OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.

Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model Power 1
Battery Conductance Value

6-Apr-12 MSHR95 155 ah 12 Volts 22 C Rectifier 2 Delta


Battery Conductance Value

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

232 263 181 243 232 250 250 250

77% 88% 60% 81% 77.30% 83.30% 83% 83.30%

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

Mehtab Ahmed

Remarks:

SECTION.

Rectifier 3

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model Power 1
Battery Conductance Value

6-Apr-12 MSHR96 150 ah 12 Volts 22 C Rectifier 2 Delta


Battery Conductance Value

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

333 333 333 357 357 192 233 238

83% 83% 83% 89% 89.25% 48.00% 58% 59.50%

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

Mehtab Ahmed

Remarks:

SECTION.

Rectifier 3

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model Power 1
Battery Conductance Value

10-Apr-12 MSHR98 150 ah 12 Volts 22 C Rectifier 2 Delta


Battery Conductance Value

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

344 344 344 344 344 344 344 366

86% 86% 86% 86% 86.00% 86.00% 86% 91.50%

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

"""""""""""""""""""""""""" Conductance Test Performed By: Mehtab Ahmed

Remarks:

SECTION.

Rectifier 3

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model Power 1
Battery Conductance Value

7-Apr-12 MSPR21 150 ah 12 Volts 22 C Rectifier 2 Delta


Battery Conductance Value

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

370 370 370 370 384 19 384 384

93% 93% 93% 93% 96.00% 0.47% 96% 96.00%

1 2 3 4 1 2 3 4 1 2 3 4

270 238 270 270

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

Mehtab Ahmed

Remarks:

SECTION.

Rectifier 3

90% 79% 90% 90%

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model Power 1
Battery Conductance Value

7-Apr-12 MSPR27 170 ah 12 Volts 22 C Rectifier 2 Delta


Battery Conductance Value

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

333 358 317 156 390 264 386 310

83% 89% 79% 39% 97,5% 66.00% 97% 77.50%

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

Mehtab Ahmed

Remarks:

SECTION.

Rectifier 3

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model Power 1
Battery Conductance Value

7-Apr-12 MSPR31 170 ah 12 Volts 22 C Rectifier 2 Delta


Battery Conductance Value

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

333 344 344 344 344 344 333 333

83% 86% 86% 86% 86.00% 86.00% 83% 83.00%

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

"""""""""""""""""""""""""" Conductance Test Performed By: Mehtab Ahmed

Remarks:

SECTION.

Rectifier 3

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model Power 1
Battery Conductance Value

10-Apr-12 MTB001 155 ah 12 Volts 22 C Rectifier 2 Delta


Battery Conductance Value

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4 """"""""""""""""""""""""""

1 2 3 4 1 2 3 4 1 2 3 4

250 243 238 229 250 250 256 250

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

Mehtab Ahmed

Remarks:

SECTION.

Rectifier 3

83% 81% 79% 76% 83.00% 83.00% 85% 83.00%

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model Power 1
Battery Conductance Value

10-Apr-12 MTB007 170/155 ah 12 Volts 22 C Rectifier 2 Delta


Battery Conductance Value

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

238 138 169 169 285 277 277 322

79% 46% 56% 56% 71.00% 69.00% 69% 80.00%

1 2 3 4 1 2 3 4 1 2 3 4 """"""""""""""""""""""""""

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

Mehtab Ahmed

Remarks:

SECTION.

Rectifier 3

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

6-Apr-12 MSW014 155 ah 12 Volts C Rectifier 2 Delta


Cell Battery Conductance Value

Rectifier 3 Eltek
Cell Battery Conductance Value

Power 1
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4 223 24 329 7 OVER 55.75% 6% 82.25% 1.75%

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks:

LANT SECTION.

Rectifier 3

ek

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

6-Apr-12 MSW002 150 ah 12 Volts C Rectifier 2 Delta


Cell Battery Conductance Value

Rectifier 3 Eltek
Cell Battery Conductance Value

Power 1
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

257 255 255 251 270 255 251 251

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks:

LANT SECTION.

