OBRA:

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACINDISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE


FORMULA ESTRUCTURAS
CLIENTE GOBIERNO REGIONAL LAMBAYEQUE
ITEM
DESCRIPCION
01
01.01

1.00
332.61
221.74
986.22
164

2,038.52
1.33
1.44
9.58
30.7

2,038.52
442.37
319.31
9,447.99
5,034.80

m
glb

241.74
1.00

8.00
2,500.00

1,933.92
2,500.00

m3
m3
m3

158.40
138.23
715.08

25.54
12.79
12.79

4,045.54
1,767.96
9,145.87

m2
70.00
m3
66.52
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m3
12.10
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo
m212 Usos) 161.36
ENCOFRADO Y DESENCOFRADO PARA CIMIENTO CORRIDO (Madera Tornillo
m2 12 Usos)266.09

21.47
165.17
213.09
28.65
28.65

1,502.90
10,987.11
2,578.39
4,622.96
7,623.48

LIMPIEZA DE TERRENO MANUAL

01.01.03

TRAZO Y REPLANTEO
DEMOLICION DE MUROS DE ADOBE
DEMOLICION DE CIMIENTO DE MUROS DE ADOBE
OBRAS PROVISIONALES

01.02.01

CERCO PERIMETRICO PROVISIONAL DE OBRA

01.02.02

ALMACEN,OFICINA Y CASETA DE GUARDIANIA

01.02

MOVIMIENTO DE TIERRAS

01.02.01

EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO

01.02.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

01.03.03

ELIMINACION DE MATERIAL DE DEMOLICION (D=5 KM)

01.03

OBRAS DE CONCRETO SIMPLE

01.04.01

SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON

01.04.02

CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG

01.04.03
01.04.04
01.04.05
01.04

P. PARCIAL

u
m2
m2
m2
m3

CARTEL DE OBRA

01.02

P. UNIT.

TRABAJOS PRELIMINARES

01.01.02

01.01.05

METRADO

CONSTRUCCION DE CERCO PERIMETRICO

01.01.01

01.01.04

UND.

OBRAS DE CONCRETO ARMADO

01.05.01

ZAPATAS

01.05.01.01

CONCRETO EN ZAPATAS F'C=175 kg/cm2

01.05.01.02

ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

01.05.02

COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)

01.05.02.01

CONCRETO EN COLUMNAS f'c=175 kg/cm2

01.05.02.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

01.05.02.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

01.05.03

VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)

01.05.03.01

CONCRETO EN VIGAS f'c=175 kg/cm2

01.05.03.02

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2

01.05.03.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

02

AMPLIACION DE TRIBUNA SUR OESTE

02.01

TRABAJOS PRELIMINARES

02.01.01

LIMPIEZA DE TERRENO MANUAL

m3
kg

30.00
800.00

290.65
3.92

8,719.50
3,136.00

m3
kg
m2

19.03
2,249.04
313.00

288.67
3.92
42.14

5,493.39
8,816.24
13,189.82

m3
kg
m2

15.00
857.65
140.00

282.78
3.92
46.29

4,241.70
3,361.99
6,480.60

m2

207.00

1.33

275.31

02.02

MOVIMIENTO DE TIERRAS

02.02.01

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL. m3

02.02.02

NIVELACION INTERIOR APISONADO MANUAL

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m2
m3

35.00
60.00
30.00

25.54
1.84
12.79

893.90
110.40
383.70

02.03

CONCRETO SIMPLE

02.03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG

02.03.02

SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON

m3
m2

18.00
20.00

165.17
21.47

2,973.06
429.40

02.04

CONCRETO ARMADO

02.04.01

ZAPATAS

02.04.01.01

CONCRETO EN ZAPATAS F'C=210 kg/cm2

02.04.01.02

ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

02.04.02

COLUMNAS

02.04.02.01

CONCRETO EN COLUMNAS f'c=210 kg/cm2

02.04.02.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

02.04.02.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

02.04.03

VIGAS

02.04.03.01

CONCRETO EN VIGAS f'c=210 kg/cm2

02.04.03.02

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2

02.04.03.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

02.04.04

GRADERIA

02.04.04.01

CONCRETO EN GRADERIA f'c=210 kg/cm2

02.04.04.02

ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIA

m3
kg

12.00
288.04

305.10
3.92

3,661.20
1,129.12

m3
kg
m2

6.00
800.00
44.80

411.23
3.92
42.14

2,467.38
3,136.00
1,887.87

m3
kg
m2

4.50
600.00
36.00

311.20
3.92
46.29

1,400.40
2,352.00
1,666.44

m3
m2
kg

16.00
120.00
1,200.00

409.14
64.91
3.96

6,546.24
7,789.20
4,752.00

m2
m2

490.00
490.00

1.33
1.44

651.70
705.60

03.02

DEMOLICION DE MALLA EXISTENTE

03.02.01

DEMOLICION DE ESTRUCTURA DE MALLA EXISTENTE (CIM,SOBRECIM Ym3


COLUMNAS) 67.63

03.02.02

DESMONTAJE DE MALLA EXISTENTE

375.79
75.00

40.01
5.37
12.79

2,705.88
2,017.99
959.25

m3
m3

45.00
70.00

25.54
12.79

1,149.30
895.30

m3

52.44

15,137.85
5,943.44
6,242.99

02.04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIA


03
03.01

REHABILITACION Y MEJORAMIENTO DE MALLA LIMITANTE CON


TRIBUNAS
TRABAJOS PRELIMINARES

03.01.01

LIMPIEZA DE TERRENO MANUAL

03.01.02

TRAZO Y REPLANTEO

03.02.03
03.02

m2
ELIMINACION DE DEMOLICION Y DESMONTAJE DE MALLA EXISTENTE m3
MOVIMIENTO DE TIERRAS

03.02.01

EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO

03.02.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

03.04

OBRAS DE CONCRETO ARMADO

03.04.01

CIMIENTO ARMADO

03.04.02

CONCRETO EN CIMIENTO ARMADO f'c=175 kg/cm2

03.04.03

ENCOFRADO Y DESENCOFRADO PARA CIMIENTO ARMADO (Madera Tornillo


m2 12 Usos) 207.45

03.04.04

kg

1,592.60

04.01

ACERO ESTRUCTURAL EN CIMIENTO ARMADO fy=4200 kg/cm2


ACONDICIONAMIENTO DE VESTIDORES -ADMINISTRACION DE
SSHH PARA HOMBRES Y MUJERES
TRABAJOS PRELIMINARES

288.67
28.65
3.92

04.01.01

LIMPIEZA DE TERRENO MANUAL

04.01.02

DEMOLICION DE ALBAILERIA

04.01.03

TRAZO Y REPLANTEO

04.01.04

DEMOLICION DE PISO

04.01.05

DEMOLICION CIMIENTO

04.01.06

DEMOLICION SOBRECIMIENTO

04.01.07

DEMOLICION DE COLUMNAS

04.01.08

DEMOLICION DE VIGAS

04.01.09

DEMOLICION DE LOSA MACIZA

04.01.10

DEMOLICION DE VEREDA

04.01.11

DESMONTAJE DE COBERTURAS

04.01.12

ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS

m2
m3
m2
m2
m3
m3
m3
m3
m3
m2
m2
m3

350.00
280.22
350.00
157.33
53.17
11.71
2.50
3.22
11.31
18.24
119.30
300.00

1.33
9.39
1.44
20.46
119.70
119.70
119.70
119.70
119.70
20.46
5.47
12.79

465.50
2,631.27
504.00
3,218.97
6,364.45
1,401.69
299.25
385.43
1,353.81
373.19
652.57
3,837.00

04.02

MOVIMIENTO DE TIERRAS

04.02.01

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL. m3

04.02.02

NIVELACION INTERIOR APISONADO MANUAL

04.02.03

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m2
m3

80.00
120.00
80.00

25.54
1.84
12.79

2,043.20
220.80
1,023.20

04.03

CONCRETO SIMPLE

04.03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG

m3

44.56

165.17

7,359.98

04

m3

12.00

m2

241.80

213.09
28.65
23.03

m3
kg

2.16
50.40

305.10
3.92

659.02
197.57

m3
kg
m2

0.57
39.20
15.00

305.10
3.92
46.29

173.91
153.66
694.35

m3
kg

12.58
1,053.51

282.78
3.92

3,557.37
4,129.76

m3
kg
m2

15.00
1,770.30
210.79

288.67
3.92
42.14

4,330.05
6,939.58
8,882.69

m3
kg
m2

16.13
1,186.17
80.65

282.78
3.92
46.29

4,561.24
4,649.79
3,733.29

m3
m2
u

21.61
779.03
247.00
2,054.00

327.89
3.92
37.51
2.10

7,085.70
3,053.80
9,264.97
4,313.40

m2
m2
m3
m2
m3

25.00
25.00
6.00
30.00
10.00

1.33
1.44
119.70
5.47
12.79

33.25
36.00
718.20
164.10
127.90

05.02.01

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.


m3

05.02.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3

57.60
74.88

25.54
12.79

1,471.10
957.72

m3
m2

8.64
10.50

165.17
23.03

1,427.07
241.82

m3
10.56
m2
50.00
ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
400.00

297.52
38.11
3.92

3,141.81
1,905.50
1,568.00

1.33

66.50

04.03.02

CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM

04.03.03

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo


m212 Usos) 149.10

04.03.04

FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)

04.04

CONCRETO ARMADO

04.04.01

ZAPATAS

04.04.01.01

CONCRETO EN ZAPATAS F'C=210 kg/cm2

04.04.01.02

ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

04.04.02

VIGAS DE CIMENTACION

04.04.02.01

CONCRETO EN VIGAS DE CIMENTACION F'C=210 kg/cm2

04.04.02.02

ACERO ESTRUCTURAL EN VIGAS DE CIMENTACION fy=4200 kg/cm2

04.04.02.03

ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION

04.04.03

SOBRECIMIENTO ARMADO

04.04.03.01

CONCRETO EN SOBRECIMIENTO ARMADO f'c=175 kg/cm2

04.04.03.02

ACERO ESTRUCTURAL EN SOBRECIMIENTO ARMADO fy=4200

04.04.04

COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)

04.04.04.01

CONCRETO EN COLUMNAS f'c=175 kg/cm2

04.04.04.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

04.04.04.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

04.04.05

VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)

04.04.05.01

CONCRETO EN VIGAS f'c=175 kg/cm2

04.04.05.02

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2

04.04.05.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

04.04.06

LOSAS ALIGERADAS

04.04.06.01

CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

04.04.06.02

ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")kg

04.04.06.03

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

04.04.06.04

05.01

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO


CONSTRUCCION DE BANQUILLA DE SUPLENTES Y COLOCACION
DE COBERTURA TRANSPARARENTE
OBRAS PROVISIONALES

05.01.01

LIMPIEZA DE TERRENO MANUAL

05.01.02

TRAZO Y REPLANTEO

05.01.03

DEMOLICION EN BAQUILLAS DE SUPLENTES EXISTENTE

05.01.04

DESMONTAJE DE COBERTURAS

05.01.05

ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS

05

05.02

05.03
05.03.01
05.03.02
05.04

MOVIMIENTO DE TIERRAS

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
CONCRETO ARMADO

05.04.01

CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2

05.04.03

ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS

05.04.02

2,557.08
4,271.72
5,568.65

06

CONSTRUCCION DE CASETA PARA BOLETERIA Y REHABILITACION


DE PISO A TRIBUNA PRINCIPAL Y CAMBIADO DE PORTONES
PRINCIPALES

06.01

OBRAS PROVISIONALES

06.01.01

LIMPIEZA DE TERRENO MANUAL

m2

50.00

m2
m2
m3
m2
m3

50.00
38.64
10.00
5.10
5.00

1.44
20.46
9.39
5.47
12.79

72.00
790.57
93.90
27.90
63.95

06.02

MOVIMIENTO DE TIERRAS

06.02.01

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL. m3

06.02.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3

8.00
6.00

25.54
12.79

204.32
76.74

06.03

CONCRETO SIMPLE

06.03.01

FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)

06.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG

06.03.03

CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM

m2
m3
m3

9.45
2.50
0.55

23.03
165.17
213.09

217.63
412.93
117.20

06.04

CONCRETO ARMADO

06.04.01

COLUMNAS

06.04.01.01

CONCRETO EN COLUMNAS f'c=210 kg/cm2

06.04.01.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

06.04.01.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

1.00
100.00
10.00

411.23
3.92
42.14

411.23
392.00
421.40

06.04.02

VIGAS

06.04.02.01

CONCRETO EN VIGAS f'c=210 kg/cm2

06.04.02.02

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2

06.04.02.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

m3
kg
m2

0.50
50.00
3.00

411.23
3.92
46.29

205.62
196.00
138.87

06.04.03

LOSAS ALIGERADAS

06.04.03.01

CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

m3

06.04.03.02

ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")kg

06.04.03.03

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

06.04.03.04

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO

1.00
50.00
10.80
90.00

327.89
3.92
37.51
2.10

327.89
196.00
405.11
189.00

06.01.02

TRAZO Y REPLANTEO

06.01.03

DEMOLICION DE PAVIMENTO DE CONCRETO DE 6"

