MM & WM Module
Material Management:
The grouping of management functions supporting the complete cycle of material flow, from the purchase and internal control of production materials to the planning and control of work in process to the warehousing, shipping, and distribution of the finished product. Here are the some key mandatory gaps between our proposed ERP system and current Matrix system very few to mentioned. Master Planning Functionality Available in Proposed ERP System
In the proposed system, it would be possible to carry out a forecast for a single material only/ several materials at once/ selected materials and using this forecasted result in Sales & Operations Planning (SOP). Forecasted results can be possible to use in Demand Management and during the requirements planning. This monthly requirement can be possible to divide into either daily or weekly requirements Sales and Operati ons Plannin g (SOP) In the proposed system it would be possible to create SOP in product level, material level & able to create different planning versions.
GAP in Matrix
It is not possible forecasting materials in current system similar manner. Current system doesnt offer this kind of planning options. This kind of master planning is not possible in matrix system. There is no such aggregated SOP in the matrix system.
Comment
Yearly forecasting might be given in the system manually in some concerns. Require function for demand planning. Needed for operational activity. Mandatory requirement for production planning Only possible to create 4-6 months demand planning for Knit Composite.
Forecas t Processi ng
It should be possible to create a demand program by copying the material forecast, the results of SOP, original plan, and planned independent requirements (PIR) of another material. In the proposed system. It is also possible to create customer requirements for demand planning. It should be possible to carry out MRP Planning at plant or at MRP area level. It should be possible to carry out a planning run for a single material or product group. Most of the MRP features like procurement quantities calculation, different types of procurement proposals, BOM explode, scheduling order to calculate the start & finish dates for the procurement proposal, plan individual storage locations separately, and different company code level MRP run. In the proposed system, it should be possible to create Planned Orders automatically and manually by carrying out an MRP run.
Not possible in current matrix system. In the current system MRP is not total functioning with SOP & demand planning. Its not possible in Matrix. This kind of advanced MRP based master planning not possible in Matrix system. Only in Cosmetics covering part of MRP.
In the proposed system planned order via MRP run is not possible. Not possible in the current system. Existing system this feature is not available.
It should be possible to check the availability of components according to both ATP Logic and or existing PIRs. In our proposed system it will be possible to convert a Planned Order into a Purchase Requisition and / or into a Process Order.
Manual planned order is adopted somewhat in the current practices. Mandatory requirement
Page 2 of
12
Page 3 of
12
GAP in Matrix
In Matrix system manual alphabetical numbering possible only. This is not possible in the Matrix system.
Commen t
Must have requirement. Required for various reporting purposes.
Not possible in the existing system. Not possible in the existing system. Not possible in the existing system. Not possible in the existing system. Would not be possible in the Matrix. Current Matrix system doesnt accommodate such features. In the Matrix ERP some of this function is
Must needed requirement Required for risk minimization Nice to have for collaboration purpose
Mandatory requirement
No such option in the Matrix ERP. Current system doesnt accommodate such feature. Not possible in the existing system. Do not have such advanced feature in the Matrix.
Page 4 of
12
Will improve the efficiency Must have requirement for controlling & visibility
The system has the ability to define different multi level PR Approval path/ strategy based on PR amount The system has the ability to make a revision in purchase requisition (other than value) so that no PR approval is required The system has the ability to easily change the approval process in the system if the Keya Group policy changes It should be possible to create a RFQ either manually or by referencing to an already existing RFQ, requisition, or outline purchase agreement. There should be an internal number assignment for RFQs and also possible to create a rejection letter. The prices and conditions set out in the quotation submitted by the vendor should be adopted into the RFQ document. A comparative appraisal of several vendor quotations by means of the price comparison list should be carried out by the system. The individual quotations should be compared item by item. The mean value quotation should represent the average value of the individual quotes. The most favorable quotation should be saved in an info record and ERP will send rejection letters to unsuccessful bidders. The system has the ability to notify when a bid/quotation is about to expire The system has the ability to record both initial and final price quoted The system has the ability to combine the purchase requisition into one tender document/RFQ (Request for Quotation)
Doesnt have in the current system Currently not Possible Its not possible into existing system Not Possible in Matrix
Nice to have
Page 5 of
12
Maintain Contract
Purchase Orders conditions should apply at various levels: To the entire purchase order At item level, to the material to be supplied or to the set of service specifications in the case of services In our proposed system has the ability to provide contract number reference for every PO created The system has the ability to capture different type of purchasing based on limit value (cash purchase, direct order, limited bid, open bid) Proposed system has the ability to do repeated purchasing (from the previous vendor) and copy previous contract terms and conditions The system has the ability to handle multiple currencies in a single purchase order Proposed system has the ability to attach text descriptions, pictures and drawings to purchase orders In the proposed system has the ability to create one purchase order consisting of goods/parts and services The system has the ability to define and maintain purchase of services (which does not require a 'receiving' process) The system has the ability to block the capability to create Purchase Order without any reference to any approved Requisition Proposed system has the ability to list outstanding PR for a specific purchaser/buyer, so that purchaser know that they need to follow up The system has the ability to convert requisitions to a purchase order automatically when requisition is approved In the proposed system has the ability to type/ enter reasons due to purchase order rejection/ cancellation The system has the ability to support multiple schedule delivery for each item in PO (one item has multiple schedule delivery) The system has the ability to support PO with multi currency In the proposed system has the capability to close PO automatically if related PO has already expired (user can specify their own expiration date for the PO) The system has the ability to support an electronic multi-level purchase order approval process Proposed system has the ability to define different multi level PO Approval path based on PO amount If batch management is activated in the material master and the user does not enter a batch number, the system should assign an internal batch number. If a minimum remaining shelf life is maintained in the material master, the system should ask for an
Mandatory requirement
Page 6 of
12
Not possible in the existing system. Its not possible in the matrix system. In Matrix its not possible currently. Currently its not possible in Matrix.