Rectifier 3

ek
NARADA

85.66% 85% 85% 83.66% 90% 85% 83.33% 83.33%

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): 10-Apr-12 MMTR81 155 ah 12 Volts C Rectifier 2 Delta
POWER SAFE Cell Battery Conductance Value BSB

Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

Rectifier 3 Eltek
Cell Battery Conductance Value

Power 1
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

200 183 185 188

50% 45.75% 46.25% 47%

1 2 3 4 1 2 3 4 1 2 3 4

300 300 300 300 189 176 170 153

100% 100% 100% 100% 63% 58.66% 56.66% 51%

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks:

LANT SECTION.

Rectifier 3

ek

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): 10-Apr-12 MHRR12 155 ah 12 Volts C Rectifier 2 Delta
Cell Battery Conductance Value

Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

Rectifier 3 Eltek
Cell Battery Conductance Value

Power 1
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

330 34 238 143 0.3 3 201 209

82.50% 8.50% 59.50% 35.75% 0.08% 0.75% 50.25% 52.25%

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks:

LANT SECTION.

Rectifier 3

ek

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): 10-Apr-12 MHR001 155 ah 12 Volts C Rectifier 2 Delta
Cell Battery Conductance Value

Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

Rectifier 3 Eltek
Cell Battery Conductance Value

Power 1
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

176 155 202 300

58.66% 51.66% 67.33% 100%

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks:

LANT SECTION.

Rectifier 3

ek

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

7-Apr-12 MAWR41 155 ah 12 Volts C Rectifier 2 Delta


Cell Battery Conductance Value

Rectifier 3 Eltek
Cell Battery Conductance Value

DELTA
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

260 286 286 286

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks: Hub site door lock and hinges found brocken

LANT SECTION.

Rectifier 3

ek
NARADA

86.66% 95.33% 95.33% 95.33%

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

7-Feb-12 MAWR39 155 ah 12 Volts C Rectifier 2 Delta


POWER SAFE Cell Battery Conductance Value POWER SAFE

Rectifier 3 Eltek
Cell Battery Conductance Value

Power 1
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

382 380 375 360 385 382 371 374

95.50% 95% 93.50% 90% 95.50% 95.50% 92.75% 93.50%

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks:

LANT SECTION.

Rectifier 3

ek

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model POWER ONE
Battery Conductance POWER Value SAFE 170AH

7-Apr-12 MAWR32 170 ah 12 Volts C Rectifier 2 Delta


Battery Conductance Value POWER SAFE 170+150AH

Rectifier 3 Eltek
Battery Conductance Value

Cell

Cell

Cell

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

251 257 286 385 375 368 380 345

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks: Hub site door lock and hinges found brocken

LANT SECTION.

Rectifier 3

ek
POWER SAFE 170AH

62.75% 64.25% 71.50% 96.25% 93.75% 92.00% 95.00% 86.25%

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

8-Apr-12 MABR21 155 ah 12 Volts C Rectifier 2 Delta


Cell Battery Conductance Value

Rectifier 3 Eltek
Cell Battery Conductance Value

DELTA
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

260 244 216 248 263 248 54 263

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks: Hub site door lock and hinges found brocken

LANT SECTION.

Rectifier 3

ek
NARADA

87% 81.33% 72% 82.66% 87.66% 82.66% 18% 87.66

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY CONDUCTANCE TEST SHEET.
Date: Location (address): Site ID: Battery Ah: Battery Volts: Weather / Temperature: Rectifier 1 Model
Cell

8-Apr-12 MABR20 150 ah 12 Volts C Rectifier 2 Delta


Cell Battery Conductance Value

Rectifier 3 Eltek
Cell Battery Conductance Value

Power 1
Battery Conductance Value

Battery Bank # 1 Left side to Right side

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

1 2 3 4 1 2 3 4 1 2 3 4

16 202 211 198 177 168 201 41

Battery Bank # 2 Left side to Right side

Battery Bank # 3 Left side to Right side

Conductance Test Performed By:

MAZHAR

Remarks:

LANT SECTION.

