LICITACION
CONTRATO
CONTRATANTE
OBRA
SISTEMA
UBICACIN
INICIO DE PLAZO
CONDICION
VENCE
REAL
MONTO
FIRMA CONTRATO
4/9/2012
ENTREGA DE TERRENO
4/24/2012
ENTREGA EXPEDIENTE
4/24/2012
SOLICITUD ADEL DIREC
4/17/2012
PAGO ADEL DIRECTO
4/24/2012
NOMBRA SUPERVISOR
4/24/2012
FECHA INICIO PLAZO
4/25/2012
LP N 0002-2011-CE-LP-EPS-TACNA SA
N 007-2012-300-EPS TACNA S.A.
ENTIDAD PRESTADORA DE SERVICIOS DE SANEAMIENTO TACNA SA
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
SUMA ALZADA
TACNA - TACNA - TACNA
MONTOS
VALOR REFERENCIAL
MONTO CONTRATO
SIN IGV
CON IGV
SIN IGV
CON IGV
11,436,152.12
13,494,659.50
10,292,536.91
12,145,193.55
PORCENTAJE
90.00%
PLAZOS
PLAZO
CONTRATO
AMP PLAZO N 01
AMP PLAZO N 02
RESUMEN DE VALORIZACION
PLAZO FINAL
PLAZO
DEL
480
0
0
4/20/2012
8/13/2013
8/13/2013
8/12/2013
8/12/2013
8/12/2013
480
4/20/2012
8/12/2013
%
N VAL
1
2
3
4
5
6
7
8
9
10
11
12
MES
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
Mar-13
PROGRAMADO
985,348.31
602,268.56
893,039.48
607,416.34
504,521.77
746,874.30
979,528.63
1,216,614.52
1,388,494.44
875,329.71
699,319.70
1,090,023.34
VAL BRUTA
8.1%
5.0%
7.4%
5.0%
4.2%
6.1%
8.1%
10.0%
11.4%
7.2%
5.8%
9.0%
73,917.45
29,826.35
REAJUSTE
19.64
255.20
DEDUCCION
REINTEGRO
FIANZAS
ADELANTO
FIEL CUMPLIMIENTO
DIRECTO
MATERIALES
AL
SUBTOTAL
73,937.08
30,081.54
AMORTIZACION
ADEL DIRECTO ADEL MAT
3,695.87
1,491.32
TOTAL COBRAR
0.00
70,241.21
28,590.23
DEL
AL
3/27/2012
7/19/2013
MONTO
1214520
1214520
607260
Contrato
Contratista
CONSORCIO COLLAO
Supervision
CONSORCIO CAPLINA
CALCULO DE PAGO
COSTO A VALORIZAR : EJECUCION DE OBRA
VALORIZACION BRUTA
VALORIZACIONES S/,
ACUM MES
EN EL MES
ACUMULADO
ANTERIOR
62,641.91
25,276.56
87,918.47
62,641.91
25,276.56
87,918.47
16.64
216.27
232.91
3,132.10
1,263.83
4,395.92
0.00
0.00
0.00
VALORIZACION NETA
59,526.45
24,229.01
83,755.46
IGV 18.00%
10,714.76
4,361.22
15,075.98
TOTAL A FACTURAR
70,241.21
28,590.23
98,831.44
0.00
0.00
0.00
70,241.21
28,590.23
98,831.44
REAJUSTES
AMORTIZACION POR ADELANTO DIRECTO (5%)
AMORTIZACION POR ADELANTO MATERIALES (10%)
OTROS
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
DATOS GENERALES
0.00
0.00
607,259.68
0.00
514,626.85
5.00%
5/5/2012
MES
01
02
03
04
05
06
07
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
CONCEPTO
MONTO
VALORIZ.
%
AMORTIZ.
AMORTIZ.
EN EL MES
AMORTIZ.
ACUMUL.
SALDO POR
AMORTIZ.
10,292,536.91
EJECUCION DE OBRA
FECHA DE PAGO:
VAL.
N
62,641.91
25,276.56
5.00%
5.00%
3,132.10
1,263.83
3,132.10
4,395.92
511,494.75
510,230.92
1,263.83
4,395.92
510,230.92
Proyecto
Contrato
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
Contratista
CONSORCIO COLLAO
ADELANTO
OTORGADO
ADELANTO EN
EFECTIVO
514,626.85
92,632.83
607,259.68
514,626.85
92,632.83
607,259.68
AMORTIZACION
ACUMULADA
DE ANTICIPO
4,395.92
791.27
5,187.19
Amortizacin TOTAL
I.G.V.
TOTAL ANTICIPO AMORTIZADO
4,395.92
791.27
5,187.19
SALDO POR
AMORTIZAR
ANTICIPO EN
EFECTIVO
510,230.92
91,841.56
602,072.48
510,230.92
91,841.56
602,072.48
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
Contrato
Contratista
Frmula
INSTALACION DE TUBERIAS
AMORTIZACIONES
DEDUCCIONES
VALORIZA. N.
FORMULA
POLINOMICA
N.
01
01
May-12
58,061.47
2,903.07
02
01
Jun-12
16,137.05
806.85
03
01
Jul-12
04
01
Aug-12
74,198.51
3,709.93
3,709.93
MES
VALORIZ
TOTALES
MONTO
VALORZ. (V)
AMORTIZAC.
(V*A)/C
AMORT.
MENSUAL
COEF.
DEDUC. PARCIAL
DEDUC.
(Kr(AMORT.*COEF.)
Ka)/Ka
K MES ADEL.
(Ka)
K MES REAJ.
(Kr)
2,903.07
1.004
1.004
0.000
806.85
1.004
1.004
0.000
DEDUCCION
ACUMULADA
0.00
0.00
0.00
0.00
ESPECIFICACIONES
V = Monto Valorizado
58,061.47
S/. 183,891.54
S/. 3,677,830.87
May-12
May-11
Frmula
AMORTIZACIONES
DEDUCCIONES
VALORIZA. N.
FORMULA
POLINOMICA
N.
01
02
May-12
3,169.13
158.46
02
02
Jun-12
2,025.00
101.25
03
02
Jul-12
04
02
Aug-12
5,194.13
259.71
259.71
MES
VALORIZ
TOTALES
MONTO
VALORZ. (V)
AMORTIZAC.
(V*A)/C
AMORT.
MENSUAL
COEF.
DEDUC. PARCIAL
DEDUC.
(Kr(AMORT.*COEF.)
Ka)/Ka
K MES ADEL.
(Ka)
K MES REAJ.
(Kr)
158.46
1.000
1.000
0.000
101.25
1.000
1.000
0.000
DEDUCCION
ACUMULADA
0.00
0.00
0.00
0.00
ESPECIFICACIONES
V = Monto Valorizado
3,169.13
S/. 251,891.77
S/. 5,037,835.45
May-12
May-12
Frmula
AMORTIZACIONES
DEDUCCIONES
VALORIZA. N.
FORMULA
POLINOMICA
N.
01
03
May-12
1,411.32
70.57
02
03
Jun-12
7,114.52
355.73
03
03
Jul-12
04
03
Aug-12
8,525.83
426.29
426.29
MES
VALORIZ
TOTALES
MONTO
VALORZ. (V)
AMORTIZAC.
(V*A)/C
AMORT.
MENSUAL
COEF.
DEDUC. PARCIAL
DEDUC.
(Kr(AMORT.*COEF.)
Ka)/Ka
K MES ADEL.
(Ka)
K MES REAJ.
(Kr)
70.57
0.992
0.992
0.000
355.73
0.992
0.992
0.000
DEDUCCION
ACUMULADA
0.00
0.00
0.00
0.00
0.00
0.00
ESPECIFICACIONES
V = Monto Valorizado
0.00
S/. 78,843.53
S/. 1,576,870.59
May-12
May-12
TOTALES
87,918.47
4,395.92
4,395.92
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
Frmula
1 INSTALACION DE TUBERIAS
REAJUSTE SEGN AVANCE PROGRAMADO
VALORIZA. N.
FORMULA
POLINOMICA N.
MES VALORIZ.
MONTO
PROGRAMADO
REAJUSTE V
(K-1)
REAJUSTE
ACUMUL.
MONTO
VALORIZADO
REAJUSTE V (K-1)
DEDUCCIONES
REAJUSTE
ACUMUL.
EFECTIVO
01
01
May-12
39,707.051
1.004
161.85
161.85
58,061.47
1.004
236.66
236.66
0.00
02
01
Jun-12
41,033.689
1.004
167.25
329.10
16,137.05
1.004
65.77
302.43
0.00
03
01
Jul-12
33,722.214
04
02
Aug-12
40,886.097
05
03
Sep-12
50,888.250
06
04
Oct-12
115,650.241
07
05
Nov-12
168,443.256
08
06
Dec-12
199,402.601
09
07
Jan-13
271,942.910
10
08
Feb-13
228,677.631
11
09
Mar-13
324,652.404
12
10
Apr-13
476,352.272
13
11
May-13
457,120.199
14
12
Jun-13
415,965.719
15
13
Jul-13
367,955.116
16
14
Aug-13
433,716.140
17
15
Sep-13
329.10
329.10
74,198.51
302.43
302.43
0.00
TOTALES
Frmula
0.00
REAJUSTE
AUTORIZADO
236.66
65.77
11,715.081
3,677,830.87
0.00
302.43
VALORIZA. N.
MATERIALES*
FORMULA
POLINOMICA N.
MES VALORIZ.
MONTO
PROGRAMADO
REAJUSTE V
(K-1)
REAJUSTE
ACUMUL.
MONTO
VALORIZADO
REAJUSTE V (K-1)
DEDUCCIONES
REAJUSTE
ACUMUL.
EFECTIVO
MATERIALES*
REAJUSTE
AUTORIZADO
01
02
May-12
0.000
1.000
0.00
3,169.13
1.000
0.350
0.35
0.00
0.00
02
02
Jun-12
2,123.800
1.000
0.23
0.23
2,025.00
1.000
0.224
0.57
0.00
0.23
03
02
Jul-12
16,459.473
04
02
Aug-12
33,135.136
05
02
Sep-12
166,827.124
06
02
Oct-12
291,428.321
07
02
Nov-12
324,463.107
08
02
Dec-12
365,334.897
09
02
Jan-13
381,890.720
10
02
Feb-13
345,888.134
11
02
Mar-13
397,553.781
12
02
Apr-13
477,313.206
13
02
May-13
443,708.260
14
02
Jun-13
471,959.875
15
02
Jul-13
513,488.859
16
02
Aug-13
496,358.493
17
02
Sep-13
309,902.274
0.23
0.23
5,194.13
0.57
0.57
0.00
TOTALES
Frmula
5,037,835.46
3
FORMULA
POLINOMICA N.
0.23
VALORIZA. N.
0.00
MES VALORIZ.
MONTO
PROGRAMADO
REAJUSTE V
(K-1)
REAJUSTE
ACUMUL.
MONTO
VALORIZADO
REAJUSTE V (K-1)
DEDUCCIONES
REAJUSTE
ACUMUL.
EFECTIVO
01
03
May-12
0.000
0.992
0.00
1,411.32
0.992
-11.545
-11.55
0.00
02
03
Jun-12
0.000
0.992
0.00
7,114.52
0.992
-58.200
-69.75
0.00
03
03
Jul-12
0.000
04
03
Aug-12
13,984.275
05
03
Sep-12
25,795.989
06
03
Oct-12
63,327.825
07
03
Nov-12
146,975.644
08
03
Dec-12
284,921.408
09
03
Jan-13
265,497.345
10
03
Feb-13
125,873.463
11
03
Mar-13
138,923.485
12
03
Apr-13
89,918.282
13
03
May-13
79,200.393
14
03
Jun-13
57,923.363
15
03
Jul-13
129,472.455
16
03
Aug-13
128,106.866
17
03
Sep-13
26,949.794
MATERIALES*
0.00
REAJUSTE
AUTORIZADO
-11.55
-58.20
TOTALES
1,576,870.59
0.00
0.00
8,525.83
-69.75
-69.75
0.00
0.00
-69.75
TOTALES
10,292,536.92
329.33
329.33
87,918.47
233.26
233.26
0.00
0.00
232.91
Proyecto
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
Contrato
Contratista
CONSORCIO COLLAO
ADELANTO
OTORGADO
ADELANTO PARA MATERIALES S/.
