Bestwork Biomass Gasification Generation System What is Biomass Energy ? Waste from Agriculture

Bestwork Biomass Gasification Generation System Biomass Gasification System Outlook

Biomass Gasification System

Biogas Engine Genset Room

Bestwork Biomass Gasification Generation System Biogas Engine Genset Outlook Biogas Engine Electric Power Generator

Bestwork Biomass Gasification Generation System How to convert Biomass as Electric Power ? Biomass

Biomass Gasification System

Biogas

Electric Power Biogas Engine Genset

Bestwork Biomass Gasification Generation System Biomass how to convert as Biogas ? Air ( N2 + O2 ) Biomass

Combustion Reaction

Thermal Splitting Reaction

N2 + CO2 + H2O + Heat

H2 + CO + CH4 + CnHm Gasify furnace

Biogas N2 + CO2 + CO + H2 + CH4 + CnHm + O2 + H2O + 50.0% 15.0% 15.5% 3.5% 6.0% 1.5% 1.0% 7.5% Heat Value ~ 1,300 kcal / Nm3 ?

Etc ?

Bestwork Biomass Gasification Generation System How to handle those 2 problem of Biogas ? Etc ?

Low Heat Value ~ 1,300 kcal / Nm3 ?

Design slow engine rotary speed ( 500 rpm ) for big volume but low heat value biogas

Design big engine cylinder head ( D:300 mm ) for big volume but low heat value biogas

Bestwork Biomass Gasification Generation System How to handle those 2 problem of Biogas ? Etc ?

Low Heat Value ~ 1,300 kcal / Nm3 ?

Ash

Tar oil

Cyclone Separator

Electrostatic Tar Oil Treatment Tower Washer Tower

Bestwork Biomass Gasification Generation System Biomass Gasification System Flow Diagram B1 Portion

Bestwork Biomass Gasification Generation System Biomass Tank load in biomass come from biomass house Dry Ash Cyclone separate dry ash from biogas Take-In Air Blower blow in pre-heat air

Gasify furnace generate biogas

Biomass Screw Feeder control biomass quantity

Ash Blower transfer dry ash to ash room

Bestwork Biomass Gasification Generation System Biomass Gasification System Flow Diagram B2 Portion

Bestwork Biomass Gasification Generation System Washer Tower wash down fine ash and cooling biogas Bag Filter Tank separate light ash and output clean water Cooling Water Pump water recycle

Wet Ash Tank collect washer water and separate heavy ash

Wet Ash Valve collect wet ash

Heat Exchanger transfer water heat to cooling tower

Bestwork Biomass Gasification Generation System Biomass Gasification System Flow Diagram B3 Portion

Bestwork Biomass Gasification Generation System Pressure Sensor control roots blower balance biogas output pressure Biogas Safety Water Seal Tank relief over pressure biogas Biogas Surplus Burner

Biogas Roots Blower carry all biogas flow through all system

Electrostatic Tar Oil Treatment Tower separate tar oil from biogas Clean and cold biogas supply to engine

Bestwork Biomass Gasification Generation System Others Accessary System Biomass Transfer System with tube Ash Collection & Transfer System With pipe Biogas Transfer tube Gasification Cooling Tower System With pipe Engine Cooling Tower System With pipe Engine, Compressor Air Start Up System With pipe and tank

Bestwork Biomass Gasification Generation System Biomass Consumption Rate ?

Biomass Heat Value

Gasify Furnace Reaction Temp.

Rice Husk Heat Value 3,400 ~ 3,600 kcal / kg

Reaction Temp. high then Biomass consumption also high But ash and tar oil can easy collection Normal operation temp for rice husk ~ 800 deg.C

Rice Husk Consumption Rate ~ 1.65 kg / kw-hr

Bestwork Biomass Gasification Generation System Electric Power Cost Generate by BGP

Biomass Cost ( Rice Husk )

System Operation Cost As operation project Sum Cost = 0.005 USD / kw-hr

Sum Cost = ( A ) USD / kw-hr

Engine Lubricant consumption Gasification Parts consumption Biogas Engine Parts consumption Make Up Water consumption Labor Cost

Bestwork Biomass Gasification Generation System BGP-1200 system Land Space Require Biomass House Gasification Zone Biogas Engine Room Ash House

Beside Biomass & Ash House which rice mill site already own Additional land space need 20 m x 25 m = 500 m2

Bestwork Biomass Gasification Generation System Bestwork BGP system own any different design with others supplier ?

Close Loop Washer Water Recycle System Design !

Do not need water treatment pool !

Real Green Energy !

No water pollution ! No smell pollution ! Save land space ! Low water consumption ! BGP-1200 make up water < 0.5 m3 / hr

Bestwork Biomass Gasification Generation System Bestwork BGP system own any different design with others supplier ?

Big Cylinder, Low Rotary Speed ( 500 rpm ) Biogas Engine Design !

Reliable continuous operation biogas engine !

Light maintenance require !

Long operation life !

Real Commercial Operation System !

Bestwork Biomass Gasification Generation System Bestwork BGP system own any different design with others supplier ? Block Unit Design !

Easy installation save time ! Real Model Engineering Job ! Easy installation save cost !

Outdoor design save building cost !

Easy installation and avoid effect system efficiency due to poor assembly job !

Bestwork Biomass Gasification Generation System Waste Heat Recover from Biogas Engine ( BGP-1200 ) Biogas Engine 400 ekw x 3 set

Exhaust Air 550 deg.C 10,800 kg / hr Waste Heat Steam Boiler Steam 8 bar, 175 deg.C 1,799 kg /hr Steam Absorption Chiller Paddy Dryer Chilled Water 450 RT

Bestwork Biomass Gasification Generation System What is Renewable Energy ? Water Power

Wind Power

Solar Power

Biomass Power

So Biomass Power can try to apply Carbon Credit by Kyoto Protocol

Bestwork Biomass Gasification Generation System Biomass how to convert as Energy ? Biomass Power

Combustion

Conversion

Heat Hot Water Steam

Bestwork Biomass Gasification Generation System Biomass how to convert as Energy ? Biomass Power

Combustion

Conversion

Bio-Conversion Chemical-Conversion Thermal-Conversion

Biogas

Bestwork Biomass Gasification Generation System

Thank You !

Você também pode gostar