CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m3
12.10
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo
m212 Usos) 161.36
ENCOFRADO Y DESENCOFRADO PARA CIMIENTO CORRIDO (Madera Tornillo
m2 12 Usos)266.09
21.47
165.17
213.09
28.65
28.65
1,502.90
10,987.11
2,578.39
4,622.96
7,623.48
01.01.03
TRAZO Y REPLANTEO
DEMOLICION DE MUROS DE ADOBE
DEMOLICION DE CIMIENTO DE MUROS DE ADOBE
OBRAS PROVISIONALES
01.02.01
01.02.02
01.02
MOVIMIENTO DE TIERRAS
01.02.01
01.02.02
01.03.03
01.03
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04
P. PARCIAL
u
m2
m2
m2
m3
CARTEL DE OBRA
01.02
P. UNIT.
TRABAJOS PRELIMINARES
01.01.02
01.01.05
METRADO
01.01.01
01.01.04
UND.
01.05.01
ZAPATAS
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.03.02
01.05.03.03
02
02.01
TRABAJOS PRELIMINARES
02.01.01
m3
kg
30.00
800.00
290.65
3.92
8,719.50
3,136.00
m3
kg
m2
19.03
2,249.04
313.00
288.67
3.92
42.14
5,493.39
8,816.24
13,189.82
m3
kg
m2
15.00
857.65
140.00
282.78
3.92
46.29
4,241.70
3,361.99
6,480.60
m2
207.00
1.33
275.31
02.02
MOVIMIENTO DE TIERRAS
02.02.01
02.02.02
02.02.03
m2
m3
35.00
60.00
30.00
25.54
1.84
12.79
893.90
110.40
383.70
02.03
CONCRETO SIMPLE
02.03.01
02.03.02
m3
m2
18.00
20.00
165.17
21.47
2,973.06
429.40
02.04
CONCRETO ARMADO
02.04.01
ZAPATAS
02.04.01.01
02.04.01.02
02.04.02
COLUMNAS
02.04.02.01
02.04.02.02
02.04.02.03
02.04.03
VIGAS
02.04.03.01
02.04.03.02
02.04.03.03
02.04.04
GRADERIA
02.04.04.01
02.04.04.02
m3
kg
12.00
288.04
305.10
3.92
3,661.20
1,129.12
m3
kg
m2
6.00
800.00
44.80
411.23
3.92
42.14
2,467.38
3,136.00
1,887.87
m3
kg
m2
4.50
600.00
36.00
311.20
3.92
46.29
1,400.40
2,352.00
1,666.44
m3
m2
kg
16.00
120.00
1,200.00
409.14
64.91
3.96
6,546.24
7,789.20
4,752.00
m2
m2
490.00
490.00
1.33
1.44
651.70
705.60
03.02
03.02.01
03.02.02
375.79
75.00
40.01
5.37
12.79
2,705.88
2,017.99
959.25
m3
m3
45.00
70.00
25.54
12.79
1,149.30
895.30
m3
52.44
15,137.85
5,943.44
6,242.99
03.01.01
03.01.02
TRAZO Y REPLANTEO
03.02.03
03.02
m2
ELIMINACION DE DEMOLICION Y DESMONTAJE DE MALLA EXISTENTE m3
MOVIMIENTO DE TIERRAS
03.02.01
03.02.02
03.04
03.04.01
CIMIENTO ARMADO
03.04.02
03.04.03
03.04.04
kg
1,592.60
04.01
288.67
28.65
3.92
04.01.01
04.01.02
DEMOLICION DE ALBAILERIA
04.01.03
TRAZO Y REPLANTEO
04.01.04
DEMOLICION DE PISO
04.01.05
DEMOLICION CIMIENTO
04.01.06
DEMOLICION SOBRECIMIENTO
04.01.07
DEMOLICION DE COLUMNAS
04.01.08
DEMOLICION DE VIGAS
04.01.09
04.01.10
DEMOLICION DE VEREDA
04.01.11
DESMONTAJE DE COBERTURAS
04.01.12
m2
m3
m2
m2
m3
m3
m3
m3
m3
m2
m2
m3
350.00
280.22
350.00
157.33
53.17
11.71
2.50
3.22
11.31
18.24
119.30
300.00
1.33
9.39
1.44
20.46
119.70
119.70
119.70
119.70
119.70
20.46
5.47
12.79
465.50
2,631.27
504.00
3,218.97
6,364.45
1,401.69
299.25
385.43
1,353.81
373.19
652.57
3,837.00
04.02
MOVIMIENTO DE TIERRAS
04.02.01
04.02.02
04.02.03
m2
m3
80.00
120.00
80.00
25.54
1.84
12.79
2,043.20
220.80
1,023.20
04.03
CONCRETO SIMPLE
04.03.01
m3
44.56
165.17
7,359.98
04
m3
12.00
m2
241.80
213.09
28.65
23.03
m3
kg
2.16
50.40
305.10
3.92
659.02
197.57
m3
kg
m2
0.57
39.20
15.00
305.10
3.92
46.29
173.91
153.66
694.35
m3
kg
12.58
1,053.51
282.78
3.92
3,557.37
4,129.76
m3
kg
m2
15.00
1,770.30
210.79
288.67
3.92
42.14
4,330.05
6,939.58
8,882.69
m3
kg
m2
16.13
1,186.17
80.65
282.78
3.92
46.29
4,561.24
4,649.79
3,733.29
m3
m2
u
21.61
779.03
247.00
2,054.00
327.89
3.92
37.51
2.10
7,085.70
3,053.80
9,264.97
4,313.40
m2
m2
m3
m2
m3
25.00
25.00
6.00
30.00
10.00
1.33
1.44
119.70
5.47
12.79
33.25
36.00
718.20
164.10
127.90
05.02.01
05.02.02
m3
57.60
74.88
25.54
12.79
1,471.10
957.72
m3
m2
8.64
10.50
165.17
23.03
1,427.07
241.82
m3
10.56
m2
50.00
ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
400.00
297.52
38.11
3.92
3,141.81
1,905.50
1,568.00
1.33
66.50
04.03.02
04.03.03
04.03.04
04.04
CONCRETO ARMADO
04.04.01
ZAPATAS
04.04.01.01
04.04.01.02
04.04.02
VIGAS DE CIMENTACION
04.04.02.01
04.04.02.02
04.04.02.03
04.04.03
SOBRECIMIENTO ARMADO
04.04.03.01
04.04.03.02
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.05
04.04.05.01
04.04.05.02
04.04.05.03
04.04.06
LOSAS ALIGERADAS
04.04.06.01
04.04.06.02
04.04.06.03
04.04.06.04
05.01
05.01.01
05.01.02
TRAZO Y REPLANTEO
05.01.03
05.01.04
DESMONTAJE DE COBERTURAS
05.01.05
05
05.02
05.03
05.03.01
05.03.02
05.04
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
CONCRETO ARMADO
05.04.01
05.04.03
05.04.02
2,557.08
4,271.72
5,568.65
06
06.01
OBRAS PROVISIONALES
06.01.01
m2
50.00
m2
m2
m3
m2
m3
50.00
38.64
10.00
5.10
5.00
1.44
20.46
9.39
5.47
12.79
72.00
790.57
93.90
27.90
63.95
06.02
MOVIMIENTO DE TIERRAS
06.02.01
06.02.02
m3
8.00
6.00
25.54
12.79
204.32
76.74
06.03
CONCRETO SIMPLE
06.03.01
06.03.02
06.03.03
m2
m3
m3
9.45
2.50
0.55
23.03
165.17
213.09
217.63
412.93
117.20
06.04
CONCRETO ARMADO
06.04.01
COLUMNAS
06.04.01.01
06.04.01.02
06.04.01.03
m3
kg
m2
1.00
100.00
10.00
411.23
3.92
42.14
411.23
392.00
421.40
06.04.02
VIGAS
06.04.02.01
06.04.02.02
06.04.02.03
m3
kg
m2
0.50
50.00
3.00
411.23
3.92
46.29
205.62
196.00
138.87
06.04.03
LOSAS ALIGERADAS
06.04.03.01
m3
06.04.03.02
06.04.03.03
06.04.03.04
1.00
50.00
10.80
90.00
327.89
3.92
37.51
2.10
327.89
196.00
405.11
189.00
06.01.02
TRAZO Y REPLANTEO
06.01.03
06.01.04
DEMOLICION DE ALBAILERIA
06.01.05
DESMONTAJE DE COBERTURAS
06.01.06
m2
u
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
01
01.01
01.01.01
01.02
01.02.01
01.03
CERCO PERIMETRICO
MUROS Y TABIQUES DE ALBAILERIA
m2
986.22
39.27
38,728.86
m2
213.66
28.16
6,016.67
m2
m2
TIJERALES Y VIGAS METALICAS PARA COBERTURAS DE TRIBUNAS m
m
REFUERZO DE COBERTURA DE TRIBUNA
16.30
490.00
485.00
36.00
98.64
15.00
100.79
67.29
1,607.83
7,350.00
48,883.15
2,422.44
245.00
615.00
51.47
10.44
12,610.15
6,420.60
m2
MURO SOGA 1 CARAVISTA LADRILLO SILICO-CALCAREO KK AMARRE
CON CEMENTO-CAL-ARENA
350.00
53.96
18,886.00
01.03.01
01.03.02
01.03.03
01.03.04
02
02.01
02.01.01
02.01.02
03
03.01
03.01.01
03.02
03.02.01
323,424.38
32,342.44
16,171.22
371,938.04
66,948.85
438,886.89
394,998.20
u
m2
ALBAILERIA
REVOQUES ENLUCIDOS
TARRAJEO RAYADO O PRIMARIO
m2
40.00
16.77
670.80
m2
m
160.00
58.00
25.10
18.13
4,016.00
1,051.54
m2
160.00
22.88
3,660.80
m2
m2
160.00
160.00
22.51
49.02
3,601.60
7,843.20
m2
29.80
49.27
1,468.25
m2 CEDRO 2"X3"
PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO
39.00
193.81
7,558.59
03.02.02
03.02.03
03.03
03.03.01
03.04
CIELO RASO
CIELO RASO CON MEZCLA DE C:A
PISOS Y PAVIMENTOS
03.04.01
CONTRAPISO DE 48 mm
03.04.02
03.05
03.05.01
03.06
03.06.01
03.07
03.07.01
03.08
ZOCALOS Y CONTRAZOCALOS
ZOCALO CERAMICA COLOR DE 30X30 cm DE 1RA
CARPINTERIA DE MADERA
CARPINTERIA METALICA
PUERTA METALICA
03.08.01
03.08.02
03.08.03
03.09
03.09.01
03.10
03.10.03
03.10.04
04.01
04.01.01
04.02
04.02.01
04.02.02
05
05.01
05.01.01
PREPARACION DE TERRENO
05.02.02
FERTILIZANTE BASE
05.02.03
DESTERRONADO
05.02.04
05.03.02
50.00
5.00
250.00
m2
m2
m2
m2
m2
160.00
144.00
144.00
12.00
8.00
5.53
5.23
8.73
14.15
11.11
884.80
753.12
1,257.12
169.80
88.88
m2
170.00
22.02
3,743.40
m2
m2
50.00
8,056.00
166.98
0.35
8,349.00
2,819.60
m2
m2
8,056.00
8,056.00
10,000.00
0.35
1.39
0.09
2,819.60
11,197.84
