Chapter – 1
GENERAL
1.1 Introduction
Power supply system is the heart of signalling system.
For a reliable signalling system installation, reliable
power supply system is most important.
RE Area
Non RE Area.
1.3 Scope
Chapter – 2
Inverter
Transformer
Functioning of ACDP
Principle features
Standard Functions
Temperature compensation
DC-DC converters.
Common Digital Voltmeter for measurement.
DC-DC Converters
Digital Voltmeter
Functioning of DCDP
2.3 Working
Chapter - 3
3.1 Unpacking
3.2 Installation
3.3 Commissioning
SMR/FRBC Module
For VRLA battery For Conventional Lead
Acid battery
Float 2.25 x 55 = 123.8 V Float 2.15 x 55 =118.25 V
DC-DC Converter
Chapter - 4
MAINTENANCE
inserted properly
If, on the other hand, many of the SMRs are not sharing
satisfactorily, then the most likely problem area is in the
Distribution Supervisory Control Unit.
VRLA battery
Cleaning of all cells near its terminals.
Reading of all cell’s voltage with Charger ON.
Reading of all cell’s voltage with Charger switched OFF.
Boosting of Sick cell using Sick cell Charger.
Replacement of the faulty cell with new cell.
4.5 Cleanliness
Do’s
Don’ts
Chapter - 5
5.2 Earthing
Chapter - 6
TROUBLE SHOOTING
6.1 General
ANNEXURE A
PRE-COMMISSIONING CHECKLIST
FOR
SMPS BASED IPS SYSTEM
SIG0101 (Revision 1)
Annexure - A
PRE-COMMISSIONING CHECKLIST FOR SMPS BASED IPS
SYSTEM
1. STATION DETAILS
2. PRE-COMMISSIONING REQUIREMENTS
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
D) DG Set supply
D1 Provision of
adequate
capacity DG
set (without
AFTC)
4 Line Non-RE 10 KVA
4 Line RE/
6 Line RE 10 KVA
6 Line Non-RE 12.5/15 KVA
With AFTC in At least 25 KVA
yard
D2 Checking of Sinusoidal within 3%
DG set at 50Hz ± 5% from no
5KW dummy load to full load
load:
ITEM
ITEM
ITEM
H) Training
H1 Imparting on 3 Days
job training to
SE/SSE/JE and
ESM
ANNEXURE B
STANDARD DRAWINGS