Monitoring Inspection Report

Use date format: 30/12/2011

1.0 General Inspection Lot No. Contractor Name Contractor PO. Contr.Inspector Name Main Vendor Name Manufacturer Name Location of inspection City Country Reference No. Contact Name Phone & Fax No. E-mail address 1.1

107000068200
SAMSUNG ENGINEERING CO. LTD 4500062482 Arafat S R, SAP#70011019 SAMSUNG ENGINEERING CO. LTD DRESSER AL-RUSHAID VALVE DRESSER AL-RUSHAID VALVE

Aramco Work Order No. Project Name Project Nr.(BI-) Dummy P.O. No. Report No. Revision Report Date Inspection Date Date Next Visit Inspector Name Agency Job No. Aramco Monitoring Coordinator SAIR Name

6510477413
SATORP 024-05200 SA-DAR-DP-W0 79-004 0 Decemeber 30th, 2011 DEC 27th & DEC 30th, 2011 10.01.2012 Divakar Panigrahi SAP#70003251 2005626 Mubarak Al-Harbi Moalla H. Al- Omari

Jubail
K.S.A NA

Shoukat Ali 03-3410278


qamn@darvico.net

Generic Materials Description Tag / Eqpt No.

Description

Control Valves

Painting inspection of 161 Valves (44+117), Final Visual and Dimensional inspection and Packing and Shipping inspection Carried out after final documents Verification including Material test certificates (MTC).

1.2

Summary of Findings

Valve Tag Nos: 131-PV-1030A, 301-FV-3101, 301-TV-2008A, 301-TV-2001A, 301-FV-2710A, 131FV-3003, 301-FV-2716, 141-LV-0054, 141-FV-0008A & 301-FV-2735-10 Valves out of 44 offered Valves, on DTD 27th Dec, 2011. Valve Tag Nos: 301-FV-2728 A, 301-TV-1057, 131-FV-3023A, 141-TV-0061B, 301-FV-1119A, 301FV-2002, 131-TV-2021, 141-PV-0040, 131-PDV-2040B, 301-FV-3030, 131-PV-1001A, 131-LV2001, 131-LV-4007, 131-LV-1009, 301-PV-2014B & 301-FV-2016-16 Valves out of 117 offered Valves, on DTD 30th Dec, 2011. Final Visual and dimensional Carried out and compared the Values with ASME B16.5 and approved Drawing and the Values found within the limits. Painting inspection on External surface after Primer and Final Coat Application as per required Coating Systems (A, M and N Etc.). All the Pressure Containing parts Verified with MTC traceable to the Heat#, by part, and data sheets were reviewed and same were checked including and on the name plates. Witnessed Packing for Control panels including Flange Faces for the Entire Valve assembly and ensured packing protection to avoid ingress of dust , moisture and debris Etc.
1.3 Order Status Item/Tag No. Brief Description Ordered Quantity Presented this Visit Accepted this Visit Accepted to date % Complete

01

Control Valves

294Nos

*161

161

161

55

1.4 Performance of LSTK contractors inspector(s) Notice for Change of Inspector is not Provided. The Inspector Mr. Arafat`s CV is not in the backup IAP list and is not SA-DAR-DP-W0 79-004, Page 1 of 6.

Monitoring Inspection Report


Use date format: 30/12/2011

approved by SATORP for the said WO#079. 2.0 Attendees Name Affiliation

Position

Tel.

e-mail

Divakar Panigrahi
Arafat S R Shoukath Ali

ABS Group Saudi Arabia Co Ltd


Velosi Saudi Arabia Dresser Al Rushaid

ASME Authorized Inspector


Inspection Engineer Quality Engineer

0535247478 0567400840 03-3410278

DPanigrahi@absconsulting.com
a-rashid@velosi.com.sa qamn@darvico.net

3.0

Applicable Insp. Requirement (IR)-Forms, Codes, Standards, Drawings, Specs, etc. Codes, etc. Status/ Issue
Approved Approved Approved Approved Approved Approved Approved Approved
Aproved, 2009 Rev 02 Rev.0 Latest Latest Latest Latest Rev.4 Rev.5 Rev-2 Rev-2 Rev-1 Rev-5 Dimensional Drawing Hydrostatic test procedure Seat Leakage test Performance Testing & Final product Inspection Packing Tightness test Specification Sheet(Data Sheet) Painting Specification Packing/Shipping procedure Preparation of the Final Disposition Report Inspection and test plan for Control Valve(Globe& Angle) Positive Material Identification Pipe Flanges and Flanged Fittings. Quality Standard for Steel Castings for valve flanges and fittings. Control Valve Response Measurement from Step Inputs Control valve seat leakage Control Valves Selection of Valves Control Valves- General services General Requirement for valves Globe Valves Coating selection & application requirements for Industrial plants & equipment

Title

JER-ARAAA-ARGD-270001 JER-ARAAA-ARGD-500001 and ISA 75.19 JER-ARAAA-ARGD-500002 JER-ARAAA-ARGD-500005 JER-ARAAA-ARGD-500007 JER-ARAAA-ARGD-640001 JER-ARAAA-ARGD-500004 JER-ARAAA-ARGD-500006 JER-ARAAA-SECO-508002 ITP 15417 JERES A 206 ASME B 16.5 MSS-SP-55 ANSI/ISA TR75.25.02 ANSI/FCI 70-2(1991) JERES-J-700 JERES-L-108 JERMS-J-4711 JERMS-L-4035 JERMS-L-4002 JERES-H-001

In status column, indicate approval status of vendor documents (drawings / ITP/ procedures)
4.0 Performed Activities incl. Results 15417 / I.T.P. Inspection/Monitoring Activity line number Results