I.G.V.
Total
SALDO POR
AMORTIZAR
Saldo por Amortizar ADELANTO PARA MATERIALES S/.
I.G.V.
Total
S/.
1,029,253.69
195,558.20
1,224,811.89
AMORTIZACION
ACUMULADA
0.00
0.00
0.00
ADELANTO
PARA MATERIALES
1,029,253.69
195,558.20
1,224,811.89
Contrato
Contratista
Supervisor
CONSORCIO CAPLINA
MES
CONCEPTO
MONTO
VALORIZ.
Jan-11 Formula1 INSTALACION DE MEDIDORES, VALVULAS, GRIFOS
1,029,253.69
Y ACCESORIOS
2,025.00
VALVULA DE BRONCE IMPORTADA (Reagrupado 30)
1,029,253.69
PARCIAL 01
OTORGADO
1,029,253.69
2,025.00
AMORTIZ.
ANTERIOR
0.00
0.00
0.00
AMORTIZ.
EN EL MES
0.00
0.00
0.00
AMORTIZ.
ACUMUL.
0.00
0.00
0.00
SALDO POR
AMORTIZ.
1,029,253.69
1,029,253.69
1,029,253.69
Formula
IU
Material
Adelanto N 01
Fecha Pago
ADELANTO
N
01
01
01
01
01
30
VALVULA DE BRONCE IMPORTADA (Reagrupado 30)
1,029,253.69
6/5/2012
Valorizacin N
IU
FOR
JUNIO 2012
JULIO 2012
AGOSTO 2012
SETIEMBRE 2012
OCTUBRE 2012
30
30
30
30
30
1
1
1
1
1
Incidencia
Coef .
%
0.352
100.000%
0.352
100.000%
0.352
100.000%
0.352
100.000%
0.352
100.000%
Io
Oct-11
361.12
361.12
361.12
361.12
361.12
Ia
Jun-12
357.90
357.90
357.90
357.90
357.90
Reajuste
Mes
Ir
jun-12
357.90
jul-12
ago-12
sep-12
oct-12
Saldo
Adelanto
1,038,513.81
1,038,513.81
Adelanto
Utilizado
-
0.00
Deduccin
0.00
Amortizacin
0.00
0.00
TOTALES S/.
0.00
0.00
0.00
0.00
CONSORCIO COLLAO
Frmula polinmica
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
Obra
Fecha presupuesto
Oct-11
Frmula
Monomio
Ubicacin Geogrfica 04
DEPARTAMENTO: TACNA
Factor
Porcentaje (%)
Smbolo
Indice
Descripcin
Oct-11
Io
1
2
3
4
5
0.275
0.192
0.184
0.175
0.079
0.079
0.095
100.000%
100.000%
100.000%
100.000%
53.165%
46.835%
100.000%
M
I
A
C
MT
M
47
39
2
21
49
72
44
MANO DE OBRA
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
ACERO DE CONSTRUCCION LISO
CEMENTO PORTLAND TIPO I
MAQUINARIA Y EQUIPO IMPORTADO
TUBERIA DE PVC
MADERA TERCIADA PARA CARPINTERIA
448.29
368.88
539.29
423.60
238.25
351.77
343.19
Apr-12
Ia
448.25
377.30
505.67
423.60
234.59
346.99
343.48
1.000
Porcentaje (%)
Smbolo
Indice
Descripcin
Oct-11
Io
0.094
0.191
0.105
0.105
0.100
0.158
0.352
4
5
6
100.000%
100.000%
11.429%
88.571%
100.000%
100.000%
100.000%
M
I
TT
V
V
V
47
39
65
72
77
78
76
MANO DE OBRA
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
TUBERIA DE ACERO NEGRO Y/O GALVANIZADO
TUBERIA DE PVC PARA AGUA
VALVULA DE BRONCE NACIONAL
VALVULA DE FIERRO FUNDIDO NACIONAL
VALVULA DE BRONCE IMPORTADA (Reagrupado 30)
448.29
368.88
263.19
351.77
276.18
456.08
361.12
Apr-12
Ia
448.25
377.30
260.470
346.99
275.39
457.73
357.90
1.000
5
6
0.275
0.196
0.173
0.175
0.041
0.036
0.095
Jun-12
Kr
448.25
377.30
505.67
423.60
234.59
346.99
343.48
0.275
0.196
0.173
0.175
0.041
0.036
0.095
0.992
Kr
0.094
0.195
0.012
0.092
0.100
0.159
0.349
May-12
448.250
377.300
260.470
346.990
275.39
457.73
357.900
Kr
0.094
0.195
0.012
0.092
0.100
0.159
0.349
Jun-12
Kr
448.250
377.300
260.470
346.990
275.39
457.73
357.900
0.094
0.195
0.012
0.092
0.100
0.159
0.349
1.000
1.000
1 INSTALACION DE TUBERIAS
Factor
Porcentaje (%)
Smbolo
Indice
Descripcin
Oct-11
Io
1
2
3
4
Kr
0.992
1.000
Frmula
Monomio
Ia
448.25
377.30
505.67
423.60
234.59
346.99
343.48
Factor
1
2
3
0.275
0.196
0.173
0.175
0.041
0.036
0.095
May-12
0.992
Frmula
Monomio
Kr
0.202
0.192
0.203
0.217
0.217
0.123
0.123
0.063
1.000
100.000%
100.000%
100.000%
23.502%
76.498%
10.569%
89.431%
100.000%
M
I
M
TA
CA
F
47
39
49
13
72
2
21
32
MANO DE OBRA
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MAQUINARIA Y EQUIPO IMPORTADO
ASFALTO
TUBERIA DE PVC PARA AGUA
ACERO DE CONSTRUCCION LISO
CEMENTO PORTLAND TIPO I
FLETE TERRESTRE
448.29
368.88
238.25
1718.06
351.77
539.29
423.60
431.91
Apr-12
Ia
448.25
377.30
234.59
1849.17
346.99
505.67
423.60
445.65
Kr
0.202
0.196
0.200
0.055
0.164
0.012
0.110
0.065
1.004
May-12
448.250
377.300
234.59
1849.170
346.99
505.67
423.60
445.650
Kr
0.202
0.196
0.200
0.055
0.164
0.012
0.110
0.065
1.004
Jun-12
448.250
377.300
234.59
1849.170
346.99
505.67
423.60
445.650
Kr
0.202
0.196
0.200
0.055
0.164
0.012
0.110
0.065
1.004
Ao
2011
2012
Enero
723.71
793.53
Febrero
721.31
792.13
Marzo
717.4
790.22
Abril
766.53
787.98
Mayo
760.69
789.88
Junio
757.55
Julio
771.64
Agosto
800.97
Setiembre
801.59
Octubre
799.73
Noviembre
795.62
Diciembre
794.18
Marzo
586.17
506.05
Abril
591.89
500.27
Mayo
583.48
505.67
Junio
580.78
Julio
570.55
Agosto
570.13
Setiembre
541.66
Octubre
539.29
Noviembre
534.16
Diciembre
532.38
580.8
501.65
Abril
586.47
496.88
Mayo
578.14
498.41
Junio
575.46
Julio
565.32
Agosto
564.91
Setiembre
536.7
Octubre
534.35
Noviembre
529.27
Diciembre
527.51
Marzo
513.75
550.56
Abril
517.59
546.24
Mayo
518.18
555.2
Junio
506.77
Julio
520.64
Agosto
523.01
Setiembre
516.25
Octubre
520.36
Noviembre
519.87
Diciembre
543.72
Marzo
Abril
614.27
611.54
Mayo
613.21
608.43
Junio
612.44
Julio
607.67
Agosto
603.47
Setiembre
601.28
Octubre
604.3
Noviembre
606.51
Diciembre
607.15
Abril
938.83
856.09
Mayo
908.63
836.45
Junio
892.73
Julio
894.43
Agosto
910.78
Setiembre
899.76
Octubre
870.65
Noviembre
827.45
Diciembre
836.42
Marzo
668.59
623.53
Abril
674.82
608.05
Mayo
652.05
598.55
Junio
637.31
Julio
637.73
Agosto
653.51
Setiembre
644.12
Octubre
620.26
Noviembre
583.24
Diciembre
592.91
Marzo
870.48
826.61
Abril
877.17
803.22
Mayo
844.33
795.62
Junio
827.12
Julio
829.22
Agosto
852.1
Setiembre
840.3
Octubre
810.29
Noviembre
761.96
Diciembre
779.1
Marzo
295.68
284.19
Abril
299.51
282.7
Mayo
295.26
283.98
Junio
294.09
Julio
291.64
Agosto
291.42
Setiembre
291.85
Octubre
290.58
Noviembre
287.81
Diciembre
286.85
Marzo
332.94
339.58
Abril
334.51
344.29
Mayo
Junio
335.45
Julio
334.97
Agosto
336.26
Setiembre
336.96
Octubre
338.25
Noviembre
338.06
Diciembre
337.44
Marzo
230.11
205.64
Abril
233.09
204.68
Mayo
229.78
208.33
Junio
228.87
Julio
226.97
Agosto
226.8
Setiembre
227.13
Octubre
226.14
Noviembre
216.63
Diciembre
211.68
Febrero
280.75
291.98
Marzo
279.63
287.42
Abril
283.69
286.26
Mayo
280.59
295.17
Junio
279.73
Julio
277.94
Agosto
277.79
Setiembre
278.1
Octubre
277.16
Noviembre
292.52
Diciembre
295.64
Febrero
1,380.33
1,718.06
Marzo
1,520.49
1,718.06
Abril
1,637.60
1,837.23
Mayo
1,718.06
1,849.17
Junio
1,718.06
Julio
1,718.06
Agosto
1,718.06
Setiembre
1,718.06
Octubre
1,718.06
Noviembre
1,718.06
Diciembre
1,718.06
Marzo
251.66
263.68
Abril
251.66
267.68
Mayo
251.66
267.68
Junio
251.66
Julio
251.66
Agosto
259.33
Setiembre
259.33
Octubre
259.33
Noviembre
259.33
Diciembre
259.33
Marzo
319.36
346.15
Abril
324.45
352.48
Mayo
333.28
352.48
Junio
324.45
Julio
324.45
Agosto
324.45
Setiembre
324.45
Octubre
324.45
Noviembre
324.45
Diciembre
324.45
Marzo
754.41
872.27
Abril
765.98
877.11
Mayo
767.69
881.68
Junio
768.14
Julio
766.23
Agosto
765.15
Setiembre
777.48
Octubre
774.25
Noviembre
782.77
Diciembre
787.76
Marzo
305.36
293.48
Abril
309.32
282.26
Mayo
298.91
275.75
Junio
291.64
Julio
291.49
Agosto
296.35
Setiembre
291.77
Octubre
283.97
Noviembre
272
Diciembre
282.48
Marzo
778.19
724.35
Abril
786.31
709.06
Mayo
761.78
691.33
Junio
743.94
Julio
746.45
Agosto
763.08
Setiembre
751.17
Octubre
722.36
Noviembre
680.39