06.01.04

DEMOLICION DE ALBAILERIA

06.01.05

DESMONTAJE DE COBERTURAS

06.01.06

ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS

m2
u

COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

01
01.01
01.01.01
01.02
01.02.01
01.03

CERCO PERIMETRICO
MUROS Y TABIQUES DE ALBAILERIA

m2

986.22

39.27

38,728.86

m2

213.66

28.16

6,016.67

m2
m2
TIJERALES Y VIGAS METALICAS PARA COBERTURAS DE TRIBUNAS m
m
REFUERZO DE COBERTURA DE TRIBUNA

16.30
490.00
485.00
36.00

98.64
15.00
100.79
67.29

1,607.83
7,350.00
48,883.15
2,422.44

245.00
615.00

51.47
10.44

12,610.15
6,420.60

m2
MURO SOGA 1 CARAVISTA LADRILLO SILICO-CALCAREO KK AMARRE
CON CEMENTO-CAL-ARENA
350.00
53.96

18,886.00

MUROS DE LADRILLO ARCILLA SOGA


REVOQUES ENLUCIDOS
TARRAJEO DE ELEMENTOS ESTRUCTURALES
COBERTURAS

01.03.01

COBERTURA CON CALAMINA GALVANIZADA Y VIGAS DE MADERA

01.03.02

COBERTURA CON CALAMINA GALVANIZADA EN TRIBUNAS

01.03.03
01.03.04
02
02.01

REHABILITACION Y MEJORAMIENTO DE MALLA LIMITANTE CON


TRIBUNAS
CERCO PERIMETRICO

02.01.01

COLOCACION DE DE TUBERIAS DE FIERRO GALVANIZADO

02.01.02

MALLA DE ALAMBRE TEJIDA


ACONDICIONAMIENTO DE VESTIDORES -ADMINISTRACION DE
SSHH PARA HOMBRES Y MUJERES

03
03.01
03.01.01
03.02
03.02.01

323,424.38
32,342.44
16,171.22
371,938.04
66,948.85
438,886.89
394,998.20

u
m2

ALBAILERIA
REVOQUES ENLUCIDOS
TARRAJEO RAYADO O PRIMARIO

m2

40.00

16.77

670.80

m2
m

160.00
58.00

25.10
18.13

4,016.00
1,051.54

m2

160.00

22.88

3,660.80

m2
m2

160.00
160.00

22.51
49.02

3,601.60
7,843.20

m2

29.80

49.27

1,468.25

m2 CEDRO 2"X3"
PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO
39.00

193.81

7,558.59

03.02.02

TARRAJEO INTERIOR DE TUNEL CON IMPERMEABILIZANTE

03.02.03

VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS

03.03
03.03.01
03.04

CIELO RASO
CIELO RASO CON MEZCLA DE C:A
PISOS Y PAVIMENTOS

03.04.01

CONTRAPISO DE 48 mm

03.04.02

PISO CERAMICO(CERAMICA DE 3030 MEZCLA 1:4)

03.05
03.05.01
03.06
03.06.01
03.07
03.07.01
03.08

ZOCALOS Y CONTRAZOCALOS
ZOCALO CERAMICA COLOR DE 30X30 cm DE 1RA
CARPINTERIA DE MADERA
CARPINTERIA METALICA
PUERTA METALICA

03.08.01

BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3"

03.08.02

BISAGRA ALUMINIZADA DE 3" X 3"

03.08.03
03.09
03.09.01
03.10

CERRADURA PARA PUERTA PRINCIPAL PESADA


VIDRIOS SEMIDOBLES INCOLORO CRUDO
PINTURA AL TEMPLE EN CIELO RASO 2 MANOS
SC PINTURA VINILICA EN MUROS INTERIORES 2 MANOS

03.10.03

PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS

03.10.04

PINTURA EN PUERTAS CON BARNIZ 2 MANOS

04.01
04.01.01
04.02
04.02.01
04.02.02
05
05.01
05.01.01

PINTURA EN VENTANAS CON BARNIZ 2 MANOS


CONSTRUCCION DE BANQUILLA DE SUPLENTES Y COLOCACION
DE COBERTURA TRANSPARARENTE
PISOS DE CEMENTO BRUADO
COBERTURA CON POLICARBONATO ALBEOLAR TRANSPARENTE
LIMPIEZA DE MALEZA
SIEMBRA DE CESPED BERMUDA EN RECTANGULO DE JUEGO

PREPARACION DE TERRENO

05.02.02

FERTILIZANTE BASE

05.02.03

DESTERRONADO

05.02.04

COLOCACION DE PUNTOS DE NIVEL


NIVELACION FINA
SEMILLA DE CESPED BERMUDA

05.03.02

SIEMBRA DEFINITIVA EN CAMPO

50.00

5.00

250.00

m2
m2
m2
m2
m2

160.00
144.00
144.00
12.00
8.00

5.53
5.23
8.73
14.15
11.11

884.80
753.12
1,257.12
169.80
88.88

m2

170.00

22.02

3,743.40

m2
m2

50.00
8,056.00

166.98
0.35

8,349.00
2,819.60

m2
m2

8,056.00
8,056.00
10,000.00

0.35
1.39
0.09

2,819.60
11,197.84
900.00

m2
m2
m2
m2
m2

8,056.00
8,056.00
8,056.00
8,056.00
8,056.00

0.74
0.16
0.53
0.15
1.55

5,961.44
1,288.96
4,269.68
1,208.40
12,486.80

kg
m2

100.00
8,056.00

119.86
0.14

11,986.00
1,127.84

glb
glb
glb
glb
glb
glb
glb

1.00
1.00
1.00
1.00
1.00
1.00
1.00

4,000.00
1,500.00
1,680.00
1,000.00
1,200.00
1,080.00
2,481.00

4,000.00
1,500.00
1,680.00
1,000.00
1,200.00
1,080.00
2,481.00

glb
glb
glb
glb

1.00
1.00
1.00
1.00

9,150.00
13,088.34
11,431.16
3,075.60

9,150.00
13,088.34
11,431.16
3,075.60

MANTENIMIENTO

05.04.01

FERTILIZANTES

05.04.02

INSECTICIDAS Y FUNGICIDAS

05.04.03

ADITIVOS

05.04.04

FERTILIZANTES FOLIARES

05.04.05

HERBICIDAS

05.04.06

GASOLINA Y LUBRICANTES

06.01

p2

SIEMBRA DE CESPED BERMUDA

05.03.01

06

218.16
192.57
160.90

SIEMBRA DE CESPED - PREPARADO DE TERRENO

05.02.01

05.04.07

12.12
9.17
80.45

TRABAJOS PRELIMINARES

APLICACION DE HERBICIDA

05.04

18.00
21.00
2.00

LIMPIEZA DE MALEZA

05.01.03

05.03

pza
pza
pza

COBERTURAS

TRAZO Y REPLANTEO

05.02.05

2,918.88

REVESTIMIENTOS

05.01.02

05.02

486.48

PINTURA

03.10.02

04

6.00

VIDRIOS, CRISTALES Y SIMILARES

03.10.01

03.10.05

CERRAJERIA

DESHIERBADO MANUAL
RIEGO PRESURIZADO EN CAMPO DE JUEGO
EQUIPO DE RIEGO POR ASPERSION

06.01.01

MOVIMIENTOS DE TIERRA

06.01.02

SUMINISTRO E INSTALACION DE TUBERIAS HDPE

06.01.03

SUMINISTRO E INSTALACION DE ASPERSORES (ROTORES)

06.01.04

SUMINISTRO E INSTALACION DE VALVULAS

06.01.05

SUMINISTRO E INSTALACION DE CABEZAL DE BOMBEO

06.01.06

PRUEBA HIDRAULICA

07
07.01

INSTALACION DE NUEVOS PORTONES PRINCIPALES


RESANE CON CEMENTO Y / O EPOXICOS

07.02.01

7,836.30
285.59

7,836.30
285.59

glb
m2
m2

2.00
2,200.00
250.00

2,098.25
7.36
22.35

4,196.50
16,192.00
5,587.50

glb

1.00

13,000.00

13,000.00

OTROS

07.01.02
07.02

1.00
1.00

CONSTRUCCION DE CASETA PARA BOLETERIA Y REHABILITACION


DE PISO A TRIBUNA PRINCIPAL Y CAMBIADO DE PORTONES
PRINCIPALES

07.01.01
07.01.03

glb
glb

MEJORAMIENTO DE VEREDAS Y PASADIZOS DE TRIBUNAS


IMPACTO AMBIENTAL
IMPACTO AMBIENTAL

344,633.26
34,463.33
17,231.66
396,328.25
71,339.08
467,667.33
420,900.60

COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

01

INSTALACIONES ELECTRICAS

01.01

SALIDA DE TECHO CON CABLE AWG TW 2.5 mm (14) + D PVC SEL 16 mm


pto(5/8)

01.02

SALIDA PARA CENTROS DE LUZ CON INTERRUPTOR DE CONMUTACION


pto

01.03

SALIDA PARA TOMACORRIENTES

01.04

TUBERIAS PVC SAP (ELECTRICAS) D=1"

01.05

TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS

pto
m
pza

12.00
3.00
26.00
1.00
1.00

61.58
61.30
44.73
23.92
380.03

2,489.79
248.98
124.49
2,863.26
515.39
3,378.65
3,040.78

COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

01
01.01

INSTALACIONES SANITARIAS
APARATOS SANITARIOS

pza
15.00
pza
15.00
DUCHA CROMADA DE CABEZA GIRATORIA Y LLAVE MEZCLADORA (INCLUYE
ACCESORIOS)
u
15.00
KIT DE ACCESORIOS ADHESIVOS BLANCOS
u
15.00

01.01.01

INODORO SIFON JET BLANCO TREBOL (incluye Accesorios)

01.01.02

LAVATORIO MALIBU BLANCO (INCL. ACCESORIOS)

01.01.03
01.01.04

01.02

738.96
183.90
1,162.98
23.92
380.03

219.88
304.23
75.19
41.42

3,298.20
4,563.45
1,127.85
621.30

47.70
30.29
32.46

3,951.43
429.30
272.61
292.14

SISTEMA DE DESAGUE

01.02.01

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

01.02.02

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

01.02.03

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

pto
pto
pto

9.00
9.00
9.00

01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11

01.03

m
m
REGISTROS DE BRONCE CROMADO 3"
pza
SOMBRERO VENTILACION PVC DE 2"
pza
CAJA DE REGISTRO DE DESAGUE 12" X 24"(Incluye colocacion)
u
CAJA CIEGA DE 10" X 20"
pza
CAJA DE REGISTRO DE ALB. DE 10" X 20" CON TAPA DE FF (Incluye colocacion)
u
EMPALME A RED EXISTENTE
glb
TUBERIA PVC SAL 2"
TUBERIA PVC SAL 4"

12.00
18.90
4.00
1.00
5.00
1.00
5.00
1.00

7.61
10.87
18.97
18.61
104.50
88.60
119.82
1,355.93

91.32
205.44
75.88
18.61
522.50
88.60
599.10
1,355.93

28.00
56.00
250.00
5.00
5.00
2.00
2.00
2.00
1.00
1.00

27.96
8.10
7.22
58.89
93.84
36.60
621.01
288.80
3,345.20
725.80

782.88
453.60
1,805.00
294.45
469.20
73.20
1,242.02
577.60
3,345.20
725.80

SISTEMA DE AGUA FRIA

01.03.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

01.03.02

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

01.03.03

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP

01.03.04

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2"

01.03.05

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 3/4"

01.03.06

LLAVE DE RIEGO CON GRIFO DE 1/2"

01.03.07

TANQUE ELEVADO DE POLIETILENO 1000 Lts

01.03.08

TANQUE ELEVADO DE POLIETILENO 1000 Lts - ACCESORIOS

01.03.09

SUMINISTRO E INSTALACION DE CISTERNA PVC 5.00 m3

01.03.10

SUMINISTRO E INSTALACION DE ELECTROBOMBA


COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

pto
m
m
u
u
pza
pza
pza
glb
glb

27,282.61
2,728.26
1,364.13
31,375.00
5,647.50
37,022.50
33,320.25

VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012


Obra
MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD
DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE
Frmula
ESTRUCTURAS
Cliente
GOBIERNO REGIONAL LAMBAYEQUE
ITEM
DESCRIPCION
UND. METRADO
P. UNIT.
P. PARCIAL

02.04.02
02.04.02.01
02.04.02.02
02.04.02.03

COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

6.00
800.00
44.80

411.23
3.92
42.14

2,467.38
3,136.00
1,887.87

02.04.03
02.04.03.01
02.04.03.02
02.04.03.03

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN VIGAS

m3
kg
m2

4.50
600.00
36.00

311.20
3.92
46.29

1,400.40
2,352.00
1,666.44

m3
m2

16.00
120.00

409.14
64.91

6,546.24
7,789.20

02.04.04
GRADERIA
02.04.04.01 CONCRETO EN GRADERIA f'c=210 kg/cm2
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIA

02.04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIA

kg

1,200.00

3.96

4,752.00

m2
m2

490.00
490.00

1.33
1.44

651.70
705.60

03.01
03.01.01
03.01.02

REHABILITACION Y MEJORAMIENTO DE MALLA LIMITANTE


CON TRIBUNAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO

03.02
03.02.01
03.02.02
03.02.03

DEMOLICION DE MALLA EXISTENTE


DEMOLICION DE ESTRUCTURA DE MALLA EXISTENTE (CIM,SOBRECIM
m3
Y COLUMNAS)
67.63
DESMONTAJE DE MALLA EXISTENTE
m2
375.79
ELIMINACION DE DEMOLICION Y DESMONTAJE DE MALLA EXISTENTE
m3
75.00

40.01
5.37
12.79

2,705.88
2,017.99
959.25

03.03
03.03.01
03.03.02

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO m3
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3

25.54
12.79

1,149.30
895.30

03.04
03.04.01
03.04.02
03.04.03
03.04.04

OBRAS DE CONCRETO ARMADO


CIMIENTO ARMADO
CONCRETO EN CIMIENTO ARMADO f'c=175 kg/cm2
m3
52.44
ENCOFRADO Y DESENCOFRADO PARA CIMIENTO ARMADO (Madera
m2 Tornillo207.45
12 Usos)
ACERO ESTRUCTURAL EN CIMIENTO ARMADO fy=4200 kg/cm2 kg
1,592.60

288.67
28.65
3.92

15,137.85
5,943.44
6,242.99

ACONDICIONAMIENTO DE VESTIDORES -ADMINISTRACION


DE SSHH PARA HOMBRES Y MUJERES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
DEMOLICION DE ALBAILERIA
m3
TRAZO Y REPLANTEO
m2
DEMOLICION DE PISO
m2
DEMOLICION CIMIENTO
m3
DEMOLICION SOBRECIMIENTO
m3
DEMOLICION DE COLUMNAS
m3
DEMOLICION DE VIGAS
m3
DEMOLICION DE LOSA MACIZA
m3
DEMOLICION DE VEREDA
m2
DESMONTAJE DE COBERTURAS
m2
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS
m3

1.33
9.39
1.44
20.46
119.70
119.70
119.70
119.70
119.70
20.46
5.47
12.79

465.50
2,631.27
504.00
3,218.97
6,364.45
1,401.69
299.25
385.43
1,353.81
373.19
652.57
3,837.00

03

04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.01.11
04.01.12

45.00
70.00

350.00
280.22
350.00
157.33
53.17
11.71
2.50
3.22
11.31
18.24
119.30
300.00

04.02
MOVIMIENTO DE TIERRAS
04.02.01
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
m3
80.00
25.54
2,043.20
04.02.02
NIVELACION INTERIOR APISONADO MANUAL
m2
120.00
1.84
220.80
04.02.03
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
80.00
12.79
1,023.20
VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012
Obra
MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD
DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE
Frmula
ESTRUCTURAS
Cliente
GOBIERNO REGIONAL LAMBAYEQUE
ITEM

DESCRIPCION

UND.

