 AWG 600V 125 GRADES CENTIGRATES of Quantity WIRE, Chip/broken/crack Sum Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18 AWG 600V 125 GRADES CENTIGRATES of Quantity WIRE, Failed Elec Test Sum Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18 AWG 600V 125 GRADES CENTIGRATES of Quantity WIRE, Solderability Sum Sum of Total Scrap Value Sum of Material Cost

KLI07-1 RUN SCHEDULE VERSION 18 AWG 600V 125 GRADES CENTIGRATES of Labor Cost WIRE, Solderability Sum Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18 AWG 600V 125 GRADES CENTIGRATES of Quantity WIRE, Eng scrap Sum Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18 AWG 600V 125 GRADES CENTIGRATES of Quantity WIRE, Operator error Sum Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18 AWG 600V 125 GRADES CENTIGRATES of Quantity WIRE, Dropped unit Sum Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE RED WIRE, Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE RED WIRE, Chip/broken/crack

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE RED WIRE, Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE RED WIRE, Solderability Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C scrap RED WIRE, Eng XLPE Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE RED WIRE, Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE RED WIRE, Dropped unit Sum of Quantity Sum of Total Scrap Value

KLI07-1 RUN SCHEDULE VERSION 18AWG 600V 125C XLPE unit WIRE, Dropped RED

Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, MYLAR Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, MYLAR Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, MYLAR Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION INSULATOR, MYLAR Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION ENCLOSURE, INSULATOR Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, CONTROL Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, CONTROL Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, CONTROL Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, CONTROL Repair Scrap Sum of Quantity

KLI07-1 RUN SCHEDULE VERSION HEATSINK, CONTROL Repair Scrap

Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION HEATSINK, CONTROL Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value Material Cost

Overhead Cost KLI07-1 RUN SCHEDULE VERSION ENCLOSURE Scratch Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ENCLOSURE Nick/cut/tear Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ENCLOSURE Damaged Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION ENCLOSURE Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total Scrap Value

Overhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Lifted Circuit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Chip/broken/crack Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Failed Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Solderability Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Eng scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Repair Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Operator error Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Dropped unit Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION KEPSNUT, 4-40 UNC Screw Torque Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40Lifted Circuit UNC X.375LG

Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40Chip/broken/crack UNC X.375LG Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40Failed X.375LG UNC Elec Test Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40Solderability UNC X.375LG Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40Eng scrap UNC X.375LG Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost

KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40 UNC X.375LG Eng scrap

Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40RepairX.375LG UNC Scrap Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40Operator error UNC X.375LG Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40Dropped unit UNC X.375LG Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION SCREW, MATCH 4-40Screw X.375LG UNC Torque Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Lifted Circuit REGULAR

Sum of Quantity

KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4 REGULAR Lifted Circuit

Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Chip/broken/crack REGULAR Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Failed Elec Test REGULAR Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Solderability REGULAR Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Eng scrap REGULAR Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Repair Scrap REGULAR Sum of Quantity Sum of Total Scrap Value Sum of Material Cost

KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4 REGULAR Repair Scrap

Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Operator error REGULAR Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Dropped unit REGULAR Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost KLI07-1 RUN SCHEDULE VERSION WASHER, FLAT NO 4Screw Torque REGULAR Sum of Quantity Sum of Total Scrap Value Sum of Material Cost Sum of Labor Cost Sum of Overhead Cost

otal Scrap Value

verhead Cost

Total 5 158.75 158.75 0 0 5 158.75 158.75 0 0 5 158.75 158.75 0 0 5 158.75 158.75 0 0 1 1.21 1.21 0 0 1 1.21 1.21 0 0 1 1.21 1.21 0 0 1 1.21 1.21 0 0 1 4.66 4.66 0 0 1 4.66 4.66 0 0 1

4.66 4.66 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 2 9.66 9.66 0 0 3 16.32 16.32 0 0 3 16.32 16.32

0 0 3 16.32 16.32 0 0 8 0.08 0.08 0 0 8 0.08 0.08 0 0 8 0.08 0.08 0 0 118 2.23 2.23 0 0 118 2.23 2.23 0 0 118 2.23 2.23 0 0 133 37.78 37.78 0 0 5 6.05 6.05 0 0 5 6.05 6.05 0 0

29 35.09 35.09 0 0 29 35.09 35.09 0 0 34 41.14 41.14 0 0 1 1.14 1.14 0 0 1 1.14 1.14 0 0 5 5.7 5.7 0 0 5 5.7 5.7 0 0 9 10.26 10.26 0 0 9 10.26 10.26 0 0 1 1.14 1.14 0 0 1 1.14

1.14 0 0 16 18.24 18.24 0 0 3 3.48 3.48 0 0 3 3.48 3.48 0 0 3 3.48 3.48 0 0 2 2.18 2.18 0 0 2 2.18 2.18 0 0 2 2.18 2.18 0 0 13 60.58 60.58 0 0 13 60.58 60.58 0 0 2 9.32 9.32 0

0 2 9.32 9.32 0 0 1 4.66 4.66 0 0 1 4.66 4.66 0 0 16 74.56 74.56 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 7 33.81 33.81 0 0 7 33.81 33.81 0 0 7

33.81 33.81 0 0 7 33.81 33.81 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 17 82.11 82.11 0 0 5 24.15 24.15 0 0 5 24.15 24.15 0 0 2 9.66 9.66 0 0 2 9.66 9.66 0 0 2 9.66 9.66 0 0 2 9.66 9.66

0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 15 72.45 72.45 0 0 15 72.45 72.45 0 0 1 4.83 4.83 0 0 1 4.83 4.83 0 0 6 28.98 28.98 0 0 6 28.98 28.98 0 0 32 154.56 154.56 0 0 1 5.53 5.53 0 0

1 5.53 5.53 0 0 1 5.53 5.53 0 0 1 5.53 5.53 0 0 2 11.06 11.06 0 0 1 5.71 5.71 0 0 1 5.71 5.71 0 0 1 5.71 5.71 0 0 2 10.9 10.9 0 0 2 10.9 10.9 0 0 4 21.8 21.8 0 0 4 21.8

21.8 0 0 6 32.7 32.7 0 0 1 5.44 5.44 0 0 1 5.44 5.44 0 0 1 5.44 5.44 0 0 1 5.44 5.44 0 0 2 10.88 10.88 0 0 2 10.88 10.88 0 0 4 21.76 21.76 0 0 1 0.09 0.09 0 0 1 0.09 0.09 0

0 10 0.85 0.85 0 0 10 0.85 0.85 0 0 41 3.5 3.5 0 0 41 3.5 3.5 0 0 14 1.19 1.19 0 0 14 1.19 1.19 0 0 2 0.17 0.17 0 0 2 0.17 0.17 0 0 68 5.8 5.8 0 0 12 0.48 0.48 0 0 12

0.48 0.48 0 0 2 0.08 0.08 0 0 2 0.08 0.08 0 0 2 0.08 0.08 0 0 2 0.08 0.08 0 0 24 0.96 0.96 0 0 24 0.96 0.96 0 0 40 1.6 1.6 0 0 36 2.7 2.7 0 0 36 2.7 2.7 0 0 24 1.8 1.8

0 0 24 1.8 1.8 0 0 6 0.45 0.45 0 0 6 0.45 0.45 0 0 234 17.55 17.55 0 0 234 17.55 17.55 0 0 197 14.78 14.78 0 0 197 14.78 14.78 0 0 112 8.4 8.4 0 0 112 8.4 8.4 0 0 72 5.4 5.4 0 0

72 5.4 5.4 0 0 12 0.9 0.9 0 0 12 0.9 0.9 0 0 693 51.98 51.98 0 0 3 0.21 0.21 0 0 3 0.21 0.21 0 0 6 0.42 0.42 0 0 6 0.42 0.42 0 0 9 0.63 0.63 0 0 1 0.08 0.08 0 0 1 0.08

0.08 0 0 2 0.16 0.16 0 0 2 0.16 0.16 0 0 5 0.39 0.39 0 0 5 0.39 0.39 0 0 8 0.63 0.63 0 0 1 0.62 0.62 0 0 1 0.62 0.62 0 0 10 6.2 6.2 0 0 10 6.2 6.2 0 0 41 25.42 25.42 0

0 41 25.42 25.42 0 0 2 1.24 1.24 0 0 2 1.24 1.24 0 0 2 1.24 1.24 0 0 2 1.24 1.24 0 0 56 34.72 34.72 0 0 6 0.57 0.57 0 0 6 0.57 0.57 0 0 7 0.66 0.66 0 0 7 0.66 0.66 0 0 4

0.38 0.38 0 0 4 0.38 0.38 0 0 1 0.1 0.1 0 0 1 0.1 0.1 0 0 37 3.52 3.52 0 0 37 3.52 3.52 0 0 1 0.1 0.1 0 0 1 0.1 0.1 0 0 88 8.36 8.36 0 0 88 8.36 8.36 0 0 6 0.57 0.57

0 0 6 0.57 0.57 0 0 12 1.13 1.13 0 0 12 1.13 1.13 0 0 2 0.19 0.19 0 0 2 0.19 0.19 0 0 164 15.58 15.58 0 0 5 1.85 1.85 0 0 5 1.85 1.85 0 0 32 11.84 11.84 0 0 32 11.84 11.84 0 0

8 2.96 2.96 0 0 8 2.96 2.96 0 0 6 2.22 2.22 0 0 6 2.22 2.22 0 0 1 0.37 0.37 0 0 1 0.37 0.37 0 0 52 19.24 19.24 0 0 1 0.98 0.98 0 0 1 0.98 0.98 0 0 5 4.92 4.92 0 0 5 4.92

4.92 0 0 9 8.85 8.85 0 0 9 8.85 8.85 0 0 1 0.98 0.98 0 0 1 0.98 0.98 0 0 16 15.73 15.73 0 0 4 0.04 0.04 0 0 4 0.04 0.04 0 0 49 0.49 0.49 0 0 49 0.49 0.49 0 0 162 1.62 1.62 0

0 162 1.62 1.62 0 0 303 3.03 3.03 0 0 303 3.03 3.03 0 0 8 0.08 0.08 0 0 8 0.08 0.08 0 0 526 5.26 5.26 0 0 6 0.4 0.4 0 0 6 0.4 0.4 0 0 4 0.27 0.27 0 0 4 0.27 0.27 0 0 1

0.07 0.07 0 0 1 0.07 0.07 0 0 37 2.46 2.46 0 0 37 2.46 2.46 0 0 1 0.07 0.07 0 0 1 0.07 0.07 0 0 19 1.26 1.26 0 0 19 1.26 1.26 0 0 8 0.54 0.54 0 0 8 0.54 0.54 0 0 12 0.8 0.8

0 0 12 0.8 0.8 0 0 2 0.13 0.13 0 0 2 0.13 0.13 0 0 90 6 6 0 0 6 11.46 11.46 0 0 6 11.46 11.46 0 0 4 7.64 7.64 0 0 4 7.64 7.64 0 0 1 1.91 1.91 0 0 1 1.91 1.91 0 0

37 70.67 70.67 0 0 37 70.67 70.67 0 0 1 1.91 1.91 0 0 1 1.91 1.91 0 0 12 22.92 22.92 0 0 12 22.92 22.92 0 0 14 26.74 26.74 0 0 14 26.74 26.74 0 0 2 3.82 3.82 0 0 2 3.82 3.82 0 0 77 147.07

147.07 0 0 12 3.06 3.06 0 0 12 3.06 3.06 0 0 8 2.04 2.04 0 0 8 2.04 2.04 0 0 2 0.51 0.51 0 0 2 0.51 0.51 0 0 74 18.87 18.87 0 0 74 18.87 18.87 0 0 2 0.51 0.51 0 0 2 0.51 0.51 0

