6.

SL. NO. 1 2 3 4 5 6 7

ALL INDIA REGIONWISE GENERATING INSTALLED CAPACITY (MW) OF POWER UTILITIES INCLUDING ALLOCATED SHARES IN JOINT AND CENTRAL SECTOR UTILITIES REGION Northern Western Southern Eastern N. Eastern Islands All India
COAL 28357.50 38924.50 22882.50 21797.88 60.00 0.00 112022.38 THERMAL GAS DSL 4421.26 12.99 8254.81 17.48 4690.78 939.32 190.00 17.20 824.20 142.74 0.00 70.02 18381.05 1199.75 Nuclear TOTAL 32791.75 47196.79 28512.60 22005.08 1026.94 70.02 131603.18 1620.00 1840.00 1320.00 0.00 0.00 0.00 4780.00 HYDRO
(Renewable) (MNRE)

(As on 31-03-12 ) R.E.S.@ TOTAL 4391.40 7909.95 11569.30 398.71 228.00 6.10 24503.45 53925.90 64394.24 52739.93 26285.91 2454.94 76.12 199877.03
31516.87

15122.75 7447.50 11338.03 3882.12 1200.00 0.00 38990.40

Captive Genration capacity in industries having demand of 1 MW and above, grid interactive (as on 31-03-10) MW RES -Renewable Energy Sources includes Small Hydro Project(SHP), Biomass Gas(BG), Biomass Power(BP), Urban & Industrial waste Power(U&I), Wind Energy solar power
The installed capacity in respect of RES as on 31-03-12 is based on MNRE email of 10.04.2012 from Ministry of Renewable Energy where cumulative Grid interactive power installed capacity has been indicated as 24914.32 MW as on 31.03.2012. ( Reconciliation of installed capacity of Hydro capacity resulted in transfer of 135 MW from conventional to SHP-RES and retrieval of installed capacity of 67.20 from SHP-RES to conventional Hydro has resulted in net addition of 67.8 MW to SHP . under RES Also 30 MW of capacity in the nature of Waste Heat Recovery Power Plant at Goa Energy Private Limited under U&I category of RES Out of this installed capacity due to wind and small hydro amounting to 508.67 MW appearing in captive capacity has been deducted to arrive at installed capacity of utilities in respect of RES(24914.32-508.67+67.8+30=22233.17)).

Note:- UNITS COMMISSIONED, DERATED & DECOMMISSIONED DURING MARCH. 12


1) Mundra TPP,Ph-III, U-2 (660 MW) of Adani Power Ltd. has been commissioned successfully (i.e Achieving full load) on 03-03-2012 2) Bhusawal TPS, U-4 (500 MW) of MSPGCL has been.commissioned successfully (i.e Achieving of Full load) on 07-03-2012 3) Bellary TPP , U-2 (500 MW) of KPCL has been commissioned successfully ( Full load) on 23-03-2012 4) Vallur St-I Ph-I TPP , U-1(500 MW) of NTPC/NTECL has been commissioned successfully ( Full load) on 28-03-2012 5) Simhadri STPP St-II U-4 (500 MW) of NTPC Ltd. has been commissioned successfully (Full load) on 30-03-2012 6) Utraula IPP, U-2 (45 MW) of Bajaj Energy Pvt. Ltd. has been commissioned successfully (Full load) on 19-03-2012 7) Bhusawal TPS, U-5 (500 MW) of MSPGCL has been.commissioned successfully (i.e Achieving of Full load) on 30-03-2012 8) Mundra TPP,Ph-III, U-3 (660 MW) of Adani Power Ltd. has been commissioned successfully (i.e Achieving full load) on 09-03-2012 9) Simhapuri TPP, U-1 (150 MW) of Simhapuri Energy Pvt Ltd. has been commissioned successfully ( Full load) on 24-03-2012 10) Rosa TPS, U-4 (300 MW) of Rosa Power Supply Co. Ltd. has been commissioned successfully ( Full load) on 28-03-2012 11) Durgapur Steel TPP, U-2 (500 MW) of DVC has been commissioned successfully ( Full load) on 23-03-2012 12) Koteshwar HEP, U-4 (100 MW) of THDC has been commissioned successfully on 22-03-2012 13) Myntdu (Leishka) Stage.I HEP, U-2 (42 MW) of MeECL has been commissioned successfully on 31-03-2012 14) Maithon RB TPS, U-2 (525 MW) of MPL has been commissioned successfully (Full Load) on 23-03-2012

15) The total Installed generating capacity retired during March 2012 was 155 MW ( Barauni TPS Units Nos 1 & 2 of BSEB & Unit No 3 of Harduaganj T P S of UPRVUNL)

199877

200000 175000 150000 125000 100000 75000 50000 25000 0


Thermal Nuclear Hydro RES Total Captive 4780 38990 24503 31516.87 131603

Thermal

Nuclear

Hydro

RES

Total

Captive

ENERGY SAVED IS ENERGY PRODUCED