2, 5, 13, 14&15

Valve Tag Nos: 131-PV-1030A, 301-FV-3101, 301-TV-2008A, 301TV-2001A, 301-FV-2710A, 131-FV-3003, 301-FV-2716, 141-LV-0054, 141-FV-0008A & 301-FV-2735-10 Valves random out of 44 offered Valves, on DTD 27th Dec, 2011. Valve Tag Nos: 301-FV-2728 A, 301-TV-1057, 131-FV-3023A, 141TV-0061B, 301-FV-1119A, 301-FV-2002, 131-TV-2021, 141-PV-0040, 131-PDV-2040B, 301-FV-3030, 131-PV-1001A, 131-LV-2001, 131-LV4007, 131-LV-1009, 301-PV-2014B & 301-FV-2016-16 Valves random
SA-DAR-DP-W0 79-004, Page 2 of 6.

Monitoring Inspection Report


Use date format: 30/12/2011

out of 117 offered Valves, on DTD 30th Dec, 2011.


13 & 14

Painting & Coating inspection of the Valves on External surface after Satisfactory Primer and Final Coat Application as per required Coating Systems. Visual inspection of the Valves after Primer coat & Final Coat application was carried out and found satisfactory. Calibration of the measuring instrument was verified. Paint certificates were reviewed.
Satisfactory

5&14

Final Visual and dimensional inspection Carried out and compared the Values with ASME B16.5 and approved STD Drawing DARVICO and Values found within the limits. All the Pressure Containing parts Verified with MTC traceable to Satisfactory the Heat#, by part, and data sheets were reviewed and same were checked including and on the name plates. Witnessed Packing for Control panels including Flange Faces for Satisfactory the Entire Valve assembly and ensured packing protection to avoid ingress of dust , moisture and debris Etc.

15
5.0

Inspection/Monitoring Details

Valve Tag Nos: 131-PV-1030A, 301-FV-3101, 301-TV-2008A, 301-TV-2001A, 301-FV-2710A, 131FV-3003, 301-FV-2716, 141-LV-0054, 141-FV-0008A & 301-FV-2735-10 Valves out of 44 offered Valves, on DTD 27th Dec, 2011. Valve Tag Nos: 301-FV-2728 A, 301-TV-1057, 131-FV-3023A, 141-TV-0061B, 301-FV-1119A, 301FV-2002, 131-TV-2021, 141-PV-0040, 131-PDV-2040B, 301-FV-3030, 131-PV-1001A, 131-LV2001, 131-LV-4007, 131-LV-1009, 301-PV-2014B & 301-FV-2016-16 Valves out of 117 offered Valves, on DTD 30th Dec, 2011. Final Visual and dimensional Carried out and compared the Values with ASME B16.5 and approved Drawing and the Values found within the limits. Painting inspection on External surface after Primer and Final Coat Application as per required Coating Systems (A, M and N Etc.). All the Pressure Containing parts Verified with MTC traceable to the Heat#, by part, and data sheets were reviewed and same were checked including and on the name plates. Witnessed Packing for Control panels including Flange Faces for the Entire Valve assembly and ensured packing protection to avoid ingress of dust , moisture and debris Etc. As recorded in summary under point 1.2 6.0
--7.0 Outstanding Non-Conforming Items/problems (excluding items under 6.0) Query No. Description Date Raised / Report No. 1. Sub-Vendor List Approval-List is approved by Samsung During MOM DTD (SECL), dated 04th July, 2011. Samsung (SECL) has to get the 19.03.2011 approval from SATORP. Non-Conforming / Punch List Items noted during this visit by Monitoring Inspector, LSTK contractors inspector and advised by Manufacturer

Status Open

SA-DAR-DP-W0 79-004, Page 3 of 6.

Monitoring Inspection Report


Use date format: 30/12/2011

2. 3. 4.

WPS/PQR Approval-Welding was not involved so far. Vendor will utlize if required for repair work. But the WPS/PQR has not been provided. Approval for Tubing & Fittings Material TP 316 used instead of TP 316L required as per JERMS J-4711. This deviates Para 2.1, SATORP approval is required. Notice for Change of Inspector is not Provided. The Inspector Mr. Arafat`s CV is not in the backup IAP list and is not approved by SATORP for the said WO#079.

During MOM dated 19.03.2011 During MOM dated 19.03.2011, DEC 04th, 2011

Open Open Open

8.0 No. -9.0

Actions required Action --Digital Pictures

Responsible --

Due date --

SA-DAR-DP-W0 79-004, Page 4 of 6.

Monitoring Inspection Report


Use date format: 30/12/2011

10.0 None 11.0

Attachments

Monitoring Inspector(s) Signature

Name

Tel.

e-mail DPanigrahi@absconsulting.co m

Divakar Panigrahi SAP#70003251


12.0 Time claimed for this visit Assigned Inspection hours

+966 535247478

Used this visit

Total used to date

Remaining

95

27.12.2011- 06Hrs. 30.12.2011- 06Hrs. Total = 12Hrs.

48

47

Per diems at cost charges Travel distance (return) TIMESHEETS for Administrative Use W.O # REPORT # PO# OR SAP : : :

Dummy # & IL#

: INSPECTORS NAME : Date of Inspection Work Hours Travel Hours Per Diem Other costs INSPECTORS NAME SA-DAR-DP-W0 79-004, Page 5 of 6. : : : :

Monitoring Inspection Report


Use date format: 30/12/2011

: Date of Inspection Work Hours Travel Hours Per Diem Other costs : : :

: Total Hours (Inspection & Travelling) Per Diem Other costs END OF REPORT

SA-DAR-DP-W0 79-004, Page 6 of 6.