Nice to have
Not possible in the existing system. Currently its not possible in the Matrix system.
Matrix doesnt cover any service acceptance part. Not possible in the current system Existing system doesnt cover the part. Not possible in the existing system.
We need to capture all the transaction. Required for controlling purpose Mandatory requirement
Its not possible in the existing system. Matrix doesnt cover this. Not exist in the current system. Not possible to use several characteristics Must have requirement Required for reporting purposes
Page 7 of
12
Matrix does not have such features Not possible in the current system.
Search function
Matrix doesnt offer this kind of advanced features Existing system doesnt support this feature Not possible in the current Matrix system Does not have several search functions only can search by name.
Nice to have
Not possible in the existing system In the current system its not possible due to absence of external device
Mandatory requirement
Not possible in the existing system Matrix doesnt have such feature Existing system not provide this feature Only quantity inspection possible. Not possible in Matrix ERP Existing system doesnt have such feature. Not existed in Matrix. Current system doesnt have such feature Not possible in the current system. Matrix doesnt have such features.
Quality Inspection Physical Inventory Perform cycle count Inventory expiration Inventory adjustments
Mandatory Requirement
Page 8 of
12
Inventory planning
Existing system doesnt have this function Matrix doesnt cover this feature Not possible in the existing system.
Matrix doesnt provide such flexibility. Currently operating under only one single method. Required for flexibility in the costing Nice to have
Inventory costing
In Matrix is not possible to perform any source determination activities Not possible in the existing system
Table of Contents
Table of Contents
Transfer Posting
Quality inspection stock to unrestricted-use stock Unrestricted-use stock to quality inspection stock Quality inspection stock to blocked stock Blocked stock to quality inspection stock Unrestricted-use stock to blocked stock Blocked stock to un-restricted use stock Posting from material to material Posting from batch to batch
Matrix doesnt offer those transfer posting options in their ERP system.
Table of Contents
In case of stock transfer from plant to plant the goods receipt should be posted into the quality inspection stock. An inspection lot should be created for the transferred goods. It should be possible to create a BOM for the following range of use: Subcontracting
Matrix doesnt cover any feature related on subcontracting Not possible in the existing Matrix system.
Nice to have
The initial creation as well as every change should be seen in a change history with the following data: Date of the change User who carried out the change The content of the field before the change The content of the field after the change Every change of a batch master should be recorded in a change document. The following information should be available in the change history: Name of the user who executed the change Date and time of the change
Mandatory for risk minimization & controlling purposes Required for reporting & controlling purposes.
Page 9 of
12
For the manual administration of batches the following functions should be available: Creation of a batch master Change of a batch master Display of a batch master The batch number should be assigned in this way: internally, if no batch number is entered externally, if a batch number is entered manually The system has the ability to have & display several stock status (available, not available, damaged, etc) The system has the ability to provide report(s) on inventory aging analysis & to generate reports on inventory turnover (ITO). The system has the ability to generate statistical report on quality inspection results & to record and report on special stock which is in vendor site (future business requirement) System should be able to categories the type of Vendors (Material Vendor / Service Vendor / Maintenance Vendor / Sub-Contractor) System should be able to set different statuses for each Vendor (Approved / Preferred / Blocked / Obsolete) System should allow workflow approval for Vendor creation. User should be able to enter details of a new Vendor within the System, but a new record within the Vendor Master can only be created after Approval. System should have Vendor Evaluation Form for annual Vendor review. Users should be able to enter the results of an annual Vendor review, and access it as part of the Vendors History for future evaluations. System should be able to auto-populate data into the Vendor Evaluation Form. System should allow user to create PR to request for Quotation and update the price into the PR once the quotations have been received. Purchasing will follow up and obtain the quotations from vendors.
Manual feeding not possible Not available currently in Matrix Existing system does not provide such report Not possible in the current system Matrix doesnt have such reporting Currently not possible Existing system doesnt have such advance feature Not possible in the current system Matrix doesnt have this reporting Existing system does not provide such report Currently not possible Not possible in the Matrix system. Not existed in the current system.
Required for Reporting & controlling Required for reporting purpose Nice to have Mandatory requirement for controlling Required for reporting purposes
Page 10 of
12
GAP in Matrix
As mentioned above, matrix doesnt have such advanced features of WM
Comment
We need these advanced features to maximum utilization of Keya resources and reducing the cost of the inventory holding.
Required for controlling & reporting purposes Mandatory requirement Mandatory for material movement.
Existing system doesnt have such method. Current system doesnt have such features.
In Matrix the material master classification does not cover such features. Current system doesnt have such features. Required for controlling purposes & minimizing risk.
Put away process and its feature doesnt exist in the Matrix system. Doesnt have such feature in the existing ERP system.
Page 11 of
12
There is no such removal process in according to picking strategy in the Matrix ERP. Existing system doesnt provide such flexibility in the operation.
Matrix doesnt offer such kind of checking capability for interim transfer. Existing system doesnt provide such flexibility in the operation. Not available in the current system.
Currently not possible in the Matrix system. In the existing system there are no such external devices for interfacing with Inventory Management module.
Required for reporting purposes. Mandatory requirement for warehouse management smooth functioning.
Page 12 of