Diciembre
689.94
Marzo
1,843.02
2,064.35
Abril
1,974.96
2,220.00
Mayo
2,064.35
2,235.76
Junio
2,064.35
Julio
2,064.35
Agosto
2,064.35
Setiembre
2,064.35
Octubre
2,064.35
Noviembre
2,064.35
Diciembre
2,064.35
Marzo
Abril
Mayo
Junio
Julio
423.6
Agosto
423.6
Setiembre
423.6
Octubre
423.6
Noviembre
423.6
Diciembre
423.6
367.3
Agosto
367.3
Setiembre
367.3
Octubre
367.3
Noviembre
367.3
Diciembre
367.3
Ao
2011
2012
Enero
533.49
531.59
Febrero
578.78
522.59
Ao
2011
2012
Enero
528.61
526.73
Febrero
573.48
517.8
Marzo
Ao
2011
2012
Enero
515.77
551.55
Febrero
530.2
543.13
Ao
2011
2012
Enero
619.69
620.63
Febrero
623.1
616.33
609.6
621.26
Ao
2011
2012
Enero
899.42
837.58
Febrero
929.76
860.62
Marzo
926.74
874.54
Ao
2011
2012
Enero
651
593.43
Febrero
672.79
612.88
Ao
2011
2012
Enero
841.95
780.85
Febrero
878.61
808.75
Ao
2011
2012
Enero
299.05
286.43
Febrero
297.22
285.47
Ao
2011
2012
Enero
328.44
338.18
Febrero
329.89
337.28
335
345.54
Ao
2011
2012
Enero
231.86
211.4
Febrero
230.45
208.78
Ao
2011
2012
Enero
282.08
295.3
Ao
2011
2012
Enero
1,265.36
1,718.06
Ao
2011
2012
Enero
250.13
263.68
Febrero
250.66
263.68
Ao
2011
2012
Enero
311.64
324.45
Febrero
311.64
329.93
Ao
2011
2012
Enero
704.56
804.81
Febrero
722.24
845.7
Ao
2011
2012
Enero
305.16
282.19
Febrero
307.93
286.13
Ao
2011
2012
Enero
762.06
691.7
Febrero
781.47
711.05
Ao
2011
2012
Enero
1,508.89
2,064.35
Febrero
1,652.54
2,064.35
Ao
2011
2012
Enero
423.6
423.6
Febrero
423.6
423.6
423.6
423.6
423.6
423.6
423.6
423.6
423.6
Ao
2011
2012
Enero
370.39
367.3
Febrero
370.39
367.3
Marzo
Abril
367.3
367.3
Mayo
367.3
367.3
Junio
367.3
367.3
Julio
367.3
Ao
2011
2012
Enero
371.32
368.1
Febrero
371.32
368.1
Marzo
Abril
368.1
368.1
368.1
368.1
Mayo
368.1
368.1
Junio
368.1
Julio
368.1
Agosto
368.1
Setiembre
368.1
Octubre
368.1
Noviembre
368.1
Diciembre
368.1
Ao
2011
2012
Enero
270.22
266.77
Febrero
269.93
267.61
Marzo
271.92
266.49
Abril
273.2
270.38
Mayo
274.47
271.05
Junio
275.14
Julio
273.32
Agosto
273.49
Setiembre
273.66
Octubre
273.44
Noviembre
272.99
Diciembre
267.22
Marzo
356.82
360.06
Abril
356.82
360.06
Mayo
357.59
360.06
Junio
359.44
Julio
359.44
Agosto
359.44
Setiembre
360.3
Octubre
360.3
Noviembre
361.03
Diciembre
361.03
Ao
2011
2012
Enero
348.33
361.03
Febrero
348.33
360.06
Ao
2011
2012
Enero
449.87
512.99
Febrero
447.11
511.28
Marzo
444.81
509.01
Abril
450.56
506.32
Mayo
444.16
508.62
Junio
442.41
Julio
438.73
Agosto
521.95
Setiembre
522.72
Octubre
520.42
Noviembre
515.47
Diciembre
513.75
Marzo
379.29
411.72
Abril
382.96
409.79
Mayo
378.87
411.95
Junio
377.75
Julio
375.39
Agosto
375.19
Setiembre
375.59
Octubre
383.11
Noviembre
416.23
Diciembre
415.18
Marzo
358.42
354.39
Abril
366.61
355.21
Mayo
363.73
357.9
Junio
363.98
Julio
360.57
Agosto
360.63
Setiembre
362.16
Octubre
361.12
Noviembre
356.94
Diciembre
355.45
Marzo
358.3
357.26
Abril
358.97
357.75
Mayo
356.82
361.24
Junio
356.48
Julio
355.78
Agosto
355.72
Setiembre
355.84
Octubre
356.76
Noviembre
355.94
Diciembre
355.66
Marzo
423.94
445.65
Abril
423.94
445.65
Mayo
423.94
445.65
Junio
429.18
Julio
429.18
Agosto
429.18
Setiembre
431.91
Octubre
431.91
Noviembre
431.91
Diciembre
438.91
Febrero
609.99
621.08
Marzo
609.97
618.3
Abril
617.83
607.19
Mayo
606.76
609.89
Junio
612.56
Julio
617.4
Agosto
616.45
Setiembre
617.77
Octubre
615.43
Noviembre
609.02
Diciembre
607.09
Febrero
506.11
545.34
Marzo
504.82
566.9
Abril
504.39
566.04
Mayo
504.39
566.04
Junio
520.77
Julio
529.82
Agosto
537.15
Setiembre
544.05
Octubre
544.91
Noviembre
560.43
Diciembre
559.57
Marzo
283.86
286.86
Abril
283.02
286.44
Mayo
280.64
290.26
Junio
279.78
Julio
279.22
Agosto
279.17
Setiembre
279.28
Octubre
278.94
Noviembre
281.03
Diciembre
283.46
Marzo
485.05
529.49
Abril
Mayo
489.01
534.95
Junio
Julio
487.7
525.13
479.4
497.6
Agosto
499.87
Setiembre
501.95
Octubre
498.71
Noviembre
500.6
Diciembre
523.89
Ao
2011
2012
Enero
383.37
414.25
Febrero
381.61
413.57
Ao
2011
2012
Enero
356
354.05
Febrero
355.5
354.43
Ao
2011
2012
Enero
358.03
355.55
Febrero
359.37
357.1
Ao
2011
2012
Enero
427.41
438.91
Febrero
427.41
438.91
Ao
2011
2012
Enero
592.49
610.91
Ao
2011
2012
Enero
506.11
542.76
Ao
2011
2012
Enero
276.17
284.11
Febrero
284.36
285.84
Ao
2011
2012
Enero
489.51
531.43
Febrero
501.56
524.89
Ao
2011
2012
Enero
356.05
371.1
Febrero
357.41
372.3
Marzo
359.92
375.16
Abril
362.38
377.15
Mayo
362.29
377.3
Junio
362.65
Julio
365.52
Agosto
366.5
Setiembre
367.72
Octubre
368.88
Noviembre
370.47
Diciembre
371.47
Febrero
275.96
286.51
Marzo
278.73
286.51
Abril
278.73
286.51
Mayo
277.59
286.51
Junio
275.49
Julio
286.51
Agosto
287.3
Setiembre
287.82
Octubre
286.48
Noviembre
285.47
Diciembre
285.47
Marzo
351.59
354.29
Abril
353.81
353.78
Mayo
354.47
353.78
Junio
352.76
Julio
352.76
Agosto
352.76
Setiembre
352.76
Octubre
352.76
Noviembre
352.76
Diciembre
352.76
Marzo
227.69
233.63
Abril
229.21
233.03
Mayo
227.55
233.48
Junio
227.14
Julio
226.16
Agosto
226.02
Setiembre
226.16
Octubre
225.74
Noviembre
224.62
Diciembre
224.33
Marzo
558.16
592.79
Abril
559.67
596.05
Mayo
559.52
603.39
Junio
563.45
Julio
568.36
Agosto
570.24
Setiembre
572.92
Octubre
569.97
Noviembre
574.65
Diciembre
571.13
Abril
345.24
345.25
Mayo
344.23
343.48
Junio
342.24
Julio
342.23
Agosto
342.47
Setiembre
342.95
Octubre
343.19
Noviembre
343.24
Diciembre
343.21
Marzo
313.05
311.46
Abril
312.57
311.46
Mayo
313.14
311.46
Junio
313.14
Julio
313.14
Agosto
313.14
Setiembre
313.13
Octubre
312.34
Noviembre
311.66
Diciembre
311.64
Marzo
512.71
474.59
Abril
509.24
469.89
Mayo
495.61
471.9
Junio
494.15
Julio
491.41
Agosto
491.18
Setiembre
485.41
Octubre
478.67
Noviembre
476.43
Diciembre
475.65
Marzo
427.68
448.25
Abril
427.68
448.25
Mayo
427.68
448.25
Junio
448.29
Julio
448.29
Agosto
448.29
Setiembre
448.29
Octubre
448.29
Noviembre
448.29
Diciembre
448.29
Marzo
104.36
105.07
Abril
104.09
105.19
Mayo
104.23
105.41
Junio
104.42
Julio
104.32
Agosto
104.11
Setiembre
104.27
Octubre
104.17
Noviembre
104.22
Diciembre
104.27
Marzo
332.16
327.49
Abril
334.3
326.76
Mayo
331.87
329.22
Junio
332.12
Julio
330.88
Agosto
330.79
Setiembre
330.74
Octubre
330.64
Noviembre
329.4
Diciembre
328.94
Marzo
240.07
234.24
Abril
243.55
233.54
Mayo
240.64
234.59
Junio
239.68
Julio
238.23
Agosto
238.59
Setiembre
239.12
Octubre
238.25
Noviembre
235.99
Diciembre
235.02
Marzo
631.52
620.22
Abril
633.84
617.1
Mayo
631.26
619.77
Junio
630.56
Julio
629.03
Agosto
628.91
Setiembre
629.18
Octubre
628.39
Noviembre
626.66
Diciembre
626.07
Marzo
Abril
358.86
323.31
Mayo
347.28
324.79
Junio
368.4
328.98
340.4
Julio
335.63
Agosto
335.17
Setiembre
344.2
Octubre
340.66
Noviembre
338.4
Diciembre
337.24
Marzo
310.37
276.66
Abril
313.29
275.7
Mayo
314.62
279.96
Junio
312.35
Julio
309.64
Agosto
309.49
Setiembre
305.48
Octubre
306.62
Noviembre
303.17
Diciembre
302.67
Marzo
780.84
906.68
Abril
780.18
906.68
Mayo
779.52
912.64
Junio
806.67
Julio
819.26
Agosto
823.89
Setiembre
851.05
Octubre
855.02
Noviembre
894.76
Diciembre
893.43
Marzo
Abril
330.58
359.83
Mayo
Junio
336.45
Julio
339.04
Agosto
338.67
Setiembre
342.17
Octubre
342.17