0 36 9.18 9.18 0 0 36 9.18 9.18 0 0 7 1.78 1.78 0 0 7 1.78 1.78 0 0 24 6.12 6.12 0 0 24 6.12 6.12 0 0 4 1.02 1.02 0 0 4 1.02 1.02 0 0 169 43.09 43.09 0 0 6 0.66 0.66 0 0 6

0.66 0.66 0 0 4 0.44 0.44 0 0 4 0.44 0.44 0 0 1 0.11 0.11 0 0 1 0.11 0.11 0 0 37 4.07 4.07 0 0 37 4.07 4.07 0 0 1 0.11 0.11 0 0 1 0.11 0.11 0 0 38 4.18 4.18 0 0 38 4.18 4.18

0 0 11 1.21 1.21 0 0 11 1.21 1.21 0 0 16 1.76 1.76 0 0 16 1.76 1.76 0 0 2 0.22 0.22 0 0 2 0.22 0.22 0 0 116 12.76 12.76 0 0 6 0.11 0.11 0 0 6 0.11 0.11 0 0 78 1.56 1.56 0 0

78 1.56 1.56 0 0 4 0.08 0.08 0 0 4 0.08 0.08 0 0 88 1.75 1.75 0 0 92 1.35 1.35 0 0 92 1.35 1.35 0 0 738 10.78 10.78 0 0 738 10.78 10.78 0 0 36 0.53 0.53 0 0 36 0.53 0.53 0 0 866 12.66

12.66 0 0 2 0.13 0.13 0 0 2 0.13 0.13 0 0 0 0.02 0.02 0 0 0 0.02 0.02 0 0 0 0.02 0.02 0 0 0 0.02 0.02 0 0 5 0.27 0.27 0 0 5 0.27 0.27 0 0 7 0.44 0.44 0 0 1052 4.68 4.68 0

0 1052 4.68 4.68 0 0 175 0.78 0.78 0 0 175 0.78 0.78 0 0 175 0.78 0.78 0 0 175 0.78 0.78 0 0 2104 9.36 9.36 0 0 2104 9.36 9.36 0 0 3506 15.6 15.6 0 0 215 0.85 0.85 0 0 215 0.85 0.85 0 0 36

0.14 0.14 0 0 36 0.14 0.14 0 0 36 0.14 0.14 0 0 36 0.14 0.14 0 0 430 1.7 1.7 0 0 430 1.7 1.7 0 0 717 2.83 2.83 0 0 2 0.04 0.04 0 0 2 0.04 0.04 0 0 20 0.42 0.42 0 0 20 0.42 0.42

0 0 80 1.68 1.68 0 0 80 1.68 1.68 0 0 80 1.68 1.68 0 0 80 1.68 1.68 0 0 4 0.08 0.08 0 0 4 0.08 0.08 0 0 186 3.9 3.9 0 0 6 2.92 2.92 0 0 6 2.92 2.92 0 0 4 1.95 1.95 0 0

4 1.95 1.95 0 0 1 0.49 0.49 0 0 1 0.49 0.49 0 0 37 17.98 17.98 0 0 37 17.98 17.98 0 0 1 0.49 0.49 0 0 1 0.49 0.49 0 0 48 23.33 23.33 0 0 48 23.33 23.33 0 0 12 5.83 5.83 0 0 12 5.83

5.83 0 0 2 0.97 0.97 0 0 2 0.97 0.97 0 0 111 53.96 53.96 0 0 1 0.29 0.29 0 0 1 0.29 0.29 0 0 10 2.92 2.92 0 0 10 2.92 2.92 0 0 41 11.96 11.96 0 0 41 11.96 11.96 0 0 55 16.06 16.06 0

0 55 16.06 16.06 0 0 2 0.58 0.58 0 0 2 0.58 0.58 0 0 109 31.81 31.81 0 0 4 3.52 3.52 0 0 4 3.52 3.52 0 0 30 26.37 26.37 0 0 30 26.37 26.37 0 0 96 84.39 84.39 0 0 96 84.39 84.39 0 0 55

48.35 48.35 0 0 55 48.35 48.35 0 0 6 5.27 5.27 0 0 6 5.27 5.27 0 0 191 167.9 167.9 0 0 4 3.46 3.46 0 0 4 3.46 3.46 0 0 4 3.46 3.46 0 0 4 4.88 4.88 0 0 4 4.88 4.88 0 0 6 7.32 7.32

0 0 6 7.32 7.32 0 0 10 12.2 12.2 0 0 2 1.7 1.7 0 0 2 1.7 1.7 0 0 2 1.7 1.7 0 0 18 3.24 3.24 0 0 18 3.24 3.24 0 0 12 2.16 2.16 0 0 12 2.16 2.16 0 0 3 0.54 0.54 0 0

3 0.54 0.54 0 0 111 19.98 19.98 0 0 111 19.98 19.98 0 0 3 0.54 0.54 0 0 3 0.54 0.54 0 0 38 6.84 6.84 0 0 38 6.84 6.84 0 0 36 6.48 6.48 0 0 36 6.48 6.48 0 0 6 1.08 1.08 0 0 6 1.08

1.08 0 0 227 40.86 40.86 0 0 6 2.28 2.28 0 0 6 2.28 2.28 0 0 4 1.52 1.52 0 0 4 1.52 1.52 0 0 1 0.38 0.38 0 0 1 0.38 0.38 0 0 37 14.06 14.06 0 0 37 14.06 14.06 0 0 14 5.32 5.32 0

0 14 5.32 5.32 0 0 9 3.42 3.42 0 0 9 3.42 3.42 0 0 12 4.56 4.56 0 0 12 4.56 4.56 0 0 2 0.76 0.76 0 0 2 0.76 0.76 0 0 85 32.3 32.3 0 0 1 0.34 0.34 0 0 1 0.34 0.34 0 0 1

0.34 0.34 0 0 1 0.12 0.12 0 0 1 0.12 0.12 0 0 15 1.76 1.76 0 0 15 1.76 1.76 0 0 69 8.08 8.08 0 0 69 8.08 8.08 0 0 2 0.23 0.23 0 0 2 0.23 0.23 0 0 2 0.24 0.24 0 0 2 0.24 0.24

0 0 3 0.35 0.35 0 0 3 0.35 0.35 0 0 92 10.78 10.78 0 0 4 0.3 0.3 0 0 4 0.3 0.3 0 0 1 0.07 0.07 0 0 1 0.07 0.07 0 0 5 0.37 0.37 0 0 5 0.37 0.37 0 0 6 0.44 0.44 0 0

6 0.44 0.44 0 0 10 0.74 0.74 0 0 10 0.74 0.74 0 0 1 0.07 0.07 0 0 1 0.07 0.07 0 0 27 1.99 1.99 0 0 4 0.46 0.46 0 0 4 0.46 0.46 0 0 1 0.12 0.12 0 0 1 0.12 0.12 0 0 5 0.58

0.58 0 0 4 0.88 0.88 0 0 4 0.88 0.88 0 0 4 0.88 0.88 0 0 3 1.49 1.49 0 0 3 1.49 1.49 0 0 6 2.98 2.98 0 0 6 2.98 2.98 0 0 10 4.96 4.96 0 0 10 4.96 4.96 0 0 2 0.99 0.99 0

0 2 0.99 0.99 0 0 21 10.42 10.42 0 0 6 10.5 10.5 0 0 6 10.5 10.5 0 0 4 7 7 0 0 4 7 7 0 0 1 1.75 1.75 0 0 1 1.75 1.75 0 0 37 64.75 64.75 0 0 37 64.75 64.75 0 0 1

1.75 1.75 0 0 1 1.75 1.75 0 0 21 36.75 36.75 0 0 21 36.75 36.75 0 0 15 26.25 26.25 0 0 15 26.25 26.25 0 0 2 3.5 3.5 0 0 2 3.5 3.5 0 0 87 152.25 152.25 0 0 6 0.19 0.19 0 0 6 0.19 0.19

0 0 1 0.03 0.03 0 0 1 0.03 0.03 0 0 1 0.03 0.03 0 0 1 0.03 0.03 0 0 2 0.07 0.07 0 0 2 0.07 0.07 0 0 12 0.39 0.39 0 0 12 0.39 0.39 0 0 22 0.71 0.71 0 0 12 0.05 0.05 0 0

12 0.05 0.05 0 0 2 0.01 0.01 0 0 2 0.01 0.01 0 0 2 0.01 0.01 0 0 2 0.01 0.01 0 0 24 0.09 0.09 0 0 24 0.09 0.09 0 0 71 0.26 0.26 0 0 71 0.26 0.26 0 0 111 0.42 0.42 0 0 1 0.02

0.02 0 0 1 0.02 0.02 0 0 12 0.25 0.25 0 0 12 0.25 0.25 0 0 35 0.76 0.76 0 0 35 0.76 0.76 0 0 17 0.37 0.37 0 0 17 0.37 0.37 0 0 2 0.04 0.04 0 0 2 0.04 0.04 0 0 67 1.44 1.44 0

0 6 1.62 1.62 0 0 6 1.62 1.62 0 0 84 22.68 22.68 0 0 84 22.68 22.68 0 0 5 1.35 1.35 0 0 5 1.35 1.35 0 0 22 5.94 5.94 0 0 22 5.94 5.94 0 0 6 1.62 1.62 0 0 6 1.62 1.62 0 0 123

33.21 33.21 0 0 7 2.24 2.24 0 0 7 2.24 2.24 0 0 7 2.24 2.24 0 0 36 9.72 9.72 0 0 36 9.72 9.72 0 0 18 4.86 4.86 0 0 18 4.86 4.86 0 0 6 1.62 1.62 0 0 6 1.62 1.62 0 0 126 34.02 34.02

0 0 126 34.02 34.02 0 0 6 1.62 1.62 0 0 6 1.62 1.62 0 0 14 3.78 3.78 0 0 14 3.78 3.78 0 0 60 16.2 16.2 0 0 60 16.2 16.2 0 0 6 1.62 1.62 0 0 6 1.62 1.62 0 0 272 73.44 73.44 0 0

6 0.14 0.14 0 0 6 0.14 0.14 0 0 6 0.14 0.14 0 0 18 0.84 0.84 0 0 18 0.84 0.84 0 0 3 0.14 0.14 0 0 3 0.14 0.14 0 0 3 0.14 0.14 0 0 3 0.14 0.14 0 0 33 1.54 1.54 0 0 33 1.54

1.54 0 0 91 4.26 4.26 0 0 91 4.26 4.26 0 0 148 6.92 6.92 0 0 6 0.1 0.1 0 0 6 0.1 0.1 0 0 1 0.02 0.02 0 0 1 0.02 0.02 0 0 22 0.35 0.35 0 0 22 0.35 0.35 0 0 12 0.19 0.19 0

0 12 0.19 0.19 0 0 41 0.66 0.66 0 0 4 0.32 0.32 0 0 4 0.32 0.32 0 0 3 0.24 0.24 0 0 3 0.24 0.24 0 0 7 0.56 0.56 0 0 2 0.36 0.36 0 0 2 0.36 0.36 0 0 1 0.18 0.18 0 0 1

0.18 0.18 0 0 3 0.54 0.54 0 0 12 3.24 3.24 0 0 12 3.24 3.24 0 0 7 1.89 1.89 0 0 7 1.89 1.89 0 0 12 3.24 3.24 0 0 12 3.24 3.24 0 0 31 8.37 8.37 0 0 6 1.32 1.32 0 0 6 1.32 1.32

0 0 15 3.3 3.3 0 0 15 3.3 3.3 0 0 17 3.74 3.74 0 0 17 3.74 3.74 0 0 1 0.22 0.22 0 0 1 0.22 0.22 0 0 40 8.8 8.8 0 0 40 8.8 8.8 0 0 7 1.54 1.54 0 0 7 1.54 1.54 0 0

1 0.22 0.22 0 0 1 0.22 0.22 0 0 2 0.44 0.44 0 0 2 0.44 0.44 0 0 12 2.64 2.64 0 0 12 2.64 2.64 0 0 2 0.44 0.44 0 0 2 0.44 0.44 0 0 103 22.66 22.66 0 0 18 0.32 0.32 0 0 18 0.32