METRADO

P. UNIT.

P. PARCIAL

04.03
04.03.01
04.03.02
04.03.03
04.03.04

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
44.56
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM m3
12.00
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera
m2 Tornillo 149.10
12 Usos)
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
241.80

165.17
213.09
28.65
23.03

7,359.98
2,557.08
4,271.72
5,568.65

04.04
04.04.01
04.04.01.01
04.04.01.02

CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=210 kg/cm2
ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

305.10
3.92

659.02
197.57

m3
kg

2.16
50.40

04.04.02
04.04.02.01
04.04.02.02
04.04.02.03

VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C=210 kg/cm2
m3
ACERO ESTRUCTURAL EN VIGAS DE CIMENTACION fy=4200 kg/cm2
kg
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2

0.57
39.20
15.00

305.10
3.92
46.29

173.91
153.66
694.35

04.04.03
SOBRECIMIENTO ARMADO
04.04.03.01 CONCRETO EN SOBRECIMIENTO ARMADO f'c=175 kg/cm2
m3
04.04.03.02 ACERO ESTRUCTURAL EN SOBRECIMIENTO ARMADO fy=4200 kg

12.58
1,053.51

282.78
3.92

3,557.37
4,129.76

04.04.04
04.04.04.01
04.04.04.02
04.04.04.03

COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)


CONCRETO EN COLUMNAS f'c=175 kg/cm2
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

15.00
1,770.30
210.79

288.67
3.92
42.14

4,330.05
6,939.58
8,882.69

04.04.05
04.04.05.01
04.04.05.02
04.04.05.03

VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)


CONCRETO EN VIGAS f'c=175 kg/cm2
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN VIGAS

m3
kg
m2

16.13
1,186.17
80.65

282.78
3.92
46.29

4,561.24
4,649.79
3,733.29

04.04.06
04.04.06.01
04.04.06.02
04.04.06.03
04.04.06.04

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
m3
21.61
ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
779.03
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
m2
247.00
LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
u
2,054.00

327.89
3.92
37.51
2.10

7,085.70
3,053.80
9,264.97
4,313.40

05.01

CONSTRUCCION DE BANQUILLA DE SUPLENTES Y


COLOCACION DE COBERTURA TRANSPARENTE
OBRAS PROVISIONALES

05.01.01
05.01.02
05.01.03
05.01.04
05.01.05

LIMPIEZA DE TERRENO MANUAL


m2
TRAZO Y REPLANTEO
m2
DEMOLICION EN BAQUILLAS DE SUPLENTES EXISTENTE
m3
DESMONTAJE DE COBERTURAS
m2
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS
m3

25.00
25.00
6.00
30.00
10.00

1.33
1.44
119.70
5.47
12.79

33.25
36.00
718.20
164.10
127.90

05.02
05.02.01
05.02.02

MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
m3
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3

57.60
74.88

25.54
12.79

1,471.10
957.72

05.03
05.03.01
05.03.02

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)

8.64
10.50

165.17
23.03

1,427.07
241.82

05

m3
m2

VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012


Obra
MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD
DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE
Frmula
ESTRUCTURAS
Cliente
GOBIERNO REGIONAL LAMBAYEQUE
ITEM

05.04
05.04.01
05.04.02
05.04.03

DESCRIPCION

UND.

CONCRETO ARMADO
CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2
m3
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2kg

METRADO

10.56
50.00
400.00

P. UNIT.

297.52
38.11
3.92

P. PARCIAL

3,141.81
1,905.50
1,568.00

06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06

CONSTRUCCION DE CASETA PARA BOLETERIA Y


REHABILITACION DE PISO A TRIBUNA PRINCIPAL Y
CAMBIADO DE PORTONES PRINCIPALES
OBRAS PROVISIONALES
LIMPIEZA DE TERRENO MANUAL
m2
TRAZO Y REPLANTEO
m2
DEMOLICION DE PAVIMENTO DE CONCRETO DE 6"
m2
DEMOLICION DE ALBAILERIA
m3
DESMONTAJE DE COBERTURAS
m2
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS
m3

06.02
06.02.01
06.02.02

06

50.00
50.00
38.64
10.00
5.10
5.00

1.33
1.44
20.46
9.39
5.47
12.79

66.50
72.00
790.57
93.90
27.90
63.95

MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
m3
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3

8.00
6.00

25.54
12.79

204.32
76.74

06.03
06.03.01
06.03.02
06.03.03

CONCRETO SIMPLE
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM m3

9.45
2.50
0.55

23.03
165.17
213.09

217.63
412.93
117.20

06.04
06.04.01
06.04.01.01
06.04.01.02
06.04.01.03

CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

1.00
100.00
10.00

411.23
3.92
42.14

411.23
392.00
421.40

06.04.02
06.04.02.01
06.04.02.02
06.04.02.03

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN VIGAS

m3
kg
m2

0.50
50.00
3.00

411.23
3.92
46.29

205.62
196.00
138.87

06.04.03
06.04.03.01
06.04.03.02
06.04.03.03
06.04.03.04

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
m2
LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
u

1.00
50.00
10.80
90.00

327.89
3.92
37.51
2.10

327.89
196.00
405.11
189.00

COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

4,442,643.11
444,264.31
222,132.16
5,109,039.58
919,627.12
6,028,666.70
5,425,800.03

E LA JUVENTUD

E LA JUVENTUD

E LA JUVENTUD

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTAD

OBRA
UBICACIN DISTRITO
FORMULA
CLIENTE
ITEM

01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.02
01.02.01
01.02.02
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
01.04.03.03
01.04.03.02
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.03
02.03.01
02.03.02
02.03.03

DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE


ESTRUCTURAS
GOBIERNO REGIONAL LAMBAYEQUE
DESCRIPCION
CONSTRUCCION DE CERCO PERIMETRICO
TRABAJOS PRELIMINARES
CARTEL DE OBRA
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
DEMOLICION DE MUROS DE ADOBE
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

UND.

u
m2
m2
m2

m3
m3

OBRAS DE CONCRETO SIMPLE


SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON
m2
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m3
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo
m2
12 Usos)
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=175 kg/cm2
m3
ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2 (3/8",1/2",5/8",3/4",1")
kg
COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)
CONCRETO EN COLUMNAS f'c=175 kg/cm2
m3
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2(1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m2
VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)
CONCRETO EN VIGAS f'c=175 kg/cm2
m3
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")kg
ENCOFRADO Y DESENCOFRADO EN VIGAS
m2
AMPLIACION DE TRIBUNA SUR OESTE
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

m2

MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3
m2
m3

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON

m3
m2
m2

02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.01.03
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03

03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.03
03.03.01
03.03.02
03.03.03

04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.04
04.04.01
04.04.01.01

CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2(1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m2
VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")kg
ENCOFRADO Y DESENCOFRADO EN VIGAS
m2
ESCALERAS
CONCRETO EN ESCALERAS f'c=210 kg/cm2
m3
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
m2
ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS
kg
REHABILITACION Y MEJORAMIENTO DE MALLA LIMITANTE CON
TRIBUNAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m2
m2

m3
m3

OBRAS DE CONCRETO SIMPLE


CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m3
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo
m2
12 Usos)
ACONDICIONAMIENTO DE VESTIDORES -ADMINISTRACION DE SSHH
PARA HOMBRES Y MUJERES
OBRAS PROVISIONALES
LIMPIEZA DE TERRENO MANUAL
DEMOLICION DE ALBAILERIA
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m2
m3

m3
m2
m3

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m3
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo
m2
12 Usos)
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
CONCRETO ARMADO
COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)
CONCRETO EN COLUMNAS f'c=175 kg/cm2

m3

04.04.01.02
04.04.01.03
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
04.04.03.04
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.03
05.03.01
05.04
05.04.01
05.04.03
05.04.02

06
06.01
06.01.01
06.01.02
06.01.03
06.02
06.02.01
06.02.02
06.03
06.03.01
06.03.02
06.04
06.04.01
06.04.01.01
06.04.01.02
06.04.01.03

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2(1/4",3/8",1/2",5/8",3/4")


kg
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m2
VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)
CONCRETO EN VIGAS f'c=175 kg/cm2
m3
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")kg
ENCOFRADO Y DESENCOFRADO EN VIGAS
m2
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
m2
LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO u
CONSTRUCCION DE BANQUILLA DE SUPLENTES Y COLOCACION DE
COBERTURA TRANSPARARENTE
OBRAS PROVISIONALES
LIMPIEZA DE TERRENO MANUAL
m2
TRAZO Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3
m3

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG

m3

CONCRETO ARMADO
CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2
m3
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
CONSTRUCCION DE CASETA PARA BOLETERIA Y REHABILITACION DE
PISO A TRIBUNA PRINCIPAL Y CAMBIADO DE PORTONES PRINCIPALES
OBRAS PROVISIONALES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
DEMOLICION DE PAVIMENTO DE CONCRETO DE 6"

m2
m2
m2

MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3
m3

CONCRETO SIMPLE
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON

m2
m2

CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2(1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m2

06.04.02
06.04.02.01
06.04.02.02
06.04.02.03
06.04.02.04

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
m2
LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

ITEM

VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012


Obra
MEJORAMIENTO DE LA
DISTRITO DE CHONGOY
Frmula
ESTRUCTURAS
Cliente
GOBIERNO REGIONAL L
DESCRIPCION
UND.

COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
02.04.02.02 ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
02.04.02.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
02.04.03.02 ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
02.04.03.03 ENCOFRADO Y DESENCOFRADO EN VIGAS

m3
kg
m2

GRADERIA
CONCRETO EN GRADERIA f'c=210 kg/cm2
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIA
02.04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIA

m3
m2
kg

02.04.02

02.04.02.01

02.04.03

02.04.03.01

02.04.04

02.04.04.01

03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.04.03
03.04.04

04
04.01
04.01.01
04.01.02
04.01.03

REHABILITACION Y MEJORAMIENTO DE MALLA LIMITANTE CON


TRIBUNAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO

m2
m2

DEMOLICION DE MALLA EXISTENTE


DEMOLICION DE ESTRUCTURA DE MALLA EXISTENTE (CIM,SOBRECIM Y COLUMNAS)
m3
DESMONTAJE DE MALLA EXISTENTE
m2
ELIMINACION DE DEMOLICION Y DESMONTAJE DE MALLA EXISTENTE
m3
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3
m3

OBRAS DE CONCRETO ARMADO


CIMIENTO ARMADO
CONCRETO EN CIMIENTO ARMADO f'c=175 kg/cm2
m3
ENCOFRADO Y DESENCOFRADO PARA CIMIENTO ARMADO (Madera Tornillo 12
m2Usos)
ACERO ESTRUCTURAL EN CIMIENTO ARMADO fy=4200 kg/cm2
kg
ACONDICIONAMIENTO DE VESTIDORES -ADMINISTRACION DE SSHH
PARA HOMBRES Y MUJERES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
DEMOLICION DE ALBAILERIA
TRAZO Y REPLANTEO

m2
m3
m2

04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.01.11
04.01.12
04.02
04.02.01
04.02.02
04.02.03

DEMOLICION DE PISO
DEMOLICION CIMIENTO
DEMOLICION SOBRECIMIENTO
DEMOLICION DE COLUMNAS
DEMOLICION DE VIGAS
DEMOLICION DE LOSA MACIZA
DEMOLICION DE VEREDA
DESMONTAJE DE COBERTURAS
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012
Obra

m2
m3
m3
m3
m3
m3
m2
m2
m3

m3
m2
m3

Frmula
Cliente

MEJORAMIENTO DE LA
DISTRITO DE CHONGOY
ESTRUCTURAS
GOBIERNO REGIONAL L

ITEM

DESCRIPCION

UND.

04.03

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m3
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo 12
m2
Usos)
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2

04.03.01
04.03.02
04.03.03
04.03.04

CONCRETO ARMADO
ZAPATAS
04.04.01.01 CONCRETO EN ZAPATAS F'C=210 kg/cm2
04.04.01.02 ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

m3
kg

VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C=210 kg/cm2
04.04.02.02 ACERO ESTRUCTURAL EN VIGAS DE CIMENTACION fy=4200 kg/cm2
04.04.02.03 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION

m3
kg
m2

SOBRECIMIENTO ARMADO
CONCRETO EN SOBRECIMIENTO ARMADO f'c=175 kg/cm2
04.04.03.02 ACERO ESTRUCTURAL EN SOBRECIMIENTO ARMADO fy=4200

m3
kg

COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)


CONCRETO EN COLUMNAS f'c=175 kg/cm2
04.04.04.02 ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
04.04.04.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)


CONCRETO EN VIGAS f'c=175 kg/cm2
04.04.05.02 ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
04.04.05.03 ENCOFRADO Y DESENCOFRADO EN VIGAS

m3
kg
m2

04.04

04.04.01

04.04.02

04.04.02.01

04.04.03

04.04.03.01

04.04.04

04.04.04.01

04.04.05

04.04.05.01

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
04.04.06.02 ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
04.04.06.03 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
04.04.06.04 LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
04.04.06

04.04.06.01

05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.02
05.02.01
05.02.02
05.03
05.03.01
05.03.02

m3
kg
m2
u

CONSTRUCCION DE BANQUILLA DE SUPLENTES Y COLOCACION DE


COBERTURA TRANSPARENTE
OBRAS PROVISIONALES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
DEMOLICION EN BAQUILLAS DE SUPLENTES EXISTENTE
DESMONTAJE DE COBERTURAS
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS

m2
m2
m3
m2
m3

MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3
m3

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)

m3
m2

VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012


Obra
MEJORAMIENTO DE LA
DISTRITO DE CHONGOY
Frmula
ESTRUCTURAS
Cliente
GOBIERNO REGIONAL L
ITEM

DESCRIPCION

UND.