Noviembre
346.64
Diciembre
348.58
Ao
2011
2012
Enero
273.94
285.94
Ao
2011
2012
Enero
353.81
352.76
Febrero
353.76
352.76
Ao
2011
2012
Enero
230.01
224.05
Febrero
229.32
234.22
Ao
2011
2012
Enero
561.16
576.05
Febrero
558.01
588.13
44 Mader a ter ciada par a encofr ado y car pinter a (ndice Base Jul.1992=100,0)
Ao
2011
2012
Enero
347.75
343.19
Febrero
347.45
343.51
Marzo
345.67
343.92
Ao
2011
2012
Enero
314.56
311.33
Febrero
314.42
311.27
Ao
2011
2012
Enero
515.8
475.3
Febrero
514.54
475.62
Ao
2011
2012
Enero
427.68
448.25
Febrero
427.68
448.25
Ao
2011
2012
Enero
105.96
104.22
Febrero
106.16
104.32
Ao
2011
2012
Enero
331.54
328.71
Febrero
331.31
328.23
Ao
2011
2012
Enero
238.94
235.2
Febrero
238.57
234.94
Ao
2011
2012
Enero
633.55
625.1
Febrero
632.45
623.04
Ao
2011
2012
Enero
351.57
336.71
Febrero
362.89
335.06
Ao
2011
2012
Enero
306.7
302.59
Febrero
310.64
277.28
Ao
2011
2012
Enero
782.17
864.95
Febrero
783.49
870.25
Ao
2011
2012
Enero
327.68
349.48
Febrero
327.55
349.48
330
359.83
331.3
363.01
Ao
2011
2012
Enero
399.02
439.57
Febrero
402.2
438.3
Marzo
397.54
443.11
Abril
399.93
445.6
Mayo
404.81
478.01
Junio
413.08
Julio
413.08
Agosto
415.71
Setiembre
407.47
Octubre
419.19
Noviembre
434.09
Diciembre
438.3
Marzo
594.11
562.77
Abril
628.75
559.82
Mayo
619.82
562.35
Junio
Julio
565.36
Agosto
564.94
Setiembre
565.77
Octubre
563.3
Noviembre
557.93
Diciembre
556.08
Marzo
456.41
410
Abril
462.32
407.85
Mayo
455.75
409.69
Junio
415.46
Julio
412
Agosto
411.7
Setiembre
412.3
Octubre
410.5
Noviembre
406.59
Diciembre
405.24
Marzo
187.35
192.9
Abril
187.35
192.9
Mayo
188.17
200.22
Junio
188.17
Julio
188.17
Agosto
188.17
Setiembre
188.17
Octubre
188.17
Noviembre
188.17
Diciembre
188.17
Marzo
Abril
Mayo
Junio
Julio
Ao
2011
2012
Enero
547
567.2
Febrero
597.21
565.3
570.1
Ao
2011
2012
Enero
417.48
413.22
Febrero
458.78
411.84
Ao
2011
2012
Enero
186.7
188.17
Febrero
188.69
192.9
Ao
2011
2012
Enero
295.5
295.99
Febrero
295.5
295.99
295.5
295.99
295.5
295.99
295.5
295.99
295.5
295.5
Agosto
295.5
Setiembre
295.5
Octubre
295.5
Noviembre
295.99
Diciembre
295.99
Marzo
347.75
288.36
Abril
352.25
286.85
Mayo
347.25
288.15
Junio
345.87
Julio
314.65
Agosto
298.84
Setiembre
299.27
Octubre
297.96
Noviembre
295.13
Diciembre
293.04
Febrero
402.07
391.46
Marzo
407.69
402.41
Abril
411.24
399.03
Mayo
407.02
402.01
Junio
405.86
Julio
403.43
Agosto
403.22
Setiembre
403.64
Octubre
402.37
Noviembre
399.62
Diciembre
398.67
Febrero
233.35
231.38
Marzo
231.38
231.38
Abril
231.38
231.38
Mayo
231.38
251.35
Junio
231.38
Julio
231.38
Agosto
231.38
Setiembre
231.38
Octubre
231.38
Noviembre
231.38
Diciembre
231.38
Abril
296.89
258.47
Mayo
276.71
260.47
Junio
263.93
Julio
262.03
Agosto
261.85
Setiembre
267.81
Octubre
263.19
Noviembre
263.1
Diciembre
262.26
Mayo
Junio
474.34
Julio
470.49
Agosto
485.24
Setiembre
485.94
Octubre
481.03
Noviembre
476.47
Diciembre
474.83
Ao
2011
2012
Enero
315.61
290.63
Febrero
332.9
289.66
Ao
2011
2012
Enero
398.5
386.19
Ao
2011
2012
Enero
233.35
231.38
Ao
2011
2012
Enero
297.41
261.97
Febrero
293.47
260.92
Marzo
291.89
259.64
66 Tuber ia de PVC par a la r ed de Agua Potable y Alcantar illado (ndice Base Jul.1992=100,0)
Ao
2011
2012
Enero
418.14
474.17
Febrero
415.01
472.64
Marzo
Abril
447.7
470.38
453.5
475.44
454.3
477.77
Marzo
324.99
298.65
Abril
329.14
297.31
Mayo
328.62
285.38
Junio
325.15
Julio
324.8
Agosto
330.49
Setiembre
336.2
Octubre
302.35
Noviembre
310.95
Diciembre
310.29
Abril
Ao
2011
2012
Enero
318.62
309.3
Febrero
323.1
299.95
Ao
2011
2012
Enero
403.28
418.72
Febrero
406.66
423.63
Marzo
406.8
422.33
406.8
416.01
Mayo
410.32
433.15
Junio
414.28
Julio
414.28
Agosto
414.28
Setiembre
414.28
Octubre
414.28
Noviembre
414.28
Diciembre
414.28
Marzo
218.25
218.25
Abril
218.25
218.25
Mayo
218.25
218.25
Junio
218.25
Julio
218.25
Agosto
218.25
Setiembre
218.25
Octubre
218.25
Noviembre
218.25
Diciembre
218.25
Marzo
515.66
504.72
Abril
518.32
502.07
Mayo
515.36
504.34
Junio
514.53
Julio
512.83
Agosto
512.68
Setiembre
512.98
Octubre
512.08
Noviembre
510.12
Diciembre
509.44
Marzo
342.38
340.98
Abril
346.02
343.28
Mayo
347.56
346.99
Junio
349.42
Julio
347.86
Agosto
354.98
Setiembre
356.79
Octubre
351.77
Noviembre
348.06
Diciembre
347.42
Marzo
388.82
399.99
Abril
393.85
403.67
Mayo
394.11
405.73
Junio
396.11
Julio
392.83
Agosto
410.18
Setiembre
410.79
Octubre
408.98
Noviembre
405.1
Diciembre
403.75
Marzo
281.73
274.69
Abril
Mayo
280.42
275.39
Junio
277.89
Julio
276.65
Agosto
276.73
Setiembre
278.33
Octubre
276.18
Noviembre
275.23
Diciembre
275.3
Marzo
461.26
452.86
Abril
Mayo
459.35
457.73
Junio
458.63
Julio
457.18
Agosto
456.95
Setiembre
457.97
Octubre
456.08
Noviembre
454.87
Diciembre
454.26
Ao
2011
2012
Enero
209.28
218.25
Febrero
209.28
218.25
Ao
2011
2012
Enero
518
508.68
Febrero
516.73
506.99
Ao
2011
2012
Enero
337.58
344.83
Febrero
339.62
342.06
Ao
2011
2012
Enero
382.66
403.14
Febrero
380.3
401.8
Ao
2011
2012
Enero
274.76
274.92
Febrero
282
274.34
283.4
274.05
Ao
Enero
Febrero
2011
463.18
462.45
2012
454.04
453.53
Fuente : Instituto Nacional de Estadstica e Informtica
462.3
452.06
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
Contrato
Contratista
CONSORCIO COLLAO
Supervision de Obra
CONSORCIO CAPLINA
CUADRO COMPARATIVO DE AVANCE DE OBRA
PROGRAMADO
MONTOS TOTAL (sin/ IGV)
MES
PARCIAL
S/
(1)
ACUMUL.
S/
(2)
EJECUTADO
AVANCE DE OBRA
PARCIAL
%
ACUMUL.
%
ACUMUL.
S/
(4)
COMPARATIVO
PORCENTAJES
PARCIAL
%
ACUMUL.
%
DIFERENCIA
ATRASO(-)
ADELANTO (+)
=((4-2)/2*100
ESTADO
May-12
39,707.05
39,707.05
0.39%
0.39%
62,641.91
62,641.91
0.61%
0.61%
0.22%
57.76%
Obra Adelantada
Jun-12
43,157.49
82,864.54
0.42%
0.81%
25,276.56
87,918.47
0.25%
0.86%
0.05%
6.10%
Obra Adelantada
Jul-12
50,181.69
133,046.23
Aug-12
88,005.51
221,051.73
Sep-12
243,511.36
464,563.10
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
Jul-13
Aug-13
Sep-13
470,406.39
639,882.01
849,658.91
919,330.98
700,439.23
861,129.67
1,043,583.76
980,028.85
945,848.96
1,010,916.43
1,058,181.50
348,567.15
934,969.48
1,574,851.49
2,424,510.40
3,343,841.37
4,044,280.60
4,905,410.27
5,948,994.03
6,929,022.88
7,874,871.84
8,885,788.27
9,943,969.77
10,292,536.92
TOTAL
10,292,536.92
1,574,851.49
0.81%
0.81%
87,918.47
0.86%
0.86%
0.05%
6.10%
Contrato
Contratista
Supervision
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
PROGRAMADO
PROG. ACUM.
AVANCE (%)
EJECUTADO
EJEC ACUM
PROGRAMADO
ACUMULADO
EJECUTADO
ACUMULADO
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
Jul-13
Aug-13
Sep-13
39,707.05
43,157.49
50,181.69
88,005.51
243,511.36
470,406.39
639,882.01
849,658.91
919,330.98
700,439.23
861,129.67
1,043,583.76
980,028.85
945,848.96
1,010,916.43
1,058,181.50
348,567.15
39,707.05
82,864.54
62,641.91
25,276.56
62,641.91
87,918.47
0.39%
0.42%
0.39%
0.81%
0.61%
0.25%
0.61%
0.86%
TOTAL
10,292,536.92
82,864.54
87,918.47
87,918.47
0.39%
0.39%
0.86%
0.61%
EJECUCION DE OBRA
12,000,000.00
10,000,000.00
8,000,000.00
S/.
Proyecto
6,000,000.00
4,000,000.00
2,000,000.00
0.00
May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
MESES
PROG. ACUM.