0.32 0 0 3 0.05 0.05 0 0 3 0.05 0.05 0 0 3 0.05 0.05 0 0 3 0.05 0.05 0 0 36 0.65 0.65 0 0 36 0.65 0.65 0 0 155 2.83 2.83 0 0 155 2.83 2.83 0 0 215 3.9 3.9 0 0 5 0.29 0.29 0

0 5 0.29 0.29 0 0 6 0.38 0.38 0 0 6 0.38 0.38 0 0 18 1.26 1.26 0 0 18 1.26 1.26 0 0 1 0.09 0.09 0 0 1 0.09 0.09 0 0 0 0.02 0.02 0 0 0 0.02 0.02 0 0 148 10.26 10.26 0 0 148

10.26 10.26 0 0 1 0.06 0.06 0 0 1 0.06 0.06 0 0 179 12.36 12.36 0 0 3 0.14 0.14 0 0 3 0.14 0.14 0 0 4 0.34 0.34 0 0 4 0.34 0.34 0 0 14 1.01 1.01 0 0 14 1.01 1.01 0 0 0 0.02 0.02

0 0 0 0.02 0.02 0 0 0 0.02 0.02 0 0 0 0.02 0.02 0 0 86 6.63 6.63 0 0 86 6.63 6.63 0 0 1 0.04 0.04 0 0 1 0.04 0.04 0 0 108 8.2 8.2 0 0 3 0.23 0.23 0 0 3 0.23 0.23 0 0

1 0.11 0.11 0 0 1 0.11 0.11 0 0 8 0.65 0.65 0 0 8 0.65 0.65 0 0 1 0.09 0.09 0 0 1 0.09 0.09 0 0 0 0.02 0.02 0 0 0 0.02 0.02 0 0 111 8.52 8.52 0 0 111 8.52 8.52 0 0 0 0.04

0.04 0 0 0 0.04 0.04 0 0 124 9.66 9.66 0 0 6 0.47 0.47 0 0 6 0.47 0.47 0 0 1 0.08 0.08 0 0 1 0.08 0.08 0 0 5 0.4 0.4 0 0 5 0.4 0.4 0 0 9 0.72 0.72 0 0 9 0.72 0.72 0

0 21 1.67 1.67 0 0 2 0.17 0.17 0 0 2 0.17 0.17 0 0 2 0.17 0.17 0 0 6 5.28 5.28 0 0 6 5.28 5.28 0 0 1 0.88 0.88 0 0 1 0.88 0.88 0 0 1 0.88 0.88 0 0 1 0.88 0.88 0 0 14

12.32 12.32 0 0 14 12.32 12.32 0 0 12 10.56 10.56 0 0 12 10.56 10.56 0 0 34 29.92 29.92 0 0 6 7.67 7.67 0 0 6 7.67 7.67 0 0 1 1.28 1.28 0 0 1 1.28 1.28 0 0 1 1.28 1.28 0 0 1 1.28 1.28

0 0 13 16.63 16.63 0 0 13 16.63 16.63 0 0 21 26.86 26.86 0 0 9 0.18 0.18 0 0 9 0.18 0.18 0 0 11 0.22 0.22 0 0 11 0.22 0.22 0 0 43 0.86 0.86 0 0 43 0.86 0.86 0 0 5 0.1 0.1 0 0

5 0.1 0.1 0 0 1 0.02 0.02 0 0 1 0.02 0.02 0 0 14 0.28 0.28 0 0 14 0.28 0.28 0 0 8 0.16 0.16 0 0 8 0.16 0.16 0 0 2 0.04 0.04 0 0 2 0.04 0.04 0 0 62 1.24 1.24 0 0 62 1.24

1.24 0 0 155 3.1 3.1 0 0 9 0.12 0.12 0 0 9 0.12 0.12 0 0 11 0.15 0.15 0 0 11 0.15 0.15 0 0 43 0.6 0.6 0 0 43 0.6 0.6 0 0 5 0.07 0.07 0 0 5 0.07 0.07 0 0 1 0.01 0.01 0

0 1 0.01 0.01 0 0 14 0.2 0.2 0 0 14 0.2 0.2 0 0 8 0.11 0.11 0 0 8 0.11 0.11 0 0 2 0.03 0.03 0 0 2 0.03 0.03 0 0 46 0.64 0.64 0 0 46 0.64 0.64 0 0 139 1.93 1.93 0 0 9

0.03 0.03 0 0 9 0.03 0.03 0 0 11 0.04 0.04 0 0 11 0.04 0.04 0 0 43 0.18 0.18 0 0 43 0.18 0.18 0 0 5 0.02 0.02 0 0 5 0.02 0.02 0 0 1 0 0 0 0 1 0 0 0 0 14 0.06 0.06

0 0 14 0.06 0.06 0 0 8 0.03 0.03 0 0 8 0.03 0.03 0 0 2 0.01 0.01 0 0 2 0.01 0.01 0 0 30 0.13 0.13 0 0 30 0.13 0.13 0 0 123 0.5 0.5 0 0 10625 1615.78 1615.78 0 0 10764 1813.52 1813.52 0 0

10764 1813.52 1813.52 0 0

Plant 0020

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description

Quantity Total Scrap Value Material Cost Labor Cost Overhead Cost 10,764 1,813.52 1,813.52 0 0

Plant 0020 0020 0020 0020

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description KLI01-1 KLI03-1 KLI07-1

Quantity 5 1 133 10,625

Total Scrap Value Material Cost Labor Cost 158.75 158.75 1.21 1.21 37.78 37.78 1,615.78 1,615.78

0 0 0 0

Overhead Cost 0 0 0 0

Plant 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description PL-8794700DXG05 KLI01-1 34-8794704HGG01 KLI03-1 36-8794704KJG04 KLI03-1 36-8794704KJG10 KLI03-1 36-8794704KJG11 KLI03-1 36-8794704NSG18 KLI03-1 A-8794720BLP47 KLI03-1 A-8794723NCPR33J KLI07-1 34-8794704HGG01 KLI07-1 34-8794704HGG03 KLI07-1 34-8794704HGG05 KLI07-1 34-8794704KKG01 KLI07-1 36-8794704KJG04 KLI07-1 36-8794704KJG10 KLI07-1 36-8794704KJG11 KLI07-1 36-8794704KXG01 KLI07-1 36-8794704KXG04 KLI07-1 36-8794704NSG17 KLI07-1 36-8794704NSG18 KLI07-1 A-8794712CGP1 KLI07-1 A-8794719BWP01 KLI07-1 A-8794719CAP1 KLI07-1 A-8794719CGP1 KLI07-1 A-8794719CHP1 KLI07-1 A-8794720CWP2 KLI07-1 A-8794720EJP1 KLI07-1 A-8794720FTP1 KLI07-1 A-8794720FTP6 KLI07-1 A-8794720HCP1 KLI07-1 A-8794720JJP1 KLI07-1 A-8794720TWP05 KLI07-1 A-8794720TXP1 KLI07-1 A-8794720TYP1 KLI07-1 A-8794720YYP22 KLI07-1 A-8794723EMP1 KLI07-1 A-8794723FFP16D KLI07-1 A-8794723FGP05B KLI07-1 A-8794723GDP1 KLI07-1 A-8794723GDP4 KLI07-1 A-8794723GDP5 KLI07-1 A-8794723JAP1 KLI07-1 A-8794723JLP1 KLI07-1 A-8794723JMP1 KLI07-1 A-8794723JXP1 KLI07-1 A-8794723PEP224 KLI07-1 A-8794723PEP334 KLI07-1 A-8794723PEP474A KLI07-1 A-8794723PMP224 KLI07-1 A-8794723PNP103 KLI07-1 A-8794723RKP1 KLI07-1 A-8794723THP1

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

A-8794723TLP06 A-8794723WXP02 A-8794723XHP1 A-8794723XLP2 A-8794723XTP1 A-8794723YMP1 A-8794726AWP2 A-8794727BNP1 A-8794732ABP103 A-8794732ABP472 A-8794740ENP01 A-8794740HAP01 A-8794740LCP10 A8794720YYP07 A8794720YYP3 A8794721DBP1 A8794721DBP2 B-8794719BNP1 B-8794719BXP1 B23W2C2-BLK B23W2C2-BLUE B23W2C2-RED C-8794712CFP1 C-8794715DLP1 N238P9B N30P9006B N402P35B

Quantity 5 1 1 1 2 3 8 118 34 16 3 2 16 17 32 2 1 6 4 68 40 693 9 8 56 164 52 16 526 90 77 169 116 866 186 111 109 191 4 10 2 227 85 1 92 27 5 4 21 87 22

Total Scrap Value Material Cost Labor Cost 158.75 158.75 1.21 1.21 4.66 4.66 4.83 4.83 9.66 9.66 16.32 16.32 0.08 0.08 2.23 2.23 41.14 41.14 18.24 18.24 3.48 3.48 2.18 2.18 74.56 74.56 82.11 82.11 154.56 154.56 11.06 11.06 5.71 5.71 32.7 32.7 21.76 21.76 5.8 5.8 1.6 1.6 51.98 51.98 0.63 0.63 0.63 0.63 34.72 34.72 15.58 15.58 19.24 19.24 15.73 15.73 5.26 5.26 6 6 147.07 147.07 43.09 43.09 12.76 12.76 12.66 12.66 3.9 3.9 53.96 53.96 31.81 31.81 167.9 167.9 3.46 3.46 12.2 12.2 1.7 1.7 40.86 40.86 32.3 32.3 0.34 0.34 10.78 10.78 1.99 1.99 0.58 0.58 0.88 0.88 10.42 10.42 152.25 152.25 0.71 0.71

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Overhead Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

111 67 123 7 272 6 148 41 7 3 31 103 215 88 7 3,506 717 21 2 179 108 124 34 21 155 139 123

0.42 1.44 33.21 2.24 73.44 0.14 6.92 0.66 0.56 0.54 8.37 22.66 3.9 1.75 0.44 15.6 2.83 1.67 0.17 12.36 8.2 9.66 29.92 26.86 3.1 1.93 0.5

0.42 1.44 33.21 2.24 73.44 0.14 6.92 0.66 0.56 0.54 8.37 22.66 3.9 1.75 0.44 15.6 2.83 1.67 0.17 12.36 8.2 9.66 29.92 26.86 3.1 1.93 0.5

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Plant 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description PL-8794700DXG05 51 KLI01-1 34-8794704HGG01 43 KLI03-1 36-8794704KJG04 4 KLI03-1 36-8794704KJG10 4 KLI03-1 36-8794704KJG11 4 KLI03-1 36-8794704KJG11 8 KLI03-1 36-8794704NSG18 4 KLI03-1 A-8794720BLP47 30 KLI03-1 A-8794723NCPR33J 30 KLI07-1 34-8794704HGG01 9 KLI07-1 34-8794704HGG01 15 KLI07-1 34-8794704HGG03 8 KLI07-1 34-8794704HGG03 9 KLI07-1 34-8794704HGG03 15 KLI07-1 34-8794704HGG03 43 KLI07-1 34-8794704HGG05 15 KLI07-1 34-8794704KKG01 9 KLI07-1 36-8794704KJG04 15 KLI07-1 36-8794704KJG04 38 KLI07-1 36-8794704KJG04 43 KLI07-1 36-8794704KJG10 2 KLI07-1 36-8794704KJG10 8 KLI07-1 36-8794704KJG10 15 KLI07-1 36-8794704KJG10 38 KLI07-1 36-8794704KJG10 43 KLI07-1 36-8794704KJG11 2 KLI07-1 36-8794704KJG11 8 KLI07-1 36-8794704KJG11 9 KLI07-1 36-8794704KJG11 10 KLI07-1 36-8794704KJG11 15 KLI07-1 36-8794704KJG11 24 KLI07-1 36-8794704KJG11 38 KLI07-1 36-8794704KXG01 8 KLI07-1 36-8794704KXG01 15 KLI07-1 36-8794704KXG04 15 KLI07-1 36-8794704NSG17 8 KLI07-1 36-8794704NSG17 20 KLI07-1 36-8794704NSG18 8 KLI07-1 36-8794704NSG18 9 KLI07-1 36-8794704NSG18 15 KLI07-1 A-8794712CGP1 8 KLI07-1 A-8794712CGP1 9 KLI07-1 A-8794712CGP1 15 KLI07-1 A-8794712CGP1 35 KLI07-1 A-8794712CGP1 43 KLI07-1 A-8794719BWP01 2 KLI07-1 A-8794719BWP01 10 KLI07-1 A-8794719BWP01 24 KLI07-1 A-8794719BWP01 38 KLI07-1 A-8794719CAP1 2 KLI07-1 A-8794719CAP1 8