05.04

CONCRETO ARMADO
CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2

m3
m2
kg

05.04.01
05.04.02
05.04.03

06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06

CONSTRUCCION DE CASETA PARA BOLETERIA Y REHABILITACION DE


PISO A TRIBUNA PRINCIPAL Y CAMBIADO DE PORTONES PRINCIPALES
OBRAS PROVISIONALES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
DEMOLICION DE PAVIMENTO DE CONCRETO DE 6"
DEMOLICION DE ALBAILERIA
DESMONTAJE DE COBERTURAS
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS

m2
m2
m2
m3
m2
m3

06.02
06.02.01
06.02.02
06.03
06.03.01
06.03.02
06.03.03

MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3
m3

CONCRETO SIMPLE
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM

m2
m3
m3

CONCRETO ARMADO
COLUMNAS
06.04.01.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2
06.04.01.02 ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
06.04.01.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
06.04.02.02 ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
06.04.02.03 ENCOFRADO Y DESENCOFRADO EN VIGAS

m3
kg
m2

LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
06.04.03.02 ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
06.04.03.03 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
06.04.03.04 LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO

m3
kg
m2
u

06.04

06.04.01

06.04.02

06.04.02.01

06.04.03

06.04.03.01

COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

URA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

Costo al 01/07/2011
P.U REAL
METRADO P. UNIT.

P REAL

P. PARCIAL

90%

1.00
986.22
986.22
986.22

2,022.02
1.33
1.39
9.58

158.40
77.22

25.54
12.79

93.44
45.02
13.51
180.08

21.47
165.17
213.09
28.65

105.60
1,005.45

290.65
3.92

17.40
#######
467.00

288.67
3.92
42.14

18.01
816.66
162.07

282.78
3.92
46.29

207.00

1.33

73.92
190.00
35.94

25.54
1.84
12.79

18.00
91.88
81.60

165.17
23.03
21.47

1,819.82
1.20
1.25
8.62
22.99
11.51
19.32
148.65
191.78
25.79
261.59
3.53
259.80
3.53
37.93
254.50
3.53
41.66

1,819.82
1,180.51
1,233.76
8,503.19
3,640.98
888.88
1,805.54
6,692.36
2,590.96
4,643.36
27,623.38
3,547.23
4,520.57
45,317.16
17,711.44
4,583.58
2,881.18
6,752.00

1.20
22.99
1.66
11.51
148.65
20.73
19.32

247.78
1,699.13
314.64
413.71
2,675.75
1,904.40
1,576.76

2,022.02
1,311.67
1,370.85
9,447.99

4,045.54
987.64

SEMANAS ANTERIORES
METRADO
1.00
1.00
986.22
986.22
986.22

158.4
77.22

2,006.16
7,435.95
2,878.85
5,159.29

81.00
30.00
9.07
-

30,692.64
3,941.36

75.00
700.00

5,022.86
50,352.40
19,679.38

12.00
9,600.00
120.00

5,092.87
3,201.31
7,502.22

275.31

207.00

1,887.92
349.60
459.67

73.92
190.00
18.00

2,973.06
2,116.00
1,751.95

7.00
81.60

12.96
1,203.09
69.12

411.23
3.92
42.14

61.00
1,068.67
35.90

311.20
3.92
46.29

35.54
260.66
2,414.00

409.14
64.91
3.96

490.00
490.00

1.33
1.39

88.70
73.92

25.54
12.79

59.19
29.57
196.80

165.17
213.09
28.65

350.00
22.50

1.33
9.39

120.00
350.00
120.00

25.54
1.84
12.79

52.00
12.00
120.00
160.00

165.17
213.09
28.65
23.03

5.50

288.67

370.11
3.53
37.93
280.08
3.53
41.66
368.23
58.42
3.56

4,796.59
4,244.50
2,621.45
17,084.88
3,770.27
1,495.63
13,086.75
15,227.50
8,603.50

1.20
1.25
22.99
11.51
148.65
191.78
25.79

586.53
612.99
2,038.86
850.89
8,798.77
5,670.96
5,074.49

1.20
8.45
22.99
1.66
11.51
148.65
191.78
25.79
20.73
259.80

418.95
190.15
2,758.32
579.60
1,381.32
7,729.96
2,301.37
3,094.20
3,316.32
1,428.92

5,329.54
4,716.11
2,912.72
18,983.20
4,189.19
1,661.81
14,540.84
16,919.44
9,559.44

651.70
681.10

490.00
490.00

2,265.40
945.44

9,776.41
6,301.07
5,638.32

465.50
211.28
3,064.80
644.00
1,534.80

8,588.84
2,557.08
3,438.00
3,684.80

1,587.69

350.00
22.50

36.00
36.00

675.00
36.74

3.92
42.14

12.50
850.00
300.50

282.78
3.92
46.29

22.40
385.00
160.00
1,600.00

327.89
3.92
37.51
2.10

25.00
25.00

1.33
1.39

57.60
74.88

25.54
12.79

8.64

165.17

10.56
50.00
400.00

297.52
38.11
3.92

50.00
50.00
38.64

1.33
1.39
20.46

28.58
37.00

25.54
12.79

7.63
0.32

23.03
21.47

1.00
400.00
40.00

411.23
3.92
42.14

3.53
37.93
254.50
3.53
41.66
295.10
3.53
33.76
1.89

2,381.40
1,393.40
3,181.28
2,998.80
12,519.13
6,610.26
1,358.28
5,401.44
3,024.00

1.20
1.25
22.99
11.51
148.65
267.77
34.30
3.53

29.93
31.28
1,323.99
861.94
1,284.36
2,827.63
1,714.95
1,411.20

1.20
1.25
18.41
22.99
11.51
20.73
19.32
370.11
3.53
37.93

59.85
62.55
711.52
656.94
425.91
158.15
6.18
370.11
1,411.20
1,517.04

2,646.00
1,548.22
3,534.75
3,332.00
13,910.15
7,344.74
1,509.20
6,001.60
3,360.00

33.25
34.75

25.00
25.00

1,471.10
957.72

1,427.07

3,141.81
1,905.50
1,568.00

66.50
69.50
790.57

729.93
473.23

175.72
6.87

411.23
1,568.00
1,685.60

50.00
50.00
38.64

0.82
150.00
38.64

327.89
3.92
37.51

322.00

2.10

295.10
3.53
33.76

241.98
529.20
1,304.45

1.89

608.58

268.87
588.00
1,449.39
676.20
365,498.47
36,549.85
18,274.92
420,323.24
75,658.18
495,981.42
446,383.28

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD


DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE
ESTRUCTURAS
GOBIERNO REGIONAL LAMBAYEQUE
METRADO P. UNIT.
P. PARCIAL

6.00
800.00
44.80

411.23
3.92
42.14

2,467.38
3,136.00
1,887.87

4.50
600.00
36.00

311.20
3.92
46.29

1,400.40
2,352.00
1,666.44

16.00
120.00
1,200.00

409.14
64.91
3.96

6,546.24
7,789.20
4,752.00

490.00
490.00

1.33
1.44

651.70
705.60

67.63
375.79
75.00

40.01
5.37
12.79

2,705.88
2,017.99
959.25

45.00
70.00

25.54
12.79

1,149.30
895.30

52.44
207.45
1,592.60

288.67
28.65
3.92

15,137.85
5,943.44
6,242.99

350.00
280.22
350.00

1.33
9.39
1.44

465.50
2,631.27
504.00

157.33
53.17
11.71
2.50
3.22
11.31
18.24
119.30
300.00

20.46
119.70
119.70
119.70
119.70
119.70
20.46
5.47
12.79

3,218.97
6,364.45
1,401.69
299.25
385.43
1,353.81
373.19
652.57
3,837.00

80.00
120.00
80.00

25.54
1.84
12.79

2,043.20
220.80
1,023.20

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD


DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE
ESTRUCTURAS
GOBIERNO REGIONAL LAMBAYEQUE
METRADO P. UNIT.

P. PARCIAL

44.56
12.00
149.10
241.80

165.17
213.09
28.65
23.03

7,359.98
2,557.08
4,271.72
5,568.65

2.16
50.40

305.10
3.92

659.02
197.57

0.57
39.20
15.00

305.10
3.92
46.29

173.91
153.66
694.35

12.58
1,053.51

282.78
3.92

3,557.37
4,129.76

15.00
1,770.30
210.79

288.67
3.92
42.14

4,330.05
6,939.58
8,882.69

16.13
1,186.17
80.65

282.78
3.92
46.29

4,561.24
4,649.79
3,733.29

21.61
779.03
247.00
2,054.00

327.89
3.92
37.51
2.10

7,085.70
3,053.80
9,264.97
4,313.40

25.00
25.00
6.00
30.00
10.00

1.33
1.44
119.70
5.47
12.79

33.25
36.00
718.20
164.10
127.90

57.60
74.88

25.54
12.79

1,471.10
957.72

8.64
10.50

165.17
23.03

1,427.07
241.82

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD


DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE
ESTRUCTURAS
GOBIERNO REGIONAL LAMBAYEQUE
METRADO P. UNIT.

P. PARCIAL

10.56
50.00
400.00

297.52
38.11
3.92

3,141.81
1,905.50
1,568.00

50.00
50.00
38.64
10.00
5.10
5.00

1.33
1.44
20.46
9.39
5.47
12.79

66.50
72.00
790.57
93.90
27.90
63.95

8.00
6.00

25.54
12.79

204.32
76.74

9.45
2.50
0.55

23.03
165.17
213.09

217.63
412.93
117.20

1.00
100.00
10.00

411.23
3.92
42.14

411.23
392.00
421.40

0.50
50.00
3.00

411.23
3.92
46.29

205.62
196.00
138.87

1.00
50.00
10.80
90.00

327.89
3.92
37.51
2.10

327.89
196.00
405.11
189.00

2,420,305.78
242,030.58
121,015.29
2,783,351.64
501,003.30
3,284,354.94
2,955,919.44

SEMANAS ANTERIORES
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16
PARCIAL % AVANCEMETRADO
PARCIAL % AVANCEMETRADO
1,819.82
1,180.51
1,233.76
8,503.19

1.00
1.00
1.00
1.00

3,640.98
888.88

1.00
1.00

1,565.16
4,459.59
1,739.45
-

0.87
0.67
0.67
-

12.44
11.55
3.50
150.00

240.38
1,716.94
671.23
3,867.75

0.13
0.26
0.26
0.83

19,618.88
2,469.60

0.71
0.70

20.00
305.45

5,231.70
1,077.63

0.19
0.30

3,117.64
33,868.80
4,551.12

0.69
0.75
0.26

2.00
2,500.00
260.00

519.61
8,820.00
9,860.76

0.11
0.19
0.56

247.78

1.00

1,699.13
314.64
207.20

1.00
1.00
0.50

1,040.57
1,576.76

0.39
1.00

3.00

445.96
-

0.17
-

586.53
612.99

7.00
1,203.09
38.00

1.00
1.00

418.95
190.15

1.00
1.00

827.50
414.40

0.30
0.30

45.00

2,590.75
4,244.50
1,441.19

1,034.37
-

0.54
1.00
0.55

0.51
-

50.00

1,149.30
-

0.42
-

26.00
3.60
50.00

3,864.98
690.41
1,289.25
-

0.50
0.30
0.42
-

29.93
31.28

1.00
1.00

340.00

1,199.52
-

0.50
-

59.85
62.55
711.52

1.00
1.00
1.00

97,689.07
9,768.91
4,884.45
112,342.43
20,221.64
132,564.07
119,307.66

49,956.22
4,995.62
2,497.81
57,449.66
10,340.94
67,790.60
61,011.54

ESTADIO DE LA JUVENTUD

ESTADIO DE LA JUVENTUD

ESTADIO DE LA JUVENTUD

SEMANA 3 ( 09 Abr al 16 Abr)SEMANA 4 ( 16 Abr al 23 Abr)SEMANA 5 ( 23 Abr al 30 Abr)


PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL
-

NA 5 ( 23 Abr al 30 Abr) SEMANAS ACUMULADAS SALDO X VALORIZ.


% AVANCE
METRADOPARCIAL % AVANCE
METRADOPARCIAL
-

1.00

1,819.82
-

1.00
-

986.22
986.22
986.22

1,311.67
1,370.85
9,447.99

158.40
77.22

4,045.54
987.64

93.44
45.02
13.51
180.08

2,006.16
7,435.95
2,878.85
5,159.29

105.60
1,005.45

#######
3,941.36

17.40
#######
467.00

5,022.86
#######
#######

18.01
816.66
162.07

5,092.87
3,201.31
7,502.22

207.00

275.31

73.92
190.00
35.94

1,887.92
349.60
459.67

18.00
91.88
81.60

2,973.06
2,116.00
1,751.95

12.96
1,203.09
69.12

5,329.54
4,716.11
2,912.72

61.00
1,068.67
35.90

#######
4,189.19
1,661.81

35.54
260.66
2,414.00

#######
#######
9,559.44

490.00
490.00

651.70
681.10

88.70
73.92

2,265.40
945.44

59.19
29.57
196.80

9,776.41
6,301.07
5,638.32

350.00
22.50

465.50
211.28

120.00
350.00
120.00

3,064.80
644.00
1,534.80

52.00
12.00
120.00
160.00

8,588.84
2,557.08
3,438.00
3,684.80

5.50

1,587.69

675.00
36.74

2,646.00
1,548.22

12.50
850.00
300.50

3,534.75
3,332.00
#######

22.40
385.00
160.00
1,600.00

7,344.74
1,509.20
6,001.60
3,360.00

25.00
25.00

33.25
34.75

57.60
74.88

1,471.10
957.72

8.64

1,427.07

10.56
50.00
400.00

3,141.81
1,905.50
1,568.00

50.00
50.00
38.64

66.50
69.50
790.57

28.58
37.00

729.93
473.23

7.63
0.32

175.72
6.87

1.00
400.00
40.00

411.23
1,568.00
1,685.60

0.82
150.00
38.64

268.87
588.00
1,449.39

322.00

676.20

AVANCE SEMANAL

ITEM

OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACIN
FORMULA
CLIENTE

DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE


ESTRUCTURAS
GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

UND. METRADO

P. UNIT.

P.U REAL

P REAL

P. PARCIAL

90%
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05

01.02
01.02.01
01.02.02

01.02
01.02.01
01.02.02
01.03.03

01.03
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05

01.04
01.05.01
01.05.01.01
01.05.01.02

01.05.02
01.05.02.01
01.05.02.02
01.05.02.03

01.05.03
01.05.03.01
01.05.03.02
01.05.03.03
02
02.01
02.01.01

02.02
02.02.01
02.02.02
02.02.03

02.03
02.03.01
02.03.02

SEMANAS ANTERIORES
SEMANA 2 (02 Abr al 09 Abr.) SEMANA 3 ( 09 Abr al 16 A
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO

CONSTRUCCION DE CERCO PERIMETRICO


TRABAJOS PRELIMINARES
CARTEL DE OBRA
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
DEMOLICION DE MUROS DE ADOBE
DEMOLICION DE CIMIENTO DE MUROS DE ADOBE

u
m2
m2
m2
m3

1.00
332.61
221.74
986.22
164

2,038.52
1.33
1.44
9.58
30.7

1,834.67
1.20
1.30
8.62
27.63

1,834.67
398.13
287.38
8,503.19
4,531.32

2,038.52
442.37
319.31
9,447.99
5,034.80

1.00
332.61
221.74
986.22
164.00

1,834.67
398.13
287.38
8,503.19
4,531.32

1.00
1.00
1.00
1.00
1.00

OBRAS PROVISIONALES
CERCO PERIMETRICO PROVISIONAL DE OBRA
ALMACEN,OFICINA Y CASETA DE GUARDIANIA

m
glb

241.74
1.00

8.00
2,500.00

7.20
2,250.00

1,740.53
2,250.00

1,933.92
2,500.00

241.74
1.00

1,740.53
2,250.00

1.00
1.00

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO
m3
158.40
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
138.23
ELIMINACION DE MATERIAL DE DEMOLICION (D=5 KM) m3
715.08

25.54
12.79
12.79

22.99
11.51
11.51

3,640.98
1,591.17
8,231.29

4,045.54
1,767.96
9,145.87

158.40
138.23
715.08

3,640.98
1,591.17
8,231.29

1.00
1.00
1.00

OBRAS DE CONCRETO SIMPLE


SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON
m2
70.00
21.47
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
66.52
165.17
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25%m3
PM
12.10
213.09
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSm2
(Madera161.36
Tornillo 12 Usos)
28.65
ENCOFRADO Y DESENCOFRADO PARA CIMIENTO CORRIDO
m2 (Madera
266.09
Tornillo 1228.65
Usos)

19.32
148.65
191.78
25.79
25.79

1,352.61
9,888.40
2,320.55
4,160.67
6,861.13

1,502.90
10,987.11
2,578.39
4,622.96
7,623.48

26.64
54.97
9.07
127.64
219.89

514.76
8,171.46
1,739.45
3,291.20
5,669.86

0.38
0.83
0.75
0.79
0.83

43.36
11.55

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO EN ZAPATAS F'C=175 kg/cm2
ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

m3
kg

30.00
800.00

290.65
3.92

261.59
3.53

7,847.55
2,822.40

8,719.50
3,136.00

11.94
308.45

3,123.32
1,088.21

COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)


CONCRETO EN COLUMNAS f'c=175 kg/cm2
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

19.03
2,249.04
313.00

288.67
3.92
42.14

259.80
3.53
37.93

4,944.05
7,934.61
11,870.84

5,493.39
8,816.24
13,189.82

7.60
2,249.04
93.10

1,974.50
7,934.61
3,530.91

m3
kg
m2

15.00
857.65
140.00

282.78
3.92
46.29

254.50
3.53
41.66

3,817.53
3,025.79
5,832.54

4,241.70
3,361.99
6,480.60

m2

207.00

1.33

1.20

247.78

275.31

207.00

247.78

MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO
m3NORMAL.
35.00
NIVELACION INTERIOR APISONADO MANUAL
m2
60.00
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
30.00

25.54
1.84
12.79

22.99
1.66
11.51

804.51
99.36
345.33

893.90
110.40
383.70

35.00
60.00

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
18.00
SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON
m2
20.00

165.17
21.47

148.65
19.32

2,675.75
386.46

2,973.06
429.40

5.95
20.00

VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)


CONCRETO EN VIGAS f'c=175 kg/cm2
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN VIGAS
AMPLIACION DE TRIBUNA SUR OESTE
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

46.20

837.85
1,716.94
1,191.27

0.62
0.17
0.17

0.40
0.39

18.06
491.55

4,724.23
1,734.19

0.60
0.61

0.40
1.00
0.30

2.15

558.58
2,578.21

0.11
0.22

67.98

1.00

804.51
99.36
-

1.00
1.00
-

884.49
386.46

0.33
1.00

02.04
02.04.01
02.04.01.01
02.04.01.02

02.04.02
02.04.02.01
02.04.02.02
02.04.02.03

CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=210 kg/cm2
ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

m3
kg

12.00
288.04

305.10
3.92

274.59
3.53

3,295.08
1,016.21

3,661.20
1,129.12

12.00
288.04

3,295.08
1,016.21

1.00
1.00

COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m3
kg
m2

6.00
800.00
44.80

411.23
3.92
42.14

370.11
3.53
37.93

2,220.64
2,822.40
1,699.08

2,467.38
3,136.00
1,887.87

1.50
462.40
22.40

555.16
1,631.35
849.54

0.25
0.58
0.50

337.60

1,191.05
-

0.42
-

AVANCE SEMANAL
OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACIN

DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

FORMULA

ESTRUCTURAS

CLIENTE
ITEM

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

UND. METRADO

P. UNIT.

P.U REAL

P REAL

P. PARCIAL

90%
02.04.03

VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN VIGAS

1,666.44

5,891.62
7,010.28

6,546.24
7,789.20

3.56

4,276.80

4,752.00

1.20
1.30

586.53
635.04

651.70
705.60

490.00
490.00

586.53
635.04

1.00
1.00

36.01
4.83
11.51

2,435.29
1,816.19
863.33

2,705.88
2,017.99
959.25

67.63
375.79
75.00

2,435.29
1,816.19
863.33

1.00
1.00
1.00

22.99
11.51

1,034.37
805.77

1,149.30
895.30

259.80
25.79
3.53

13,624.07
5,349.10
5,618.69

15,137.85
5,943.44
6,242.99

1.20
8.45
1.30
18.41
107.73
107.73

418.95
2,368.14
453.60
2,897.07
5,728.00
1,261.52

465.50
2,631.27
504.00
3,218.97
6,364.45
1,401.69

m3
kg
m2

4.50
600.00
36.00

311.20
3.92
46.29

280.08
3.53

1,260.36
2,116.80

1,400.40
2,352.00

41.66

1,499.80

GRADERIA
CONCRETO EN GRADERIA f'c=210 kg/cm2
m3
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIA m2
02.04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIA
kg

16.00
120.00

409.14
64.91

368.23
58.42

1,200.00

3.96

490.00
490.00

1.33
1.44

02.04.03.01
02.04.03.02
02.04.03.03

SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO

02.04.04

02.04.04.01

03
03.01
03.01.01
03.01.02

03.02
03.02.01
03.02.02
03.02.03

03.02
03.02.01
03.02.02

03.04
03.04.01
03.04.02
03.04.03
03.04.04

04

04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06

REHABILITACION Y MEJORAMIENTO DE MALLA


LIMITANTE CON TRIBUNAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO

m2
m2

DEMOLICION DE MALLA EXISTENTE


DEMOLICION DE ESTRUCTURA DE MALLA EXISTENTE (CIM,SOBRECIM
m3
67.63
Y COLUMNAS)
40.01
DESMONTAJE DE MALLA EXISTENTE
m2
375.79
5.37
ELIMINACION DE DEMOLICION Y DESMONTAJE DE MALLA m3
EXISTENTE
75.00
12.79
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO
m3
45.00
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
70.00

25.54
12.79

OBRAS DE CONCRETO ARMADO


CIMIENTO ARMADO
CONCRETO EN CIMIENTO ARMADO f'c=175 kg/cm2
m3
52.44
288.67
ENCOFRADO Y DESENCOFRADO PARA CIMIENTO ARMADO
m2(Madera
207.45
Tornillo 12 Usos)
28.65
ACERO ESTRUCTURAL EN CIMIENTO ARMADO fy=4200 kg/cm2
kg
1,592.60
3.92
ACONDICIONAMIENTO DE VESTIDORES ADMINISTRACION DE SSHH PARA HOMBRES Y
MUJERES
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
350.00
1.33
DEMOLICION DE ALBAILERIA
m3
280.22
9.39
TRAZO Y REPLANTEO
m2
350.00
1.44
DEMOLICION DE PISO
m2
157.33
20.46
DEMOLICION CIMIENTO
m3
53.17
119.70
DEMOLICION SOBRECIMIENTO
m3
11.71
119.70

350.00
280.22
350.00
157.33
53.17
11.71

418.95
2,368.14
453.60
2,897.07
5,728.00
1,261.52

1.00
1.00
1.00
1.00
1.00
1.00

14.50

333.30
-

0.32
-

04.01.11

DEMOLICION DE COLUMNAS
DEMOLICION DE VIGAS
DEMOLICION DE LOSA MACIZA
DEMOLICION DE VEREDA
DESMONTAJE DE COBERTURAS

2.50
3.22
11.31
18.24
119.30

119.70
119.70
119.70
20.46
5.47

107.73
107.73
107.73
18.41
4.92

269.33
346.89
1,218.43
335.87
587.31

299.25
385.43
1,353.81
373.19
652.57

2.50
3.22
11.31
18.24
119.30

269.33
346.89
1,218.43
335.87
587.31

1.00
1.00
1.00
1.00
1.00

04.01.12

ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS


m3
300.00

12.79

11.51

3,453.30

3,837.00

300.00

3,453.30

1.00

04.02

MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO
m3NORMAL.
80.00
NIVELACION INTERIOR APISONADO MANUAL
m2
120.00
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
80.00

25.54
1.84
12.79

22.99
1.66
11.51

1,838.88
198.72
920.88

2,043.20
220.80
1,023.20

55.89

1,284.69
-

0.70
-

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
44.56
165.17
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25%m3
PM
12.00
213.09
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSm2
(Madera149.10
Tornillo 12 Usos)
28.65
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
241.80
23.03

148.65
191.78
25.79
20.73

6,623.98
2,301.37
3,844.54
5,011.79

7,359.98
2,557.08
4,271.72
5,568.65

26.65

3,961.60
-

0.60
-

CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=210 kg/cm2
ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

274.59
3.53

593.11
177.81

659.02
197.57

04.01.07
04.01.08
04.01.09
04.01.10

04.02.01
04.02.02
04.02.03

04.03
04.03.01
04.03.02
04.03.03
04.03.04

04.04
04.04.01
04.04.01.01
04.04.01.02

m3
m3
m3
m2
m2

m3
kg

2.16
50.40

305.10
3.92

11.25
6.35
82.17

1,672.35
1,217.81
2,118.75
-

0.25
0.53
0.55
-

2.16
50.40

593.11
177.81

1.00
1.00

AVANCE SEMANAL
OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACIN

DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

FORMULA

ESTRUCTURAS

CLIENTE
ITEM

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

UND. METRADO

P. UNIT.

P.U REAL

P REAL

P. PARCIAL

90%
04.04.02

VIGAS DE CIMENTACION

04.04.02.01

CONCRETO EN VIGAS DE CIMENTACION F'C=210 kg/cm2

0.57

305.10

274.59

156.52

173.91

04.04.02.02

ACERO ESTRUCTURAL EN VIGAS DE CIMENTACION fy=4200


kg kg/cm2 39.20

3.92

3.53

138.30

153.66

04.04.02.03

ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION


m2

15.00

46.29

41.66
-

624.92

694.35

04.04.03

SOBRECIMIENTO ARMADO

04.04.03.01

CONCRETO EN SOBRECIMIENTO ARMADO f'c=175 kg/cm2 m3

12.58

282.78

254.50

3,201.64

3,557.37

04.04.03.02

ACERO ESTRUCTURAL EN SOBRECIMIENTO ARMADO fy=4200


kg

1,053.51

3.92

3.53

3,716.78

4,129.76

04.04.04

COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)

04.04.04.01

CONCRETO EN COLUMNAS f'c=175 kg/cm2

m3

15.00

288.67

259.80

3,897.05

4,330.05

04.04.04.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

kg

1,770.30

3.92

3.53

6,245.62

6,939.58

04.04.04.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

210.79

42.14

37.93

7,994.42

8,882.69

m3

SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO
-

0.52
39.20
14.00

142.79
138.30
583.25

0.91
1.00
0.93

3.33
508.00

847.49
1,792.22

0.26
0.48

7.09
824.60
97.07

1,842.00
2,909.19
3,681.48

0.47
0.47
0.46

04.04.05

VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)