EJEC ACUM
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
INSTALACION DE TUBERIAS
ITEM
01
1.01
1.02
1.03
1.04
1.05
02
2.01
02.01.01
02.01.02
02.01.03
02.01.04
2.02
02.02.01
02.02.02
02.02.03
02.02.04
2.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
2.04
02.04.01
02.04.02
2.05
02.05.01
02.05.02
02.05.03
02.05.04
03
3.01
03.01.01
03.01.02
03.01.03
03.01.04
3.02
03.02.01
03.02.02
03.02.03
03.02.04
3.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
3.04
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
3.05
03.05.01
03.05.02
03.05.03
03.05.04
03.05.05
DESCRIPCION
UND
METRADO
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
und
14.00
ALMACEN Y GUARDIANIA
m2
300.00
OFICINA DE RESIDENTE, SUOERVISION Y COMEDOR DE OBREROS
m2
150.00
AGUA PARA LA OBRA
m3
1.00
BAOS PORTATILES PARA LA OBRA
mes
12.00
LINEAS DE CONDUCCION
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, HERRAMIENTAS Y EQUIPOS
glb
0.12
TRAZO, NIVELES Y REPLANTEO CONDUCCION
m
1939.15
SEALIZACIONES Y SEGURIDAD PEATONAL Y VEHICULAR
und
1939.15
SEGURIDAD Y VIGILANCIA
mes
1.40
CORTES Y DEMOLICIONES
CORTE DE PAVIMENTO
m
3878.30
DEMOLICION DE PAVIMENTO MIXTO E=0.25M
m2
912.08
ELIMINACION DE MATERIAL EXCEDENTE PROCEDENTE DE LAS DEMOLICIONES
m3
303.24
ACOPIO DE MATERIAL EXCEDENTE PROCEDENTE DE DEMOLICIONES A PUNTO
m3 CARGUIO303.24
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/MAQ. NORMAL PARA TUBERIAS
m
1939.15
REFINE Y NIVELACION ZANJA TERRENO NORMAL PARA TUBERIAS
m
1939.15
CAMA DE APOYO Y SOBRECAMA P/TUBERIAS
m
1939.15
RELLENO Y COMPACTACION DE ZANJA P/TUBERIAS
m
1939.15
ELIMINACION DE MATERIAL EXCEDENTE
m3
2063.26
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC 160 MM C-7.5 ISO 4422
m
1939.15
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS
m
1939.15
SUMINISTRO E INSTALACION DE ACCESORIOS
TEE H.D. 160 MM X 100MM TIPO LUFLEX ISO 2531
pza
6.00
TEE H.D. 160 MM X 160MM TIPO LUFLEX ISO 2531
pza
3.00
VALVULA 110 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO
pza
1.00
VALVULA 160 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO
und
6.00
LINEAS DE ADUCCION
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA, HERRAMIENTAS Y EQUIPOS
glb
0.88
TRAZO, NIVELES Y REPLANTEO ADUCCION
m
11222.63
SEALIZACIONES Y SEGURIDAD PEATONAL Y VEHICULAR
m
11222.63
SEGURIDAD Y VIGILANCIA
mes
10.60
CORTES Y DEMOLICIONES
CORTE DE PAVIMENTO
m
17457.18
ELIMINACION DE MATERIAL EXCEDENTE PROCEDENTE DE LAS DEMOLICIONES
m3
464.36
ACOPIO DE MATERIAL EXCEDENTE PROCEDENTE DE DEMOLICIONES A PUNTO
m3 CARGUIO464.36
EXCAVACION Y DESMONTAJE DE GRIFO C/INCENDIO
m3
300.00
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA C/MAQ. NORMAL PARA TUBERIAS
m
11222.63
REFINE Y NIVELACION ZANJA TERRENO NORMAL PARA TUBERIAS
m
11222.63
CAMA DE APOYO Y SOBRECAMA P/TUBERIAS
m
11222.63
RELLENO Y COMPACTACION DE ZANJA P/TUBERIAS
m
11222.63
ELIMINACION DE MATERIAL EXCEDENTE
m3
14058.80
SUMINISTRO E INSTALACION DE TUBERIAS
TUBERIA PVC 110 MM C-7.5 ISO 4422
m
1404.20
TUBERIA PVC 200 MM C-7.5 ISO 4422
m
4458.89
TUBERIA PVC 250 MM C-7.5 ISO 4422
m
528.86
TUBERIA PVC 315 MM C-7.5 ISO 4422
m
2669.20
TUBERIA PVC 400 MM C-7.5 ISO 4422
m
862.37
TUBERIA PVC 450 MM C-7.5 ISO 4422
m
1301.11
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS
m
11222.63
SUMINISTRO E INSTALACION DE ACCESORIOS
CODO HED 100 MM X 45 TIPO LUFLEX ISO 2531
pza
2.00
CODO HED 100 MM X 90 TIPO LUFLEX ISO 2531
pza
1.00
CODO HED 200 MM X 22.5 TIPO LUFLEX ISO 2531
pza
2.00
CODO HED 200 MM X 45 TIPO LUFLEX ISO 2531
pza
9.00
CODO HED 200 MM X 90 TIPO LUFLEX ISO 2531
pza
5.00
PRECIO
1352.65
57.26
64.22
14123.75
1546.20
20952.40
1.25
7.17
24459.12
17.79
11.59
21.23
27.55
13.98
5.23
19.77
18.75
20.78
22.75
2.90
268.86
293.15
500.87
780.51
20952.40
1.25
7.17
24459.12
17.79
21.23
27.55
126.28
13.98
5.23
19.77
18.75
20.78
13.07
40.26
64.97
105.10
154.79
226.40
2.90
190.16
204.72
366.36
399.04
486.11
VALORIZACION ANTERIOR
VALORIZACION ACTUAL
VALORIZACION ACUMULADA
SALDO POR EJECUTAR
PARCIAL METRADO
PARCIAL S/. METRADO
PARCIAL S/. METRADO
PARCIAL S/. %
METRADO
PARCIAL S/. %
78426.25
45748.10
0.00
45748.10
32678.15
18937.10
14.00
18937.10
0.00
14.00
18937.10
100.00%
0.00
0.00
17178.00
300.00
17178.00
0.00
300.00
17178.00
100.00%
0.00
0.00
9633.00
150.00
9633.00
0.00
150.00
9633.00
100.00%
0.00
0.00
14123.75
0.00
0.00
0.00
0.00
0.00%
1.00
14123.75
18554.40
0.00
0.00
0.00
0.00
0.00%
12.00
18554.40
359680.14
3471.56
0.00
3471.56
356208.56
53084.71
3471.56
0.00
3471.56
49613.14
2514.29
0.05
1047.62
0.00
0.00
0.05
1047.62
41.67%
0.07
1466.67
2423.94
1939.15
2423.94
0.00
1939.15
2423.94
100.00%
0.00
0.00
13903.71
0.00
0.00
0.00
0.00
0.00
0.00%
1939.15
13903.71
34242.77
0.00
0.00
0.00
0.00
0.00
0.00%
1.40
34242.77
94358.02
0.00
0.00
0.00
94358.01
68994.96
0.00
0.00
0.00
0.00
0.00
0.00%
3878.30
68994.96
10571.01
0.00
0.00
0.00
0.00
0.00
0.00%
912.08
10571.01
6437.79
0.00
0.00
0.00
0.00
0.00
0.00%
303.24
6437.79
8354.26
0.00
0.00
0.00
0.00
0.00
0.00%
303.24
8354.26
154821.67
0.00
0.00
0.00
154821.67
27109.32
0.00
0.00
0.00
0.00
0.00
0.00%
1939.15
27109.32
10141.75
0.00
0.00
0.00
0.00
0.00
0.00%
1939.15
10141.75
38337.00
0.00
0.00
0.00
0.00
0.00
0.00%
1939.15
38337.00
36359.06
0.00
0.00
0.00
0.00
0.00
0.00%
1939.15
36359.06
42874.54
0.00
0.00
0.00
0.00
0.00
0.00%
2063.26
42874.54
49739.20
0.00
0.00
0.00
49739.20
44115.66
0.00
0.00
0.00
0.00
0.00
0.00%
1939.15
44115.66
5623.54
0.00
0.00
0.00
0.00
0.00
0.00%
1939.15
5623.54
7676.54
0.00
0.00
0.00
7676.54
1613.16
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
1613.16
879.45
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
879.45
500.87
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
500.87
4683.06
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
4683.06
2741904.04
8125.00
15937.82
24062.82
2717841.23
372199.33
8125.00
7042.82
15167.82
357031.50
18438.11
0.00
0.00
0.00
0.00
0.00%
0.88
18438.11
14028.29
6500.00
8125.00
0.00
6500.00
8125.00
57.92%
4722.63
5903.29
80466.26
0.00
300.00
2151.00
300.00
2151.00
2.67%
10922.63
78315.26
259266.67
0.00
0.20
4891.82
0.20
4891.82
1.89%
10.40
254374.85
371098.71
0.00
8895.00
8895.00
362203.71
310563.23
0.00
500.00
8895.00
500.00
8895.00
2.86%
16957.18
301668.23
9858.36
0.00
0.00
0.00
0.00
0.00%
464.36
9858.36
12793.12
0.00
0.00
0.00
0.00
0.00%
464.36
12793.12
37884.00
0.00
0.00
0.00
0.00
0.00%
300.00
37884.00
940024.29
0.00
0.00
0.00
940024.29
156892.37
0.00
0.00
0.00
0.00
0.00%
11222.63
156892.37
58694.35
0.00
0.00
0.00
0.00
0.00%
11222.63
58694.35
221871.40
0.00
0.00
0.00
0.00
0.00%
11222.63
221871.40
210424.31
0.00
0.00
0.00
0.00
0.00%
11222.63
210424.31
292141.86
0.00
0.00
0.00
0.00
0.00%
14058.80
292141.86
973363.93
0.00
0.00
0.00
973363.94
18352.89
0.00
0.00
0.00
0.00
0.00
0.00%
1404.20
18352.89
179514.91
0.00
0.00
0.00
0.00
0.00
0.00%
4458.89
179514.91
34360.03
0.00
0.00
0.00
0.00
0.00
0.00%
528.86
34360.03
280532.92
0.00
0.00
0.00
0.00
0.00
0.00%
2669.20
280532.92
133486.25
0.00
0.00
0.00
0.00
0.00
0.00%
862.37
133486.25
294571.30
0.00
0.00
0.00
0.00
0.00
0.00%
1301.11
294571.30
32545.63
0.00
0.00
0.00
0.00
0.00%
11222.63
32545.63
85217.78
0.00
0.00
0.00
85217.78
380.32
0.00
0.00
0.00
0.00
0.00%
2.00
380.32
204.72
0.00
0.00
0.00
0.00
0.00%
1.00
204.72
732.72
0.00
0.00
0.00
0.00
0.00%
2.00
732.72
3591.36
0.00
0.00
0.00
0.00
0.00%
9.00
3591.36
2430.55
0.00
0.00
0.00
0.00
0.00%
5.00
2430.55
0.00%
0.00%
0.00%
100.00%
100.00%
58.33%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
42.08%
97.33%
98.11%
97.14%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
INSTALACION DE TUBERIAS
ITEM
03.05.06
03.05.07
03.05.08
03.05.09
03.05.10
03.05.11
03.05.12
03.05.13
03.05.14
03.05.15
03.05.16
03.05.17
03.05.18
03.05.19
03.05.20
03.05.21
03.05.22
03.05.23
03.05.24
03.05.25
03.05.26
03.05.27
03.05.28
03.05.29
03.05.30
03.05.31
03.05.32
03.05.33
03.05.34
03.05.35
03.05.36
04
4.01
4.02
4.03
4.04
05
5.01
DESCRIPCION
CODO HED 250 MM X 45 TIPO LUFLEX ISO 2531
CODO HED 250 MM X 90 TIPO LUFLEX ISO 2531
CODO HED 315 MM X 45 TIPO LUFLEX ISO 2531
CODO HED 315 MM X 90 TIPO LUFLEX ISO 2531
CODO HED 400 MM X 22.5 TIPO LUFLEX ISO 2531
CODO HED 400 MM X 45 TIPO LUFLEX ISO 2531
CODO HED 450 MM X 22.5 TIPO LUFLEX ISO 2531
CODO HED 450 MM X 90 TIPO LUFLEX ISO 2531
REDUCCION HE DUCTIL 200 MM X 100 MM ISO 2531LUFLEX
REDUCCION HE DUCTIL 200 MM X 150 MM ISO 2531LUFLEX
REDUCCION HE DUCTIL 250 MM X 100 MM ISO 2531LUFLEX
REDUCCION HE DUCTIL 250 MM X 150 MM ISO 2531LUFLEX
REDUCCION HE DUCTIL 250 MM X 200 MM ISO 2531LUFLEX
REDUCCION HE DUCTIL 300 MM X 200 MM ISO 2531LUFLEX