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

A-8794719CAP1 A-8794719CAP1 A-8794719CAP1 A-8794719CAP1 A-8794719CAP1 A-8794719CAP1 A-8794719CGP1 A-8794719CGP1 A-8794719CHP1 A-8794719CHP1 A-8794719CHP1 A-8794720CWP2 A-8794720CWP2 A-8794720CWP2 A-8794720CWP2 A-8794720CWP2 A-8794720EJP1 A-8794720EJP1 A-8794720EJP1 A-8794720EJP1 A-8794720EJP1 A-8794720EJP1 A-8794720EJP1 A-8794720EJP1 A-8794720EJP1 A-8794720EJP1 A-8794720FTP1 A-8794720FTP1 A-8794720FTP1 A-8794720FTP1 A-8794720FTP1 A-8794720FTP6 A-8794720FTP6 A-8794720FTP6 A-8794720FTP6 A-8794720HCP1 A-8794720HCP1 A-8794720HCP1 A-8794720HCP1 A-8794720HCP1 A-8794720JJP1 A-8794720JJP1 A-8794720JJP1 A-8794720JJP1 A-8794720JJP1 A-8794720JJP1 A-8794720JJP1 A-8794720JJP1 A-8794720JJP1 A-8794720TWP05 A-8794720TWP05 A-8794720TWP05

10 15 24 35 38 43 8 15 8 15 35 8 9 15 35 43 2 7 8 10 15 24 33 35 38 43 9 15 24 35 43 8 9 15 43 8 9 15 38 43 2 8 10 15 24 33 35 38 43 2 8 10

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

A-8794720TWP05 A-8794720TWP05 A-8794720TWP05 A-8794720TWP05 A-8794720TWP05 A-8794720TXP1 A-8794720TXP1 A-8794720TXP1 A-8794720TXP1 A-8794720TXP1 A-8794720TXP1 A-8794720TXP1 A-8794720TXP1 A-8794720TXP1 A-8794720TYP1 A-8794720TYP1 A-8794720TYP1 A-8794720TYP1 A-8794720TYP1 A-8794720TYP1 A-8794720TYP1 A-8794720TYP1 A-8794720TYP1 A-8794720YYP22 A-8794720YYP22 A-8794720YYP22 A-8794723EMP1 A-8794723EMP1 A-8794723EMP1 A-8794723EMP1 A-8794723EMP1 A-8794723FFP16D A-8794723FFP16D A-8794723FFP16D A-8794723FFP16D A-8794723FFP16D A-8794723FFP16D A-8794723FFP16D A-8794723FFP16D A-8794723FGP05B A-8794723FGP05B A-8794723FGP05B A-8794723FGP05B A-8794723FGP05B A-8794723GDP1 A-8794723GDP1 A-8794723GDP1 A-8794723GDP1 A-8794723GDP1 A-8794723GDP4 A-8794723GDP5 A-8794723GDP5

15 24 35 38 43 2 8 10 15 24 33 35 38 43 2 8 10 15 24 33 35 38 43 9 15 43 8 9 15 35 43 2 8 10 15 24 35 38 43 8 9 15 35 43 8 9 15 35 43 9 15 35

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

A-8794723JAP1 A-8794723JLP1 A-8794723JLP1 A-8794723JLP1 A-8794723JLP1 A-8794723JLP1 A-8794723JLP1 A-8794723JLP1 A-8794723JLP1 A-8794723JMP1 A-8794723JMP1 A-8794723JMP1 A-8794723JMP1 A-8794723JMP1 A-8794723JMP1 A-8794723JMP1 A-8794723JMP1 A-8794723JXP1 A-8794723PEP224 A-8794723PEP224 A-8794723PEP224 A-8794723PEP224 A-8794723PEP224 A-8794723PEP224 A-8794723PEP334 A-8794723PEP334 A-8794723PEP334 A-8794723PEP334 A-8794723PEP334 A-8794723PEP334 A-8794723PEP474A A-8794723PEP474A A-8794723PMP224 A-8794723PNP103 A-8794723PNP103 A-8794723PNP103 A-8794723PNP103 A-8794723RKP1 A-8794723RKP1 A-8794723RKP1 A-8794723RKP1 A-8794723RKP1 A-8794723RKP1 A-8794723RKP1 A-8794723RKP1 A-8794723THP1 A-8794723THP1 A-8794723THP1 A-8794723THP1 A-8794723THP1 A-8794723TLP06 A-8794723TLP06

9 2 8 10 15 24 35 38 43 2 8 10 15 24 35 38 43 35 8 9 15 35 38 43 1 8 9 15 35 43 9 35 15 8 15 35 38 2 8 10 15 24 35 38 43 2 10 24 35 38 2 10

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

A-8794723TLP06 A-8794723TLP06 A-8794723TLP06 A-8794723WXP02 A-8794723WXP02 A-8794723WXP02 A-8794723WXP02 A-8794723WXP02 A-8794723XHP1 A-8794723XHP1 A-8794723XHP1 A-8794723XHP1 A-8794723XHP1 A-8794723XLP2 A-8794723XTP1 A-8794723XTP1 A-8794723XTP1 A-8794723XTP1 A-8794723XTP1 A-8794723XTP1 A-8794723XTP1 A-8794723XTP1 A-8794723YMP1 A-8794726AWP2 A-8794726AWP2 A-8794726AWP2 A-8794726AWP2 A-8794726AWP2 A-8794727BNP1 A-8794727BNP1 A-8794727BNP1 A-8794727BNP1 A-8794732ABP103 A-8794732ABP103 A-8794732ABP472 A-8794732ABP472 A-8794740ENP01 A-8794740ENP01 A-8794740ENP01 A-8794740HAP01 A-8794740HAP01 A-8794740HAP01 A-8794740HAP01 A-8794740HAP01 A-8794740HAP01 A-8794740HAP01 A-8794740HAP01 A-8794740HAP01 A-8794740HAP01 A-8794740LCP10 A-8794740LCP10 A-8794740LCP10

24 38 44 8 9 15 35 43 8 15 35 38 43 35 2 8 10 15 24 35 38 43 9 2 10 24 38 44 2 10 24 38 9 35 9 35 15 35 38 2 8 9 10 15 20 24 33 38 43 2 10 24

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

A-8794740LCP10 A-8794740LCP10 A8794720YYP07 A8794720YYP07 A8794720YYP07 A8794720YYP3 A8794720YYP3 A8794720YYP3 A8794720YYP3 A8794721DBP1 A8794721DBP1 A8794721DBP1 A8794721DBP1 A8794721DBP2 A8794721DBP2 A8794721DBP2 A8794721DBP2 B-8794719BNP1 B-8794719BNP1 B-8794719BNP1 B-8794719BNP1 B-8794719BXP1 B23W2C2-BLK B23W2C2-BLK B23W2C2-BLK B23W2C2-BLK B23W2C2-BLK B23W2C2-BLK B23W2C2-BLK B23W2C2-BLUE B23W2C2-BLUE B23W2C2-BLUE B23W2C2-BLUE B23W2C2-BLUE B23W2C2-BLUE B23W2C2-BLUE B23W2C2-RED B23W2C2-RED B23W2C2-RED B23W2C2-RED B23W2C2-RED B23W2C2-RED B23W2C2-RED C-8794712CFP1 C-8794712CFP1 C-8794712CFP1 C-8794712CFP1 C-8794712CFP1 C-8794715DLP1 C-8794715DLP1 C-8794715DLP1 C-8794715DLP1

38 44 9 15 43 2 10 24 38 2 10 24 38 2 10 24 38 2 10 24 38 24 8 9 15 20 33 38 43 8 9 15 20 33 38 43 8 9 15 20 33 38 43 2 10 24 35 38 2 10 24 38

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

N238P9B N238P9B N238P9B N238P9B N238P9B N238P9B N238P9B N238P9B N238P9B N30P9006B N30P9006B N30P9006B N30P9006B N30P9006B N30P9006B N30P9006B N30P9006B N30P9006B N402P35B N402P35B N402P35B N402P35B N402P35B N402P35B N402P35B N402P35B N402P35B

8 9 15 20 33 35 38 43 44 8 9 15 20 33 35 38 43 44 8 9 15 20 33 35 38 43 44

Quantity 5 1 1 1 1 1 3 8 118 5 29 1 5 9 1 3 2 13 2 1 1 1 7 7 1 5 2 2 1 15 1 6 1 1 1 2 4 1 1 2 1 10 41 14 2 12 2 2 24 36 24

Total Scrap Value Material Cost Labor Cost 158.75 158.75 1.21 1.21 4.66 4.66 4.83 4.83 4.83 4.83 4.83 4.83 16.32 16.32 0.08 0.08 2.23 2.23 6.05 6.05 35.09 35.09 1.14 1.14 5.7 5.7 10.26 10.26 1.14 1.14 3.48 3.48 2.18 2.18 60.58 60.58 9.32 9.32 4.66 4.66 4.83 4.83 4.83 4.83 33.81 33.81 33.81 33.81 4.83 4.83 24.15 24.15 9.66 9.66 9.66 9.66 4.83 4.83 72.45 72.45 4.83 4.83 28.98 28.98 5.53 5.53 5.53 5.53 5.71 5.71 10.9 10.9 21.8 21.8 5.44 5.44 5.44 5.44 10.88 10.88 0.09 0.09 0.85 0.85 3.5 3.5 1.19 1.19 0.17 0.17 0.48 0.48 0.08 0.08 0.08 0.08 0.96 0.96 2.7 2.7 1.8 1.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Overhead Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 234 197 112 72 12 3 6 1 2 5 1 10 41 2 2 6 7 4 1 37 1 88 6 12 2 5 32 8 6 1 1 5 9 1 4 49 162 303 8 6 4 1 37 1 19 8 12 2 6 4 1

0.45 17.55 14.78 8.4 5.4 0.9 0.21 0.42 0.08 0.16 0.39 0.62 6.2 25.42 1.24 1.24 0.57 0.66 0.38 0.1 3.52 0.1 8.36 0.57 1.13 0.19 1.85 11.84 2.96 2.22 0.37 0.98 4.92 8.85 0.98 0.04 0.49 1.62 3.03 0.08 0.4 0.27 0.07 2.46 0.07 1.26 0.54 0.8 0.13 11.46 7.64 1.91

0.45 17.55 14.78 8.4 5.4 0.9 0.21 0.42 0.08 0.16 0.39 0.62 6.2 25.42 1.24 1.24 0.57 0.66 0.38 0.1 3.52 0.1 8.36 0.57 1.13 0.19 1.85 11.84 2.96 2.22 0.37 0.98 4.92 8.85 0.98 0.04 0.49 1.62 3.03 0.08 0.4 0.27 0.07 2.46 0.07 1.26 0.54 0.8 0.13 11.46 7.64 1.91

