HAN SUNG METAL PVT. LTD.

S.NO. MARKS DAILY AUDIT CONTENTS Work Instructions 1 Check all stations have respective W.I. Check W.I. are easily readable by the Operators Check W.I. are followed by the Operators. Cut. M/c 1
RESP

SHOP FLOOR MONITORING SHEET


Cut. M/c 2
RESP

DATE

REV.NO./DATE 00/24-01-05 REMARKS

Sold. M/c 1
RESP

Sold. M/c 2
RESP

Expd. M/c
RESP

Debrr. M/c
RESP

Buff. M/c Suction Line


RESP RESP

H.Pipe Line
RESP

Cluster Line
RESP

Disch. Line
RESP

N2/ E-Cap
RESP

Packing
RESP

1 A

2 A

Daily Activity 1 Check FOS Report is maintained by Opt/Sup daily. Check In-Process Check Sheet is maintained by Opt/Sup daily. Check M/cs are Oiled/Greased Daily by the Maint. Sup. Check M/cs Break Down Records Maintained by the Maint. Sup.

3 A

5S 1 Check all material is Sorted & Identification is properly tagged. Check all material is placed at its marked locations. Check gangway is free from obstackles. Check floor, working area etc are neat & clean. Check 5S is followed by the operators. TOTAL MARKS OBTAINED MAXIMUM MARKS

PREPARED BY MARKING SCHEME : 1 0.5 0

MONITORED BY

HAN SUNG METAL PVT. LTD. R/ M STORE MONITORING SHEET


S.NO. MARKS AUDIT CONTENTS 5S 1 Check all material is Sorted & Identification is properly tagged. Check all material is placed at its marked locations. Check gangway is free from obstackles. Check floor, working area etc are neat & clean. COPPER STORE
RESP

DATE

REV.NO./DATE 00/24-01-05

CAPILLARY STORE
RESP

STEEL STORE
RESP

1 A

2 A

Ware House 1 Check R/M is covered & safe from direct sunlight, dust etc Check R/M stock board is maintained properly Check FIFO is maintained properly Check Layout is maintained properly

TOTAL MARKS OBTAINED MAXIMUM MARKS

PREPARED BY MARKING SCHEME : 1 0.5 0

MONITORED BY