900.00
m2
m2
m2
m2
m2
8,056.00
8,056.00
8,056.00
8,056.00
8,056.00
0.74
0.16
0.53
0.15
1.55
5,961.44
1,288.96
4,269.68
1,208.40
12,486.80
kg
m2
100.00
8,056.00
119.86
0.14
11,986.00
1,127.84
glb
glb
glb
glb
glb
glb
glb
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4,000.00
1,500.00
1,680.00
1,000.00
1,200.00
1,080.00
2,481.00
4,000.00
1,500.00
1,680.00
1,000.00
1,200.00
1,080.00
2,481.00
glb
glb
glb
glb
1.00
1.00
1.00
1.00
9,150.00
13,088.34
11,431.16
3,075.60
9,150.00
13,088.34
11,431.16
3,075.60
MANTENIMIENTO
05.04.01
FERTILIZANTES
05.04.02
INSECTICIDAS Y FUNGICIDAS
05.04.03
ADITIVOS
05.04.04
FERTILIZANTES FOLIARES
05.04.05
HERBICIDAS
05.04.06
GASOLINA Y LUBRICANTES
06.01
p2
05.03.01
06
218.16
192.57
160.90
05.02.01
05.04.07
12.12
9.17
80.45
TRABAJOS PRELIMINARES
APLICACION DE HERBICIDA
05.04
18.00
21.00
2.00
LIMPIEZA DE MALEZA
05.01.03
05.03
pza
pza
pza
COBERTURAS
TRAZO Y REPLANTEO
05.02.05
2,918.88
REVESTIMIENTOS
05.01.02
05.02
486.48
PINTURA
03.10.02
04
6.00
03.10.01
03.10.05
CERRAJERIA
DESHIERBADO MANUAL
RIEGO PRESURIZADO EN CAMPO DE JUEGO
EQUIPO DE RIEGO POR ASPERSION
06.01.01
MOVIMIENTOS DE TIERRA
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
PRUEBA HIDRAULICA
07
07.01
07.02.01
7,836.30
285.59
7,836.30
285.59
glb
m2
m2
2.00
2,200.00
250.00
2,098.25
7.36
22.35
4,196.50
16,192.00
5,587.50
glb
1.00
13,000.00
13,000.00
OTROS
07.01.02
07.02
1.00
1.00
07.01.01
07.01.03
glb
glb
344,633.26
34,463.33
17,231.66
396,328.25
71,339.08
467,667.33
420,900.60
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
01
INSTALACIONES ELECTRICAS
01.01
01.02
01.03
01.04
01.05
pto
m
pza
12.00
3.00
26.00
1.00
1.00
61.58
61.30
44.73
23.92
380.03
2,489.79
248.98
124.49
2,863.26
515.39
3,378.65
3,040.78
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
01
01.01
INSTALACIONES SANITARIAS
APARATOS SANITARIOS
pza
15.00
pza
15.00
DUCHA CROMADA DE CABEZA GIRATORIA Y LLAVE MEZCLADORA (INCLUYE
ACCESORIOS)
u
15.00
KIT DE ACCESORIOS ADHESIVOS BLANCOS
u
15.00
01.01.01
01.01.02
01.01.03
01.01.04
01.02
738.96
183.90
1,162.98
23.92
380.03
219.88
304.23
75.19
41.42
3,298.20
4,563.45
1,127.85
621.30
47.70
30.29
32.46
3,951.43
429.30
272.61
292.14
SISTEMA DE DESAGUE
01.02.01
01.02.02
01.02.03
pto
pto
pto
9.00
9.00
9.00
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.03
m
m
REGISTROS DE BRONCE CROMADO 3"
pza
SOMBRERO VENTILACION PVC DE 2"
pza
CAJA DE REGISTRO DE DESAGUE 12" X 24"(Incluye colocacion)
u
CAJA CIEGA DE 10" X 20"
pza
CAJA DE REGISTRO DE ALB. DE 10" X 20" CON TAPA DE FF (Incluye colocacion)
u
EMPALME A RED EXISTENTE
glb
TUBERIA PVC SAL 2"
TUBERIA PVC SAL 4"
12.00
18.90
4.00
1.00
5.00
1.00
5.00
1.00
7.61
10.87
18.97
18.61
104.50
88.60
119.82
1,355.93
91.32
205.44
75.88
18.61
522.50
88.60
599.10
1,355.93
28.00
56.00
250.00
5.00
5.00
2.00
2.00
2.00
1.00
1.00
27.96
8.10
7.22
58.89
93.84
36.60
621.01
288.80
3,345.20
725.80
782.88
453.60
1,805.00
294.45
469.20
73.20
1,242.02
577.60
3,345.20
725.80
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.03.08
01.03.09
01.03.10
pto
m
m
u
u
pza
pza
pza
glb
glb
27,282.61
2,728.26
1,364.13
31,375.00
5,647.50
37,022.50
33,320.25
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m3
kg
m2
6.00
800.00
44.80
411.23
3.92
42.14
2,467.38
3,136.00
1,887.87
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03
VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN VIGAS
m3
kg
m2
4.50
600.00
36.00
311.20
3.92
46.29
1,400.40
2,352.00
1,666.44
m3
m2
16.00
120.00
409.14
64.91
6,546.24
7,789.20
02.04.04
GRADERIA
02.04.04.01 CONCRETO EN GRADERIA f'c=210 kg/cm2
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIA
kg
1,200.00
3.96
4,752.00
m2
m2
490.00
490.00
1.33
1.44
651.70
705.60
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
40.01
5.37
12.79
2,705.88
2,017.99
959.25
03.03
03.03.01
03.03.02
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO m3
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
25.54
12.79
1,149.30
895.30
03.04
03.04.01
03.04.02
03.04.03
03.04.04
288.67
28.65
3.92
15,137.85
5,943.44
6,242.99
1.33
9.39
1.44
20.46
119.70
119.70
119.70
119.70
119.70
20.46
5.47
12.79
465.50
2,631.27
504.00
3,218.97
6,364.45
1,401.69
299.25
385.43
1,353.81
373.19
652.57
3,837.00
03
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.01.11
04.01.12
45.00
70.00
350.00
280.22
350.00
157.33
53.17
11.71
2.50
3.22
11.31
18.24
119.30
300.00
04.02
MOVIMIENTO DE TIERRAS
04.02.01
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
m3
80.00
25.54
2,043.20
04.02.02
NIVELACION INTERIOR APISONADO MANUAL
m2
120.00
1.84
220.80
04.02.03
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
80.00
12.79
1,023.20
VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012
Obra
MEJORAMIENTO DE LA INFRAESTRUCTURA DEPORTIVA MUNICIPAL ESTADIO DE LA JUVENTUD
DISTRITO DE CHONGOYAPE- CHICLAYO- LAMBAYEQUE
Frmula
ESTRUCTURAS
Cliente
GOBIERNO REGIONAL LAMBAYEQUE
ITEM
DESCRIPCION
UND.
METRADO
P. UNIT.
P. PARCIAL
04.03
04.03.01
04.03.02
04.03.03
04.03.04
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
44.56
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM m3
12.00
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera
m2 Tornillo 149.10
12 Usos)
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
241.80
165.17
213.09
28.65
23.03
7,359.98
2,557.08
4,271.72
5,568.65
04.04
04.04.01
04.04.01.01
04.04.01.02
CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=210 kg/cm2
ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2
305.10
3.92
659.02
197.57
m3
kg
2.16
50.40
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C=210 kg/cm2
m3
ACERO ESTRUCTURAL EN VIGAS DE CIMENTACION fy=4200 kg/cm2
kg
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2
0.57
39.20
15.00
305.10
3.92
46.29
173.91
153.66
694.35
04.04.03
SOBRECIMIENTO ARMADO
04.04.03.01 CONCRETO EN SOBRECIMIENTO ARMADO f'c=175 kg/cm2
m3
04.04.03.02 ACERO ESTRUCTURAL EN SOBRECIMIENTO ARMADO fy=4200 kg
12.58
1,053.51
282.78
3.92
3,557.37
4,129.76
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
m3
kg
m2
15.00
1,770.30
210.79
288.67
3.92
42.14
4,330.05
6,939.58
8,882.69
04.04.05
04.04.05.01
04.04.05.02
04.04.05.03
m3
kg
m2
16.13
1,186.17
80.65
282.78
3.92
46.29
4,561.24
4,649.79
3,733.29
04.04.06
04.04.06.01
04.04.06.02
04.04.06.03
04.04.06.04
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
m3
21.61
ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
779.03
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
m2
247.00
LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
u
2,054.00
327.89
3.92
37.51
2.10
7,085.70
3,053.80
9,264.97
4,313.40
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
25.00
25.00
6.00
30.00
10.00
1.33
1.44
119.70
5.47
12.79
33.25
36.00
718.20
164.10
127.90
05.02
05.02.01
05.02.02
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
m3
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
57.60
74.88
25.54
12.79
1,471.10
957.72
05.03
05.03.01
05.03.02
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
8.64
10.50
165.17
23.03
1,427.07
241.82
05
m3
m2
05.04
05.04.01
05.04.02
05.04.03
DESCRIPCION
UND.