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

37 1 12 14 2 12 8 2 74 2 36 7 24 4 6 4 1 37 1 38 11 16 2 92 738 36 2 20 80 80 4 6 4 1 37 1 48 12 2 1 10 41 55 2 4 30 96 55 6 4 4 6

70.67 1.91 22.92 26.74 3.82 3.06 2.04 0.51 18.87 0.51 9.18 1.78 6.12 1.02 0.66 0.44 0.11 4.07 0.11 4.18 1.21 1.76 0.22 1.35 10.78 0.53 0.04 0.42 1.68 1.68 0.08 2.92 1.95 0.49 17.98 0.49 23.33 5.83 0.97 0.29 2.92 11.96 16.06 0.58 3.52 26.37 84.39 48.35 5.27 3.46 4.88 7.32

70.67 1.91 22.92 26.74 3.82 3.06 2.04 0.51 18.87 0.51 9.18 1.78 6.12 1.02 0.66 0.44 0.11 4.07 0.11 4.18 1.21 1.76 0.22 1.35 10.78 0.53 0.04 0.42 1.68 1.68 0.08 2.92 1.95 0.49 17.98 0.49 23.33 5.83 0.97 0.29 2.92 11.96 16.06 0.58 3.52 26.37 84.39 48.35 5.27 3.46 4.88 7.32

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 18 12 3 111 3 38 36 6 6 4 1 37 14 9 12 2 1 1 15 69 2 2 3 4 1 5 6 10 1 4 1 4 3 6 10 2 6 4 1 37 1 21 15 2 6 1 1 2 12 12 2

1.7 3.24 2.16 0.54 19.98 0.54 6.84 6.48 1.08 2.28 1.52 0.38 14.06 5.32 3.42 4.56 0.76 0.34 0.12 1.76 8.08 0.23 0.24 0.35 0.3 0.07 0.37 0.44 0.74 0.07 0.46 0.12 0.88 1.49 2.98 4.96 0.99 10.5 7 1.75 64.75 1.75 36.75 26.25 3.5 0.19 0.03 0.03 0.07 0.39 0.05 0.01

1.7 3.24 2.16 0.54 19.98 0.54 6.84 6.48 1.08 2.28 1.52 0.38 14.06 5.32 3.42 4.56 0.76 0.34 0.12 1.76 8.08 0.23 0.24 0.35 0.3 0.07 0.37 0.44 0.74 0.07 0.46 0.12 0.88 1.49 2.98 4.96 0.99 10.5 7 1.75 64.75 1.75 36.75 26.25 3.5 0.19 0.03 0.03 0.07 0.39 0.05 0.01

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 24 71 1 12 35 17 2 6 84 5 22 6 7 36 18 6 126 6 14 60 6 6 18 3 3 33 91 6 1 22 12 4 3 2 1 12 7 12 6 15 17 1 40 7 1 2 12 2 18 3 3

0.01 0.09 0.26 0.02 0.25 0.76 0.37 0.04 1.62 22.68 1.35 5.94 1.62 2.24 9.72 4.86 1.62 34.02 1.62 3.78 16.2 1.62 0.14 0.84 0.14 0.14 1.54 4.26 0.1 0.02 0.35 0.19 0.32 0.24 0.36 0.18 3.24 1.89 3.24 1.32 3.3 3.74 0.22 8.8 1.54 0.22 0.44 2.64 0.44 0.32 0.05 0.05

0.01 0.09 0.26 0.02 0.25 0.76 0.37 0.04 1.62 22.68 1.35 5.94 1.62 2.24 9.72 4.86 1.62 34.02 1.62 3.78 16.2 1.62 0.14 0.84 0.14 0.14 1.54 4.26 0.1 0.02 0.35 0.19 0.32 0.24 0.36 0.18 3.24 1.89 3.24 1.32 3.3 3.74 0.22 8.8 1.54 0.22 0.44 2.64 0.44 0.32 0.05 0.05

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

36 155 6 78 4 2 0 0 5 1,052 175 175 2,104 215 36 36 430 6 1 5 9 2 5 6 18 1 0 148 1 3 4 14 0 0 86 1 3 1 8 1 0 111 0 6 1 1 14 12 6 1 1 13

0.65 2.83 0.11 1.56 0.08 0.13 0.02 0.02 0.27 4.68 0.78 0.78 9.36 0.85 0.14 0.14 1.7 0.47 0.08 0.4 0.72 0.17 0.29 0.38 1.26 0.09 0.02 10.26 0.06 0.14 0.34 1.01 0.02 0.02 6.63 0.04 0.23 0.11 0.65 0.09 0.02 8.52 0.04 5.28 0.88 0.88 12.32 10.56 7.67 1.28 1.28 16.63

0.65 2.83 0.11 1.56 0.08 0.13 0.02 0.02 0.27 4.68 0.78 0.78 9.36 0.85 0.14 0.14 1.7 0.47 0.08 0.4 0.72 0.17 0.29 0.38 1.26 0.09 0.02 10.26 0.06 0.14 0.34 1.01 0.02 0.02 6.63 0.04 0.23 0.11 0.65 0.09 0.02 8.52 0.04 5.28 0.88 0.88 12.32 10.56 7.67 1.28 1.28 16.63

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

9 11 43 5 1 14 8 2 62 9 11 43 5 1 14 8 2 46 9 11 43 5 1 14 8 2 30

0.18 0.22 0.86 0.1 0.02 0.28 0.16 0.04 1.24 0.12 0.15 0.6 0.07 0.01 0.2 0.11 0.03 0.64 0.03 0.04 0.18 0.02 0 0.06 0.03 0.01 0.13

0.18 0.22 0.86 0.1 0.02 0.28 0.16 0.04 1.24 0.12 0.15 0.6 0.07 0.01 0.2 0.11 0.03 0.64 0.03 0.04 0.18 0.02 0 0.06 0.03 0.01 0.13

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Plant

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description

Quantity

Total Scrap Value Material Cost Labor Cost

Overhead Cost

Plant

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description

Quantity

Total Scrap Value Material Cost Labor Cost

Overhead Cost

Plant

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description

Quantity

Total Scrap Value Material Cost Labor Cost

Overhead Cost

Plant

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description

Quantity

Total Scrap Value Material Cost Labor Cost

Overhead Cost

Plant

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description

Quantity

Total Scrap Value Material Cost Labor Cost

Overhead Cost

Plant

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description

Quantity

Total Scrap Value Material Cost Labor Cost

Overhead Cost

Plant 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

Production Line / Storage Location Line / LocationMaterial Description Material description for Movement Reason Description PL-8794700DXG05 ECM142 ODF 230V ASM, RBC 51 Customer Owned Scrap KLI01-1 Rate capacity Planing for KSM05-1 34-8794704HGG01ASM, AXIAL POWER BOARD G01 SUB 43 Dropped unit KLI03-1 kLI03-1 Rate capacity Planing ASM, AUTO INS CNTRL 1/2HP, IGBT 23XH 36-8794704KJG04 SUB 4 Off Location KLI03-1 kLI03-1 Rate capacity Planing ASM, AUTO INS CONTROL 1HP (G10,G12) 36-8794704KJG10 SUB 4 Off Location KLI03-1 kLI03-1 Rate capacity Planing ASM, AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 SUB 4 Off Location KLI03-1 kLI03-1 Rate capacity Planing ASM, AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 SUB 8 Lifted Circuit KLI03-1 kLI03-1 Rate capacity Planing 36-8794704NSG18 X-MOTOR SUB 4 ASM Off Location KLI03-1 kLI03-1 Rate capacity Planing A-8794720BLP47 DIODE, ZENER 1N5261B DO35 drop/equip fail 30 Mach KLI03-1 kLI03-1 Rate capacity Planing A-8794723NCPR33J OHM 1/2W 5% TH Mach drop/equip fail RES, .33 30 KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL POWER BOARD G01 34-8794704HGG01ASM, SUB 9 Chip/broken/crack KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL POWER BOARDElec Test 34-8794704HGG01ASM, SUB 15 Failed G01 KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL POWER BOARD G03 34-8794704HGG03ASM, SUB 8 Lifted Circuit KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL POWER BOARD G03 34-8794704HGG03ASM, SUB 9 Chip/broken/crack KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL POWER BOARDElec Test 34-8794704HGG03ASM, SUB 15 Failed G03 KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL POWER BOARD G03 34-8794704HGG03ASM, SUB 43 Dropped unit KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL POWER BOARDElec Test 34-8794704HGG05ASM, SUB 15 Failed G05 KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL KKG01 Chip/broken/crack 34-8794704KKG01 ASM, SUB 9 KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 1/2HP, IGBT 23XH 36-8794704KJG04 ASM, SUB 15 Failed Elec Test KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 1/2HP, error 23XH 36-8794704KJG04 ASM, SUB 38 Operator IGBT KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 1/2HP, unit 23XH 36-8794704KJG04 ASM, SUB 43 Dropped IGBT KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CONTROL 1HP (G10,G12) 36-8794704KJG10 ASM, SUB 2 Scratch KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CONTROL 1HP (G10,G12) 36-8794704KJG10 ASM, SUB 8 Lifted Circuit KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CONTROL 1HP (G10,G12) 36-8794704KJG10 ASM, SUB 15 Failed Elec Test KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CONTROL 1HP (G10,G12) 36-8794704KJG10 ASM, SUB 38 Operator error KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CONTROL 1HP (G10,G12) 36-8794704KJG10 ASM, SUB 43 Dropped unit KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 ASM, SUB 2 Scratch KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 ASM, SUB 8 Lifted Circuit KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 ASM, SUB 9 Chip/broken/crack KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 ASM, SUB 10 Nick/cut/tear KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 ASM, SUB 15 Failed Elec Test KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 ASM, SUB 24 Damaged KLI07-1 KLI07-1 RUN SCHEDULE VERSION AUTO INS CNTRL 3/4HP (G11,G13) 36-8794704KJG11 ASM, SUB 38 Operator error KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL KXG01 Lifted Circuit 36-8794704KXG01 ASM, SUB 8 KLI07-1 KLI07-1 RUN SCHEDULE VERSION AXIAL KXG01 Failed Elec Test 36-8794704KXG01 ASM, SUB 15 KLI07-1 KLI07-1 RUN SCHEDULE VERSION CONTROL 1.0HP CE MAR Test 36-8794704KXG04 ASM, SUB 15 Failed Elec KLI07-1 KLI07-1 RUN SCHEDULE VERSION 1HP 8 36-8794704NSG17 X-MOTOR 230VAC SUB ASM Lifted Circuit KLI07-1 KLI07-1 RUN SCHEDULE VERSION 1HP20 36-8794704NSG17 X-MOTOR 230VAC SUB ASM Solderability KLI07-1 KLI07-1 RUN SCHEDULE VERSION SUB 8 36-8794704NSG18 X-MOTOR ASM Lifted Circuit KLI07-1 KLI07-1 RUN SCHEDULE VERSION SUB 9 36-8794704NSG18 X-MOTOR ASM Chip/broken/crack KLI07-1 KLI07-1 RUN SCHEDULE VERSION SUB15 36-8794704NSG18 X-MOTOR ASM Failed Elec Test KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794712CGP1 HEATSINK, POWER 8 Lifted Circuit KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794712CGP1 HEATSINK, POWER 9 Chip/broken/crack KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794712CGP1 HEATSINK, POWER 15 Failed Elec Test KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794712CGP1 HEATSINK, POWER 35 Repair Scrap KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794712CGP1 HEATSINK, POWER 43 Dropped unit KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794719BWP01 INSULATOR, BOLT 2 Scratch KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794719BWP01 INSULATOR, BOLT 10 Nick/cut/tear KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794719BWP01 INSULATOR, BOLT 24 Damaged KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794719BWP01 INSULATOR, BOLT 38 Operator error KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794719CAP1 INSULATOR, BOOTS 2 Scratch KLI07-1 KLI07-1 RUN SCHEDULE VERSION A-8794719CAP1 INSULATOR, BOOTS 8 Lifted Circuit