Rectifier 3

ek
HAZE

5.33% 67.33% 70.33% 66% 59% 56% 67% 13.67%

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY DISCHARGE TEST SHEET.
Date: 7-Apr-2012 Location (address): Site ID: Battery Ah: Battery Volts: Total volt of Battery set before start: Total volt of Battery set on load: Total load of System: Numbers of Battery Set: Total Discharging Hours: No of Rectifier cabinets: Weather / Temperature: With out load Time:
Battery Volt Total Volt Batt Total Amps

MBUW02 ah Volts Volts Volts Amps Set's Hour C On load After 5 Minutes Time:
Total Amps Battery Volt Total Volt Batt Total Amps

GLO

Time
Sl #

Time:
Battery Volt Total Volt Batt

After 15 Minutes Time:


Battery Volt Total Volt Batt

Battery Set # 1

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Battery Set # 2

Battery Set # 1

Battery Set #

1 2 3 4 Test Perfumed By: Nokia Representative: Battery Set # Remarks:

Test Witness By: Telenor Representative:

R PLANT SECTION. T.

After 15 Minutes :
Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 10 Minutes Time:


Battery Volt Total Volt Batt Total Amps

nor Representative:

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY DISCHARGE TEST SHEET.
Date: 7-Apr-2012 Location (address): Site ID: Battery Ah: Battery Volts: Total volt of Battery set before start: Total volt of Battery set on load: Total load of System: Numbers of Battery Set: Total Discharging Hours: No of Rectifier cabinets: Weather / Temperature: With out load Time:
Battery Volt Total Volt Batt Total Amps

155 12 54.4 50.4 32 2+1 1:30 1 28 On load

MMGR57 ah Volts Volts Volts Amps Set's Hour C After 5 Minutes Time: After 15 Minutes Time:
Battery Volt Total Volt Batt

Time
Sl #

Time:
Battery Volt Total Volt Batt Total Amps

Battery Volt

Total Volt Batt

Total Amps

Battery Set # 1

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6

54.4

0.4

12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5

50.4

14.7

12.6 12.6 12.4 12.6 12.6 12.6 12.3 12.6

50.1

13.8

12.5 12.6 12.6 12.6 12.6 12.6 12.6 12.6

50.4

Battery Set # 2

54.4

0.4

50.4

13.3

50.1

13.4

50.3

Battery Set # 1

Battery Set #

Battery Set # Test Perfumed By: Nokia Representative: Remarks: Test Witness By: Telenor Representative:

R PLANT SECTION. T.

After 15 Minutes :
Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 10 Minutes Time:


Battery Volt Total Volt Batt Total Amps

11.8

12.5 12.4 12.5 12.5 12.5 12.5 12.3 12.6

49.7

15.5

12.3 12.2 124 12.5 12.3 12.2 12.2 12.3

49.5

16.7

12.2 12.2 12.1 12.3 12.2 12.2 12,1 12.2

49.2

13.9

16.5

49.6

18.8

49.4

14.6

49.2

14.6

nor Representative:

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY DISCHARGE TEST SHEET.
Date: 7-Apr-2012 Location (address): Site ID: Battery Ah: Battery Volts: Total volt of Battery set before start: Total volt of Battery set on load: Total load of System: Numbers of Battery Set: Total Discharging Hours: No of Rectifier cabinets: Weather / Temperature: With out load Time:
Battery Volt Total Volt Batt Total Amps

150 12 54.4 50.4 32 2 1:30 1 29 On load

MMGR58 ah Volts Volts Volts Amps Set's Hour C After 5 Minutes Time: After 15 Minutes Time:
Battery Volt Total Volt Batt

Time
Sl #

Time:
Battery Volt Total Volt Batt Total Amps

Battery Volt

Total Volt Batt

Total Amps

Battery Set # 1

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6

54.4

0.4

12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5

50.4

14.7

12.6 12.6 12.4 12.6 12.6 12.6 12.3 12.6

50.1

13.8

12.5 12.6 12.6 12.6 12.6 12.6 12.6 12.6

50.4

Battery Set # 2

54.4

0.4

50.4

13.3

50.1

13.4

50.3

Battery Set # 1

Battery Set #

1 2 3 4 Test Perfumed By: Nokia Representative: Battery Set # Remarks:

Test Witness By: Telenor Representative:

R PLANT SECTION. T.