CONCRETO ARMADO
CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2
m3
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2kg
METRADO
10.56
50.00
400.00
P. UNIT.
297.52
38.11
3.92
P. PARCIAL
3,141.81
1,905.50
1,568.00
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.02
06.02.01
06.02.02
06
50.00
50.00
38.64
10.00
5.10
5.00
1.33
1.44
20.46
9.39
5.47
12.79
66.50
72.00
790.57
93.90
27.90
63.95
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
m3
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
8.00
6.00
25.54
12.79
204.32
76.74
06.03
06.03.01
06.03.02
06.03.03
CONCRETO SIMPLE
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM m3
9.45
2.50
0.55
23.03
165.17
213.09
217.63
412.93
117.20
06.04
06.04.01
06.04.01.01
06.04.01.02
06.04.01.03
CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m3
kg
m2
1.00
100.00
10.00
411.23
3.92
42.14
411.23
392.00
421.40
06.04.02
06.04.02.01
06.04.02.02
06.04.02.03
VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN VIGAS
m3
kg
m2
0.50
50.00
3.00
411.23
3.92
46.29
205.62
196.00
138.87
06.04.03
06.04.03.01
06.04.03.02
06.04.03.03
06.04.03.04
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
m2
LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
u
1.00
50.00
10.80
90.00
327.89
3.92
37.51
2.10
327.89
196.00
405.11
189.00
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
4,442,643.11
444,264.31
222,132.16
5,109,039.58
919,627.12
6,028,666.70
5,425,800.03
E LA JUVENTUD
E LA JUVENTUD
E LA JUVENTUD
OBRA
UBICACIN DISTRITO
FORMULA
CLIENTE
ITEM
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.02
01.02.01
01.02.02
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
01.04.03.03
01.04.03.02
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.03
02.03.01
02.03.02
02.03.03
UND.
u
m2
m2
m2
m3
m3
m2
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
m2
m3
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON
m3
m2
m2
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.01.03
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.03
03.03.01
03.03.02
03.03.03
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.04
04.04.01
04.04.01.01
CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2(1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m2
VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")kg
ENCOFRADO Y DESENCOFRADO EN VIGAS
m2
ESCALERAS
CONCRETO EN ESCALERAS f'c=210 kg/cm2
m3
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
m2
ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS
kg
REHABILITACION Y MEJORAMIENTO DE MALLA LIMITANTE CON
TRIBUNAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m2
m2
m3
m3
m2
m3
m3
m2
m3
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m3
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo
m2
12 Usos)
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
CONCRETO ARMADO
COLUMNAS F'C=175 KG/cm2 (CONFINAMIENTO)
CONCRETO EN COLUMNAS f'c=175 kg/cm2
m3
04.04.01.02
04.04.01.03
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
04.04.03.04
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.03
05.03.01
05.04
05.04.01
05.04.03
05.04.02
06
06.01
06.01.01
06.01.02
06.01.03
06.02
06.02.01
06.02.02
06.03
06.03.01
06.03.02
06.04
06.04.01
06.04.01.01
06.04.01.02
06.04.01.03
m3
m3
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO ARMADO
CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2
m3
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
m2
ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
CONSTRUCCION DE CASETA PARA BOLETERIA Y REHABILITACION DE
PISO A TRIBUNA PRINCIPAL Y CAMBIADO DE PORTONES PRINCIPALES
OBRAS PROVISIONALES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
DEMOLICION DE PAVIMENTO DE CONCRETO DE 6"
m2
m2
m2
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
m3
CONCRETO SIMPLE
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON
m2
m2
CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2(1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m2
06.04.02
06.04.02.01
06.04.02.02
06.04.02.03
06.04.02.04
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
m3
ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
kg
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
m2
LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
ITEM
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
02.04.02.02 ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
02.04.02.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m3
kg
m2
VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
02.04.03.02 ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
02.04.03.03 ENCOFRADO Y DESENCOFRADO EN VIGAS
m3
kg
m2
GRADERIA
CONCRETO EN GRADERIA f'c=210 kg/cm2
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIA
02.04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIA
m3
m2
kg
02.04.02
02.04.02.01
02.04.03
02.04.03.01
02.04.04
02.04.04.01
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.04.03
03.04.04
04
04.01
04.01.01
04.01.02
04.01.03
m2
m2
m3
m3
m2
m3
m2
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.01.11
04.01.12
04.02
04.02.01
04.02.02
04.02.03
DEMOLICION DE PISO
DEMOLICION CIMIENTO
DEMOLICION SOBRECIMIENTO
DEMOLICION DE COLUMNAS
DEMOLICION DE VIGAS
DEMOLICION DE LOSA MACIZA
DEMOLICION DE VEREDA
DESMONTAJE DE COBERTURAS
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
NIVELACION INTERIOR APISONADO MANUAL
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
VALORIZACION No 02: DEL 01 FEBRERO 2012- AL 29 FEBRERO DEL 2012
Obra
m2
m3
m3
m3
m3
m3
m2
m2
m3
m3
m2
m3
Frmula
Cliente
MEJORAMIENTO DE LA
DISTRITO DE CHONGOY
ESTRUCTURAS
GOBIERNO REGIONAL L
ITEM
DESCRIPCION
UND.
04.03
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m3
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS (Madera Tornillo 12
m2
Usos)
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
04.03.01
04.03.02
04.03.03
04.03.04
CONCRETO ARMADO
ZAPATAS
04.04.01.01 CONCRETO EN ZAPATAS F'C=210 kg/cm2
04.04.01.02 ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2
m3
kg
VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C=210 kg/cm2
04.04.02.02 ACERO ESTRUCTURAL EN VIGAS DE CIMENTACION fy=4200 kg/cm2
04.04.02.03 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION
m3
kg
m2
SOBRECIMIENTO ARMADO
CONCRETO EN SOBRECIMIENTO ARMADO f'c=175 kg/cm2
04.04.03.02 ACERO ESTRUCTURAL EN SOBRECIMIENTO ARMADO fy=4200
m3
kg
m3
kg
m2
m3
kg
m2
04.04
04.04.01
04.04.02
04.04.02.01
04.04.03
04.04.03.01
04.04.04
04.04.04.01
04.04.05
04.04.05.01
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
04.04.06.02 ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
04.04.06.03 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
04.04.06.04 LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
04.04.06
04.04.06.01
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.02
05.02.01
05.02.02
05.03
05.03.01
05.03.02
m3
kg
m2
u
m2
m2
m3
m2
m3
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
m3
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m3
m2
DESCRIPCION
UND.
05.04
CONCRETO ARMADO
CONCRETO EN MUROS REFORZADOS f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS
ACERO ESTRUCTURAL EN MUROS REFORZADO fy=4200 kg/cm2
m3
m2
kg
05.04.01
05.04.02
05.04.03
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
m2
m2
m2
m3
m2
m3
06.02
06.02.01
06.02.02
06.03
06.03.01
06.03.02
06.03.03
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL.
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
m3
CONCRETO SIMPLE
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25% PM
m2
m3
m3
CONCRETO ARMADO
COLUMNAS
06.04.01.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2
06.04.01.02 ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
06.04.01.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m3
kg
m2
VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
06.04.02.02 ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
06.04.02.03 ENCOFRADO Y DESENCOFRADO EN VIGAS
m3
kg
m2
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2
06.04.03.02 ACERO ESTRUCTURAL EN LOSAS fy=4200 kg/cm2 (1/4",3/8",1/2",5/8",3/4")
06.04.03.03 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
06.04.03.04 LADRILLO HUECO DE ARCILLA 15X30X30 cm PARA TECHO ALIGERADO
m3
kg
m2
u
06.04
06.04.01
06.04.02
06.04.02.01
06.04.03
06.04.03.01
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
Costo al 01/07/2011
P.U REAL
METRADO P. UNIT.
P REAL
P. PARCIAL
90%
1.00
986.22
986.22
986.22
2,022.02
1.33
1.39
9.58
158.40
77.22
25.54
12.79
93.44
45.02
13.51
180.08
21.47
165.17
213.09
28.65
105.60
1,005.45
290.65
3.92
17.40
#######
467.00
288.67
3.92
42.14
18.01
816.66
162.07
282.78
3.92
46.29
207.00
1.33
73.92
190.00
35.94
25.54
1.84
12.79
18.00
91.88
81.60
165.17
23.03
21.47
1,819.82
1.20
1.25
8.62
22.99
11.51
19.32
148.65
191.78
25.79
261.59
3.53
259.80
3.53
37.93
254.50
3.53
41.66
1,819.82
1,180.51
1,233.76
8,503.19
3,640.98
888.88
1,805.54
6,692.36
2,590.96
4,643.36
27,623.38
3,547.23
4,520.57
45,317.16
17,711.44
4,583.58
2,881.18