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

KLI07-1 RUN SCHEDULE VERSION A-8794719CAP1 INSULATOR, BOOTS 10 KLI07-1 RUN SCHEDULE VERSION A-8794719CAP1 INSULATOR, BOOTS 15 KLI07-1 RUN SCHEDULE VERSION A-8794719CAP1 INSULATOR, BOOTS 24 KLI07-1 RUN SCHEDULE VERSION A-8794719CAP1 INSULATOR, BOOTS 35 KLI07-1 RUN SCHEDULE VERSION A-8794719CAP1 INSULATOR, BOOTS 38 KLI07-1 RUN SCHEDULE VERSION A-8794719CAP1 INSULATOR, BOOTS 43 KLI07-1 RUN SCHEDULE VERSION A-8794719CGP1 INSULATOR, CLAMP BAR 8 KLI07-1 RUN SCHEDULE VERSION A-8794719CGP1 INSULATOR, CLAMP BAR 15 KLI07-1 RUN SCHEDULE VERSION A-8794719CHP1 INSULATOR, HEATSINK 8 KLI07-1 RUN SCHEDULE VERSION A-8794719CHP1 INSULATOR, HEATSINK 15 KLI07-1 RUN SCHEDULE VERSION A-8794719CHP1 INSULATOR, HEATSINK 35 KLI07-1 RUN SCHEDULE VERSION A-8794720CWP2 INDUCTOR, 3MH 8 KLI07-1 RUN SCHEDULE VERSION A-8794720CWP2 INDUCTOR, 3MH 9 KLI07-1 RUN SCHEDULE VERSION A-8794720CWP2 INDUCTOR, 3MH 15 KLI07-1 RUN SCHEDULE VERSION A-8794720CWP2 INDUCTOR, 3MH 35 KLI07-1 RUN SCHEDULE VERSION A-8794720CWP2 INDUCTOR, 3MH 43 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 2 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 7 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 8 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 10 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 15 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 24 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 33 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 35 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 38 KLI07-1 RUN SCHEDULE VERSION A-8794720EJP1 OPTOCOUPLER 6P TH IC, 43 KLI07-1 RUN SCHEDULE VERSION 1 OHM920 DISP A-8794720FTP1 THERM, KLI07-1 RUN SCHEDULE VERSION 1 OHM 20 DISP A-8794720FTP1 THERM, 15 KLI07-1 RUN SCHEDULE VERSION 1 OHM 20 DISP A-8794720FTP1 THERM, 24 KLI07-1 RUN SCHEDULE VERSION 1 OHM 20 DISP A-8794720FTP1 THERM, 35 KLI07-1 RUN SCHEDULE VERSION 1 OHM 20 DISP A-8794720FTP1 THERM, 43 KLI07-1 RUN SCHEDULE VERSION 1 OHM820 DISP A-8794720FTP6 THERM, KLI07-1 RUN SCHEDULE VERSION 1 OHM920 DISP A-8794720FTP6 THERM, KLI07-1 RUN SCHEDULE VERSION 1 OHM 20 DISP A-8794720FTP6 THERM, 15 KLI07-1 RUN SCHEDULE VERSION 1 OHM 20 DISP A-8794720FTP6 THERM, 43 KLI07-1 RUN SCHEDULE VERSION A-8794720HCP1 TERMINAL, SN 8 KLI07-1 RUN SCHEDULE VERSION A-8794720HCP1 TERMINAL, SN 9 KLI07-1 RUN SCHEDULE VERSION A-8794720HCP1 TERMINAL, SN15 KLI07-1 RUN SCHEDULE VERSION A-8794720HCP1 TERMINAL, SN38 KLI07-1 RUN SCHEDULE VERSION A-8794720HCP1 TERMINAL, SN43 KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH 2 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH 8 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH10 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH15 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH24 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH33 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH35 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH38 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720JJP1 339 14P TH43 IC, KLI07-1 RUN SCHEDULE VERSION A-8794720TWP05 IC, COP881CL 2 KLI07-1 RUN SCHEDULE VERSION A-8794720TWP05 IC, COP881CL 8 KLI07-1 RUN SCHEDULE VERSION A-8794720TWP05 IC, COP881CL 10

Nick/cut/tear Failed Elec Test Damaged Repair Scrap Operator error Dropped unit Lifted Circuit Failed Elec Test Lifted Circuit Failed Elec Test Repair Scrap Lifted Circuit Chip/broken/crack Failed Elec Test Repair Scrap Dropped unit Scratch Delamination Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit Chip/broken/crack Failed Elec Test Damaged Repair Scrap Dropped unit Lifted Circuit Chip/broken/crack Failed Elec Test Dropped unit Lifted Circuit Chip/broken/crack Failed Elec Test Operator error Dropped unit Scratch Lifted Circuit Nick/cut/tear Failed Elec Test Damaged Eng scrap Repair Scrap Operator error Dropped unit Scratch Lifted Circuit Nick/cut/tear

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

KLI07-1 RUN SCHEDULE VERSION A-8794720TWP05 IC, COP881CL 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION A-8794720TWP05 IC, COP881CL 24 Damaged KLI07-1 RUN SCHEDULE VERSION A-8794720TWP05 IC, COP881CL 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION A-8794720TWP05 IC, COP881CL 38 Operator error KLI07-1 RUN SCHEDULE VERSION A-8794720TWP05 IC, COP881CL 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Scratch IC, 2 KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Lifted Circuit IC, 8 KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Nick/cut/tear IC, 10 KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Failed Elec Test IC, 15 KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Damaged IC, 24 KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Eng scrap IC, 33 KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Repair Scrap IC, 35 KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Operator error IC, 38 KLI07-1 RUN SCHEDULE VERSION A-8794720TXP1 OPTOCOUPLER DIP16 Dropped unit IC, 43 KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 2 Scratch KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 24 Damaged KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 33 Eng scrap KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 38 Operator error KLI07-1 RUN SCHEDULE VERSION 8P TH A-8794720TYP1 93C46 IC, 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION A-8794720YYP22 748 RTV, 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION A-8794720YYP22 748 RTV, 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION A-8794720YYP22 748 RTV, 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION A-8794723EMP1 RIVET, PLASTIC 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION A-8794723EMP1 RIVET, PLASTIC 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION A-8794723EMP1 RIVET, PLASTIC 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION A-8794723EMP1 RIVET, PLASTIC 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION A-8794723EMP1 RIVET, PLASTIC 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION 16P RA TH A-8794723FFP16D HEADER, 2 Scratch KLI07-1 RUN SCHEDULE VERSION 16P RA TH A-8794723FFP16D HEADER, 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION 16P RA TH A-8794723FFP16D HEADER, 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION 16P RA TH A-8794723FFP16D HEADER, 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION 16P RA TH A-8794723FFP16D HEADER, 24 Damaged KLI07-1 RUN SCHEDULE VERSION 16P RA TH A-8794723FFP16D HEADER, 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION 16P RA TH A-8794723FFP16D HEADER, 38 Operator error KLI07-1 RUN SCHEDULE VERSION 16P RA TH A-8794723FFP16D HEADER, 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION 5P RA TH A-8794723FGP05B HEADER, 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION 5P RA TH A-8794723FGP05B HEADER, 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION 5P RA TH A-8794723FGP05B HEADER, 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION 5P RA TH A-8794723FGP05B HEADER, 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION 5P RA TH A-8794723FGP05B HEADER, 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION A-8794723GDP1 1000UF 200V 20% THLifted Circuit CAP, 8 KLI07-1 RUN SCHEDULE VERSION A-8794723GDP1 1000UF 200V 20% THChip/broken/crack CAP, 9 KLI07-1 RUN SCHEDULE VERSION A-8794723GDP1 1000UF 200V 20% THFailed Elec Test CAP, 15 KLI07-1 RUN SCHEDULE VERSION A-8794723GDP1 1000UF 200V 20% THRepair Scrap CAP, 35 KLI07-1 RUN SCHEDULE VERSION A-8794723GDP1 1000UF 200V 20% THDropped unit CAP, 43 KLI07-1 RUN SCHEDULE VERSION A-8794723GDP4 680UF 200V 20% TH Chip/broken/crack CAP, 9 KLI07-1 RUN SCHEDULE VERSION A-8794723GDP5 680UF 250V 20% TH Failed Elec Test CAP, 15 KLI07-1 RUN SCHEDULE VERSION A-8794723GDP5 680UF 250V 20% TH Repair Scrap CAP, 35

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

KLI07-1 RUN SCHEDULE VERSION A-8794723JAP1 INDUCTOR, COMMON MODE 2A 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 INDUCTOR, COMMON MODE 1MH TH 2 Scratch KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 INDUCTOR, COMMON MODE 1MH TH 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 INDUCTOR, COMMON MODE 1MH TH 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 INDUCTOR, COMMON MODE 1MH TH Test 15 Failed Elec KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 INDUCTOR, COMMON MODE 1MH TH 24 Damaged KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 INDUCTOR, COMMON MODE 1MH TH 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 INDUCTOR, COMMON MODE 1MH TH 38 Operator error KLI07-1 RUN SCHEDULE VERSION A-8794723JLP1 INDUCTOR, COMMON MODE 1MH TH 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION A-8794723JMP1 INDUCTOR, 2.5MH +/-20% @ 100KH 2 Scratch KLI07-1 RUN SCHEDULE VERSION A-8794723JMP1 INDUCTOR, 2.5MH +/-20% @ 100KH 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION A-8794723JMP1 INDUCTOR, 2.5MH +/-20% @ 100KH 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION A-8794723JMP1 INDUCTOR, 2.5MH +/-20% @ 100KH Test 15 Failed Elec KLI07-1 RUN SCHEDULE VERSION A-8794723JMP1 INDUCTOR, 2.5MH +/-20% @ 100KH 24 Damaged KLI07-1 RUN SCHEDULE VERSION A-8794723JMP1 INDUCTOR, 2.5MH +/-20% @ 100KH 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION A-8794723JMP1 INDUCTOR, 2.5MH +/-20% @ 100KHerror 38 Operator KLI07-1 RUN SCHEDULE VERSION A-8794723JMP1 INDUCTOR, 2.5MH +/-20% @ 100KHunit 43 Dropped KLI07-1 RUN SCHEDULE VERSION A-8794723JXP1 TRANSFORMER, WIDE BAND 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION A-8794723PEP224 .22UF 275V 20% TH Lifted Circuit CAP, 8 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP224 .22UF 275V 20% TH Chip/broken/crack CAP, 9 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP224 .22UF 275V 20% TH Failed Elec Test CAP, 15 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP224 .22UF 275V 20% TH Repair Scrap CAP, 35 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP224 .22UF 275V 20% TH Operator error CAP, 38 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP224 .22UF 275V 20% TH Dropped unit CAP, 43 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP334 .33UF 250V 20% TH Dents CAP, 1 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP334 .33UF 250V 20% TH Lifted Circuit CAP, 8 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP334 .33UF 250V 20% TH Chip/broken/crack CAP, 9 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP334 .33UF 250V 20% TH Failed Elec Test CAP, 15 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP334 .33UF 250V 20% TH Repair Scrap CAP, 35 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP334 .33UF 250V 20% TH Dropped unit CAP, 43 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP474A CAP, .47UF 275V 20% TH Chip/broken/crack 9 KLI07-1 RUN SCHEDULE VERSION A-8794723PEP474A CAP, .47UF 275V 20% TH Repair Scrap 35 KLI07-1 RUN SCHEDULE VERSION A-8794723PMP224 .22UF 300V 20% TH Failed Elec Test CAP, 15 KLI07-1 RUN SCHEDULE VERSION A-8794723PNP103 .01UF 300V 20% Y5U Lifted Circuit CAP, 8 TH KLI07-1 RUN SCHEDULE VERSION A-8794723PNP103 .01UF 300V 20% Y5U Failed Elec Test CAP, 15 TH KLI07-1 RUN SCHEDULE VERSION A-8794723PNP103 .01UF 300V 20% Y5U Repair Scrap CAP, 35 TH KLI07-1 RUN SCHEDULE VERSION A-8794723PNP103 .01UF 300V 20% Y5U Operator error CAP, 38 TH KLI07-1 RUN SCHEDULE VERSION A-8794723RKP1 8794723RKP1 TH IC, 2 Scratch KLI07-1 RUN SCHEDULE VERSION A-8794723RKP1 8794723RKP1 TH IC, 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION A-8794723RKP1 8794723RKP1 TH IC, 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION A-8794723RKP1 8794723RKP1 TH IC, 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION A-8794723RKP1 8794723RKP1 TH IC, 24 Damaged KLI07-1 RUN SCHEDULE VERSION A-8794723RKP1 8794723RKP1 TH IC, 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION A-8794723RKP1 8794723RKP1 TH IC, 38 Operator error KLI07-1 RUN SCHEDULE VERSION A-8794723RKP1 8794723RKP1 TH IC, 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION A-8794723THP1 HARDWARE, SUPPORT POST 2 Scratch KLI07-1 RUN SCHEDULE VERSION A-8794723THP1 HARDWARE, SUPPORT POST 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION A-8794723THP1 HARDWARE, SUPPORT POST 24 Damaged KLI07-1 RUN SCHEDULE VERSION A-8794723THP1 HARDWARE, SUPPORT POST 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION A-8794723THP1 HARDWARE, SUPPORT POST 38 Operator error KLI07-1 RUN SCHEDULE VERSION PAN HD PHI 6-20X.375 THRD RO A-8794723TLP06 SCREW, 2 Scratch KLI07-1 RUN SCHEDULE VERSION PAN HD PHI 6-20X.375 THRD RO A-8794723TLP06 SCREW, 10 Nick/cut/tear

