i.
Cycle Time
Line No 7 11
06:52
Line No 7
Line NO 11
Analysis of 30 Batches on both Line No7 and Line 11 showed that the average cycle time for one batch on Line no 7 is 4 Hrs higher than Line no 11. To identify this difference we further went into identifying in which areas Line No 7 is taking more time than Line No 11. Below graphs compare the Average Defects, First Pass Yield and OEE on Line no 7 and Line No 11
ii.
Defects:
Avg Defects
300 250 200 150 100 50 0 7 11 263 218
Line No 7 11
The No of defects on both lines is very consistent thus defects cannot be accounted for the time difference for processing more defects.
iii.
Line No 7 11
The Avg first pass yield on line no 7 and Line no 11 shows a difference of approximately 2200 tubes which results in a loss of 25min of production time. This time does not include the time lost due to micro stoppages.
iv.
OEE:
OEE in %
70% 60% 50% 40% 30% 20% 10% 0% 7 11 40% 58%
Line No
Overall Equipment efficiency shows of difference of 18% while the Target OEE is 65% which is not met by both the lines however line no7 shows significant variation from the target value. Further drilling down into the reasons for Low OEE on line no7 the next check was for equipment Downtime on both the lines.