6,752.00
1.20
22.99
1.66
11.51
148.65
20.73
19.32
247.78
1,699.13
314.64
413.71
2,675.75
1,904.40
1,576.76
2,022.02
1,311.67
1,370.85
9,447.99
4,045.54
987.64
SEMANAS ANTERIORES
METRADO
1.00
1.00
986.22
986.22
986.22
158.4
77.22
2,006.16
7,435.95
2,878.85
5,159.29
81.00
30.00
9.07
-
30,692.64
3,941.36
75.00
700.00
5,022.86
50,352.40
19,679.38
12.00
9,600.00
120.00
5,092.87
3,201.31
7,502.22
275.31
207.00
1,887.92
349.60
459.67
73.92
190.00
18.00
2,973.06
2,116.00
1,751.95
7.00
81.60
12.96
1,203.09
69.12
411.23
3.92
42.14
61.00
1,068.67
35.90
311.20
3.92
46.29
35.54
260.66
2,414.00
409.14
64.91
3.96
490.00
490.00
1.33
1.39
88.70
73.92
25.54
12.79
59.19
29.57
196.80
165.17
213.09
28.65
350.00
22.50
1.33
9.39
120.00
350.00
120.00
25.54
1.84
12.79
52.00
12.00
120.00
160.00
165.17
213.09
28.65
23.03
5.50
288.67
370.11
3.53
37.93
280.08
3.53
41.66
368.23
58.42
3.56
4,796.59
4,244.50
2,621.45
17,084.88
3,770.27
1,495.63
13,086.75
15,227.50
8,603.50
1.20
1.25
22.99
11.51
148.65
191.78
25.79
586.53
612.99
2,038.86
850.89
8,798.77
5,670.96
5,074.49
1.20
8.45
22.99
1.66
11.51
148.65
191.78
25.79
20.73
259.80
418.95
190.15
2,758.32
579.60
1,381.32
7,729.96
2,301.37
3,094.20
3,316.32
1,428.92
5,329.54
4,716.11
2,912.72
18,983.20
4,189.19
1,661.81
14,540.84
16,919.44
9,559.44
651.70
681.10
490.00
490.00
2,265.40
945.44
9,776.41
6,301.07
5,638.32
465.50
211.28
3,064.80
644.00
1,534.80
8,588.84
2,557.08
3,438.00
3,684.80
1,587.69
350.00
22.50
36.00
36.00
675.00
36.74
3.92
42.14
12.50
850.00
300.50
282.78
3.92
46.29
22.40
385.00
160.00
1,600.00
327.89
3.92
37.51
2.10
25.00
25.00
1.33
1.39
57.60
74.88
25.54
12.79
8.64
165.17
10.56
50.00
400.00
297.52
38.11
3.92
50.00
50.00
38.64
1.33
1.39
20.46
28.58
37.00
25.54
12.79
7.63
0.32
23.03
21.47
1.00
400.00
40.00
411.23
3.92
42.14
3.53
37.93
254.50
3.53
41.66
295.10
3.53
33.76
1.89
2,381.40
1,393.40
3,181.28
2,998.80
12,519.13
6,610.26
1,358.28
5,401.44
3,024.00
1.20
1.25
22.99
11.51
148.65
267.77
34.30
3.53
29.93
31.28
1,323.99
861.94
1,284.36
2,827.63
1,714.95
1,411.20
1.20
1.25
18.41
22.99
11.51
20.73
19.32
370.11
3.53
37.93
59.85
62.55
711.52
656.94
425.91
158.15
6.18
370.11
1,411.20
1,517.04
2,646.00
1,548.22
3,534.75
3,332.00
13,910.15
7,344.74
1,509.20
6,001.60
3,360.00
33.25
34.75
25.00
25.00
1,471.10
957.72
1,427.07
3,141.81
1,905.50
1,568.00
66.50
69.50
790.57
729.93
473.23
175.72
6.87
411.23
1,568.00
1,685.60
50.00
50.00
38.64
0.82
150.00
38.64
327.89
3.92
37.51
322.00
2.10
295.10
3.53
33.76
241.98
529.20
1,304.45
1.89
608.58
268.87
588.00
1,449.39
676.20
365,498.47
36,549.85
18,274.92
420,323.24
75,658.18
495,981.42
446,383.28
6.00
800.00
44.80
411.23
3.92
42.14
2,467.38
3,136.00
1,887.87
4.50
600.00
36.00
311.20
3.92
46.29
1,400.40
2,352.00
1,666.44
16.00
120.00
1,200.00
409.14
64.91
3.96
6,546.24
7,789.20
4,752.00
490.00
490.00
1.33
1.44
651.70
705.60
67.63
375.79
75.00
40.01
5.37
12.79
2,705.88
2,017.99
959.25
45.00
70.00
25.54
12.79
1,149.30
895.30
52.44
207.45
1,592.60
288.67
28.65
3.92
15,137.85
5,943.44
6,242.99
350.00
280.22
350.00
1.33
9.39
1.44
465.50
2,631.27
504.00
157.33
53.17
11.71
2.50
3.22
11.31
18.24
119.30
300.00
20.46
119.70
119.70
119.70
119.70
119.70
20.46
5.47
12.79
3,218.97
6,364.45
1,401.69
299.25
385.43
1,353.81
373.19
652.57
3,837.00
80.00
120.00
80.00
25.54
1.84
12.79
2,043.20
220.80
1,023.20
P. PARCIAL
44.56
12.00
149.10
241.80
165.17
213.09
28.65
23.03
7,359.98
2,557.08
4,271.72
5,568.65
2.16
50.40
305.10
3.92
659.02
197.57
0.57
39.20
15.00
305.10
3.92
46.29
173.91
153.66
694.35
12.58
1,053.51
282.78
3.92
3,557.37
4,129.76
15.00
1,770.30
210.79
288.67
3.92
42.14
4,330.05
6,939.58
8,882.69
16.13
1,186.17
80.65
282.78
3.92
46.29
4,561.24
4,649.79
3,733.29
21.61
779.03
247.00
2,054.00
327.89
3.92
37.51
2.10
7,085.70
3,053.80
9,264.97
4,313.40
25.00
25.00
6.00
30.00
10.00
1.33
1.44
119.70
5.47
12.79
33.25
36.00
718.20
164.10
127.90
57.60
74.88
25.54
12.79
1,471.10
957.72
8.64
10.50
165.17
23.03
1,427.07
241.82
P. PARCIAL
10.56
50.00
400.00
297.52
38.11
3.92
3,141.81
1,905.50
1,568.00
50.00
50.00
38.64
10.00
5.10
5.00
1.33
1.44
20.46
9.39
5.47
12.79
66.50
72.00
790.57
93.90
27.90
63.95
8.00
6.00
25.54
12.79
204.32
76.74
9.45
2.50
0.55
23.03
165.17
213.09
217.63
412.93
117.20
1.00
100.00
10.00
411.23
3.92
42.14
411.23
392.00
421.40
0.50
50.00
3.00
411.23
3.92
46.29
205.62
196.00
138.87
1.00
50.00
10.80
90.00
327.89
3.92
37.51
2.10
327.89
196.00
405.11
189.00
2,420,305.78
242,030.58
121,015.29
2,783,351.64
501,003.30
3,284,354.94
2,955,919.44
SEMANAS ANTERIORES
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16
PARCIAL % AVANCEMETRADO
PARCIAL % AVANCEMETRADO
1,819.82
1,180.51
1,233.76
8,503.19
1.00
1.00
1.00
1.00
3,640.98
888.88
1.00
1.00
1,565.16
4,459.59
1,739.45
-
0.87
0.67
0.67
-
12.44
11.55
3.50
150.00
240.38
1,716.94
671.23
3,867.75
0.13
0.26
0.26
0.83
19,618.88
2,469.60
0.71
0.70
20.00
305.45
5,231.70
1,077.63
0.19
0.30
3,117.64
33,868.80
4,551.12
0.69
0.75
0.26
2.00
2,500.00
260.00
519.61
8,820.00
9,860.76
0.11
0.19
0.56
247.78
1.00
1,699.13
314.64
207.20
1.00
1.00
0.50
1,040.57
1,576.76
0.39
1.00
3.00
445.96
-
0.17
-
586.53
612.99
7.00
1,203.09
38.00
1.00
1.00
418.95
190.15
1.00
1.00
827.50
414.40
0.30
0.30
45.00
2,590.75
4,244.50
1,441.19
1,034.37
-
0.54
1.00
0.55
0.51
-
50.00
1,149.30
-
0.42
-
26.00
3.60
50.00
3,864.98
690.41
1,289.25
-
0.50
0.30
0.42
-
29.93
31.28
1.00
1.00
340.00
1,199.52
-
0.50
-
59.85
62.55
711.52
1.00
1.00
1.00
97,689.07
9,768.91
4,884.45
112,342.43
20,221.64
132,564.07
119,307.66
49,956.22
4,995.62
2,497.81
57,449.66
10,340.94
67,790.60
61,011.54
ESTADIO DE LA JUVENTUD
ESTADIO DE LA JUVENTUD
ESTADIO DE LA JUVENTUD
1.00
1,819.82
-
1.00
-
986.22
986.22
986.22
1,311.67
1,370.85
9,447.99
158.40
77.22
4,045.54
987.64
93.44
45.02
13.51
180.08
2,006.16
7,435.95
2,878.85
5,159.29
105.60
1,005.45
#######
3,941.36
17.40
#######
467.00
5,022.86
#######
#######
18.01
816.66
162.07
5,092.87
3,201.31
7,502.22
207.00
275.31
73.92
190.00
35.94
1,887.92
349.60
459.67
18.00
91.88
81.60
2,973.06
2,116.00
1,751.95
12.96
1,203.09
69.12
5,329.54
4,716.11
2,912.72
61.00
1,068.67
35.90
#######
4,189.19
1,661.81
35.54
260.66
2,414.00
#######
#######
9,559.44
490.00
490.00
651.70
681.10
88.70
73.92
2,265.40
945.44
59.19
29.57
196.80
9,776.41
6,301.07
5,638.32
350.00
22.50
465.50
211.28
120.00
350.00
120.00
3,064.80
644.00
1,534.80
52.00
12.00
120.00
160.00
8,588.84
2,557.08
3,438.00
3,684.80
5.50
1,587.69
675.00
36.74
2,646.00
1,548.22
12.50
850.00
300.50
3,534.75
3,332.00
#######
22.40
385.00
160.00
1,600.00
7,344.74
1,509.20
6,001.60
3,360.00
25.00
25.00
33.25
34.75
57.60
74.88
1,471.10
957.72
8.64
1,427.07
10.56
50.00
400.00
3,141.81
1,905.50
1,568.00
50.00
50.00
38.64
66.50
69.50
790.57
28.58
37.00
729.93
473.23
7.63
0.32
175.72
6.87
1.00
400.00
40.00
411.23
1,568.00
1,685.60
0.82
150.00
38.64
268.87
588.00
1,449.39
322.00
676.20
AVANCE SEMANAL
ITEM
OBRA
UBICACIN
FORMULA
CLIENTE
DESCRIPCION
UND. METRADO
P. UNIT.
P.U REAL
P REAL
P. PARCIAL
90%
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.02
01.02.01
01.02.02
01.02
01.02.01
01.02.02
01.03.03
01.03
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.03
01.05.03.01
01.05.03.02
01.05.03.03
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.03
02.03.01
02.03.02
SEMANAS ANTERIORES
SEMANA 2 (02 Abr al 09 Abr.) SEMANA 3 ( 09 Abr al 16 A
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO
u
m2
m2
m2
m3
1.00
332.61
221.74
986.22
164
2,038.52
1.33
1.44
9.58
30.7
1,834.67
1.20
1.30
8.62
27.63
1,834.67
398.13
287.38
8,503.19
4,531.32
2,038.52
442.37
319.31
9,447.99
5,034.80
1.00
332.61
221.74
986.22
164.00
1,834.67
398.13
287.38
8,503.19
4,531.32
1.00
1.00
1.00
1.00
1.00
OBRAS PROVISIONALES
CERCO PERIMETRICO PROVISIONAL DE OBRA
ALMACEN,OFICINA Y CASETA DE GUARDIANIA
m
glb
241.74
1.00
8.00
2,500.00
7.20
2,250.00
1,740.53
2,250.00
1,933.92
2,500.00
241.74
1.00
1,740.53
2,250.00
1.00
1.00
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA TERRENO GRAVO-ARENOSO
m3
158.40
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
138.23
ELIMINACION DE MATERIAL DE DEMOLICION (D=5 KM) m3
715.08
25.54
12.79
12.79
22.99
11.51
11.51
3,640.98
1,591.17
8,231.29
4,045.54
1,767.96
9,145.87
158.40
138.23
715.08
3,640.98
1,591.17
8,231.29
1.00
1.00
1.00
19.32
148.65
191.78
25.79
25.79
1,352.61
9,888.40
2,320.55
4,160.67
6,861.13
1,502.90
10,987.11
2,578.39
4,622.96
7,623.48
26.64
54.97
9.07
127.64
219.89
514.76
8,171.46
1,739.45
3,291.20
5,669.86
0.38
0.83
0.75
0.79
0.83
43.36
11.55
m3
kg
30.00
800.00
290.65
3.92
261.59
3.53
7,847.55
2,822.40
8,719.50
3,136.00
11.94
308.45
3,123.32
1,088.21
m3
kg
m2
19.03
2,249.04
313.00
288.67
3.92
42.14
259.80
3.53
37.93
4,944.05
7,934.61
11,870.84
5,493.39
8,816.24
13,189.82
7.60
2,249.04
93.10
1,974.50
7,934.61
3,530.91
m3
kg
m2
15.00
857.65
140.00
282.78
3.92
46.29
254.50
3.53
41.66
3,817.53
3,025.79
5,832.54
4,241.70
3,361.99
6,480.60
m2
207.00
1.33
1.20
247.78
275.31
207.00
247.78
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO
m3NORMAL.