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

KLI07-1 RUN SCHEDULE VERSION PAN HD PHI 6-20X.375 THRD RO A-8794723TLP06 SCREW, 24 Damaged KLI07-1 RUN SCHEDULE VERSION PAN HD PHI 6-20X.375 THRD RO A-8794723TLP06 SCREW, 38 Operator error KLI07-1 RUN SCHEDULE VERSION PAN HD PHI 6-20X.375 THRD RO A-8794723TLP06 SCREW, 44 Screw Torque KLI07-1 RUN SCHEDULE VERSION A-8794723WXP02 TERMINAL 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION A-8794723WXP02 TERMINAL 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION A-8794723WXP02 TERMINAL 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION A-8794723WXP02 TERMINAL 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION A-8794723WXP02 TERMINAL 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION IGBT 600V 10A TO220AB A-8794723XHP1 TRANS, 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION IGBT 600V 10A TO220AB Elec Test A-8794723XHP1 TRANS, 15 Failed KLI07-1 RUN SCHEDULE VERSION IGBT 600V 10A TO220AB Scrap A-8794723XHP1 TRANS, 35 Repair KLI07-1 RUN SCHEDULE VERSION IGBT 600V 10A TO220AB error A-8794723XHP1 TRANS, 38 Operator KLI07-1 RUN SCHEDULE VERSION IGBT 600V 10A TO220AB unit A-8794723XHP1 TRANS, 43 Dropped KLI07-1 RUN SCHEDULE VERSION IRF840 TO220 A-8794723XLP2 TRANS, 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION IGBT 600V 13A INSULATED A-8794723XTP1 TRANS, 2 Scratch KLI07-1 RUN SCHEDULE VERSION IGBT 600V 13A INSULATED A-8794723XTP1 TRANS, 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION IGBT 600V 13A INSULATED A-8794723XTP1 TRANS, 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION IGBT 600V 13A INSULATED Test A-8794723XTP1 TRANS, 15 Failed Elec KLI07-1 RUN SCHEDULE VERSION IGBT 600V 13A INSULATED A-8794723XTP1 TRANS, 24 Damaged KLI07-1 RUN SCHEDULE VERSION IGBT 600V 13A INSULATED A-8794723XTP1 TRANS, 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION IGBT 600V 13A INSULATED error A-8794723XTP1 TRANS, 38 Operator KLI07-1 RUN SCHEDULE VERSION IGBT 600V 13A INSULATEDunit A-8794723XTP1 TRANS, 43 Dropped KLI07-1 RUN SCHEDULE VERSION A-8794723YMP1 HARDWARE, TAB SN - Terminal Tyco 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION BAR 2 A-8794726AWP2 CLAMP, Scratch KLI07-1 RUN SCHEDULE VERSION BAR 10 A-8794726AWP2 CLAMP, Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION BAR 24 A-8794726AWP2 CLAMP, Damaged KLI07-1 RUN SCHEDULE VERSION BAR 38 A-8794726AWP2 CLAMP, Operator error KLI07-1 RUN SCHEDULE VERSION BAR 44 A-8794726AWP2 CLAMP, Screw Torque KLI07-1 RUN SCHEDULE VERSIONWARNING HIGH VOLTAGE A-8794727BNP1 LABEL, 2 Scratch KLI07-1 RUN SCHEDULE VERSIONWARNING HIGH VOLTAGE A-8794727BNP1 LABEL, 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSIONWARNING HIGH VOLTAGE A-8794727BNP1 LABEL, 24 Damaged KLI07-1 RUN SCHEDULE VERSIONWARNING HIGH VOLTAGE error A-8794727BNP1 LABEL, 38 Operator KLI07-1 RUN SCHEDULE VERSION A-8794732ABP103 .01UF 250V 20% TH Chip/broken/crack CAP, 9 KLI07-1 RUN SCHEDULE VERSION A-8794732ABP103 .01UF 250V 20% TH Repair Scrap CAP, 35 KLI07-1 RUN SCHEDULE VERSION A-8794732ABP472 .0047UF 400V 20% TH CAP, 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION A-8794732ABP472 .0047UF 400V 20% TH CAP, 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION IGBT 600V 10A INSULATED Test A-8794740ENP01 TRANS, 15 Failed Elec KLI07-1 RUN SCHEDULE VERSION IGBT 600V 10A INSULATED A-8794740ENP01 TRANS, 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION IGBT 600V 10A INSULATED error A-8794740ENP01 TRANS, 38 Operator KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 2 Scratch KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 20 Solderability KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 24 Damaged KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 33 Eng scrap KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 38 Operator error KLI07-1 RUN SCHEDULE VERSION 3P TH A-8794740HAP01 HEADER, 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION SERRATED HEX WASH HD M4X0.7X10MM" A-8794740LCP10 SCREW, 2 Scratch KLI07-1 RUN SCHEDULE VERSION SERRATED HEX WASH HD M4X0.7X10MM" A-8794740LCP10 SCREW, 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION SERRATED HEX WASH HD M4X0.7X10MM" A-8794740LCP10 SCREW, 24 Damaged

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

KLI07-1 RUN SCHEDULE VERSION SERRATED HEX WASH HD M4X0.7X10MM" A-8794740LCP10 SCREW, 38 Operator error KLI07-1 RUN SCHEDULE VERSION SERRATED HEX WASH HD M4X0.7X10MM" A-8794740LCP10 SCREW, 44 Screw Torque KLI07-1 RUN SCHEDULE VERSION A8794720YYP07 CONFORMAL, COATING Chip/broken/crack 9 KLI07-1 RUN SCHEDULE VERSION A8794720YYP07 CONFORMAL, 15 COATING Failed Elec Test KLI07-1 RUN SCHEDULE VERSION A8794720YYP07 CONFORMAL, 43 COATING Dropped unit KLI07-1 RUN SCHEDULE VERSION JOINT COMPOUND A8794720YYP3 THERMAL 2 Scratch KLI07-1 RUN SCHEDULE VERSION JOINT COMPOUND A8794720YYP3 THERMAL 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION JOINT COMPOUND A8794720YYP3 THERMAL 24 Damaged KLI07-1 RUN SCHEDULE VERSION JOINT COMPOUND A8794720YYP3 THERMAL 38 Operator error KLI07-1 RUN SCHEDULE VERSION A8794721DBP1 RESIN 2 Scratch KLI07-1 RUN SCHEDULE VERSION A8794721DBP1 RESIN 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION A8794721DBP1 RESIN 24 Damaged KLI07-1 RUN SCHEDULE VERSION A8794721DBP1 RESIN 38 Operator error KLI07-1 RUN SCHEDULE VERSION A8794721DBP2 HARDENER 2 Scratch KLI07-1 RUN SCHEDULE VERSION A8794721DBP2 HARDENER 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION A8794721DBP2 HARDENER 24 Damaged KLI07-1 RUN SCHEDULE VERSION A8794721DBP2 HARDENER 38 Operator error KLI07-1 RUN SCHEDULE VERSION B-8794719BNP1 INSULATOR, MYLAR 2 Scratch KLI07-1 RUN SCHEDULE VERSION B-8794719BNP1 INSULATOR, MYLAR 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION B-8794719BNP1 INSULATOR, MYLAR 24 Damaged KLI07-1 RUN SCHEDULE VERSION B-8794719BNP1 INSULATOR, MYLAR 38 Operator error KLI07-1 RUN SCHEDULE VERSION B-8794719BXP1 ENCLOSURE, INSULATOR Damaged 24 KLI07-1 RUN SCHEDULE VERSION B23W2C2-BLK WIRE, 18AWG 600V 125C XLPE BLACK 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION B23W2C2-BLK WIRE, 18AWG 600V 125C XLPE BLACK 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION B23W2C2-BLK WIRE, 18AWG 15 600V 125C XLPE BLACK Failed Elec Test KLI07-1 RUN SCHEDULE VERSION B23W2C2-BLK WIRE, 18AWG 20 600V 125C XLPE BLACK Solderability KLI07-1 RUN SCHEDULE VERSION B23W2C2-BLK WIRE, 18AWG 33 600V 125C XLPEscrap Eng BLACK KLI07-1 RUN SCHEDULE VERSION B23W2C2-BLK WIRE, 18AWG 38 600V 125C XLPE BLACK Operator error KLI07-1 RUN SCHEDULE VERSION B23W2C2-BLK WIRE, 18AWG 43 600V 125C XLPE BLACK Dropped unit KLI07-1 RUN SCHEDULE VERSION AWG 8 B23W2C2-BLUE WIRE, 18 600V 125 GRADES CENTIGRATES Lifted Circuit KLI07-1 RUN SCHEDULE VERSION AWG 9 B23W2C2-BLUE WIRE, 18 600V 125 GRADES CENTIGRATES Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION AWG15 B23W2C2-BLUE WIRE, 18 600V 125 GRADES CENTIGRATES Failed Elec Test KLI07-1 RUN SCHEDULE VERSION AWG20 B23W2C2-BLUE WIRE, 18 600V 125 GRADES CENTIGRATES Solderability KLI07-1 RUN SCHEDULE VERSION AWG33 B23W2C2-BLUE WIRE, 18 600V 125 GRADES CENTIGRATES Eng scrap KLI07-1 RUN SCHEDULE VERSION AWG38 B23W2C2-BLUE WIRE, 18 600V 125 GRADES CENTIGRATES Operator error KLI07-1 RUN SCHEDULE VERSION AWG43 B23W2C2-BLUE WIRE, 18 600V 125 GRADES CENTIGRATES Dropped unit KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED IRE, 18AWG 600V 125C XLPE RED W 8 Lifted Circuit KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED IRE, 18AWG 600V 125C XLPE RED W 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED IRE, 18AWG 15 W 600V 125C XLPE RED Test Failed Elec KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED IRE, 18AWG 20 W 600V 125C XLPE RED Solderability KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED IRE, 18AWG 33 W 600V 125C XLPEscrap Eng RED KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED IRE, 18AWG 38 W 600V 125C XLPE RED Operator error KLI07-1 RUN SCHEDULE VERSION B23W2C2-RED IRE, 18AWG 43 W 600V 125C XLPE RED Dropped unit KLI07-1 RUN SCHEDULE VERSION C-8794712CFP1 HEATSINK, CONTROL 2 Scratch KLI07-1 RUN SCHEDULE VERSION C-8794712CFP1 HEATSINK, CONTROL 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION C-8794712CFP1 HEATSINK, CONTROL 24 Damaged KLI07-1 RUN SCHEDULE VERSION C-8794712CFP1 HEATSINK, CONTROL 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION C-8794712CFP1 HEATSINK, CONTROL 38 Operator error KLI07-1 RUN SCHEDULE VERSION C-8794715DLP1 ENCLOSURE 2 Scratch KLI07-1 RUN SCHEDULE VERSION C-8794715DLP1 ENCLOSURE 10 Nick/cut/tear KLI07-1 RUN SCHEDULE VERSION C-8794715DLP1 ENCLOSURE 24 Damaged KLI07-1 RUN SCHEDULE VERSION C-8794715DLP1 ENCLOSURE 38 Operator error

