Você está na página 1de 5

Input Data: 0

Tubing ID: 1.66 in 0.05


Wellhead pressure: 500 psia 3.5
Liquid production rate: 2000 stb/d 65
Producing gas-liquid ratio (GLR): 1000 scf/stb 200
Water cut (WC): 25 % 25
Oil gravity: 30
o
API 0.9
Water specific gravity: 1.05 1 for fresh water 1.07
Gas specific gravity: 0.65 1 for air 0.65
N
2
content in gas: 0 mole fraction 0
CO
2
content in gas: 0 mole fraction 0
H
2
S content in gas: 0 mole fraction 0
Formation volume factor for water: 1.2 rb/stb 1
Wellhead temperature: 100
o
F 35
Tubing shoe depth: 5000 ft 1500
Bottom hole temperature: 150
o
F 60
Oil specific gravity = 0.90 1 for fresh water 0.90
Mass associated with 1 stb of oil = 514.50 lb 233.07
Solution gas ratio at wellhead = 70.87 scf/stb 12.62
Oil formation volume factor at wellhead = 1.04 rb/stb 1.04
Volume associated with 1 stb of oil at wellhead = 48.03 cf 1.36
Fluid density at wellhead = 10.71 lb/cf 171.23
Solution gas-oil ratio at bottom hole = 306.72 scf/stb 54.63
Oil formation volume factor at bottom hole = 1.16 rb/stb 1.16
Volume associated with 1 stb of oil at bottom hole = 17.14 cf 0.49
Fluid density at bottom hole = 30.02 lb/cf 479.90
The average fluid density = 20.37 lb/cf 325.57
Inertial force (Dv) = 14.17 lb/day-ft 21.06
Friction factor = 0.1471 0.15
Friction term = 415.56 (lb/cf)
2
106187
Error in depth = 0.00 ft 0.00
Bottom hole pressure = 1907 psia 12.98
Instruction: 1) Select a unit system; 2) Update parameter values in the Input Data section; 3) Click "Solution"
button; and 4) View result in the Solution section.
Description: This spreadsheet calculates flowing bottom hole pressure based on tubing head pressure and
tubing flow performance using Poettmann-Carpenter Method.
Poettman-CarpenterBHP.xls
g air w o
GOR WOR M + + = ) ( 17 . 350
2048 . 1
00091 . 0
0125 . 0
10
10
18
(

=
t
API
g s
p
R
2048 . 1
00091 . 0
0125 . 0
10
10
18
(

=
t
API
g s
p
R
175 . 1
5 . 0
25 . 1 000147 . 0 971 . 0
(
(

+
|
|
.
|

\
|
+ = t R B
o
g
s o

( )( )( )
0 . 1 520
7 . 14
) ( ) ( 615 . 5
z T
p s w o m
R GOR B WOR B V + + =
( )
D
Mq
v D
o
5
10 4737 . 1

=
( ) v D
m
f
log 5 . 2 444 . 1
10 4

=
1
m 1.9685 in
MPa 514.5 psia
m
3
/d 408.8050314 bbl/d liquid 306.604 stb/d oil
sm
3
/m
3
1123 scf/bbl 1497.33 scf/stb
% 102.2012579 bbl/d water 0.33333 bbl/stb
1 for fresh water 25.7222
o
API
1 for fresh water 1.07 1 for fresh water
1 for air 0.65 1 for air
mole fraction 0 mole fraction
mole fraction 0 mole fraction
mole fraction 0 mole fraction
rm
3
/sm
3
1 rb/stb

o
C 95
o
F
m 4920 ft

o
C 140
o
F
1 for fresh water
kg
sm
3
/m
3
rm
3
/m
3
m
3
kg/m
3
sm
3
/m
3
rm
3
/m
3
m
3
kg/m
3
kg/m
3
kg/day-m
(kg/cm)
2
m
MPa
Instruction: 1) Select a unit system; 2) Update parameter values in the Input Data section; 3) Click "Solution"
button; and 4) View result in the Solution section.
Description: This spreadsheet calculates flowing bottom hole pressure based on tubing head pressure and
tubing flow performance using Poettmann-Carpenter Method.
Poettman-CarpenterBHP.xls
0.16404199 ft
Gas rate = 459088.05 scf/d
Z-factor Calculations:
Ppc = 670.5 psia
Tpc = 373.355
o
R
Wellhead Bottom hole
Ppr = 0.76733781 2.84488151
Tpr = 1.48652087 1.60704959
A = 0.41007186 0.47261167
B = 0.25364077 1.12845472
C = 0.07690528 0.06607063
D = 0.96663415 0.98676439
z = 0.92737478 0.82861908

Você também pode gostar