35.00
NIVELACION INTERIOR APISONADO MANUAL
m2
60.00
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
30.00
25.54
1.84
12.79
22.99
1.66
11.51
804.51
99.36
345.33
893.90
110.40
383.70
35.00
60.00
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
18.00
SOLADOS PARA ZAPATAS DE 2" MEZCLA 1:12 CEMENTO -HORMIGON
m2
20.00
165.17
21.47
148.65
19.32
2,675.75
386.46
2,973.06
429.40
5.95
20.00
46.20
837.85
1,716.94
1,191.27
0.62
0.17
0.17
0.40
0.39
18.06
491.55
4,724.23
1,734.19
0.60
0.61
0.40
1.00
0.30
2.15
558.58
2,578.21
0.11
0.22
67.98
1.00
804.51
99.36
-
1.00
1.00
-
884.49
386.46
0.33
1.00
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=210 kg/cm2
ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2
m3
kg
12.00
288.04
305.10
3.92
274.59
3.53
3,295.08
1,016.21
3,661.20
1,129.12
12.00
288.04
3,295.08
1,016.21
1.00
1.00
COLUMNAS
CONCRETO EN COLUMNAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN COLUMNAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
m3
kg
m2
6.00
800.00
44.80
411.23
3.92
42.14
370.11
3.53
37.93
2,220.64
2,822.40
1,699.08
2,467.38
3,136.00
1,887.87
1.50
462.40
22.40
555.16
1,631.35
849.54
0.25
0.58
0.50
337.60
1,191.05
-
0.42
-
AVANCE SEMANAL
OBRA
UBICACIN
FORMULA
ESTRUCTURAS
CLIENTE
ITEM
DESCRIPCION
UND. METRADO
P. UNIT.
P.U REAL
P REAL
P. PARCIAL
90%
02.04.03
VIGAS
CONCRETO EN VIGAS f'c=210 kg/cm2
ACERO ESTRUCTURAL EN VIGAS fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO EN VIGAS
1,666.44
5,891.62
7,010.28
6,546.24
7,789.20
3.56
4,276.80
4,752.00
1.20
1.30
586.53
635.04
651.70
705.60
490.00
490.00
586.53
635.04
1.00
1.00
36.01
4.83
11.51
2,435.29
1,816.19
863.33
2,705.88
2,017.99
959.25
67.63
375.79
75.00
2,435.29
1,816.19
863.33
1.00
1.00
1.00
22.99
11.51
1,034.37
805.77
1,149.30
895.30
259.80
25.79
3.53
13,624.07
5,349.10
5,618.69
15,137.85
5,943.44
6,242.99
1.20
8.45
1.30
18.41
107.73
107.73
418.95
2,368.14
453.60
2,897.07
5,728.00
1,261.52
465.50
2,631.27
504.00
3,218.97
6,364.45
1,401.69
m3
kg
m2
4.50
600.00
36.00
311.20
3.92
46.29
280.08
3.53
1,260.36
2,116.80
1,400.40
2,352.00
41.66
1,499.80
GRADERIA
CONCRETO EN GRADERIA f'c=210 kg/cm2
m3
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIA m2
02.04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIA
kg
16.00
120.00
409.14
64.91
368.23
58.42
1,200.00
3.96
490.00
490.00
1.33
1.44
02.04.03.01
02.04.03.02
02.04.03.03
SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO
02.04.04
02.04.04.01
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.02
03.02.01
03.02.02
03.04
03.04.01
03.04.02
03.04.03
03.04.04
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
m2
m2
25.54
12.79
350.00
280.22
350.00
157.33
53.17
11.71
418.95
2,368.14
453.60
2,897.07
5,728.00
1,261.52
1.00
1.00
1.00
1.00
1.00
1.00
14.50
333.30
-
0.32
-
04.01.11
DEMOLICION DE COLUMNAS
DEMOLICION DE VIGAS
DEMOLICION DE LOSA MACIZA
DEMOLICION DE VEREDA
DESMONTAJE DE COBERTURAS
2.50
3.22
11.31
18.24
119.30
119.70
119.70
119.70
20.46
5.47
107.73
107.73
107.73
18.41
4.92
269.33
346.89
1,218.43
335.87
587.31
299.25
385.43
1,353.81
373.19
652.57
2.50
3.22
11.31
18.24
119.30
269.33
346.89
1,218.43
335.87
587.31
1.00
1.00
1.00
1.00
1.00
04.01.12
12.79
11.51
3,453.30
3,837.00
300.00
3,453.30
1.00
04.02
MOVIMIENTO DE TIERRAS
EXCAVACION DE PARA CIMIENTOS HASTA 1.00 M TERRENO
m3NORMAL.
80.00
NIVELACION INTERIOR APISONADO MANUAL
m2
120.00
ELIMINACION DE MATERIAL EXCEDENTE (D=5 KM)
m3
80.00
25.54
1.84
12.79
22.99
1.66
11.51
1,838.88
198.72
920.88
2,043.20
220.80
1,023.20
55.89
1,284.69
-
0.70
-
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
m3
44.56
165.17
CONCRETO EN SOBRECIMIENTOS MEZCLA 1:8 C - H,+25%m3
PM
12.00
213.09
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSm2
(Madera149.10
Tornillo 12 Usos)
28.65
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
m2
241.80
23.03
148.65
191.78
25.79
20.73
6,623.98
2,301.37
3,844.54
5,011.79
7,359.98
2,557.08
4,271.72
5,568.65
26.65
3,961.60
-
0.60
-
CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F'C=210 kg/cm2
ACERO ESTRUCTURAL EN ZAPATAS fy=4200 kg/cm2
274.59
3.53
593.11
177.81
659.02
197.57
04.01.07
04.01.08
04.01.09
04.01.10
04.02.01
04.02.02
04.02.03
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.04
04.04.01
04.04.01.01
04.04.01.02
m3
m3
m3
m2
m2
m3
kg
2.16
50.40
305.10
3.92
11.25
6.35
82.17
1,672.35
1,217.81
2,118.75
-
0.25
0.53
0.55
-
2.16
50.40
593.11
177.81
1.00
1.00
AVANCE SEMANAL
OBRA
UBICACIN
FORMULA
ESTRUCTURAS
CLIENTE
ITEM
DESCRIPCION
UND. METRADO
P. UNIT.
P.U REAL
P REAL
P. PARCIAL
90%
04.04.02
VIGAS DE CIMENTACION
04.04.02.01
0.57
305.10
274.59
156.52
173.91
04.04.02.02
3.92
3.53
138.30
153.66
04.04.02.03
15.00
46.29
41.66
-
624.92
694.35
04.04.03
SOBRECIMIENTO ARMADO
04.04.03.01
12.58
282.78
254.50
3,201.64
3,557.37
04.04.03.02
1,053.51
3.92
3.53
3,716.78
4,129.76
04.04.04
04.04.04.01
m3
15.00
288.67
259.80
3,897.05
4,330.05
04.04.04.02
kg
1,770.30
3.92
3.53
6,245.62
6,939.58
04.04.04.03
m2
210.79
42.14
37.93
7,994.42
8,882.69
m3
SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO
-
0.52
39.20
14.00
142.79
138.30
583.25
0.91
1.00
0.93
3.33
508.00
847.49
1,792.22
0.26
0.48
7.09
824.60
97.07
1,842.00
2,909.19
3,681.48
0.47
0.47
0.46
04.04.05
04.04.05.01
m3
16.13
282.78
254.50
4,105.12
4,561.24
04.04.05.02
kg
1,186.17
3.92
3.53
4,184.81
4,649.79
04.04.05.03
m2
80.65
46.29
41.66
3,359.96
3,733.29
04.04.06
LOSAS ALIGERADAS
04.04.06.01
21.61
327.89
295.10
6,377.13
7,085.70
04.04.06.02
3.92
3.53
2,748.42
3,053.80
04.04.06.03
37.51
33.76
8,338.47
9,264.97
m3
m2
247.00
04.04.06.04
05
05.01
OBRAS PROVISIONALES
05.01.01
m2
05.01.02
TRAZO Y REPLANTEO
m2
05.01.03
05.01.04
DESMONTAJE DE COBERTURAS
05.01.05
m3
ELIMINACION DE DEMOLICION Y DESMONTAJE DE COBERTURAS
05.02
m2
2.10
1.89
3,882.06
4,313.40
25.00
1.33
1.20
29.93
33.25
25.00
1.44
1.30
32.40
36.00
6.00
119.70
107.73
646.38
718.20
30.00
5.47
4.92
147.69
164.10
10.00
12.79
11.51
115.11
127.90
25.54
22.99
1,323.99
1,471.10
05.02.02
74.88
12.79
11.51
861.94
957.72
m3
8.64
165.17
148.65
1,284.36
1,427.07
m2
10.50
23.03
20.73
217.63
241.82
10.56
297.52
267.77
2,827.63
3,141.81
05.04.03
50.00
38.11
34.30
1,714.95
1,905.50
05.04.02
1,411.20
1,568.00
05.03.01
05.03.02
05.04
05.04.01
29.93
32.40
646.38
147.69
115.11
1.00
1.00
1.00
1.00
1.00
50.00
50.00
38.64
10.00
5.10
5.00
59.85
64.80
711.52
84.51
25.11
57.56
1.00
1.00
1.00
1.00
1.00
1.00
8.00
6.00
183.89
69.07
1.00
1.00
25.00
25.00
6.00
30.00
10.00
MOVIMIENTO DE TIERRAS
05.02.01
05.03
m3
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 C-H,+ 30% PG
FALSO PISO DE 4" C-H 1:8 (Incluye Juntas de Dilatacion)
