Escolar Documentos
Profissional Documentos
Cultura Documentos
S.NO. MARKS DAILY AUDIT CONTENTS Work Instructions 1 Check all stations have respective W.I. Check W.I. are easily readable by the Operators Check W.I. are followed by the Operators. Cut. M/c 1
RESP
DATE
Sold. M/c 1
RESP
Sold. M/c 2
RESP
Expd. M/c
RESP
Debrr. M/c
RESP
H.Pipe Line
RESP
Cluster Line
RESP
Disch. Line
RESP
N2/ E-Cap
RESP
Packing
RESP
1 A
2 A
Daily Activity 1 Check FOS Report is maintained by Opt/Sup daily. Check In-Process Check Sheet is maintained by Opt/Sup daily. Check M/cs are Oiled/Greased Daily by the Maint. Sup. Check M/cs Break Down Records Maintained by the Maint. Sup.
3 A
5S 1 Check all material is Sorted & Identification is properly tagged. Check all material is placed at its marked locations. Check gangway is free from obstackles. Check floor, working area etc are neat & clean. Check 5S is followed by the operators. TOTAL MARKS OBTAINED MAXIMUM MARKS
MONITORED BY
DATE
REV.NO./DATE 00/24-01-05
CAPILLARY STORE
RESP
STEEL STORE
RESP
1 A
2 A
Ware House 1 Check R/M is covered & safe from direct sunlight, dust etc Check R/M stock board is maintained properly Check FIFO is maintained properly Check Layout is maintained properly
MONITORED BY