REDUCCION HE DUCTIL 450 MM X 200 MM ISO 2531LUFLEX
REDUCCION HE DUCTIL 450 MM X 315 MM ISO 2531LUFLEX
TEE H.D. 100 MM X 100MM TIPO LUFLEX ISO 2531
TEE HED 200 MM X 200MM ISO 2531 LUFLEX
TEE H.D. 250 MM X 100MM TIPO LUFLEX ISO 2531
TEE HED 250 MM X 250MM ISO 2531 LUFLEX
TEE HED 315 MM X 315MM ISO 2531 LUFLEX
TEE HED 400 MM X 400MM ISO 2531 LUFLEX
TEE HED 450 MM X 450MM ISO 2531 LUFLEX
CRUZ H.D. 200 MM X 150 MM TIPO LUFLEX ISO 2531
CRUZ H.D. 150 MM X 100 MM TIPO LUFLEX ISO 2531
VALVULA 110 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO
VALVULA 160 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO
VALVULA 200 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO
VALVULA 250 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO
VALVULA 315 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO
VALVULA 400 MM T/COMPUERTA HD TIPO LUFLEX C/ANILLO
VARIOS
REPOSICION DE CARPETA ASFALTICA DE 2"
REPOSICION DE CARPETA CONCRETO DE 4"
REUBICACION DE TUBERIA EXISTENTE
SUMINISTRO E INSTALACION DE TUBERIAS PARA RESERVORIO
EDUCACION SANITARIA
EDUCACION SANITARIA
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
SUBTOTAL
SUBTOTAL X FR
IGV
TOTAL
UND
pza
pza
pza
pza
pza
pza
pza
pza
und
und
und
und
und
und
und
und
pza
und
pza
und
und
und
und
pza
pza
pza
und
pza
pza
pza
pza
METRADO
1.00
2.00
1.00
2.00
1.00
3.00
3.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
4.00
2.00
1.00
1.00
1.00
1.00
1.00
6.00
1.00
8.00
1.00
4.00
1.00
PRECIO
588.01
669.55
1028.20
1046.70
1199.65
3080.50
1532.39
2286.99
276.39
277.16
363.43
366.08
370.13
539.81
1273.20
1286.02
218.27
538.22
608.47
818.83
1259.62
2755.20
3431.47
514.59
396.01
500.87
780.51
1132.79
2160.36
2636.62
5648.71
m2
m2
glb
glb
8534.19
912.08
2.00
2.00
43.73
55.40
2508.06
6834.82
glb
1.00
10000.00
7.5%
5.0%
90.0%
VALORIZACION ANTERIOR
VALORIZACION ACTUAL
VALORIZACION ACUMULADA
SALDO POR EJECUTAR
PARCIAL METRADO
PARCIAL S/. METRADO
PARCIAL S/. METRADO
PARCIAL S/. %
METRADO
PARCIAL S/. %
588.01
0.00
0.00
0.00
0.00
0.00%
1.00
588.01
1339.10
0.00
0.00
0.00
0.00
0.00%
2.00
1339.10
1028.20
0.00
0.00
0.00
0.00
0.00%
1.00
1028.20
2093.40
0.00
0.00
0.00
0.00
0.00%
2.00
2093.40
1199.65
0.00
0.00
0.00
0.00
0.00%
1.00
1199.65
9241.50
0.00
0.00
0.00
0.00
0.00%
3.00
9241.50
4597.17
0.00
0.00
0.00
0.00
0.00%
3.00
4597.17
6860.97
0.00
0.00
0.00
0.00
0.00%
3.00
6860.97
552.78
0.00
0.00
0.00
0.00
0.00%
2.00
552.78
277.16
0.00
0.00
0.00
0.00
0.00%
1.00
277.16
363.43
0.00
0.00
0.00
0.00
0.00%
1.00
363.43
366.08
0.00
0.00
0.00
0.00
0.00%
1.00
366.08
370.13
0.00
0.00
0.00
0.00
0.00%
1.00
370.13
539.81
0.00
0.00
0.00
0.00
0.00%
1.00
539.81
1273.20
0.00
0.00
0.00
0.00
0.00%
1.00
1273.20
1286.02
0.00
0.00
0.00
0.00
0.00%
1.00
1286.02
654.81
0.00
0.00
0.00
0.00
0.00%
3.00
654.81
1614.66
0.00
0.00
0.00
0.00
0.00%
3.00
1614.66
2433.88
0.00
0.00
0.00
0.00
0.00%
4.00
2433.88
1637.66
0.00
0.00
0.00
0.00
0.00%
2.00
1637.66
1259.62
0.00
0.00
0.00
0.00
0.00%
1.00
1259.62
2755.20
0.00
0.00
0.00
0.00
0.00%
1.00
2755.20
3431.47
0.00
0.00
0.00
0.00
0.00%
1.00
3431.47
514.59
0.00
0.00
0.00
0.00
0.00%
1.00
514.59
396.01
0.00
0.00
0.00
0.00
0.00%
1.00
396.01
3005.22
0.00
0.00
0.00
0.00
0.00%
6.00
3005.22
780.51
0.00
0.00
0.00
0.00
0.00%
1.00
780.51
9062.32
0.00
0.00
0.00
0.00
0.00%
8.00
9062.32
2160.36
0.00
0.00
0.00
0.00
0.00%
1.00
2160.36
10546.48
0.00
0.00
0.00
0.00
0.00%
4.00
10546.48
5648.71
0.00
0.00
0.00
0.00
0.00%
1.00
5648.71
442415.12
0.00
0.00
0.00
442415.12
373200.13
0.00
0.00
0.00
0.00
0.00%
8534.19
373200.13
50529.23
0.00
0.00
0.00
0.00
0.00%
912.08
50529.23
5016.12
0.00
0.00
0.00
0.00
0.00%
2.00
5016.12
13669.64
0.00
0.00
0.00
0.00
0.00%
2.00
13669.64
10000.00
0.00
0.00
0.00
10000.00
10000.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
10000.00
3632425.55
57344.66
15937.82
73282.48
3559143.07
272431.92
4300.85
1195.34
5496.19
266935.73
181621.28
2867.23
796.89
3664.12
177957.15
4086478.74
64512.74
17930.05
82442.79
4004035.95
3677830.87
662009.56
4339840.43
58061.47
10451.06
68512.53
16137.05
2904.67
19041.72
74198.51
13355.73
87554.24
3603632.36
648653.82
4252286.18
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS
ITEM
01
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
02
2.01
2.02
2.03
2.04
2.05
2.06
2.07
03
3.01
3.02
3.03
3.04
3.05
3.06
04
4.01
05
5.01
5.02
5.03
5.04
5.05
5.06
5.07
06
6.01
06.01.01
6.02
06.02.01
6.03
06.03.01
6.04
06.04.01
07
7.01
DESCRIPCION
UND
METRADO PRECIO S/.
INSTALACIONES DE MACROMEDIDORES
INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 6"
u
6.00
15723.61
INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 8"
u
5.00
17247.61
INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 10"
u
1.00
18971.86
INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 10" EN CAM. 2 DE MAYO
u
1.00
17997.76
INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 10" EN CAM. AV. AREQUIPA
u
1.00
17273.37
INST. MACROMEDIDOR ELECTROMAGAG A BAT DE 12"
u
1.00
18872.93
INST. MACROMEDIDOR ELECTROMAGAG DE 10"
u
1.00
14871.86
INST. MACROMEDIDOR ELECTROMAGAG DE 12"
u
1.00
18877.03
INST. MACROMEDIDOR ELECTROMAG. DE 12" C/ACCESOR. P/TUB. LLENO
u
1.00
21363.60
INST. MACROMEDIDOR ULTRASONICO DE 1CANAL EN TUB DE 16"
u
1.00
28435.08
INST. MACROMEDIDOR ULTRASONICO DE 1 CANAL EN TUB. DE 24"
u
1.00
29835.08
INST. MACROMEDIDOR ULTRASONICO DE 2 CANALES EN TUB. DE 12" YuDE 20"
1.00
34614.41
INST. MACROMEDIDOR ULTRASONICO DE 2 CANALES EN TUB. DE 14" YuDE 14"
1.00
32539.27
INST. MACROMEDIDOR ULTRASONICO DE 2 CANALES EN TUB. DE 14" YuDE 10"
1.00
32207.34
INSTALACIONES DE MICROMEDIDORES
NOTIFICACION DE USUARIOS
u
24680.00
3.13
INSPECCION DE INSTALACIONES EXTERNAS E INTERNAS
u
24680.00
4.62
INSTALACION DE MEDIDOR DOMICILIARIO DE 1/2" (MSD)
u
23901.00
122.41
INSTALACION DE MEDIDOR DOMICILIARIO DE 3/4" (MSD)
u
645.00
207.71
INSTALACION DE MEDIDOR DOMICILIARIO DE 1" (MSD)
u
107.00
478.25
INSTALACION DE MEDIDOR DOMICILIARIO DE 2" (MSD)
u
25.00
2291.92
INSTALACION DE MEDIDOR DOMICILIARIO DE 4" (MSD)
u
2.00
4042.03
INSTALACIONES DE VALVULAS DE AIRE
VALVULA AIRE D=1" SOBRE LINEA DE 3"
u
2.00
1048.92
VALVULA AIRE D=1" SOBRE LINEA DE 4"
u
47.00
1053.92
VALVULA AIRE D=1" SOBRE LINEA DE 6"
u
13.00
1058.92
VALVULA AIRE D=2" SOBRE LINEA DE 8"
u
9.00
1588.23
VALVULA AIRE D=2" SOBRE LINEA DE 10"
u
5.00
1695.76
VALVULA AIRE D=2" SOBRE LINEA DE 12"
u
4.00
1715.76
INSTALACIONES DE GRIFOS CONTRA INCENDIOS
GRIFO CONTRAINCENDIO TIPO POSTE DE 2 BOCAS
u
300.00
2465.40
INSTALACIONES DE VALVULAS EN CAMARAS REDUCTORAS DE PRESION
INSTALACION VALVULAS Y ACCESORIOS EN CAMARA REDUCTORA DEuPRESION DE 4" EN
4.00TUB DE
16487.21
4"
INSTALACION VALVULAS Y ACCESORIOS EN CAMARA REDUCTORA DEuPRESION DE 4" EN
5.00TUB DE
17080.95
6"
INSTALACION DE VALVULA DE D=4" PARA SECTORIZACION
u
5.00
2481.16
INSTALACION DE VALVULA DE D=8" PARA SECTORIZACION
u
4.00
4289.03
INSTALACION DE VALVULA DE D=12" PARA SECTORIZACION
u
3.00
5996.37
INSTALACION DE VALVULA DE D=14" PARA SECTORIZACION
u
1.00
7473.21
INSTALACION DE VALVULA DE D=16" PARA SECTORIZACION
u
2.00
7588.31
INSTALACIONES DE VALVULAS EN RESERVORIOS DE CONCRETO ARMADO
RESERVORIO APOYADO R-2
INSTALACION DE VALVULAS - RESERVORIO R-2
u
1.00
29159.47
RESERVORIO APOYADO R-4
INSTALACION DE VALVULAS - RESERVORIO R-4
u
1.00
8306.89
RESERVORIO APOYADO R-5
INSTALACION DE VALVULAS - RESERVORIO R-5
u
1.00
24410.48
RESERVORIO APOYADO R-7
INSTALACION DE VALVULAS - RESERVORIO R-7
u
1.00
3596.24
EDUCACION SANITARIA
EDUCACION SANITARIA
glb
1.00
20000.00
Costo Directo
GASTOS GENERALES
7.50%
UTILIDADES
5%
SUBTOTAL
SUBTOTAL X FR
IGV
TOTAL
0.90
PARCIAL S/.
466,439.30
94341.66
86238.05
18971.86
17997.76
17273.37
18872.93
14871.86
18877.03
21363.60
28435.08
29835.08
34614.41
32539.27
32207.34
3,367,519.17
77248.40
114021.60
2925721.41
133972.95
51172.75
57298.00
8084.06
95,033.95
2097.84
49534.24
13765.96
14294.07
8478.80
6863.04
739,620.00
739620.00
221,554.45
65948.84
85404.75
12405.80
17156.12
17989.11
7473.21
15176.62
65,473.08
29,159.47
29159.47
8,306.89
8306.89
24,410.48
24410.48
3,596.24
3596.24
20,000.00
20000.00
4,975,639.95
373,173.00
248,782.00
5,597,594.94
VALORIZACION ANTERIOR
METRADO
PARCIAL S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3130.00
1000.00
3130.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,130.00
234.75
156.50
3,521.25
VALORIZACION ACTUAL
METRADO
PARCIAL S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2000.00
0.10
2000.00
2,000.00
150.00
100.00
2,250.00
5,037,835.45
906,810.38
5,944,645.83
3,169.13
570.44
3,739.57
2,025.00
364.50
2,389.50
VALORIZACION ACUMULADA
METRADO
PARCIAL S/.