After 15 Minutes :
Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 10 Minutes Time:


Battery Volt Total Volt Batt Total Amps

11.8

12.5 12.4 12.5 12.5 12.5 12.5 12.3 12.6

49.7

15.5

12.3 12.2 124 12.5 12.3 12.2 12.2 12.3

49.5

16.7

12.2 12.2 12.1 12.3 12.2 12.2 12,1 12.2

49.2

13.9

16.5

49.6

18.8

49.4

14.6

49.2

14.6

nor Representative:

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY DISCHARGE TEST SHEET.
Date: 10-Apr-2012 Location (address): Site ID: Battery Ah: Battery Volts: Total volt of Battery set before start: Total volt of Battery set on load: Total load of System: Numbers of Battery Set: Total Discharging Hours: No of Rectifier cabinets: Weather / Temperature: With out load Time:
Battery Volt Total Volt Batt Total Amps

MBK004 ah Volts Volts Volts Amps Set's Hour C On load After 5 Minutes Time:
Total Amps Battery Volt Total Volt Batt Total Amps

GLO

Time
Sl #

Time:
Battery Volt Total Volt Batt

After 15 Minutes Time:


Battery Volt Total Volt Batt

Battery Set # 1

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Battery Set # 2

Battery Set # 1

Battery Set #

1 2 3 4 Test Perfumed By: Nokia Representative: Battery Set # Remarks:

Test Witness By: Telenor Representative:

R PLANT SECTION. T.

After 15 Minutes :
Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 10 Minutes Time:


Battery Volt Total Volt Batt Total Amps

nor Representative:

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY DISCHARGE TEST SHEET.
Date: 4-1012 Location (address): Site ID: Battery Ah: Battery Volts: Total volt of Battery set before start: Total volt of Battery set on load: Total load of System: Numbers of Battery Set: Total Discharging Hours: No of Rectifier cabinets: Weather / Temperature: With out load Time:
Battery Volt Total Volt Batt Total Amps

MBK001 ah Volts Volts Volts Amps Set's Hour C On load After 5 Minutes Time:
Total Amps Battery Volt Total Volt Batt Total Amps

GLO

Time
Sl #

Time:
Battery Volt Total Volt Batt

After 15 Minutes Time:


Battery Volt Total Volt Batt

Battery Set # 1

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Battery Set # 2

Battery Set # 1

Battery Set #

1 2 3 4 Test Perfumed By: Nokia Representative: Battery Set # Remarks:

Test Witness By: Telenor Representative:

R PLANT SECTION. T.

After 15 Minutes :
Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 10 Minutes Time:


Battery Volt Total Volt Batt Total Amps

nor Representative:

OPERATION & MAINTENANCE DEPARTMENT, POWER PLANT SECTION. BATTERY DISCHARGE TEST SHEET.
Date: 10-Apr-2012 Location (address): Site ID: Battery Ah: Battery Volts: Total volt of Battery set before start: Total volt of Battery set on load: Total load of System: Numbers of Battery Set: Total Discharging Hours: No of Rectifier cabinets: Weather / Temperature: With out load Time:
Battery Volt Total Volt Batt Total Amps

MBK003 150+17 0 12 54.4 50.4 32 1+1 2:30 1 29 On load Time:


Battery Volt Total Volt Batt Total Amps

ah Volts Volts Volts Amps Set's Hour C After 5 Minutes Time:


Battery Volt Total Volt Batt Total Amps

Time
Sl #

After 15 Minutes Time:


Battery Volt Total Volt Batt

Battery Set # 1

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

13.6 13.6 13.6 13.6 13.6 13.6 13.6 13.6

54.4

0.4

12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.5

50.4

14.7

12.6 12.6 12.4 12.6 12.6 12.6 12.3 12.6

50.1

13.8

12.5 12.6 12.6 12.6 12.6 12.6 12.6 12.6

50.4

Battery Set # 2

54.4

0.4

50.4

13.3

50.1

13.4

50.3

Battery Set # 1

Battery Set #

1 2 3 4 Test Perfumed By: Nokia Representative: Battery Set # Remarks:

Test Witness By: Telenor Representative:

R PLANT SECTION. T.

After 15 Minutes :
Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 15 Minutes Time:


Battery Volt Total Volt Batt Total Amps

After 10 Minutes Time:


Battery Volt Total Volt Batt Total Amps

11.8

12.5 12.4 12.5 12.5 12.5 12.5 12.3 12.6

49.7

15.5

12.3 12.2 124 12.5 12.3 12.2 12.2 12.3

49.5

16.7

12.2 12.2 12.1 12.3 12.2 12.2 12,1 12.2

49.2

13.9

16.5

49.6

18.8

49.4

14.6

49.2

14.6