CONCRETO ARMADO
06
06.01
OBRAS PROVISIONALES
06.01.01
m2
50.00
1.33
1.20
59.85
66.50
06.01.02
TRAZO Y REPLANTEO
m2
50.00
1.44
1.30
64.80
72.00
06.01.03
m2
38.64
20.46
18.41
711.52
790.57
06.01.04
DEMOLICION DE ALBAILERIA
m3
10.00
9.39
8.45
84.51
93.90
06.01.05
DESMONTAJE DE COBERTURAS
m2
5.10
5.47
4.92
25.11
27.90
06.01.06
5.00
12.79
11.51
57.56
63.95
06.02
MOVIMIENTO DE TIERRAS
06.02.01
25.54
22.99
183.89
204.32
06.02.02
12.79
11.51
69.07
76.74
m3
6.00
AVANCE SEMANAL
OBRA
UBICACIN
FORMULA
ESTRUCTURAS
CLIENTE
DESCRIPCION
ITEM
UND. METRADO
P. UNIT.
P.U REAL
P REAL
90%
06.03
CONCRETO SIMPLE
P. PARCIAL
Costo al 01/07/2011
SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO
06.03.01
m2
9.45
23.03
20.73
195.87
217.63
06.03.02
m3
2.50
165.17
148.65
371.63
412.93
06.03.03
0.55
213.09
191.78
105.48
117.20
06.04
CONCRETO ARMADO
06.04.01
COLUMNAS
06.04.01.01
m3
1.00
411.23
370.11
370.11
411.23
06.04.01.02
kg
100.00
3.92
3.53
352.80
392.00
06.04.01.03
m2
10.00
42.14
37.93
379.26
421.40
06.04.02
VIGAS
06.04.02.01
m3
0.50
411.23
370.11
185.05
205.62
06.04.02.02
kg
50.00
3.92
3.53
176.40
196.00
06.04.02.03
m2
3.00
46.29
41.66
124.98
138.87
06.04.03
LOSAS ALIGERADAS
06.04.03.01
m3
1.00
327.89
295.10
295.10
327.89
06.04.03.02
3.92
3.53
176.40
196.00
06.04.03.03
10.80
37.51
33.76
364.60
405.11
06.04.03.04
2.10
1.89
170.10
189.00
291,081.95
323,424.38
29,108.19
32,342.44
m2
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
14,554.10
16,171.22
334,744.24
371,938.04
60,253.96
66,948.85
394,998.20
438,886.89
355,498.38
394,998.20
112,965.75
11,296.58
5,648.29
129,910.62
23,383.91
153,294.53
137,965.07
32,582.16
3,258.22
1,629.11
37,469.49
6,744.51
44,213.99
39,792.59
AVANCE SEMANAL
OBRA
UBICACIN
FORMULA
ESTRUCTURAS
CLIENTE
ITEM
DESCRIPCION
UND. METRADO
P. UNIT.
P. PARCIAL
SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO
01
01.01
CERCO PERIMETRICO
MUROS Y TABIQUES DE ALBAILERIA
205.00
8,050.35
0.21
600.00
23,562.00
0.61
m2
986.22
39.27
38,728.86
m2
213.66
28.16
6,016.67
01.03.01
m2 MADERA
COBERTURA CON CALAMINA GALVANIZADA Y VIGAS DE
16.30
98.64
1,607.83
01.03.02
m2
COBERTURA CON CALAMINA GALVANIZADA EN TRIBUNAS
490.00
15.00
7,350.00
01.03.03
m TRIBUNAS
TIJERALES Y VIGAS METALICAS PARA COBERTURAS DE
485.00
01.01.01
01.02
01.02.01
01.03
01.03.04
02
02.01
02.01.01
02.01.02
03
03.01
03.01.01
03.02
u
COLOCACION DE DE TUBERIAS DE FIERRO GALVANIZADO
m2
03.04.01
03.04.02
03.05
03.05.01
03.06
03.06.01
03.07
03.07.01
03.08
51.47
12,610.15
615.00
10.44
6,420.60
18,886.00
m2 KK AMARRE
MURO SOGA 1 CARAVISTA LADRILLO SILICO-CALCAREO
350.00 CON 53.96
CEMENTO-CAL-ARENA
40.00
16.77
670.80
160.00
25.10
4,016.00
18.13
1,051.54
m2
m2
TARRAJEO INTERIOR DE TUNEL CON IMPERMEABILIZANTE
03.04
245.00
70.00
3,777.20
0.20
REVOQUES ENLUCIDOS
TARRAJEO RAYADO O PRIMARIO
03.03.01
2,422.44
ALBAILERIA
03.02.02
03.03
48,883.15
67.29
CERCO PERIMETRICO
03.02.01
03.02.03
100.79
36.00
CIELO RASO
CIELO RASO CON MEZCLA DE C:A
m2
160.00
22.88
3,660.80
m2
m2
160.00
160.00
22.51
49.02
3,601.60
7,843.20
m2
29.80
49.27
1,468.25
7,558.59
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 mm
PISO CERAMICO(CERAMICA DE 3030 MEZCLA 1:4)
ZOCALOS Y CONTRAZOCALOS
ZOCALO CERAMICA COLOR DE 30X30 cm DE 1RA
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mmm2
INCLUYE 39.00
MARCO CEDRO
193.81 2"X3"
CARPINTERIA METALICA
PUERTA METALICA
6.00
486.48
2,918.88
CERRAJERIA
03.08.01
pza
18.00
12.12
218.16
03.08.02
pza
21.00
9.17
192.57
pza
2.00
80.45
160.90
p2
50.00
5.00
250.00
03.08.03
03.09
03.09.01
03.10
03.10.01
m2
160.00
5.53
884.80
03.10.02
m2
SC PINTURA VINILICA EN MUROS INTERIORES 2 MANOS
144.00
5.23
753.12
03.10.03
144.00
8.73
1,257.12
03.10.04
m2
12.00
14.15
169.80
03.10.05
m2
8.00
11.11
88.88
04
04.01
170.00
22.02
3,743.40
04.02.01
m2
COBERTURA CON POLICARBONATO ALBEOLAR TRANSPARENTE
50.00
04.02.02
LIMPIEZA DE MALEZA
1.00
1.00
1.00
04.01.01
04.02
m2
COBERTURAS
m2
166.98
8,349.00
8,056.00
0.35
2,819.60
05
05.01
TRABAJOS PRELIMINARES
LIMPIEZA DE MALEZA
8,056.00
0.35
2,819.60
05.01.02
TRAZO Y REPLANTEO
m2
8,056.00
1.39
11,197.84
05.01.03
APLICACION DE HERBICIDA
m2
10,000.00
0.09
900.00
05.01.01
8,056.00
8,056.00
#######
2,819.60
11,197.84
900.00
AVANCE SEMANAL
OBRA
UBICACIN
FORMULA
ESTRUCTURAS
CLIENTE
05.02
DESCRIPCION
ITEM
UND. METRADO
P. UNIT.
P. PARCIAL
05.02.01
PREPARACION DE TERRENO
m2
8,056.00
0.74
5,961.44
05.02.02
FERTILIZANTE BASE
m2
8,056.00
0.16
1,288.96
05.02.03
DESTERRONADO
m2
8,056.00
0.53
4,269.68
05.02.04
m2
8,056.00
0.15
1,208.40
05.02.05
NIVELACION FINA
m2
8,056.00
1.55
12,486.80
05.03
05.03.01
kg
100.00
119.86
11,986.00
05.03.02
m2
8,056.00
0.14
1,127.84
05.04
MANTENIMIENTO
05.04.01
FERTILIZANTES
glb
1.00
4,000.00
4,000.00
05.04.02
INSECTICIDAS Y FUNGICIDAS
glb
1.00
1,500.00
1,500.00
05.04.03
ADITIVOS
glb
1.00
1,680.00
1,680.00
05.04.04
FERTILIZANTES FOLIARES
glb
1.00
1,000.00
1,000.00
05.04.05
HERBICIDAS
glb
1.00
1,200.00
1,200.00
05.04.06
GASOLINA Y LUBRICANTES
glb
1.00
1,080.00
1,080.00
05.04.07
DESHIERBADO MANUAL
glb
1.00
2,481.00
2,481.00
06
06.01
SEMANAS ANTERIORES
SEMANA 1 (26 Mar al 02 Abr) SEMANA 2 (02 Abr al 09 Ab
METRADO PARCIAL % AVANCE
METRADO PARCIAL % AVANCEMETRADO
06.01.01
MOVIMIENTOS DE TIERRA
glb
1.00
9,150.00
9,150.00
06.01.02
glb
1.00
13,088.34
13,088.34
06.01.03
glb
SUMINISTRO E INSTALACION DE ASPERSORES (ROTORES)
1.00
11,431.16
11,431.16
06.01.04
glb
1.00
3,075.60
3,075.60
06.01.05
glb
SUMINISTRO E INSTALACION DE CABEZAL DE BOMBEO
1.00
7,836.30
7,836.30
06.01.06
PRUEBA HIDRAULICA
glb
1.00
285.59
285.59
07
07.01
OTROS
07.01.01
2.00
2,098.25
4,196.50
07.01.02
m2
2,200.00
7.36
16,192.00
250.00
22.35
5,587.50
1.00
13,000.00
13,000.00
07.01.03
07.02
07.02.01
m2
MEJORAMIENTO DE VEREDAS Y PASADIZOS DE TRIBUNAS
IMPACTO AMBIENTAL
IMPACTO AMBIENTAL
glb
COSTO DIRECTO
22,967.79
2,296.78
1,148.39
26,412.96
4,754.33
31,167.29
28,050.56
344,633.26
GASTOS GENERALES(10.0%)
34,463.33
UTILIDAD (5%)
17,231.66
SUBTOTAL
396,328.25
71,339.08
TOTAL PRESUPUESTO
467,667.33
420,900.60
OBRA
UBICACIN
FORMULA
INSTALACIONES ELECTRICAS
CLIENTE
ITEM
DESCRIPCION
UND. METRADO
P. UNIT.
P. PARCIAL
METRADO
01
VALORIZACION ANTERIOR
PARCIAL % AVANCE
INSTALACIONES ELECTRICAS
01.01
738.96
01.02
61.30
183.90
01.03
pto
26.00
44.73
1,162.98
01.04
1.00
23.92
23.92
01.05
1.00
380.03
380.03
COSTO DIRECTO
2,489.79
GASTOS GENERALES(10.0%)
248.98
UTILIDAD (5%)
124.49
SUBTOTAL
2,863.26
515.39
TOTAL PRESUPUESTO
3,378.65
3,040.78
OBRA
UBICACIN
FORMULA
INSTALACIONES SANITARIAS
CLIENTE
DESCRIPCION
ITEM
UND. METRADO
P. UNIT.
P. PARCIAL
METRADO
01
01.01
INSTALACIONES SANITARIAS
APARATOS SANITARIOS
01.01.01
15.00
219.88
3,298.20
01.01.02
15.00
304.23
4,563.45
01.01.03
01.01.04
01.02
pza
15.00
41.42
SISTEMA DE DESAGUE
1,127.85
621.30
pto
9.00
47.70
429.30
01.02.02
pto
9.00
30.29
272.61
01.02.03
292.14
pto
9.00
32.46
01.02.04
12.00
7.61
91.32
01.02.05
18.90
10.87
205.44
75.88
01.02.06
pza
4.00
18.97
01.02.07
pza
1.00
18.61
18.61
01.02.08
5.00
104.50
522.50
01.02.09
1.00
88.60
88.60
01.02.10
599.10
pza
glb
1.00
1,355.93
1,355.93
01.03.01
28.00
27.96
782.88
01.03.02
56.00
8.10
453.60
01.03.03
250.00
7.22
1,805.00
01.03.04
58.89
294.45
01.03.05
93.84
469.20
01.03.06
pza
2.00
36.60
73.20
01.03.07
pza
2.00
621.01
1,242.02
01.03.08
2.00
288.80
577.60
01.03.09
1.00
3,345.20
3,345.20
01.03.10
1.00
725.80
725.80
01.03
3,951.43
01.02.01
01.02.11
VALORIZACION ANTERIOR
PARCIAL % AVANCE
COSTO DIRECTO
GASTOS GENERALES(10.0%)