0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020 0020

KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1 KLI07-1

KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-408UNC Lifted Circuit KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-409UNC Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-40 UNC 15 Failed Elec Test KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-40 UNC 20 Solderability KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-40 UNC 33 Eng scrap KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-40 UNC 35 Repair Scrap KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-40 UNC 38 Operator error KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-40 UNC 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION N238P9B KEPSNUT, 4-40 UNC 44 Screw Torque KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Lifted Circuit N30P9006B SCREW, 8 X.375LG KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Chip/broken/crack N30P9006B SCREW, 9 X.375LG KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Failed Elec Test N30P9006B SCREW, 15 X.375LG KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Solderability N30P9006B SCREW, 20 X.375LG KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Eng scrap N30P9006B SCREW, 33 X.375LG KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Repair Scrap N30P9006B SCREW, 35 X.375LG KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Operator error N30P9006B SCREW, 38 X.375LG KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Dropped unit N30P9006B SCREW, 43 X.375LG KLI07-1 RUN SCHEDULE VERSION MATCH 4-40 UNC Screw Torque N30P9006B SCREW, 44 X.375LG KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR Circuit N402P35B WASHER, 8 Lifted KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR N402P35B WASHER, 9 Chip/broken/crack KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR Elec Test N402P35B WASHER, 15 Failed KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR N402P35B WASHER, 20 Solderability KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR N402P35B WASHER, 33 Eng scrap KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR Scrap N402P35B WASHER, 35 Repair KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR N402P35B WASHER, 38 Operator error KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR N402P35B WASHER, 43 Dropped unit KLI07-1 RUN SCHEDULE VERSION FLAT NO 4 REGULAR Torque N402P35B WASHER, 44 Screw

Quantity 5 1 1 1 1 1 3 8 118 5 29 1 5 9 1 3 2 13 2 1 1 1 7 7 1 5 2 2 1 15 1 6 1 1 1 2 4 1 1 2 1 10 41 14 2 12 2 2 24 36 24

Total Scrap Value Material Cost Labor Cost 158.75 158.75 1.21 1.21 4.66 4.66 4.83 4.83 4.83 4.83 4.83 4.83 16.32 16.32 0.08 0.08 2.23 2.23 6.05 6.05 35.09 35.09 1.14 1.14 5.7 5.7 10.26 10.26 1.14 1.14 3.48 3.48 2.18 2.18 60.58 60.58 9.32 9.32 4.66 4.66 4.83 4.83 4.83 4.83 33.81 33.81 33.81 33.81 4.83 4.83 24.15 24.15 9.66 9.66 9.66 9.66 4.83 4.83 72.45 72.45 4.83 4.83 28.98 28.98 5.53 5.53 5.53 5.53 5.71 5.71 10.9 10.9 21.8 21.8 5.44 5.44 5.44 5.44 10.88 10.88 0.09 0.09 0.85 0.85 3.5 3.5 1.19 1.19 0.17 0.17 0.48 0.48 0.08 0.08 0.08 0.08 0.96 0.96 2.7 2.7 1.8 1.8

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Overhead Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

6 234 197 112 72 12 3 6 1 2 5 1 10 41 2 2 6 7 4 1 37 1 88 6 12 2 5 32 8 6 1 1 5 9 1 4 49 162 303 8 6 4 1 37 1 19 8 12 2 6 4 1

0.45 17.55 14.78 8.4 5.4 0.9 0.21 0.42 0.08 0.16 0.39 0.62 6.2 25.42 1.24 1.24 0.57 0.66 0.38 0.1 3.52 0.1 8.36 0.57 1.13 0.19 1.85 11.84 2.96 2.22 0.37 0.98 4.92 8.85 0.98 0.04 0.49 1.62 3.03 0.08 0.4 0.27 0.07 2.46 0.07 1.26 0.54 0.8 0.13 11.46 7.64 1.91

0.45 17.55 14.78 8.4 5.4 0.9 0.21 0.42 0.08 0.16 0.39 0.62 6.2 25.42 1.24 1.24 0.57 0.66 0.38 0.1 3.52 0.1 8.36 0.57 1.13 0.19 1.85 11.84 2.96 2.22 0.37 0.98 4.92 8.85 0.98 0.04 0.49 1.62 3.03 0.08 0.4 0.27 0.07 2.46 0.07 1.26 0.54 0.8 0.13 11.46 7.64 1.91

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

37 1 12 14 2 12 8 2 74 2 36 7 24 4 6 4 1 37 1 38 11 16 2 92 738 36 2 20 80 80 4 6 4 1 37 1 48 12 2 1 10 41 55 2 4 30 96 55 6 4 4 6

70.67 1.91 22.92 26.74 3.82 3.06 2.04 0.51 18.87 0.51 9.18 1.78 6.12 1.02 0.66 0.44 0.11 4.07 0.11 4.18 1.21 1.76 0.22 1.35 10.78 0.53 0.04 0.42 1.68 1.68 0.08 2.92 1.95 0.49 17.98 0.49 23.33 5.83 0.97 0.29 2.92 11.96 16.06 0.58 3.52 26.37 84.39 48.35 5.27 3.46 4.88 7.32

70.67 1.91 22.92 26.74 3.82 3.06 2.04 0.51 18.87 0.51 9.18 1.78 6.12 1.02 0.66 0.44 0.11 4.07 0.11 4.18 1.21 1.76 0.22 1.35 10.78 0.53 0.04 0.42 1.68 1.68 0.08 2.92 1.95 0.49 17.98 0.49 23.33 5.83 0.97 0.29 2.92 11.96 16.06 0.58 3.52 26.37 84.39 48.35 5.27 3.46 4.88 7.32

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 18 12 3 111 3 38 36 6 6 4 1 37 14 9 12 2 1 1 15 69 2 2 3 4 1 5 6 10 1 4 1 4 3 6 10 2 6 4 1 37 1 21 15 2 6 1 1 2 12 12 2

1.7 3.24 2.16 0.54 19.98 0.54 6.84 6.48 1.08 2.28 1.52 0.38 14.06 5.32 3.42 4.56 0.76 0.34 0.12 1.76 8.08 0.23 0.24 0.35 0.3 0.07 0.37 0.44 0.74 0.07 0.46 0.12 0.88 1.49 2.98 4.96 0.99 10.5 7 1.75 64.75 1.75 36.75 26.25 3.5 0.19 0.03 0.03 0.07 0.39 0.05 0.01

1.7 3.24 2.16 0.54 19.98 0.54 6.84 6.48 1.08 2.28 1.52 0.38 14.06 5.32 3.42 4.56 0.76 0.34 0.12 1.76 8.08 0.23 0.24 0.35 0.3 0.07 0.37 0.44 0.74 0.07 0.46 0.12 0.88 1.49 2.98 4.96 0.99 10.5 7 1.75 64.75 1.75 36.75 26.25 3.5 0.19 0.03 0.03 0.07 0.39 0.05 0.01

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 24 71 1 12 35 17 2 6 84 5 22 6 7 36 18 6 126 6 14 60 6 6 18 3 3 33 91 6 1 22 12 4 3 2 1 12 7 12 6 15 17 1 40 7 1 2 12 2 18 3 3

0.01 0.09 0.26 0.02 0.25 0.76 0.37 0.04 1.62 22.68 1.35 5.94 1.62 2.24 9.72 4.86 1.62 34.02 1.62 3.78 16.2 1.62 0.14 0.84 0.14 0.14 1.54 4.26 0.1 0.02 0.35 0.19 0.32 0.24 0.36 0.18 3.24 1.89 3.24 1.32 3.3 3.74 0.22 8.8 1.54 0.22 0.44 2.64 0.44 0.32 0.05 0.05

0.01 0.09 0.26 0.02 0.25 0.76 0.37 0.04 1.62 22.68 1.35 5.94 1.62 2.24 9.72 4.86 1.62 34.02 1.62 3.78 16.2 1.62 0.14 0.84 0.14 0.14 1.54 4.26 0.1 0.02 0.35 0.19 0.32 0.24 0.36 0.18 3.24 1.89 3.24 1.32 3.3 3.74 0.22 8.8 1.54 0.22 0.44 2.64 0.44 0.32 0.05 0.05

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

36 155 6 78 4 2 0 0 5 1,052 175 175 2,104 215 36 36 430 6 1 5 9 2 5 6 18 1 0 148 1 3 4 14 0 0 86 1 3 1 8 1 0 111 0 6 1 1 14 12 6 1 1 13

0.65 2.83 0.11 1.56 0.08 0.13 0.02 0.02 0.27 4.68 0.78 0.78 9.36 0.85 0.14 0.14 1.7 0.47 0.08 0.4 0.72 0.17 0.29 0.38 1.26 0.09 0.02 10.26 0.06 0.14 0.34 1.01 0.02 0.02 6.63 0.04 0.23 0.11 0.65 0.09 0.02 8.52 0.04 5.28 0.88 0.88 12.32 10.56 7.67 1.28 1.28 16.63

0.65 2.83 0.11 1.56 0.08 0.13 0.02 0.02 0.27 4.68 0.78 0.78 9.36 0.85 0.14 0.14 1.7 0.47 0.08 0.4 0.72 0.17 0.29 0.38 1.26 0.09 0.02 10.26 0.06 0.14 0.34 1.01 0.02 0.02 6.63 0.04 0.23 0.11 0.65 0.09 0.02 8.52 0.04 5.28 0.88 0.88 12.32 10.56 7.67 1.28 1.28 16.63

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

9 11 43 5 1 14 8 2 62 9 11 43 5 1 14 8 2 46 9 11 43 5 1 14 8 2 30

0.18 0.22 0.86 0.1 0.02 0.28 0.16 0.04 1.24 0.12 0.15 0.6 0.07 0.01 0.2 0.11 0.03 0.64 0.03 0.04 0.18 0.02 0 0.06 0.03 0.01 0.13

0.18 0.22 0.86 0.1 0.02 0.28 0.16 0.04 1.24 0.12 0.15 0.6 0.07 0.01 0.2 0.11 0.03 0.64 0.03 0.04 0.18 0.02 0 0.06 0.03 0.01 0.13

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

H A A A A A A #N/A #N/A #N/A #N/A

KEG Combined Scrap Report Kimball International(Kimball Electronics Group) Program: ZEMR_COMBINED_SCRAP System: P10 Client: 010 Date: 08/25/2009 Time: 08:27:15 EST Local Date: 08/25/2009 Local Time: 07:27:15 CST Currency: USD Exch.rate type : M #N/A #N/A