04.04.05.01

CONCRETO EN VIGAS f'c=175 kg/cm2

m3

16.13

282.78

254.50

4,105.12

4,561.24

04.04.05.02

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2

kg

1,186.17

3.92

3.53

4,184.81

4,649.79

04.04.05.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

80.65

46.29

41.66

3,359.96

3,733.29

04.04.06

LOSAS ALIGERADAS

04.04.06.01

CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

21.61

327.89

295.10

6,377.13

7,085.70

04.04.06.02

ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")


kg
779.03

3.92

3.53

2,748.42

3,053.80

04.04.06.03

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

37.51

33.76

8,338.47

9,264.97

m3

m2

247.00

04.04.06.04

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO


u
2,054.00

05

CONSTRUCCION DE BANQUILLA DE SUPLENTES Y


COLOCACION DE COBERTURA TRANSPARARENTE

05.01

OBRAS PROVISIONALES

05.01.01

LIMPIEZA DE TERRENO MANUAL

m2

05.01.02

TRAZO Y REPLANTEO

m2

05.01.03

DEMOLICION EN BAQUILLAS DE SUPLENTES EXISTENTE m3

05.01.04

DESMONTAJE DE COBERTURAS

05.01.05

m3
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS

05.02

m2

2.10

1.89

3,882.06

4,313.40

25.00

1.33

1.20

29.93

33.25

25.00

1.44

1.30

32.40

36.00

6.00

119.70

107.73

646.38

718.20

30.00

5.47

4.92

147.69

164.10

10.00

12.79

11.51

115.11

127.90

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO


NORMAL.
m3
57.60

25.54

22.99

1,323.99

1,471.10

05.02.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

74.88

12.79

11.51

861.94

957.72

m3

8.64

165.17

148.65

1,284.36

1,427.07

m2

10.50

23.03

20.73

217.63

241.82

CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2 m3


ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2

10.56

297.52

267.77

2,827.63

3,141.81

05.04.03

50.00

38.11

34.30

1,714.95

1,905.50

05.04.02

ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200


(1/4",3/8",1/2",5/8",3/4")
kg kg/cm2400.00
3.92
3.53

1,411.20

1,568.00

05.03.01
05.03.02

05.04
05.04.01

29.93
32.40
646.38
147.69
115.11

1.00
1.00
1.00
1.00
1.00

50.00
50.00
38.64
10.00
5.10
5.00

59.85
64.80
711.52
84.51
25.11
57.56

1.00
1.00
1.00
1.00
1.00
1.00

8.00
6.00

183.89
69.07

1.00
1.00

25.00
25.00
6.00
30.00
10.00

MOVIMIENTO DE TIERRAS

05.02.01

05.03

m3

CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
CONCRETO ARMADO

06

CONSTRUCCION DE CASETA PARA BOLETERIA Y


REHABILITACION DE PISO A TRIBUNA PRINCIPAL Y
CAMBIADO DE PORTONES PRINCIPALES

06.01

OBRAS PROVISIONALES

06.01.01

LIMPIEZA DE TERRENO MANUAL

m2

50.00

1.33

1.20

59.85

66.50

06.01.02

TRAZO Y REPLANTEO

m2

50.00

1.44

1.30

64.80

72.00

06.01.03

DEMOLICION DE PAVIMENTO DE CONCRETO DE 6"

m2

38.64

20.46

18.41

711.52

790.57

06.01.04

DEMOLICION DE ALBAILERIA

m3

10.00

9.39

8.45

84.51

93.90

06.01.05

DESMONTAJE DE COBERTURAS

m2

5.10

5.47

4.92

25.11

27.90

06.01.06

ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS


m3

5.00

12.79

11.51

57.56

63.95

06.02

MOVIMIENTO DE TIERRAS

06.02.01

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO


m3NORMAL.
8.00

25.54

22.99

183.89

204.32

06.02.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

12.79

11.51

69.07

76.74

m3

6.00

AVANCE SEMANAL
OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACIN

DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

FORMULA

ESTRUCTURAS

CLIENTE

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

ITEM

UND. METRADO

P. UNIT.

P.U REAL

P REAL
90%

06.03

CONCRETO SIMPLE

P. PARCIAL

Costo al 01/07/2011
SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO

06.03.01

FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)

m2

9.45

23.03

20.73

195.87

217.63

06.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG

m3

2.50

165.17

148.65

371.63

412.93

06.03.03

CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25%m3


PM

0.55

213.09

191.78

105.48

117.20

06.04

CONCRETO ARMADO

06.04.01

COLUMNAS

06.04.01.01

CONCRETO EN COLUMNAS f'c=210 kg/cm2

m3

1.00

411.23

370.11

370.11

411.23

06.04.01.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

kg

100.00

3.92

3.53

352.80

392.00

06.04.01.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

10.00

42.14

37.93

379.26

421.40

06.04.02

VIGAS

06.04.02.01

CONCRETO EN VIGAS f'c=210 kg/cm2

m3

0.50

411.23

370.11

185.05

205.62

06.04.02.02

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2

kg

50.00

3.92

3.53

176.40

196.00

06.04.02.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

3.00

46.29

41.66

124.98

138.87

06.04.03

LOSAS ALIGERADAS

06.04.03.01

CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

m3

1.00

327.89

295.10

295.10

327.89

06.04.03.02

ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")


kg
50.00

3.92

3.53

176.40

196.00

06.04.03.03

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

10.80

37.51

33.76

364.60

405.11

06.04.03.04

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO


u
90.00

2.10

1.89

170.10

189.00

291,081.95

323,424.38

29,108.19

32,342.44

m2

COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

14,554.10

16,171.22

334,744.24

371,938.04

60,253.96

66,948.85

394,998.20

438,886.89

355,498.38

394,998.20

112,965.75
11,296.58
5,648.29
129,910.62
23,383.91
153,294.53
137,965.07

32,582.16
3,258.22
1,629.11
37,469.49
6,744.51
44,213.99
39,792.59

AVANCE SEMANAL
OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACIN

DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

FORMULA

ESTRUCTURAS

CLIENTE
ITEM

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

UND. METRADO

P. UNIT.

P. PARCIAL

SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO

01
01.01

CERCO PERIMETRICO
MUROS Y TABIQUES DE ALBAILERIA

205.00

8,050.35

0.21

600.00

23,562.00

0.61

m2

986.22

39.27

38,728.86

m2

213.66

28.16

6,016.67

01.03.01

m2 MADERA
COBERTURA CON CALAMINA GALVANIZADA Y VIGAS DE
16.30

98.64

1,607.83

01.03.02

m2
COBERTURA CON CALAMINA GALVANIZADA EN TRIBUNAS

490.00

15.00

7,350.00

01.03.03

m TRIBUNAS
TIJERALES Y VIGAS METALICAS PARA COBERTURAS DE
485.00

01.01.01
01.02
01.02.01
01.03

01.03.04
02
02.01
02.01.01
02.01.02

03

03.01
03.01.01
03.02

MUROS DE LADRILLO ARCILLA SOGA


REVOQUES ENLUCIDOS
TARRAJEO DE ELEMENTOS ESTRUCTURALES
COBERTURAS

REFUERZO DE COBERTURA DE TRIBUNA


REHABILITACION Y MEJORAMIENTO DE MALLA
LIMITANTE CON TRIBUNAS

u
COLOCACION DE DE TUBERIAS DE FIERRO GALVANIZADO

MALLA DE ALAMBRE TEJIDA


ACONDICIONAMIENTO DE VESTIDORES ADMINISTRACION DE SSHH PARA HOMBRES Y
MUJERES

m2

03.04.01
03.04.02
03.05
03.05.01
03.06
03.06.01
03.07
03.07.01
03.08

51.47

12,610.15

615.00

10.44

6,420.60

18,886.00

m2 KK AMARRE
MURO SOGA 1 CARAVISTA LADRILLO SILICO-CALCAREO
350.00 CON 53.96
CEMENTO-CAL-ARENA

40.00

16.77

670.80

160.00

25.10

4,016.00

VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS YmVANOS 58.00

18.13

1,051.54

m2

m2
TARRAJEO INTERIOR DE TUNEL CON IMPERMEABILIZANTE

03.04

245.00

70.00

3,777.20

0.20

REVOQUES ENLUCIDOS
TARRAJEO RAYADO O PRIMARIO

03.03.01

2,422.44

ALBAILERIA

03.02.02

03.03

48,883.15

67.29

CERCO PERIMETRICO

03.02.01

03.02.03

100.79

36.00

CIELO RASO
CIELO RASO CON MEZCLA DE C:A

m2

160.00

22.88

3,660.80

m2
m2

160.00
160.00

22.51
49.02

3,601.60
7,843.20

m2

29.80

49.27

1,468.25

7,558.59

PISOS Y PAVIMENTOS
CONTRAPISO DE 48 mm
PISO CERAMICO(CERAMICA DE 3030 MEZCLA 1:4)
ZOCALOS Y CONTRAZOCALOS
ZOCALO CERAMICA COLOR DE 30X30 cm DE 1RA
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mmm2
INCLUYE 39.00
MARCO CEDRO
193.81 2"X3"
CARPINTERIA METALICA
PUERTA METALICA

6.00

486.48

2,918.88

CERRAJERIA

03.08.01

BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3"

pza

18.00

12.12

218.16

03.08.02

BISAGRA ALUMINIZADA DE 3" X 3"

pza

21.00

9.17

192.57

CERRADURA PARA PUERTA PRINCIPAL PESADA

pza

2.00

80.45

160.90

p2

50.00

5.00

250.00

03.08.03
03.09
03.09.01
03.10

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES INCOLORO CRUDO
PINTURA

03.10.01

PINTURA AL TEMPLE EN CIELO RASO 2 MANOS

m2

160.00

5.53

884.80

03.10.02

m2
SC PINTURA VINILICA EN MUROS INTERIORES 2 MANOS

144.00

5.23

753.12

03.10.03

PINTURA VINILICA EN MUROS EXTERIORES 2 MANOS m2

144.00

8.73

1,257.12

03.10.04

PINTURA EN PUERTAS CON BARNIZ 2 MANOS

m2

12.00

14.15

169.80

03.10.05

PINTURA EN VENTANAS CON BARNIZ 2 MANOS

m2

8.00

11.11

88.88

04

04.01

CONSTRUCCION DE BANQUILLA DE SUPLENTES Y


COLOCACION DE COBERTURA TRANSPARARENTE
REVESTIMIENTOS

170.00

22.02

3,743.40

04.02.01

m2
COBERTURA CON POLICARBONATO ALBEOLAR TRANSPARENTE
50.00

04.02.02

LIMPIEZA DE MALEZA

1.00
1.00
1.00

04.01.01
04.02

PISOS DE CEMENTO BRUADO

m2

COBERTURAS
m2

166.98

8,349.00

8,056.00

0.35

2,819.60

SIEMBRA DE CESPED BERMUDA EN RECTANGULO DE


JUEGO

05
05.01

TRABAJOS PRELIMINARES
LIMPIEZA DE MALEZA

8,056.00

0.35

2,819.60

05.01.02

TRAZO Y REPLANTEO

m2

8,056.00

1.39

11,197.84

05.01.03

APLICACION DE HERBICIDA

m2

10,000.00

0.09

900.00

05.01.01

8,056.00
8,056.00
#######

2,819.60
11,197.84
900.00

AVANCE SEMANAL
OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACIN

DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

FORMULA

ESTRUCTURAS

CLIENTE

05.02

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

ITEM

UND. METRADO

P. UNIT.

P. PARCIAL

SIEMBRA DE CESPED - PREPARADO DE TERRENO

05.02.01

PREPARACION DE TERRENO

m2

8,056.00

0.74

5,961.44

05.02.02

FERTILIZANTE BASE

m2

8,056.00

0.16

1,288.96

05.02.03

DESTERRONADO

m2

8,056.00

0.53

4,269.68

05.02.04

COLOCACION DE PUNTOS DE NIVEL

m2

8,056.00

0.15

1,208.40

05.02.05

NIVELACION FINA

m2

8,056.00

1.55

12,486.80

05.03

SIEMBRA DE CESPED BERMUDA

05.03.01

SEMILLA DE CESPED BERMUDA

kg

100.00

119.86

11,986.00

05.03.02

SIEMBRA DEFINITIVA EN CAMPO

m2

8,056.00

0.14

1,127.84

05.04

MANTENIMIENTO

05.04.01

FERTILIZANTES

glb

1.00

4,000.00

4,000.00

05.04.02

INSECTICIDAS Y FUNGICIDAS

glb

1.00

1,500.00

1,500.00

05.04.03

ADITIVOS

glb

1.00

1,680.00

1,680.00

05.04.04

FERTILIZANTES FOLIARES

glb

1.00

1,000.00

1,000.00

05.04.05

HERBICIDAS

glb

1.00

1,200.00

1,200.00

05.04.06

GASOLINA Y LUBRICANTES

glb

1.00

1,080.00

1,080.00

05.04.07

DESHIERBADO MANUAL

glb

1.00

2,481.00

2,481.00

06
06.01

SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO

RIEGO PRESURIZADO EN CAMPO DE JUEGO


EQUIPO DE RIEGO POR ASPERSION

06.01.01

MOVIMIENTOS DE TIERRA

glb

1.00

9,150.00

9,150.00

06.01.02

SUMINISTRO E INSTALACION DE TUBERIAS HDPE

glb

1.00

13,088.34

13,088.34

06.01.03

glb
SUMINISTRO E INSTALACION DE ASPERSORES (ROTORES)

1.00

11,431.16

11,431.16

06.01.04

SUMINISTRO E INSTALACION DE VALVULAS

glb

1.00

3,075.60

3,075.60

06.01.05

glb
SUMINISTRO E INSTALACION DE CABEZAL DE BOMBEO

1.00

7,836.30

7,836.30

06.01.06

PRUEBA HIDRAULICA

glb

1.00

285.59

285.59

CONSTRUCCION DE CASETA PARA BOLETERIA Y


REHABILITACION DE PISO A TRIBUNA PRINCIPAL Y
CAMBIADO DE PORTONES PRINCIPALES

07

07.01

OTROS

07.01.01

INSTALACION DE NUEVOS PORTONES PRINCIPALES glb

2.00

2,098.25

4,196.50

07.01.02

RESANE CON CEMENTO Y / O EPOXICOS

m2

2,200.00

7.36

16,192.00

250.00

22.35

5,587.50

1.00

13,000.00

13,000.00

07.01.03
07.02
07.02.01

m2
MEJORAMIENTO DE VEREDAS Y PASADIZOS DE TRIBUNAS

IMPACTO AMBIENTAL
IMPACTO AMBIENTAL

glb

COSTO DIRECTO

22,967.79
2,296.78
1,148.39
26,412.96
4,754.33
31,167.29
28,050.56

344,633.26

GASTOS GENERALES(10.0%)

34,463.33

UTILIDAD (5%)

17,231.66

SUBTOTAL

396,328.25

IMPUESTO (IGV 18%)

71,339.08

TOTAL PRESUPUESTO

467,667.33

COSTO TOTAL FACTORIZADO (90%)

420,900.60

VALORIZACION SEMANAL No 02: DEL 12 DE MARZO 2012- AL 19 DE MARZO DEL 2012

OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACIN

DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

FORMULA

INSTALACIONES ELECTRICAS

CLIENTE
ITEM

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

UND. METRADO

P. UNIT.

P. PARCIAL

METRADO
01

VALORIZACION ANTERIOR
PARCIAL % AVANCE

INSTALACIONES ELECTRICAS

01.01

SALIDA DE TECHO CON CABLE AWG TW 2.5 mm (14) + Dpto


PVC SEL 12.00
16 mm (5/8)61.58

738.96

01.02

SALIDA PARA CENTROS DE LUZ CON INTERRUPTOR DEpto


CONMUTACION
3.00

61.30

183.90

01.03

SALIDA PARA TOMACORRIENTES

pto

26.00

44.73

1,162.98

01.04

TUBERIAS PVC SAP (ELECTRICAS) D=1"