glb
27,282.61
2,728.26
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
1,364.13
31,375.00
5,647.50
37,022.50
33,320.25
Frmula
ESTRUCTURAS
Cliente
ITEM
Costo al 01/07/2011
DESCRIPCION
UND. METRADO
P. UNIT.
P. PARCIAL
METRADO
VALORIZACION ANTERIOR
PARCIAL % AVANCE
02.04.02
COLUMNAS
02.04.02.01
m3
6.00
411.23
2,467.38
02.04.02.02
kg
800.00
3.92
3,136.00
02.04.02.03
m2
44.80
42.14
1,887.87
02.04.03
VIGAS
02.04.03.01
m3
4.50
311.20
1,400.40
02.04.03.02
kg
600.00
3.92
2,352.00
02.04.03.03
m2
36.00
46.29
1,666.44
02.04.04
GRADERIA
02.04.04.01
m3
16.00
409.14
6,546.24
02.04.04.02
120.00
64.91
7,789.20
02.04.04.03
kg
1,200.00
3.96
4,752.00
03.01
03.01.01
m2
490.00
1.33
651.70
03.01.02
TRAZO Y REPLANTEO
m2
490.00
1.44
705.60
03.02
03.02.01
2,705.88
03.02.02
375.79
5.37
2,017.99
03.02.03
12.79
959.25
03.03
MOVIMIENTO DE TIERRAS
03.03.01
45.00
25.54
1,149.30
03.03.02
m3
70.00
12.79
895.30
03.04
03.04.01
CIMIENTO ARMADO
03.04.02
m3
52.44
288.67
15,137.85
03.04.03
5,943.44
03.04.04
6,242.99
03
m2
1,592.60
3.92
04.01
04.01.01
m2
350.00
1.33
465.50
04.01.02
DEMOLICION DE ALBAILERIA
m3
280.22
9.39
2,631.27
04.01.03
TRAZO Y REPLANTEO
m2
350.00
1.44
504.00
04.01.04
DEMOLICION DE PISO
m2
157.33
20.46
3,218.97
04.01.05
DEMOLICION CIMIENTO
m3
53.17
119.70
6,364.45
04.01.06
DEMOLICION SOBRECIMIENTO
m3
11.71
119.70
1,401.69
04.01.07
DEMOLICION DE COLUMNAS
m3
2.50
119.70
299.25
04.01.08
DEMOLICION DE VIGAS
m3
3.22
119.70
385.43
04.01.09
m3
11.31
119.70
1,353.81
04
04.01.10
DEMOLICION DE VEREDA
m2
18.24
20.46
373.19
04.01.11
DESMONTAJE DE COBERTURAS
m2
119.30
5.47
652.57
04.01.12
12.79
3,837.00
04.02
MOVIMIENTO DE TIERRAS
04.02.01
25.54
2,043.20
04.02.02
m2
120.00
1.84
220.80
04.02.03
m3
80.00
12.79
1,023.20
Frmula
ESTRUCTURAS
Cliente
DESCRIPCION
ITEM
Costo al 01/07/2011
P. UNIT.
P. PARCIAL
METRADO
04.03
CONCRETO SIMPLE
04.03.01
04.03.02
m3
44.56
165.17
7,359.98
12.00
213.09
2,557.08
04.03.03
4,271.72
04.03.04
04.04
CONCRETO ARMADO
04.04.01
ZAPATAS
04.04.01.01
04.04.01.02
04.04.02
VIGAS DE CIMENTACION
04.04.02.01
04.04.02.02
04.04.02.03
04.04.03
SOBRECIMIENTO ARMADO
04.04.03.01
04.04.03.02
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.05
04.04.05.01
241.80
23.03
5,568.65
m3
2.16
305.10
659.02
kg
50.40
3.92
197.57
m3
0.57
305.10
173.91
3.92
153.66
15.00
46.29
694.35
m2
12.58
282.78
3,557.37
1,053.51
3.92
4,129.76
m3
15.00
288.67
4,330.05
kg
1,770.30
3.92
6,939.58
m2
210.79
42.14
8,882.69
m3
16.13
282.78
4,561.24
kg
m2
1,186.17
80.65
3.92
46.29
4,649.79
3,733.29
m3
04.04.06
LOSAS ALIGERADAS
04.04.06.01
21.61
327.89
7,085.70
04.04.06.02
3.92
3,053.80
VALORIZACION ANTERIOR
PARCIAL % AVANCE
04.04.06.03
247.00
37.51
9,264.97
04.04.06.04
2.10
4,313.40
05
05.01
OBRAS PROVISIONALES
05.01.01
m2
25.00
1.33
33.25
05.01.02
TRAZO Y REPLANTEO
m2
25.00
1.44
36.00
05.01.03
05.01.04
DESMONTAJE DE COBERTURAS
05.01.05
m2
6.00
119.70
718.20
30.00
5.47
164.10
10.00
12.79
127.90
05.02
MOVIMIENTO DE TIERRAS
05.02.01
25.54
1,471.10
05.02.02
74.88
12.79
957.72
05.03
CONCRETO SIMPLE
05.03.01
m3
8.64
165.17
1,427.07
05.03.02
m2
10.50
23.03
241.82
m2
m3
Frmula
ESTRUCTURAS
Cliente
ITEM
Costo al 01/07/2011
DESCRIPCION
UND. METRADO
P. UNIT.
P. PARCIAL
METRADO
05.04
CONCRETO ARMADO
05.04.01
m3
10.56
297.52
3,141.81
05.04.02
50.00
38.11
1,905.50
05.04.03
400.00
3.92
1,568.00
06
06.01
OBRAS PROVISIONALES
06.01.01
m2
50.00
1.33
66.50
06.01.02
TRAZO Y REPLANTEO
m2
50.00
1.44
72.00
06.01.03
m2
38.64
20.46
790.57
06.01.04
DEMOLICION DE ALBAILERIA
m3
10.00
9.39
93.90
06.01.05
DESMONTAJE DE COBERTURAS
m2
5.10
5.47
27.90
06.01.06
5.00
12.79
63.95
VALORIZACION ANTERIOR
PARCIAL % AVANCE
06.02
MOVIMIENTO DE TIERRAS
06.02.01
25.54
204.32
06.02.02
6.00
12.79
76.74
06.03
CONCRETO SIMPLE
06.03.01
9.45
2.50
0.55
23.03
165.17
213.09
217.63
412.93
06.03.03
06.04
CONCRETO ARMADO
06.04.01
COLUMNAS
06.04.01.01
m3
1.00
411.23
411.23
06.04.01.02
kg
100.00
3.92
392.00
06.04.01.03
m2
10.00
42.14
421.40
06.04.02
VIGAS
06.04.02.01
m3
0.50
411.23
205.62
06.04.02.02
kg
50.00
3.92
196.00
06.04.02.03
m2
3.00
46.29
138.87
06.04.03
LOSAS ALIGERADAS
06.04.03.01
m3
1.00
327.89
327.89
06.04.03.02
3.92
196.00
06.04.03.03
10.80
37.51
405.11
06.04.03.04
2.10
189.00
06.03.02
COSTO DIRECTO
GASTOS GENERALES(10.0%)
UTILIDAD (5%)
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
COSTO TOTAL FACTORIZADO (90%)
m3
m2
117.20
4,442,643.11
444,264.31
222,132.16
5,109,039.58
919,627.12
6,028,666.70
5,425,800.03
827,196.39
82,719.64
41,359.82
951,275.85
171,229.65
#########
#########
Costo al 01/07/2011
SEMANA 3 ( 09 Abr al 16 Abr)SEMANA 4 ( 16 Abr al 23 Abr)
SEMANA 5 ( 23 Abr al 30 Abr)
SEMANAS ACUMULADAS
SALDO X VALORIZ.
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
1.00
332.61
221.74
986.22
164.00
1,834.67
398.13
287.38
8,503.19
4,531.32
1.00
1.00
1.00
1.00
1.00
241.74
1.00
1,740.53
2,250.00
1.00
1.00
158.40
138.23
715.08
3,640.98
1,591.17
8,231.29
1.00
1.00
1.00
70.00
66.52
9.07
127.64
266.09
1,352.61
9,888.40
1,739.45
3,291.20
6,861.13
1.00
1.00
0.75
0.79
1.00
3.03
33.72
-
645.66
966.08
-
30.00
800.00
7,847.55
2,822.40
1.00
1.00
9.75
2,249.04
161.08
2,533.08
7,934.61
6,109.12
0.51
1.00
0.51
9.28
151.92
2,678.86
6,401.91
15.00
857.65
140.00
4,241.70
3,361.99
6,480.60
207.00
247.78
1.00
35.00
60.00
-
804.51
99.36
-
1.00
1.00
-
30.00
383.70
5.95
20.00
884.49
386.46
0.33
1.00
12.05
-
1,990.30
-
12.00
288.04
3,295.08
1,016.21
1.00
1.00
1.50
800.00
22.40
555.16
2,822.40
849.54
0.25
1.00
0.50
4.50
22.40
1,850.54
943.94
Costo al 01/07/2011
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)
SEMANA 4 ( 16 Abr al 23 Abr)
SEMANAS ACUMULADAS
SALDO X VALORIZ.
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
-
4.50
600.00
36.00
1,400.40
2,352.00
1,666.44
16.00
120.00
6,546.24
7,789.20
1,200.00
4,752.00
490.00
490.00
586.53
635.04
1.00
1.00
67.63
375.79
75.00
2,435.29
1,816.19
863.33
1.00
1.00
1.00
14.50
-
333.30
-
0.32
-
30.50
70.00
778.97
895.30
52.44
207.45
1,592.60
15,137.85
5,943.44
6,242.99
350.00
280.22
350.00
157.33
53.17
11.71
418.95
2,368.14
453.60
2,897.07
5,728.00
1,261.52
1.00
1.00
1.00
1.00
1.00
1.00
2.50
3.22
11.31
18.24
119.30
269.33
346.89
1,218.43
335.87
587.31
1.00
1.00
1.00
1.00
1.00
300.00
3,453.30
1.00
55.89
-
1,284.69
-
0.70
-
24.11
120.00
80.00
615.77
220.80
1,023.20
37.90
6.35
82.17
-
5,633.95
1,217.81
2,118.75
-
0.85
0.53
0.55
-
6.66
5.65
66.93
241.80
1,100.03
1,203.96
1,917.54
5,568.65
2.16
50.40
593.11
177.81
1.00
1.00
Costo al 01/07/2011
SALDO X VALORIZ.