%
0.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3130.00
1000.00
3130.00
4.05%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00%
2000.00
0.10
2000.00
10.00%
5,130.00
384.75
256.50
5,771.25
5,194.13
934.94
6,129.07
%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.95%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
90.00%
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
ITEM
01
1.01
01.01.01
1.02
01.02.01
01.02.02
01.02.03
1.03
01.03.01
1.04
01.04.01
01.04.02
01.04.03
01.04.04
02
2.01
02.01.01
2.02
02.02.01
02.02.02
02.02.03
02.02.04
2.03
02.03.01
02.03.02
02.03.03
02.03.04
2.04
02.04.01
02.04.02
02.04.03
02.04.04
03
3.01
04
4.01
04.01.01
4.02
04.02.01
04.02.02
04.02.03
4.03
04.03.01
4.04
04.04.01
04.04.02
04.04.03
04.04.04
05
5.01
05.01.01
05.01.01.01
05.01.01.02
05.01.01.03
05.01.02
05.01.02.01
05.01.02.02
05.01.02.03
05.01.03
DESCRIPCION
UND
INSTALACION DE MICROMEDIDORES
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
m
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA MICROMEDIDORES
m3
NIVELACION INTERIOR Y APISONADO MANUAL
m2
ELIMINACION DE MATERIAL EXCEDENTE
m3
OBRAS DE CONCRETO SIMPLE
SOLADO MEZCLA 1:12 CEMENTO-HORMIGON
m2
CONCRETO ARMADO
CONCRETO F'C= 210 KG/CM2. P/CAM.MACR.
m3
ENCOFRADO Y DESENCOFRADO MUROS Y LOSA
m2
ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/C.MUROS Y LOSA kg
CURADO DE CONCRETO
m2
INSTALACION DE VALVULAS DE AIRE
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
m
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA VALVULAS
m3
RELLENO COMPACTADO C/MAT PROPIO C/EQUIPO LIG.
m3
NIVELACION INTERIOR Y APISONADO MANUAL
m2
ELIMINACION DE MATERIAL EXCEDENTE
m3
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 KG/CM2. P/CAJA DE VALVULA
m3
SOLADO MEZCLA 1:12 CEMENTO-HORMIGON
m2
ENCOFRADO Y DESENCOF MUROS
m2
CURADO DE CONCRETO
m2
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2. P/CAM.VALVULAS
m3
ENCOFRADO Y DESENCOFRADO MUROS Y LOSA
m2
ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/C.MUROS Y LOSA kg
CURADO DE CONCRETO
m2
SUMINISTRO E INSTALACION DE GRIFO CONTRAINCENDIO
REPOSICION DE VEREDA DE CONCRETO DE 4"
m2
CAMARAS REDUCTORAS DE PRESION
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
m
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA CAMARAS REDUCTORAS
m3
NIVELACION INTERIOR Y APISONADO MANUAL
m2
ELIMINACION DE MATERIAL EXCEDENTE
m3
OBRAS DE CONCRETO SIMPLE
SOLADO MEZCLA 1:12 CEMENTO-HORMIGON
m2
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2. P/CAM. REDUCTORAS P.
m3
ENCOFRADO Y DESENCOFRADO MUROS Y LOSA
m2
ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/C.MUROS Y LOSA kg
CURADO DE CONCRETO
m2
RESERVORIOS APOYADOS DE CONCRETO ARMADO
CONSTRUCCION DE RESERVORIO APOYADO V=2500m3
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
und
ALMACEN Y GUARDIANIA
m2
OFICINA DE RESIDENTE, SUPERVISION Y COMEDOR DE OBREROS
m2
TRABAJOS PRELIMINARES
MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA
glb
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
LIMPIEZA DE TERRENO MANUAL
m2
MOVIMIENTO DE TIERRAS
METRADO
PRECIO S/.
56.70
1.84
122.71
56.70
163.20
26.16
3.28
20.65
56.70
23.07
62.97
219.90
3,214.02
219.90
384.73
45.88
4.48
3.19
80.00
1.84
99.60
41.80
80.00
75.14
29.89
37.57
3.28
20.78
25.93
80.00
159.36
159.36
368.88
23.07
39.59
3.19
5.18
74.24
501.12
501.12
384.73
45.88
4.48
3.19
450.00
50.73
69.93
1.84
158.73
69.93
206.35
29.89
3.28
20.78
69.93
23.07
61.75
223.56
7,682.33
223.56
384.73
45.88
4.48
3.19
1.00
200.00
80.00
1,179.48
57.26
64.22
1.00
246.05
246.05
5,162.82
1.84
2.56
PARCIAL S/.
57,594.30
104.33
104.33
6,766.15
3,210.09
185.98
3,370.08
1,308.07
1,308.07
49,415.75
24,226.45
10,089.01
14,398.81
701.48
33,989.18
147.20
147.20
6,371.28
2,977.04
1,570.43
262.40
1,561.41
18,228.08
9,565.06
1,845.60
6,309.06
508.36
9,242.62
1,992.90
3,406.13
2,245.02
1,598.57
22,828.50
22,828.50
80,147.73
128.67
128.67
9,261.76
4,744.44
229.37
4,287.95
1,613.29
1,613.29
69,144.01
23,757.08
10,256.93
34,416.84
713.16
1,357,843.34
744,366.88
17,769.08
1,179.48
11,452.00
5,137.60
6,245.44
5,162.82
452.73
629.89
26,659.79
VALORIZACION ANTERIOR
METRADO
PARCIAL S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147.20
147.20
80.00
147.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,393.89
452.73
0.00
0.00
0.00
0.00
452.73
0.00
246.05
452.73
0.00
0.00
VALORIZACION ACTUAL
METRADO
PARCIAL S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,026.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION ACUMULADA
METRADO
PARCIAL S/.
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147.20
147.20
80.00
147.20
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,420.58
452.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
452.73
0.00
0.00
0.00
246.05
452.73
1.00
0.00
0.00
0.00
0.00
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
ITEM
DESCRIPCION
UND
METRADO PRECIO S/.
05.01.03.01
EXCAVACION P/CIMENTACION C/MAQ T.S.R.H < 3.0 M
m3
787.20
4.80
05.01.03.02
RELLENO Y COMPACTADO PARA ESTRUCTURAS CON MATERIAL
m3 PROPIO 76.35
18.42
05.01.03.03
NIVELACION Y COMPACTACION C/RODILLO P/SOLADO
m2
219.05
4.69
05.01.03.04
ELIMINACION DE MATERIAL EXCEDENTE
m3
984.00
20.78
05.01.04
OBRAS DE CONCRETO SIMPLE
05.01.04.01
SOLADO MEZCLA 1:12 CEMENTO-HORMIGON
m2
219.05
23.07
05.01.05
OBRAS DE CONCRETO ARMADO
05.01.05.01
CIMIENTO DE MURO DE CUBA
05.01.05.01.01 CONCRETO F'C= 280 KG/CM2 P/ZAPATAS
m3
91.55
388.11
05.01.05.01.02 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/ZAPATAS
kg
5,701.85
4.44
05.01.05.02
LOSA DE FONDO
05.01.05.02.01 CONCRETO F'C= 280 KG/CM2 C/IMPERMEABILIZANTE P/LOSA DE
m3 FONDO 16.65
446.41
05.01.05.02.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO
m2
7.25
45.72
05.01.05.02.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/LOSAS DE FONDO kg
387.90
4.44
05.01.05.03
MURO DE CUBA
05.01.05.03.01 CONCRETO F'C= 280 KG/CM2 P/MURO DE CUBA
m3
253.90
468.14
05.01.05.03.02 ENCOFRADO Y DESENCOF MURO CIRCULAR DE CUBA
m2
1,398.40
97.01
05.01.05.03.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/MURO CIRCULAR CUBA
kg
34,434.30
4.46
05.01.05.03.04 CURADO DE CONCRETO
m2
1,398.40
3.19
05.01.05.04
ARTESA DE REBOSE
05.01.05.04.01 CONCRETO F'C=280 KG/M2 P/ARTESA DE REBOSE H=4.20 M m3
0.35
419.04
05.01.05.04.02 ENCOFRADO Y DESENCOFRADO P/ARTESA DE REBOSE H=4.20M
m2
2.85
81.07
05.01.05.04.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/ARTESA DE REBOSE
kgH=4.20 M 22.25
4.47
05.01.05.04.04 CURADO DE CONCRETO
m2
2.85
3.19
05.01.05.05
VIGA PERIMETRAL CUBA-CPULA
05.01.05.05.01 CONCRETO F'C=280 KG/CM2 EN VIGA CIRCULAR CUBA
m3
14.65
476.54
05.01.05.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGA CIRC. DE
m2CUBA
58.60
90.73
05.01.05.05.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/VIGA CIRCULAR
kg
2,535.15
4.47
05.01.05.05.04 CURADO DE CONCRETO
m2
58.60
3.19
05.01.05.06
CUPULA DE RESERVORIO
05.01.05.06.01 CONCRETO F'C=210 KG/CM2 PARA LOSA EN CUPULA ESFERICA
m3
46.25
399.66
05.01.05.06.02 ENCOFRADO Y DESENCOFRADO EN CUPULA ESFERICA
m2
205.90
137.87
05.01.05.06.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 EN CUPULA ESFERICA
kg
1,289.25
4.58
05.01.05.06.04 CURADO DE CONCRETO
m2
411.80
3.19
05.01.06
REVESTIMIENTOS
05.01.06.01
CONFORM. DE FONDO C/IMPERMEABILIZANTE Emin = 2 CM LOSA
m2 DE FONDO
219.05
21.24
DE RESERVORIO
05.01.06.02
TARRAJEO C/IMPERMEABILIZANTE 1 capa E=2.5CM EN MUROS
m2INTERIORES
699.20
30.81
(INCL. VERTEDEROS)
05.01.06.03
TARRAJEO C/IMPERMEABILIZANTE 2 capa E=1.5CM EN MUROS
m2INTERIORES
699.20
27.95
05.01.06.04
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
699.20
33.38
05.01.06.05
REVESTIMIENTO DE CUPULA E=25MM C/MORTERO C:A 1:5 m2
411.80
21.84
05.01.06.06
CURADO DE CONCRETO
m2
2,728.45
3.19
05.01.07
CARPINTERIA METALICA
05.01.07.01
ESCALERA TIPO MARINERO (INTERIOR Y EXTERIOR)
m
14.00
111.34
05.01.07.02
MARCO Y TAPA DE FIERRO C/MECANISM. DE SEGURIDAD S/DISEO
und
1.00
364.09
05.01.07.03
VENTILACION C/TUBERIA DE FIERRO S/DISEO DE 3"
und
4.00
180.85
05.01.08
PINTURAS
05.01.08.01
PINTURA LATEX VINILICO EN LOSA CUPULA
m2
205.90
12.64
05.01.08.02
PINTURA LATEX VINILICA EN MURO Y CUBA EXTERIOR 2 MANOS
m2
699.20
12.64
05.01.09
VARIOS
05.01.09.01
WATER STOP DE NEOPRENE DE 6".PROVISION Y COLOCADO DE
m JUNTA 698.10
37.95
5.02
CONSTRUCCION DE RESERVORIO APOYADO V=2100m3
05.02.01
OBRAS PROVISIONALES
05.02.01.01
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
und
1.00
1,179.48
05.02.01.02
ALMACEN Y GUARDIANIA
m2
200.00
57.26
05.02.01.03
OFICINA DE RESIDENTE, SUPERVISION Y COMEDOR DE OBREROS
m2
80.00
64.22
05.02.02
TRABAJOS PRELIMINARES
05.02.02.01
MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA
glb
1.00
5,162.82
PARCIAL S/.
3,778.56
1,406.37
1,027.34
20,447.52
5,053.48
5,053.48
561,285.09
60,847.68
35,531.47
25,316.21
9,486.48
7,432.73
331.47
1,722.28
412,557.41
118,860.75
135,658.78
153,576.98
4,460.90
486.26
146.66
231.05
99.46
9.09
23,817.14
6,981.31
5,316.78
11,332.12
186.93
54,090.12
18,484.28
28,387.43
5,904.77
1,313.64
86,774.38
4,652.62
VALORIZACION ANTERIOR
METRADO
PARCIAL S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION ACTUAL
METRADO
PARCIAL S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21,542.35
0.00
0.00
0.00
0.00
0.00
699.20
21,542.35
100%
19,542.64
23,339.30
8,993.71
8,703.76
2,646.25
1,558.76
364.09
723.40
11,440.47
2,602.58
8,837.89
26,492.90
26,492.90
613,476.46
17,769.08
1,179.48
11,452.00
5,137.60
7,413.42
5,162.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
941.16
0.00
0.00
0.00
0.00
941.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,026.68
4,684.68
1,179.48
2,863.00
642.20
2,342.00
1,032.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,967.84
4,684.68
1,179.48
2,863.00
642.20
3,283.16
1,032.56
0.00
0.00
0.00
0.00
699.20
699.20
411.80
2,728.45
100%
100%
100%
100%
0.00
0.00
0.00
14.00
1.00
4.00
0.00
0.00
205.90
699.20
0.00
698.10
1.00
0.25
0.13
0.00
150.00
70.00
0.20
0.80
19,542.64
23,339.30
8,993.71
8,703.76
2,646.25
1,558.76
364.09
723.40
11,440.46
2,602.58
8,837.89
26,492.90
26,492.90
605,508.60
13,084.40
0.00
8,589.00
4,495.40
4,130.26
4,130.26
1.00
50.00
10.00
0.20
VALORIZACION ACUMULADA
METRADO
PARCIAL S/.
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
50.00
10.00
0.20
%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
75%
88%
80%
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
ITEM
DESCRIPCION
UND
METRADO PRECIO S/.
