POWER AND WATER UTILITY COMPANY FOR JUBAIL & YANBU (MARAFIQ)
ABBY
ITEM No.
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DOC.NO: 12306-ME-A4-2702
Acceptance Criteria
Reference Document
QC Checklist
AKWAN
M.E
MFQ
Remarks
MATERIAL INSPECTION
Equipment/Material Receiving inspection for HVAC equipment,duct & accessories,hanger/supports, Insullation, air terminal devices,Flexible Connection, volume/fire dampers,Electrical Instument Materials. RC Standard 15820/15670,Material Approval submittal,Drawing,Relav ant applicable Industrial Codes/standars. Drawing,Manufacturer Instruction, Approved Material Submittal,Purchase Order,Project Specification, QCP/M.S
QCF-001
Project Specification, Project RC Standard Specification,,Manufactu 15820/15670,Manufactu rer Recommendation. rer instruction.
QCF - 113
RC Standard 15810/15820,QCP Project specification,Relavant applicable Industrial codes/standards Manufacturer Installation manual.
Page 1 of 5
ABBY
ITEM No.
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DOC.NO: 12306-ME-A4-2702
Acceptance Criteria
Reference Document
QC Checklist
AKWAN
M.E
MFQ
Remarks
MATERIAL INSPECTION
Duct accessories, duct heater, Volume Damper,sound alternator,Flow grid inspection,fire damper.
RC Standard 15820/15670,SMACNA Standards,Project specification, Approved drawing,QCP Relavant Drawing,SMACNA applicable industrial Standard QCP code & standards, Manufacturer installation manual. RC Standard 15840,SMACNA Standards,Project specification, drawing,QCP Relavant applicable industrial code & standards, Manufacturer installation manual. Project Specification, RC Standard 15820, Codes/relavant applicable Industrial codes & standards, Manufacturer manual.
QCF - 117
QCF - 118
Project Specification
RC Specification
Page 2 of 5
ABBY
ITEM No.
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DOC.NO: 12306-ME-A4-2702
Acceptance Criteria
Reference Document
QC Checklist
AKWAN
M.E
MFQ
Remarks
RC Standard 15820/15670,Project specification, drawing,QCP Relavant applicable code & standards, Manufacturer instructions manual.
QCF-120
LEAK TEST INSPECTION RC Standard 15820 / 15670,QCP ,Project specification,Relavant applicable codes/standards Manufacturer Instruction manual.
Check for Leak Test for Duct Installation, by conducting light test Method
QCF-119
EQUIPMENT INSTALLATION Equipment Foundation Location Check as per Approved Drawing. 10.1) Verify unit Installation is as per approved Drawing, Check Vibration pad Place Beneath 10 the Package Equipment installation. 10.2) Check Orientation & Level is per IFC Drawing. C) Check Condensate Drain System is as per approved drawing. RC Standard 15820/15730,QCP Project specification,Relavant Approved Drawing. applicable Industrial codes/standards Manufacturer Installation manual.
QCF - 114
Page 3 of 5
ABBY
ITEM No.
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DOC.NO: 12306-ME-A4-2702
Acceptance Criteria
Reference Document
QC Checklist
AKWAN
M.E
MFQ
Remarks
MATERIAL INSPECTION
RC Standard 15820/15670, QCP Project Pre-Commissioning Check for HVAC System specification,Relavant Includes package equipment duct, Volume / Fire applicable Industrial dampers, Electrical / Instrumentations. codes/standards Manufacturer Installation manual. RC Standard 15840, Project Final visual Inspection of HVAC System includes specification,Relavant identification tag for equipment, Volume / Fire applicable Dampers, Air flow direction on the Duct Air terminal codes/standards devices. Manufacturer Installation manual. Testing & Balancing: Perform by HVAC third party / Third party testing Vendor. procedures.
11
12
QCF-121
13
INVOLVEMENT INVOLVEMENT
ABBY
INTERVENTION CODES
P - Perform C - Certificate
An inspection point, defined in an appropriate document, beyond which an activity can proceed after notifying the designated organization or authority. Contractor's QC Inspector has full responsibility for performing detailed inspections during the work activity. Part of the Work, defined in an appropriate document that cannot proceed until it has been inspected and certified by the signature of the appropriate authority. Continual monitoring and verification of the status of an entity and analysis of records to ensure that the Contract specified requirements are fulfilled
Hold Point
(H)
Surveillance
(S)
Page 4 of 5
ABBY
ITEM No.
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DOC.NO: 12306-ME-A4-2702
Acceptance Criteria
Reference Document
QC Checklist
AKWAN
M.E
MFQ
Remarks
Performance (P)
MATERIAL INSPECTION
Inspection and test performed by Subcontractor / SETE Inspector and/or Site Engineer or the approved Independent Inspection Agency
Review Point ( R )
A review point, defined in an appropriate document, Done by SETE or the point at which a work activity cannot proceed without first ensuring the review and approval of applicable documents or personnel qualifications by a designated organization or authority.
Page 5 of 5