Você está na página 1de 7

S/N

DESCRIPTION

QTY UNIT

RATE(N)

AMOUNT(N)

PROPOSED REHABILITATION OF DOCTORS QUARTERS BINGHAM UNIVERSITY TEACHING HOSPITAL JOS NORTH L.G.A, PLATEAU STATE.

ELEMENT No.1 DEMOLITION/ALTERATION Electrical installation


A Allow for the careful dismantling and removal of existing electrical installation to include cabling, other accessories, etc and stack where directed. Item 20,000.00

Walls and floors


B Allow for demolition of wall areas and stack debris as may be directed. Item 112,000.00

C Allow for hacking out all cracked areas on walls and make good as directed

Item

30,000.00

Roof
D Carefully remove existing but deteriorated Zinc roofing sheet including stagnant and stack materials where directed (Approx. area 284 sq.m). E Ditto timber roof carcass( Kingposts and struts) F Ditto hard board ceiling complete with timber batten. Item 15,000.00

25,000.00 20,000.00

ELEMENT NO.1 DEMOLITION/ALTERATION SCHEDULE Carried to Summary ELEMENT No.2 SUBSTRUCTURE


A Excavate Column pits starting from stripped level maximum depth not exceeding 1.50m deep. 142

222,000.00

350.00

49,700.00

Earth backfill B Backfill previously excavated materials around Column pit and compact in layers not exceeding 300mm thick 100 Disposal C Remove surplus excavated material from site Surface Treatment D Level and compact bottom of excavation to receive concrete in foundation E Dieldrex 20, or other approved anti-termite chemical treatment to bottom and sides of excavation 190 m2 50.00 9,500.00 42 m3 120.00 5,040.00 m3 80.00 8,000.00

69

m2

45.00

3,105.00

Concrete Work Reinforced insitu concrete (1:2:4-20mm aggregate) cast and well vibrated developing minimum 21 N/sq.m works strength at 28 days in.

F Isolated Column bases & stud column

18 Cub.m

21,000.00

378,000.00

Reinforcement
High yield reinforcement bar to BS 4449 in straight and bent position, secured together with tying wire in column bases and stud columns and ground beams in. G 12mm diameter bars H 8mm diameter bars 240 45 Kg Kg 300.00 280.00 72,000.00 12,600.00

Form Work Sawn Softwood Formwork to Sides of:

J Sides of column bases & stud column

194 Sq.m

400.00

77,600.00

FINISHING Rendering Render and finish fair and smooth on:


K Wall externally. 18 Sq.m 350.00 6,300.00

Painting Prepare and apply texcote textured Paint on:


L

Rendered wall externally.

18 Sq.m

450

8,100.00

ELEMENT NO.2 SUBSTRUCTURE Carried to Summary

629,945.00

SUPERSTRUCTURE ELEMENT NO.3


WALLS Blockwork High quality hollow Sandcrete block,bedded and jointed in cement and sand(1;6) laid in stretcher bond A 230mm wall

104

m2

1,500.00

156,000.00

Concrete Work Reinforced,vibrated Insitu Concrete ,grade 21;developing minimum 21N/mm2 work strength in 28days B Columns C Beams Sawn formwork to: 4 6 m3 m
3

21,000.00 21,000.00

84,000.00 126,000.00

D Sides of Columns Sides and soffits of Beams Reinforcement High yield steel bars to comply with BS 4449 in lintels E 12mm diameter bars F 8mm diameter bars as stirrups

132 52

480.00 480.00

63,360.00 24,960.00

m2

330 174

kg kg

180.00 180.00

59,400.00 31,320.00

ELEMENT NO.3
Walls Carried to Summary N 545,040.00

ELEMENT NO.4 ROOF


Carpentry/Timber Framing Sawn hardwood roof carcass ;pitched,treated with solignum,nailed In scarfed joint;members fixed together with galvanised nails of appropriate specifications A 50 x 50mm kingpost B 50 x 100mm struts D 50 x 100mm Tie beam E 50 x 50mm purlins H 25mm wide batten 36 67 82 57 304 m m m m m 120.00 300.00 300.00 230.00 70.00 4,320.00 20,100.00 24,600.00 13,110.00 21,280.00

Roof Covering Corrugated Roofing Sheets

Corrugated roofing sheets and accessories,fixed in accordance with manufacturer's instructions ,fixed to J purlins (measured separately) Roofing in various lengths laid to slope not exceeding 363 K 30 degrees from horizontal L Ridge capping 600mm girth 40 m2 1,100.00 399,300.00

1,200.00

48,000.00

ELEMENT NO.4
Roof carried to Summary N 530,710.00

ELEMENT NO.5
WALL FINISHES Internal walls Rendering 15mm thick cement and sand (1:4) rendering,finished fair and smooth, to: A Walls,over 300mm girth B surfaces not exceeding 300mm girth Painting Prepare and apply two finishing coats of emulsion paint on: C Rendered Walls D Surfaces not exceeding 300mm girth External walls Rendering 15mm thick cement and sand (1:4) rendering,finished fair and smooth, to: 303 154 m
2

303 154

m2 m

450.00 135.00

136,350.00 20,790.00

250.00 75.00

75,750.00 11,550.00

E Walls F surfaces not exceeding 300mm girth

289 101

m2 m

450.00 135.00

130,050.00 13,635.00

Painting Prepare and apply Emulsion paint on: G Rendered Walls H Surfaces not exceeding 300mm girth 289 101 m2 m 250.00 75.00 72,250.00 7,575.00

ELEMENT NO.5
Wall Finishes carried to Summary N 467,950.00

ELEMENT NO.6
FLOOR FINISHES Beds A 25mm thick cement and sand(1:3) screeded bed (columns area)

56

900.00

50,400.00

ELEMENT NO.6
Floor Finishes Carried to summary N 50,400.00

ELEMENT NO.7
CEILING FINISHES Painting Prepare and apply Emulsion paint on: A Ceiling 354 m2 250.00 88,500.00

ELEMENT NO.7
Ceiling Finishes Carried to summary N 88,500.00

PROPOSED REHABILITATION OF DOCTORS QUARTERS BINGHAM UNIVERSITY TEACHING HOSPITAL


DEMOLITION/ALTERATION SUBSTRUCTURE WALLS (BLOCKWORK) ROOF WALL FINISHES FLOOR FINISHES CEILING FINISHES N N N N N N N 222,000.00 629,945.00 515,040.00 530,710.00 467,950.00 50,400.00 88,500.00 2,504,545.00 PRELIMINARIES SUB-TOTAL ADD: TOTAL N 25,000.00 2,529,545.00

2,529,545