05.02.02.02
TRAZO, NIVELACION Y REPLANTEO DE ESTRUCTURAS
m2
511.50
1.84
05.02.02.03
LIMPIEZA DE TERRENO MANUAL
m2
511.50
2.56
05.02.03
MOVIMIENTO DE TIERRAS
05.02.03.01
EXCAVACION P/CIMENTACION C/MAQ T.S.R.H < 3.0 M
m3
608.05
4.80
05.02.03.02
RELLENO Y COMPACTADO PARA ESTRUCTURAS CON MATERIAL
m3 PROPIO 35.50
18.42
05.02.03.03
NIVELACION Y COMPACTACION C/RODILLO P/SOLADO
m2
411.45
4.69
05.02.03.04
ELIMINACION DE MATERIAL EXCEDENTE
m3
760.07
20.78
05.02.04
OBRAS DE CONCRETO SIMPLE
05.02.04.01
SOLADO MEZCLA 1:12 CEMENTO-HORMIGON
m2
411.45
23.07
05.02.05
OBRAS DE CONCRETO ARMADO
05.02.05.01
CIMIENTO DE MURO DE CUBA
05.02.05.01.01 CONCRETO F'C= 280 KG/CM2 P/ZAPATAS
m3
111.50
388.11
05.02.05.01.02 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/ZAPATAS
kg
8,163.40
4.44
05.02.05.02
LOSA DE FONDO
05.02.05.02.01 CONCRETO F'C= 280 KG/CM2 C/IMPERMEABILIZANTE P/LOSA DE
m3 FONDO 52.20
446.41
05.02.05.02.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO
m2
12.80
45.72
05.02.05.02.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/LOSAS DE FONDO kg
826.70
4.44
05.02.05.03
MURO DE CUBA
05.02.05.03.01 CONCRETO F'C= 280 KG/CM2 P/MURO DE CUBA
m3
137.70
468.14
05.02.05.03.02 ENCOFRADO Y DESENCOF MURO CIRCULAR DE CUBA
m2
835.75
97.01
05.02.05.03.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/MURO CIRCULAR CUBA
kg
17,675.35
4.46
05.02.05.03.04 CURADO DE CONCRETO
m2
835.75
3.19
05.02.05.04
ARTESA DE REBOSE
05.02.05.04.01 CONCRETO F'C=280 KG/M2 P/ARTESA DE REBOSE H=4.20 M m3
0.35
419.04
05.02.05.04.02 ENCOFRADO Y DESENCOFRADO P/ARTESA DE REBOSE H=4.20M
m2
2.85
81.07
05.02.05.04.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/ARTESA DE REBOSE
kgH=4.20 M 22.25
4.47
05.02.05.04.04 CURADO DE CONCRETO
m2
2.85
3.19
05.02.05.05
VIGA PERIMETRAL CUBA-CPULA
05.02.05.05.01 CONCRETO F'C=280 KG/CM2 EN VIGA CIRCULAR CUBA
m3
13.80
476.54
05.02.05.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGA CIRC. DE
m2CUBA
79.20
90.73
05.02.05.05.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 P/VIGA CIRCULAR
kg
2,763.15
4.47
05.02.05.05.04 CURADO DE CONCRETO
m2
79.20
3.19
05.02.05.06
CUPULA DE RESERVORIO
05.02.05.06.01 CONCRETO F'C=210 KG/CM2 PARA LOSA EN CUPULA ESFERICA
m3
77.75
399.66
05.02.05.06.02 ENCOFRADO Y DESENCOFRADO EN CUPULA ESFERICA
m2
381.40
137.87
05.02.05.06.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 EN CUPULA ESFERICA
kg
1,032.40
4.58
05.02.05.06.04 CURADO DE CONCRETO
m2
1,190.90
3.19
05.02.06
REVESTIMIENTOS
05.02.06.01
CONFORM. DE FONDO C/IMPERMEABILIZANTE Emin = 2 CM LOSA
m2 DE FONDO
381.40
21.24
DE RESERVORIO
05.02.06.02
TARRAJEO C/IMPERMEABILIZANTE 1 capa E=2.5CM EN MUROS
m2INTERIORES
410.00
30.81
(INCL. VERTEDEROS)
05.02.06.03
TARRAJEO C/IMPERMEABILIZANTE 2 capa E=1.5CM EN MUROS
m2INTERIORES
410.00
27.95
05.02.06.04
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
m2
425.75
33.38
05.02.06.05
REVESTIMIENTO DE CUPULA E=25MM C/MORTERO C:A 1:5 m2
762.80
21.84
05.02.06.06
CURADO DE CONCRETO
m2
1,598.55
3.19
05.02.07
CARPINTERIA METALICA
05.02.07.01
ESCALERA TIPO MARINERO (INTERIOR Y EXTERIOR)
m
9.00
111.34
05.02.07.02
MARCO Y TAPA DE FIERRO C/MECANISM. DE SEGURIDAD S/DISEO
und
1.00
364.09
05.02.07.03
VENTILACION C/TUBERIA DE FIERRO S/DISEO DE 3"
und
4.00
180.85
05.02.08
PINTURAS
05.02.08.01
PINTURA LATEX VINILICO EN LOSA CUPULA
m2
511.50
12.64
05.02.08.02
PINTURA LATEX VINILICA EN MURO Y CUBA EXTERIOR 2 MANOS
m2
425.75
12.64
05.02.09
VARIOS
05.02.09.01
WATER STOP DE NEOPRENE DE 6".PROVISION Y COLOCADO DE
m JUNTA 586.40
37.95
6.00
EDUCACION SANITARIA
6.01
EDUCACION SANITARIA
glb
1.00
5,000.00
COSTO DIRECTO
GASTOS GENERALES
7.50%
PARCIAL S/.
941.16
1,309.44
21,296.50
2,918.64
653.91
1,929.70
15,794.25
9,492.15
9,492.15
453,152.04
79,519.77
43,274.27
36,245.50
27,558.37
23,302.60
585.22
3,670.55
227,037.09
64,462.88
81,076.11
78,832.06
2,666.04
486.26
146.66
231.05
99.46
9.09
26,366.00
6,576.25
7,185.82
12,351.28
252.65
92,184.55
31,073.57
52,583.62
4,728.39
3,798.97
68,163.00
8,100.94
VALORIZACION ANTERIOR
METRADO
PARCIAL S/.
511.50
941.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION ACTUAL
METRADO
PARCIAL S/.
0.00
0.00
511.50
1,309.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VALORIZACION ACUMULADA
METRADO
PARCIAL S/.
%
511.50
941.16
1.00
511.50
1,309.44
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,632.10
0.00
0.00
0.00
0.00
0.00
410.00
12,632.10
100%
11,459.50
14,211.54
16,659.55
5,099.37
2,089.55
1,002.06
364.09
723.40
11,846.84
6,465.36
5,381.48
22,253.88
22,253.88
5,000.00
5,000.00
1,557,403.05
116,805.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,393.89
104.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,026.68
527.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,567.78
642.58
0.00
0.00
0.00
0.00
410.00
425.75
762.80
1,598.55
100%
100%
100%
100%
0.00
0.00
0.00
9.00
1.00
4.00
0.00
0.00
511.50
425.75
0.00
586.40
0.00
1.00
11,459.50
14,211.54
16,659.55
5,099.37
2,089.55
1,002.06
364.09
723.40
11,846.84
6,465.36
5,381.48
22,253.88
22,253.88
5,000.00
5,000.00
1,548,835.24
116,162.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
ITEM
DESCRIPCION
UTILIDADES
SUBTOTAL
SUBTOTAL X FR
IGV
TOTAL
UND
5.00%
0.9
METRADO
PRECIO S/.
PARCIAL S/.
77,870.15
1,752,078.43
VALORIZACION ANTERIOR
METRADO
PARCIAL S/.
69.69
1,568.13
VALORIZACION ACTUAL
METRADO
PARCIAL S/.
351.33
7,905.02
1,576,870.59
283,836.71
1,860,707.29
1,411.32
254.04
1,665.35
7,114.52
1,280.61
8,395.13
VALORIZACION ACUMULADA
METRADO
PARCIAL S/.
%
428.39
9,638.75
8,674.87
1,561.48
10,236.35
MEJORAMIENTO Y AMPLIACION INTEGRAL DEL SISTEMA DE DISTRIBUCION DE AGUA POTABLE EN LA CIUDAD DE TACNA
N 007-2012-300-EPS TACNA S.A.
CONSORCIO COLLAO
CONSORCIO CAPLINA
CODIGO
DESCRIPCION
METRADO
PRECIO
UND PRESUPUESTO UNITARIO
SOLES
PRECIO
PARCIAL
ACUMULADO ANTERIOR
Metrados
SOLES
EN EL MES
Metrados
ACUMULADO ACTUAL
SOLES
Metrados
SOLES
% Avance
Metrados
SOLES
OBRAS SECUNDARIAS
01
02
03
INSTALACIONES DE TUBERIAS
INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS
CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
TOTAL COSTO DIRECTO
IGV
TOTAL PRESUPUESTO
AVANCE PARCIAL
% AVANCE PARCIAL
% AVANCE ACUMULADO
1.00
1.00
1.00
3,677,830.87
5,037,835.45
1,576,870.59
3,677,830.87
5,037,835.45
1,576,870.59
58,061.47
3,169.13
1,411.32
16,137.05
2,025.00
7,114.52
74,198.51
5,194.13
8,525.83
10,292,536.91
1,852,656.64
12,145,193.55
62,641.91
11,275.54
73,917.45
25,276.56
4,549.78
29,826.34
87,918.47
15,825.32
103,743.79
100.00%
100.00%
0.61%
0.61%
0.25%
0.25%
0.85%
0.85%
2.02%
0.10%
0.54%
3,603,632.36
5,032,641.32
1,568,344.75
10,204,618.44
1,836,831.32
12,041,449.76
99.15%
100.00%
HOJA DE RESUMEN
OBRA
PRESUPUESTO BASE
001
003
004
INSTALACIONES DE TUBERIAS
INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACCESORIOS
CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARMADO
COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
SUB TOTAL
SUB TOTAL X FR
IGV
TOTAL
7.50%
5.00%
0.9
ESTUDIOS
2.12%
SUPERVISION Y LIQUIDACION
5.00%
IGV
18.00%
(INCLUYE IGV)
PRESUPUESTO TOTAL
Nota : Los precios de los recursos no incluyen I.G.V. son vigentes al : 09/07/2011
S/.
HOJA D
DE AGUA POTABLE
OBRA
PRE
3,632,425.55
4,975,639.95
1,557,403.05
001
003
004
INSTALACIONES DE TUBERIAS
INSTALACION DE MEDIDORES, VALVULAS, GRIFOS Y ACC
CONSTRUCCION DE ESTRUCTURAS DE CONCRETO ARM
10,165,468.55
COSTO DIR
762,410.14
508,273.43
11,436,152.12
10,292,536.91
1,852,656.64
12,145,193.55
SUB TOTAL X FR
IGV
TOTAL
242,916.29
571,807.61
2,058,507.38
===============
38,599,770.50
PRESUPUESTO BASE
3,632,425.5500
4,320,513.5400
1,557,403.0500
COSTO DIRECTO
S/.
0.80%
4.20%
3.224675363782%
9,510,342.1400
76,082.7400
399,434.3700
306,677.6600
10,292,536.9100
10,292,536.9100
1,852,656.6438
12,145,193.5538
PLANILLA DE METRADOS
PARTIDA
DESCRIPCION
UND
METRADO
INSTALACION DE TUBERIAS
03.01.03
03.02.01
300.00
AV LOS ANGELES
300.00
CORTE DE PAVIMENTO
500.00
AV LOS ANGELES
500.00
CONCRETO ARMADO
05.02.01.01
05.02.01.02
05.02.01.03
05.02.02.01
05.02.02.03
und
1.00
RESERVORIO R-02A
und
1.00
ALMACEN Y GUARDIANIA
m2
50.00
RESERVORIO R-02A
m2
50.00
10.00
RESERVORIO R-02A
m2
10.00
0.20
RESERVORIO R-02A
glb
0.20
m2
511.50
RESERVORIO R-02A
m2
511.50