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)
SEMANA 4 ( 16 Abr al 23 Abr)
SEMANAS ACUMULADAS
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
0.52
142.79
0.91
0.05
15.26
39.20
138.30
1.00
14.00
583.25
0.93
1.00
46.29
-
3.33
508.00
7.09
824.60
97.07
847.49
1,792.22
1,842.00
2,909.19
3,681.48
0.26
0.48
9.25
545.51
2,615.72
2,138.40
0.47
0.47
0.46
7.91
945.70
113.72
2,283.38
3,707.14
4,792.16
16.13
######
80.65
4,561.24
4,649.79
3,733.29
21.61
779.03
247.00
7,085.70
3,053.80
9,264.97
######
4,313.40
25.00
25.00
6.00
30.00
10.00
29.93
32.40
646.38
147.69
115.11
1.00
1.00
1.00
1.00
1.00
57.60
74.88
1,471.10
957.72
8.64
10.50
1,427.07
241.82
10.56
50.00
400.00
3,141.81
1,905.50
1,568.00
50.00
50.00
38.64
10.00
5.10
5.00
59.85
64.80
711.52
84.51
25.11
57.56
1.00
1.00
1.00
1.00
1.00
1.00
8.00
6.00
183.89
69.07
1.00
1.00
/07/2011
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)SEMANA 4 ( 16 Abr al 23 Abr) SEMANAS ACUMULADAS
SALDO X VALORIZ.
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
9.45
2.50
0.55
217.63
412.93
117.20
1.00
100.00
10.00
411.23
392.00
421.40
0.50
50.00
3.00
205.62
196.00
138.87
1.00
50.00
10.80
90.00
327.89
196.00
405.11
189.00
145,547.91
14,554.79
7,277.40
167,380.10
30,128.42
197,508.52
177,757.67
########
16,170.45
8,085.22
########
33,472.83
########
########
Costo al 01/07/2011
SALDO X VALORIZ.
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)
SEMANA 4 ( 16 Abr al 23 Abr)
SEMANAS ACUMULADAS
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
805.00
31,612.35
0.82
181.22
7,116.51
213.66
6,016.67
16.30
490.00
485.00
36.00
1,607.83
7,350.00
48,883.15
2,422.44
245.00
615.00
12,610.15
6,420.60
70.00
0.20
280.00
15,108.80
40.00
160.00
58.00
670.80
4,016.00
1,051.54
160.00
3,660.80
160.00
160.00
3,601.60
7,843.20
29.80
1,468.25
39.00
7,558.59
6.00
2,918.88
18.00
21.00
2.00
218.16
192.57
160.90
50.00
250.00
160.00
144.00
144.00
12.00
8.00
884.80
753.12
1,257.12
169.80
88.88
3,777.20
170.00
3,743.40
50.00
######
8,349.00
2,819.60
1.00
1.00
1.00
8,056.00
8,056.00
#######
2,819.60
11,197.84
900.00
Costo al 01/07/2011
SALDO X VALORIZ.
SEMANA 2 (02 Abr al 09 Abr.)
SEMANA 3 ( 09 Abr al 16 Abr)
SEMANA 4 ( 16 Abr al 23 Abr)
SEMANAS ACUMULADAS
PARCIAL% AVANCE
METRADOPARCIAL% AVANCE
METRADOPARCIAL% AVANCEMETRADO PARCIAL % AVANCE
METRADO PARCIAL
-
######
5,961.44
50,306.99
5,030.70
2,515.35
57,853.04
10,413.55
68,266.59
61,439.93
########
16,517.46
8,258.73
########
34,191.14
########
########
Costo al 01/07/2011
VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE
-
VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL
-
12.00
3.00
26.00
1.00
1.00
738.96
183.90
1,162.98
23.92
380.03
2,489.79
248.98
124.49
2,863.26
515.39
3,378.65
3,040.78
Costo al 01/07/2011
VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE
VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL
15.00
15.00
15.00
15.00
3,298.20
4,563.45
1,127.85
621.30
9.00
9.00
9.00
12.00
18.90
4.00
1.00
5.00
1.00
5.00
1.00
429.30
272.61
292.14
91.32
205.44
75.88
18.61
522.50
88.60
599.10
1,355.93
28.00
56.00
250.00
5.00
5.00
2.00
2.00
2.00
1.00
1.00
782.88
453.60
1,805.00
294.45
469.20
73.20
1,242.02
577.60
3,345.20
725.80
4,648.60
464.86
232.43
5,345.89
962.26
6,308.15
5,677.34
VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE
VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL
800.00
350.00
280.22
350.00
157.33
53.17
11.71
2.50
3.22
11.31
######
-
1.00
-
800.00
-
3,136.00
-
1.00
-
6.00
44.80
2,467.38
1,887.87
4.50
600.00
36.00
1,400.40
2,352.00
1,666.44
16.00
120.00
######
6,546.24
7,789.20
4,752.00
490.00
490.00
651.70
705.60
67.63
375.79
75.00
2,705.88
2,017.99
959.25
45.00
70.00
1,149.30
895.30
465.50
######
504.00
######
######
######
299.25
385.43
######
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
350.00
280.22
350.00
157.33
53.17
11.71
2.50
3.22
11.31
465.50
2,631.27
504.00
3,218.97
6,364.45
1,401.69
299.25
385.43
1,353.81
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
52.44 15,137.85
207.45
5,943.44
###### 6,242.99
18.24
119.30
300.00
373.19
652.57
######
1.00
1.00
1.00
18.24
119.30
300.00
VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE
373.19
652.57
3,837.00
1.00
1.00
1.00
80.00
120.00
80.00
2,043.20
220.80
1,023.20
VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL
44.56
12.00
149.10
241.80
7,359.98
2,557.08
4,271.72
5,568.65
2.16
50.40
659.02
197.57
0.57
39.20
15.00
173.91
153.66
694.35
12.58
######
3,557.37
4,129.76
15.00
######
210.79
4,330.05
6,939.58
8,882.69
16.13
######
80.65
4,561.24
4,649.79
3,733.29
21.61
779.03
7,085.70
3,053.80
25.00
25.00
6.00
30.00
10.00
247.00
######
33.25
36.00
718.20
164.10
127.90
1.00
1.00
1.00
1.00
1.00
25.00
25.00
6.00
30.00
10.00
33.25
36.00
718.20
164.10
127.90
1.00
1.00
1.00
1.00
1.00
57.60
74.88
1,471.10
957.72
8.64
10.50
1,427.07
241.82
VALORIZACION ACTUAL
METRADOPARCIAL% AVANCE
50.00
50.00
38.64
10.00
5.10
5.00
66.50
72.00
790.57
93.90
27.90
63.95
1.00
1.00
1.00
1.00
1.00
1.00
9,264.97
4,313.40
VALORIZACION ACUMULADA
SALDO X VALORIZ.
METRADO PARCIAL % AVANCE
METRADO PARCIAL
10.56
3,141.81
50.00
1,905.50
400.00
1,568.00
50.00
50.00
38.64
10.00
5.10
5.00
66.50
72.00
790.57
93.90
27.90
63.95
1.00
1.00
1.00
1.00
1.00
1.00
8.00
6.00
204.32
76.74
9.45
2.50
0.55
217.63
412.93
117.20
1.00
100.00
10.00
411.23
392.00
421.40
0.50
50.00
3.00
205.62
196.00
138.87
1.00
50.00
10.80
90.00
327.89
196.00
405.11
189.00
######
######
######
######
######
######
######
1,218,653.25
121,865.33
60,932.66
1,401,451.24
252,261.22
1,653,712.46
1,488,341.21
########
########
########
########
########
########
########
CLIENTE
S/.145,574.91
S/.50,306.99
S/.0.00
S/.0.00
S/.195,881.90
ANALISIS FINANCIERO-CHONGOYAPE
OBRA
UBICACIN
CLIENTE
CUADRO No 2 . RESUMEN DE GASTOS EN OFICINA SIN DESCONTAR MATERIALES QUE AUN NO SE USAN
RESUMEN
MATERIALES
HERRAMIENTAS
MANO DE OBRA
COMBUSTIBLE
GASTOS GENERALES DIRECTOS
GASTOS GENERALES INDIRECTOS
TOTAL
MONTO S/.
S/.76,872.37
S/.11,674.30
S/.54,659.52
S/.6,687.89
S/.6,744.90
S/.8,188.97
S/.164,827.95
MATERIALES
MONTO REAL
MONTO NO USADO
S/.76,872.37
17582.85
TOTAL
HASTA LA FECHA
Hasta el 31 de Marzo
Hasta el 29 de Marzo
Hasta el 29 de Marzo
Hasta el 31 de Marzo
Hasta el 31 de Marzo
Hasta el 29 de Marzo
Hasta el 31 de Marzo
S/.149,894.08
S/.59,289.52
RESUMEN
MATERIALES
HERRAMIENTAS
MANO DE OBRA
COMBUSTIBLE
GASTOS GENERALES DIRECTOS
GASTOS GENERALES INDIRECTOS
TOTAL
MONTO S/.
S/.59,289.52
S/.11,674.30
S/.54,659.52
S/.6,687.89
S/.6,744.90
S/.8,188.97
S/.164,827.95
HASTA LA FECHA
Hasta el 31 de Marzo
Hasta el 29 de Marzo
Hasta el 29 de Marzo
Hasta el 31 de Marzo
Hasta el 31 de Marzo
Hasta el 29 de Marzo
Hasta el 31 de Marzo
S/.132,311.23
MATERIAL EN STOCK
CANTIDAD
FIERRO 5/8"
FIERRO 1"
FIERRO 3/4"
P.UNIT
P.PARCIAL
41
114.85
61.45
FIERRO 3/8"
551
15.2
8375.2
FIERRO 1/2"
75
27.15
2036.25
6.2
3.7
3.7
3.8
3.8
3.8
3.8
19.6
48
12
12
12
40
0.36
296
355.2
49.4
0
49.4
26.6
4174.8
384
240
180
216
1200
0
FIERRO 1/4"
ALAMBRE No 16
ALAMBRE No 08
CLAVOS 2"
CLAVOS 2 1/2"
CLAVOS 3"
CLAVOS 4"
CEMENTO
PIEDRA CHANCADA 1/2
ARENA GRUESA
HORMIGON
PIEDRA BASE
PIEDRA 3/4
LADRILLO TIPO IV
TOTAL
80
96
13
13
7
213
8
20
15
18
30
17582.85