1.00

23.92

23.92

01.05

TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS


pza

1.00

380.03

380.03

COSTO DIRECTO

2,489.79

GASTOS GENERALES(10.0%)

248.98

UTILIDAD (5%)

124.49

SUBTOTAL

2,863.26

IMPUESTO (IGV 18%)

515.39

TOTAL PRESUPUESTO

3,378.65

COSTO TOTAL FACTORIZADO (90%)

3,040.78

VALORIZACION SEMANAL No 02: DEL 12 DE MARZO 2012- AL 19 DE MARZO DEL 2012

OBRA

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD

UBICACIN

DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

FORMULA

INSTALACIONES SANITARIAS

CLIENTE

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

ITEM

UND. METRADO

P. UNIT.

P. PARCIAL

METRADO
01
01.01

INSTALACIONES SANITARIAS
APARATOS SANITARIOS

01.01.01

INODORO SIFON JET BLANCO TREBOL (incluye Accesorios)


pza

15.00

219.88

3,298.20

01.01.02

LAVATORIO MALIBU BLANCO (INCL. ACCESORIOS)

15.00

304.23

4,563.45

01.01.03

DUCHA CROMADA DE CABEZA GIRATORIA Y LLAVE MEZCLADORA


u
15.00
(INCLUYE75.19
ACCESORIOS)

01.01.04

KIT DE ACCESORIOS ADHESIVOS BLANCOS

01.02

pza

15.00

41.42

SISTEMA DE DESAGUE

1,127.85
621.30

SALIDAS DE PVC SAL PARA DESAGUE DE 2"

pto

9.00

47.70

429.30

01.02.02

SALIDAS DE PVC SAL PARA DESAGUE DE 4"

pto

9.00

30.29

272.61

01.02.03

292.14

SALIDAS DE PVC SAL PARA VENTILACION DE 2"

pto

9.00

32.46

01.02.04

TUBERIA PVC SAL 2"

12.00

7.61

91.32

01.02.05

TUBERIA PVC SAL 4"

18.90

10.87

205.44
75.88

01.02.06

REGISTROS DE BRONCE CROMADO 3"

pza

4.00

18.97

01.02.07

SOMBRERO VENTILACION PVC DE 2"

pza

1.00

18.61

18.61

01.02.08

CAJA DE REGISTRO DE DESAGUE 12" X 24"(Incluye colocacion)


u

5.00

104.50

522.50

01.02.09

CAJA CIEGA DE 10" X 20"

1.00

88.60

88.60

01.02.10

CAJA DE REGISTRO DE ALB. DE 10" X 20" CON TAPA DEu FF (Incluye


5.00
colocacion)
119.82

599.10

EMPALME A RED EXISTENTE

pza

glb

1.00

1,355.93

1,355.93

01.03.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto

28.00

27.96

782.88

01.03.02

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

56.00

8.10

453.60

01.03.03

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP

250.00

7.22

1,805.00

01.03.04

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA


u DE 1/2" 5.00

58.89

294.45

01.03.05

VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA


u DE 3/4" 5.00

93.84

469.20

01.03.06

LLAVE DE RIEGO CON GRIFO DE 1/2"

pza

2.00

36.60

73.20

01.03.07

TANQUE ELEVADO DE POLIETILENO 1000 Lts

pza

2.00

621.01

1,242.02

01.03.08

TANQUE ELEVADO DE POLIETILENO 1000 Lts - ACCESORIOS


pza

2.00

288.80

577.60

01.03.09

SUMINISTRO E INSTALACION DE CISTERNA PVC 5.00 m3


glb

1.00

3,345.20

3,345.20

01.03.10

SUMINISTRO E INSTALACION DE ELECTROBOMBA

1.00

725.80

725.80

01.03

3,951.43

01.02.01

01.02.11

VALORIZACION ANTERIOR
PARCIAL % AVANCE

SISTEMA DE AGUA FRIA

COSTO DIRECTO
GASTOS GENERALES(10.0%)

glb

27,282.61
2,728.26

UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

1,364.13
31,375.00
5,647.50
37,022.50
33,320.25

VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012


Obra

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD


DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

Frmula

ESTRUCTURAS

Cliente
ITEM

Costo al 01/07/2011

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

UND. METRADO

P. UNIT.

P. PARCIAL

METRADO

VALORIZACION ANTERIOR
PARCIAL % AVANCE

02.04.02

COLUMNAS

02.04.02.01

CONCRETO EN COLUMNAS f'c=210 kg/cm2

m3

6.00

411.23

2,467.38

02.04.02.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

kg

800.00

3.92

3,136.00

02.04.02.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

44.80

42.14

1,887.87

02.04.03

VIGAS

02.04.03.01

CONCRETO EN VIGAS f'c=210 kg/cm2

m3

4.50

311.20

1,400.40

02.04.03.02

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2

kg

600.00

3.92

2,352.00

02.04.03.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

36.00

46.29

1,666.44

02.04.04

GRADERIA

02.04.04.01

CONCRETO EN GRADERIA f'c=210 kg/cm2

m3

16.00

409.14

6,546.24

02.04.04.02

ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIA m2

120.00

64.91

7,789.20

02.04.04.03

ACERO ESTRUCTURAL TRABAJADO PARA GRADERIA

kg

1,200.00

3.96

4,752.00

03.01

REHABILITACION Y MEJORAMIENTO DE MALLA


LIMITANTE CON TRIBUNAS
TRABAJOS PRELIMINARES

03.01.01

LIMPIEZA DE TERRENO MANUAL

m2

490.00

1.33

651.70

03.01.02

TRAZO Y REPLANTEO

m2

490.00

1.44

705.60

03.02

DEMOLICION DE MALLA EXISTENTE

03.02.01

DEMOLICION DE ESTRUCTURA DE MALLA EXISTENTE (CIM,SOBRECIM


m3
67.63
Y COLUMNAS)
40.01

2,705.88

03.02.02

DESMONTAJE DE MALLA EXISTENTE

375.79

5.37

2,017.99

03.02.03

ELIMINACION DE DEMOLICION Y DESMONTAJE DE MALLA m3


EXISTENTE
75.00

12.79

959.25

03.03

MOVIMIENTO DE TIERRAS

03.03.01

EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO


m3

45.00

25.54

1,149.30

03.03.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3

70.00

12.79

895.30

03.04

OBRAS DE CONCRETO ARMADO

03.04.01

CIMIENTO ARMADO

03.04.02

CONCRETO EN CIMIENTO ARMADO f'c=175 kg/cm2

m3

52.44

288.67

15,137.85

03.04.03

ENCOFRADO Y DESENCOFRADO PARA CIMIENTO ARMADO


m2(Madera
207.45
Tornillo 12 Usos)
28.65

5,943.44

03.04.04

ACERO ESTRUCTURAL EN CIMIENTO ARMADO fy=4200 kg/cm2


kg

6,242.99

03

m2

1,592.60

3.92

04.01

ACONDICIONAMIENTO DE VESTIDORES ADMINISTRACION DE SSHH PARA HOMBRES Y


MUJERES
TRABAJOS PRELIMINARES

04.01.01

LIMPIEZA DE TERRENO MANUAL

m2

350.00

1.33

465.50

04.01.02

DEMOLICION DE ALBAILERIA

m3

280.22

9.39

2,631.27

04.01.03

TRAZO Y REPLANTEO

m2

350.00

1.44

504.00

04.01.04

DEMOLICION DE PISO

m2

157.33

20.46

3,218.97

04.01.05

DEMOLICION CIMIENTO

m3

53.17

119.70

6,364.45

04.01.06

DEMOLICION SOBRECIMIENTO

m3

11.71

119.70

1,401.69

04.01.07

DEMOLICION DE COLUMNAS

m3

2.50

119.70

299.25

04.01.08

DEMOLICION DE VIGAS

m3

3.22

119.70

385.43

04.01.09

DEMOLICION DE LOSA MACIZA

m3

11.31

119.70

1,353.81

04

04.01.10

DEMOLICION DE VEREDA

m2

18.24

20.46

373.19

04.01.11

DESMONTAJE DE COBERTURAS

m2

119.30

5.47

652.57

04.01.12

ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS


m3
300.00

12.79

3,837.00

04.02

MOVIMIENTO DE TIERRAS

04.02.01

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO


m3NORMAL.
80.00

25.54

2,043.20

04.02.02

NIVELACION INTERIOR APISONADO MANUAL

m2

120.00

1.84

220.80

04.02.03

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

m3

80.00

12.79

1,023.20

VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012


Obra

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD


DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

Frmula

ESTRUCTURAS

Cliente
DESCRIPCION

ITEM

Costo al 01/07/2011

GOBIERNO REGIONAL LAMBAYEQUE


UND. METRADO

P. UNIT.

P. PARCIAL

METRADO
04.03

CONCRETO SIMPLE

04.03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG

04.03.02

CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25%m3


PM

m3

44.56

165.17

7,359.98

12.00

213.09

2,557.08

04.03.03

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSm2


(Madera149.10
Tornillo 12 Usos)
28.65

4,271.72

04.03.04

FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)

04.04

CONCRETO ARMADO

04.04.01

ZAPATAS

04.04.01.01

CONCRETO EN ZAPATAS F'C=210 kg/cm2

04.04.01.02

ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2

04.04.02

VIGAS DE CIMENTACION

04.04.02.01

CONCRETO EN VIGAS DE CIMENTACION F'C=210 kg/cm2

04.04.02.02
04.04.02.03

ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION


m2

04.04.03

SOBRECIMIENTO ARMADO

04.04.03.01

CONCRETO EN SOBRECIMIENTO ARMADO f'c=175 kg/cm2 m3

04.04.03.02

ACERO ESTRUCTURAL EN SOBRECIMIENTO ARMADO fy=4200


kg

04.04.04

COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)

04.04.04.01

CONCRETO EN COLUMNAS f'c=175 kg/cm2

04.04.04.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

04.04.04.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

04.04.05

VIGAS F'C=175 KG/cm2 (CONFINAMIENTO)

04.04.05.01

CONCRETO EN VIGAS f'c=175 kg/cm2

241.80

23.03

5,568.65

m3

2.16

305.10

659.02

kg

50.40

3.92

197.57

m3

0.57

305.10

173.91

ACERO ESTRUCTURAL EN VIGAS DE CIMENTACION fy=4200


kg kg/cm2 39.20

3.92

153.66

15.00

46.29

694.35

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2


04.04.05.03 ENCOFRADO Y DESENCOFRADO EN VIGAS
04.04.05.02

m2

12.58

282.78

3,557.37

1,053.51

3.92

4,129.76

m3

15.00

288.67

4,330.05

kg

1,770.30

3.92

6,939.58

m2

210.79

42.14

8,882.69

m3

16.13

282.78

4,561.24

kg
m2

1,186.17
80.65

3.92
46.29

4,649.79
3,733.29

m3

04.04.06

LOSAS ALIGERADAS

04.04.06.01

CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

21.61

327.89

7,085.70

04.04.06.02

ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")


kg
779.03

3.92

3,053.80

VALORIZACION ANTERIOR
PARCIAL % AVANCE

04.04.06.03

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

247.00

37.51

9,264.97

04.04.06.04

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO


u
2,054.00

2.10

4,313.40

05

CONSTRUCCION DE BANQUILLA DE SUPLENTES Y


COLOCACION DE COBERTURA TRANSPARENTE

05.01

OBRAS PROVISIONALES

05.01.01

LIMPIEZA DE TERRENO MANUAL

m2

25.00

1.33

33.25

05.01.02

TRAZO Y REPLANTEO

m2

25.00

1.44

36.00

05.01.03

DEMOLICION EN BAQUILLAS DE SUPLENTES EXISTENTE m3

05.01.04

DESMONTAJE DE COBERTURAS

05.01.05

ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS


m3

m2

6.00

119.70

718.20

30.00

5.47

164.10

10.00

12.79

127.90

05.02

MOVIMIENTO DE TIERRAS

05.02.01

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO


m3NORMAL.
57.60

25.54

1,471.10

05.02.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

74.88

12.79

957.72

05.03

CONCRETO SIMPLE

05.03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG

m3

8.64

165.17

1,427.07

05.03.02

FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)

m2

10.50

23.03

241.82

m2

m3

VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012


Obra

MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD


DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

Frmula

ESTRUCTURAS

Cliente
ITEM

Costo al 01/07/2011

GOBIERNO REGIONAL LAMBAYEQUE

DESCRIPCION

UND. METRADO

P. UNIT.

P. PARCIAL

METRADO
05.04

CONCRETO ARMADO

05.04.01

CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2

m3

10.56

297.52

3,141.81

05.04.02

ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2

50.00

38.11

1,905.50

05.04.03

ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2


kg

400.00

3.92

1,568.00

06

CONSTRUCCION DE CASETA PARA BOLETERIA Y


REHABILITACION DE PISO A TRIBUNA PRINCIPAL Y
CAMBIADO DE PORTONES PRINCIPALES

06.01

OBRAS PROVISIONALES

06.01.01

LIMPIEZA DE TERRENO MANUAL

m2

50.00

1.33

66.50

06.01.02

TRAZO Y REPLANTEO

m2

50.00

1.44

72.00

06.01.03

DEMOLICION DE PAVIMENTO DE CONCRETO DE 6"

m2

38.64

20.46

790.57

06.01.04

DEMOLICION DE ALBAILERIA

m3

10.00

9.39

93.90

06.01.05

DESMONTAJE DE COBERTURAS

m2

5.10

5.47

27.90

06.01.06

ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS


m3

5.00

12.79

63.95

VALORIZACION ANTERIOR
PARCIAL % AVANCE

06.02

MOVIMIENTO DE TIERRAS

06.02.01

EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO


m3NORMAL.
8.00

25.54

204.32

06.02.02

ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)

