Você está na página 1de 48

The C3P

Beam & Piling Finishing Center (C3P)


What is C3P ?
Centre de Parachvement Poutrelles et Palplanches

"Finishing Operational Centre for Beams and Steel Sheet Piles"

The Main Products

Special Finishing AM B.Lambinet Staff: 43

COMETAL

CAR PARKS

WALLUX

MISC. FIN / ACB / IFB

SPECIAL FINISHING AM

BRIDGES + HEAVY FINISHING

KLEINLUX

SURFACE TREATMENT

Location of the different Beam& Piling Finishing units


Eurostructures Office

Special Finishing AM C3P Hall

Surf. Treatment KLEINLUX

Grey mill

C3P Key values

Capacities
Special Finishing ArcelorMittal: Wallux: Cometal: Kleinlux: 65.000 h/year 50.000 h/year 40.000 h/year 60.000 h/year

Total:

215.000 h/year

Sawing
Reduced tolerances Oblique cut up to 45
a b L a

b L

Bundle cutting

Cutting of sections with depths up to 1100mm

Oxygen-Plasma Cutting /Coping

Oxygen cutting

Coping of flanges and webs

Plasma cutting

Drilling
6 - 40 mm Max. thick: 125mm

40 - 120 mm

Cambering
Cambering of beams according to parabolic curves Cambering into two axis via 400 / 450 t jacks

Welding
Automatic and manual welding of cover plates, stiffeners Welding following EN ISO 14555 valid for bridge applications

Welding
Fabrication of a jumbo section

Cross-column

T-cutting
HL 1000 M

HD400x592

Bending
Bending of beams with a constant radius: Bending along the strong and weak axis of beams Bending of T-sections Bending of U-sections

Bending up to 550mm R = 35m

Painting
Shotblasting according to SA 2.5, 3.0 and primer

Painting
Cold galvanizing Application of complete paint systems (primer + final paint system layers according to DB-TL, ZTV-Kor, ISO EN 12944)

Application - Bridges

Composite bridge
HLR 1100 120 to Eiffage TP (F)

VFT-WIB Beam system Prefabricated Composite Bridges

Oxycutting

=
Advantages No welding No stud connectors Fatigue behaviour

VFT-WIB Beam system Prefabricated Composite Bridges


Assembling of the rolled beams in pairs

Application - Car Parks

Car parks: Galvanizing


Galvanizing partner on customers choice

Car Parks
IPE/A360-550 S460 1070 to Airport Dsseldorf (D)

Car Parks
IPE/A 360-550 S460 280 to Kassel (D)

Application Cellular Beams ACB

Oxycutting

Fabrication process

In it ia l pr of ile fr om

rc

el

or M

Angelina

it ta

ls ec ti on

ra

ng

es

Fabrication process Oxycutting Separation

Angelina

Fabrication process Oxycutting Separation Rotation

Angelina

Fabrication process Oxycutting Separation Rotation

Angelina
Assembling

Fabrication process Oxycutting Separation Rotation

Angelina
Assembling Welding

Fabrication process Oxycutting Separation Rotation

Angelina
Assembling Welding Final length

Fi na ll

en

gt h

H 1,5 h

Initial profile from ArcelorMittal section ranges

Final beam Angelina

Application Cellular Beams ACB

IMD (CH)

Application Cellular Beams ACB

Purification plant Beggen (L)

Application Cellular Beams ACB


Klimahaus Bremerhaven (D)

HE 1000 B/M 1000 267 to Fmax= 267mm

Application Cellular Beams ACB

Industrial Wendelstein (G)

Application Cellular Beams ACB

Skiing descend (F)

Application Angelina Beam Recent projects Wallerich S.A. (F)

Wallerich S.A.
1st Angelina project in France
Fabrication hall Surface: 3900m2 210t with 80t galvanised Angelinas from IPE 550

Application Angelina Beam

Application Angelina Beam

Parker Hannefin Head Office (CH)

Application Angelina Beam

Optifutura Fribourg Industrial (CH)

Application IFB Beams


Rives de Clausen Luxembourg-Grund 500 to

Applications
VERTIGO Luxembourg 1000 to

Applications

Casino2000 (L) Exhibition hall Surface: 2000m2 230t up to bended HE 800

Recent projects

Casino2000 (L)

Heavy Finishing
Fabrication hall for Liebherr at Rostock (D) Cross columns

Heavy Finishing
Fabrication hall for Liebherr at Rostock (D) 2200to HE 1000 B

Heavy Finishing

Fabrication hall / Warehouse Liebherr Surface: 30.700 m2 5.200 to HE/HL 1100

Heavy Finishing

Você também pode gostar