6.00

12.79

76.74

06.03

CONCRETO SIMPLE

06.03.01

9.45
2.50
0.55

23.03
165.17
213.09

217.63
412.93

06.03.03

FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)


m2
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25%m3
PM

06.04

CONCRETO ARMADO

06.04.01

COLUMNAS

06.04.01.01

CONCRETO EN COLUMNAS f'c=210 kg/cm2

m3

1.00

411.23

411.23

06.04.01.02

ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2

kg

100.00

3.92

392.00

06.04.01.03

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

10.00

42.14

421.40

06.04.02

VIGAS

06.04.02.01

CONCRETO EN VIGAS f'c=210 kg/cm2

m3

0.50

411.23

205.62

06.04.02.02

ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2

kg

50.00

3.92

196.00

06.04.02.03

ENCOFRADO Y DESENCOFRADO EN VIGAS

m2

3.00

46.29

138.87

06.04.03

LOSAS ALIGERADAS

06.04.03.01

CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

m3

1.00

327.89

327.89

06.04.03.02

ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")


kg
50.00

3.92

196.00

06.04.03.03

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

10.80

37.51

405.11

06.04.03.04

LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO


u
90.00

2.10

189.00

06.03.02

COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)

m3

m2

117.20

4,442,643.11
444,264.31
222,132.16
5,109,039.58
919,627.12
6,028,666.70
5,425,800.03

827,196.39
82,719.64
41,359.82
951,275.85
171,229.65
#########
#########

Costo al 01/07/2011
SEMANA 3 ( 09 Abr al 16 Abr)SEMANA 4 ( 16 Abr al 23 Abr)
SEMANA 5 ( 23 Abr al 30 Abr)
SEMANAS ACUMULADAS
SALDO X VALORIZ.
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL

1.00
332.61
221.74
986.22
164.00

1,834.67
398.13
287.38
8,503.19
4,531.32

1.00
1.00
1.00
1.00
1.00

241.74
1.00

1,740.53
2,250.00

1.00
1.00

158.40
138.23
715.08

3,640.98
1,591.17
8,231.29

1.00
1.00
1.00

70.00
66.52
9.07
127.64
266.09

1,352.61
9,888.40
1,739.45
3,291.20
6,861.13

1.00
1.00
0.75
0.79
1.00

3.03
33.72
-

645.66
966.08
-

30.00
800.00

7,847.55
2,822.40

1.00
1.00

9.75
2,249.04
161.08

2,533.08
7,934.61
6,109.12

0.51
1.00
0.51

9.28
151.92

2,678.86
6,401.91

15.00
857.65
140.00

4,241.70
3,361.99
6,480.60

207.00

247.78

1.00

35.00
60.00
-

804.51
99.36
-

1.00
1.00
-

30.00

383.70

5.95
20.00

884.49
386.46

0.33
1.00

12.05
-

1,990.30
-

12.00
288.04

3,295.08
1,016.21

1.00
1.00

1.50
800.00
22.40

555.16
2,822.40
849.54

0.25
1.00
0.50

4.50
22.40

1,850.54
943.94

Costo al 01/07/2011
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)
SEMANA 4 ( 16 Abr al 23 Abr)
SEMANAS ACUMULADAS
SALDO X VALORIZ.
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
-

4.50
600.00
36.00

1,400.40
2,352.00
1,666.44

16.00
120.00

6,546.24
7,789.20

1,200.00

4,752.00

490.00
490.00

586.53
635.04

1.00
1.00

67.63
375.79
75.00

2,435.29
1,816.19
863.33

1.00
1.00
1.00

14.50
-

333.30
-

0.32
-

30.50
70.00

778.97
895.30

52.44
207.45
1,592.60

15,137.85
5,943.44
6,242.99

350.00
280.22
350.00
157.33
53.17
11.71

418.95
2,368.14
453.60
2,897.07
5,728.00
1,261.52

1.00
1.00
1.00
1.00
1.00
1.00

2.50
3.22
11.31
18.24
119.30

269.33
346.89
1,218.43
335.87
587.31

1.00
1.00
1.00
1.00
1.00

300.00

3,453.30

1.00

55.89
-

1,284.69
-

0.70
-

24.11
120.00
80.00

615.77
220.80
1,023.20

37.90
6.35
82.17
-

5,633.95
1,217.81
2,118.75
-

0.85
0.53
0.55
-

6.66
5.65
66.93
241.80

1,100.03
1,203.96
1,917.54
5,568.65

2.16
50.40

593.11
177.81

1.00
1.00

Costo al 01/07/2011
SALDO X VALORIZ.
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)
SEMANA 4 ( 16 Abr al 23 Abr)
SEMANAS ACUMULADAS
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
0.52
142.79
0.91
0.05
15.26
39.20
138.30
1.00
14.00
583.25
0.93
1.00
46.29
-

3.33
508.00

7.09
824.60
97.07

847.49
1,792.22
1,842.00
2,909.19
3,681.48

0.26
0.48

9.25
545.51

2,615.72
2,138.40

0.47
0.47
0.46

7.91
945.70
113.72

2,283.38
3,707.14
4,792.16

16.13
######
80.65

4,561.24
4,649.79
3,733.29

21.61
779.03
247.00

7,085.70
3,053.80
9,264.97

######

4,313.40

25.00
25.00
6.00
30.00
10.00

29.93
32.40
646.38
147.69
115.11

1.00
1.00
1.00
1.00
1.00

57.60
74.88

1,471.10
957.72

8.64
10.50

1,427.07
241.82

10.56
50.00
400.00

3,141.81
1,905.50
1,568.00

50.00
50.00
38.64
10.00
5.10
5.00

59.85
64.80
711.52
84.51
25.11
57.56

1.00
1.00
1.00
1.00
1.00
1.00

8.00
6.00

183.89
69.07

1.00
1.00

/07/2011
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)SEMANA 4 ( 16 Abr al 23 Abr) SEMANAS ACUMULADAS
SALDO X VALORIZ.
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL

9.45
2.50
0.55

217.63
412.93
117.20

1.00
100.00
10.00

411.23
392.00
421.40

0.50
50.00
3.00

205.62
196.00
138.87

1.00
50.00
10.80
90.00

327.89
196.00
405.11
189.00

145,547.91
14,554.79
7,277.40
167,380.10
30,128.42
197,508.52
177,757.67

########
16,170.45
8,085.22
########
33,472.83
########
########

Costo al 01/07/2011
SALDO X VALORIZ.
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)
SEMANA 4 ( 16 Abr al 23 Abr)
SEMANAS ACUMULADAS
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL

805.00

31,612.35

0.82

181.22

7,116.51

213.66

6,016.67

16.30
490.00
485.00
36.00

1,607.83
7,350.00
48,883.15
2,422.44

245.00
615.00

12,610.15
6,420.60

70.00

0.20

280.00

15,108.80

40.00
160.00
58.00

670.80
4,016.00
1,051.54

160.00

3,660.80

160.00
160.00

3,601.60
7,843.20

29.80

1,468.25

39.00

7,558.59

6.00

2,918.88

18.00
21.00
2.00

218.16
192.57
160.90

50.00

250.00

160.00
144.00
144.00
12.00
8.00

884.80
753.12
1,257.12
169.80
88.88

3,777.20

170.00

3,743.40

50.00
######

8,349.00
2,819.60

1.00
1.00
1.00

8,056.00
8,056.00
#######

2,819.60
11,197.84
900.00

Costo al 01/07/2011
SALDO X VALORIZ.
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)
SEMANA 4 ( 16 Abr al 23 Abr)
SEMANAS ACUMULADAS
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
-

######

5,961.44

50,306.99
5,030.70
2,515.35
57,853.04
10,413.55
68,266.59
61,439.93

########
16,517.46
8,258.73
########
34,191.14
########
########

MARZO DEL 2012

Costo al 01/07/2011
VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE
-

VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL
-

12.00
3.00
26.00
1.00
1.00

738.96
183.90
1,162.98
23.92
380.03

2,489.79
248.98
124.49
2,863.26
515.39
3,378.65
3,040.78

MARZO DEL 2012

Costo al 01/07/2011
VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE

VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL

15.00
15.00
15.00
15.00

3,298.20
4,563.45
1,127.85
621.30

9.00
9.00
9.00
12.00
18.90
4.00
1.00
5.00
1.00
5.00
1.00

429.30
272.61
292.14
91.32
205.44
75.88
18.61
522.50
88.60
599.10
1,355.93

28.00
56.00
250.00
5.00
5.00
2.00
2.00
2.00
1.00
1.00

782.88
453.60
1,805.00
294.45
469.20
73.20
1,242.02
577.60
3,345.20
725.80

4,648.60
464.86

232.43
5,345.89
962.26
6,308.15
5,677.34

VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE

VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL

800.00

350.00
280.22
350.00
157.33
53.17
11.71
2.50
3.22
11.31

######
-

1.00
-

800.00
-

3,136.00
-

1.00
-

6.00
44.80

2,467.38
1,887.87

4.50
600.00
36.00

1,400.40
2,352.00
1,666.44

16.00
120.00
######

6,546.24
7,789.20
4,752.00

490.00
490.00

651.70
705.60

67.63
375.79
75.00

2,705.88
2,017.99
959.25

45.00
70.00

1,149.30
895.30

465.50
######
504.00
######
######
######
299.25
385.43
######

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

350.00
280.22
350.00
157.33
53.17
11.71
2.50
3.22
11.31

465.50
2,631.27
504.00
3,218.97
6,364.45
1,401.69
299.25
385.43
1,353.81

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

52.44 15,137.85
207.45
5,943.44
###### 6,242.99

18.24
119.30
300.00

373.19
652.57
######

1.00
1.00
1.00

18.24
119.30
300.00

VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE

373.19
652.57
3,837.00

1.00
1.00
1.00

80.00
120.00
80.00

2,043.20
220.80
1,023.20

VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL

44.56
12.00
149.10
241.80

7,359.98
2,557.08
4,271.72
5,568.65

2.16
50.40

659.02
197.57

0.57
39.20
15.00

173.91
153.66
694.35

12.58
######

3,557.37
4,129.76

15.00
######
210.79

4,330.05
6,939.58
8,882.69

16.13
######
80.65

4,561.24
4,649.79
3,733.29

21.61
779.03

7,085.70
3,053.80

25.00
25.00
6.00
30.00
10.00

247.00
######

33.25
36.00
718.20
164.10
127.90

1.00
1.00
1.00
1.00
1.00

25.00
25.00
6.00
30.00
10.00

33.25
36.00
718.20
164.10
127.90

1.00
1.00
1.00
1.00
1.00

57.60
74.88

1,471.10
957.72

8.64
10.50

1,427.07
241.82

VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE

50.00
50.00
38.64
10.00
5.10
5.00

66.50
72.00
790.57
93.90
27.90
63.95

1.00
1.00
1.00
1.00
1.00
1.00

9,264.97
4,313.40

VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL
10.56
3,141.81
50.00
1,905.50
400.00
1,568.00

50.00
50.00
38.64
10.00
5.10
5.00

66.50
72.00
790.57
93.90
27.90
63.95

1.00
1.00
1.00
1.00
1.00
1.00

8.00
6.00

204.32
76.74

9.45
2.50
0.55

217.63
412.93
117.20

1.00
100.00
10.00

411.23
392.00
421.40

0.50
50.00
3.00

205.62
196.00
138.87

1.00
50.00
10.80
90.00

327.89
196.00
405.11
189.00

######
######
######
######
######
######
######

1,218,653.25
121,865.33
60,932.66
1,401,451.24
252,261.22
1,653,712.46
1,488,341.21

########
########
########
########
########
########
########

ANALISIS TECNICO DE LA OBRA- CHONGOYAPE


OBRA
UBICACIN

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA


DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

CLIENTE

GOBIERNO REGIONAL DE FERREAFE

CUADRO No 1 . RESUMEN DE GASTOS EN OBRA


COSTO DIRECTO
hasta 9 abr.
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS
INS. ELECTRICAS
TOTAL

S/.145,574.91
S/.50,306.99
S/.0.00
S/.0.00
S/.195,881.90

ANALISIS FINANCIERO-CHONGOYAPE
OBRA
UBICACIN

MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA


DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE

CLIENTE

GOBIERNO REGIONAL DE FERREAFE

CUADRO No 2 . RESUMEN DE GASTOS EN OFICINA SIN DESCONTAR MATERIALES QUE AUN NO SE USAN

RESUMEN
MATERIALES
HERRAMIENTAS
MANO DE OBRA
COMBUSTIBLE
GASTOS GENERALES DIRECTOS
GASTOS GENERALES INDIRECTOS
TOTAL

MONTO S/.
S/.76,872.37
S/.11,674.30
S/.54,659.52
S/.6,687.89
S/.6,744.90
S/.8,188.97
S/.164,827.95

MATERIALES

MONTO REAL
MONTO NO USADO
S/.76,872.37
17582.85

TOTAL

CUADRO No 3 . RESUMEN DE GASTOS EN OFICINA

HASTA LA FECHA
Hasta el 31 de Marzo
Hasta el 29 de Marzo
Hasta el 29 de Marzo
Hasta el 31 de Marzo
Hasta el 31 de Marzo
Hasta el 29 de Marzo
Hasta el 31 de Marzo

S/.149,894.08

S/.59,289.52

RESUMEN
MATERIALES
HERRAMIENTAS
MANO DE OBRA
COMBUSTIBLE
GASTOS GENERALES DIRECTOS
GASTOS GENERALES INDIRECTOS
TOTAL

MONTO S/.
S/.59,289.52
S/.11,674.30
S/.54,659.52
S/.6,687.89
S/.6,744.90
S/.8,188.97
S/.164,827.95

HASTA LA FECHA
Hasta el 31 de Marzo
Hasta el 29 de Marzo
Hasta el 29 de Marzo
Hasta el 31 de Marzo
Hasta el 31 de Marzo
Hasta el 29 de Marzo
Hasta el 31 de Marzo

S/.132,311.23

LES QUE AUN NO SE USAN

MATERIAL EN STOCK

CANTIDAD

FIERRO 5/8"
FIERRO 1"
FIERRO 3/4"

P.UNIT

P.PARCIAL
41

114.85

61.45

FIERRO 3/8"

551

15.2

8375.2

FIERRO 1/2"

75

27.15

2036.25

6.2
3.7
3.7
3.8
3.8
3.8
3.8
19.6
48
12
12
12
40
0.36

296
355.2
49.4
0
49.4
26.6
4174.8
384
240
180
216
1200
0

FIERRO 1/4"
ALAMBRE No 16
ALAMBRE No 08
CLAVOS 2"
CLAVOS 2 1/2"
CLAVOS 3"
CLAVOS 4"
CEMENTO
PIEDRA CHANCADA 1/2
ARENA GRUESA
HORMIGON
PIEDRA BASE
PIEDRA 3/4
LADRILLO TIPO IV

TOTAL

80
96
13
13
7
213
8
20
15
18
30

17582.85