TEAM-3

Coventry University Track Locate and Assemble (CUTLASS) Iteration assessment Version <1.0>

Coventry University Track Locate and Assemble (CUTLASS) Iteration Assessment CUTLASS iteration Assessment V1.0

Version: <1.0> Date: <23/October/2011>

Revision History
Date <23/October/2011> Version 1.0 Initial vision Description Author Zainab Al-mussa

CONFIDENTIAL

(C) TEAM-3, 2011

Page 2 of 6

Coventry University Track Locate and Assemble (CUTLASS) Iteration Assessment CUTLASS iteration Assessment V1.0

Version: <1.0> Date: <23/October/2011>

Table of Contents
1. Introduction 1.1 Overview 1.2 Scope 1.3 Definitions, Acronyms and Abbreviations 1.4 References 1.5 Overview 2. Iteration Objectives Reached 3. Adherence to plan 4. Use Case and Scenarios Implemented 5. Results Relative to Evaluation Criteria 6. Test Results 7. External Changes Occurred 8. Rework Required. 4 4 4 4 4 4 5 5 5 5 6 6 6

CONFIDENTIAL

(C) TEAM-3, 2011

Page 3 of 6

Coventry University Track Locate and Assemble (CUTLASS) Iteration Assessment CUTLASS iteration Assessment V1.0

Version: <1.0> Date: <23/October/2011>

1.

Introduction 1.1 Purpose The objective of the iteration assessment is to capture the result of the iteration, the degree to which the evaluation criteria were met, and lessons learned and changes to be done. Available from World Wide Web, http://www.ts.mah.se/RUP/RationalUnifiedProcess/process/artifact/ar_itass.htm, Accessed (October, 2011). 1.2 Scope The evaluation of the iteration plan for the inception phase of CUTLASS project depends on the iteration assessment. This document will show the targets have been accomplished in the iteration plan .Also, it will find any changes in the user's requirements which need to be developed in the next stage of iteration . 1.3 Definitions, Acronyms, and Abbreviations CUTLASS: Coventry University Track Locate and Assemble. 1.4 References 1. Software development plan v 1.0, CUTLASS. 2. Iteration plan v 1.0, CUTLASS. 3. Risk list v 1.0, CUTLASS. 4. Use case model survey v 1.0, CUTLASS. 5. http://www.ts.mah.se/RUP/RationalUnifiedProcess/process/artifact/ar_i tass.htm

1.5

Overview This document identifies the iteration plan targets which were faced and how this stage execute according to the schedule plan. It is very important for this document two aspects which are lists of use cases and scenarios implemented of the system and evaluation criteria is to assess the result of this document . Also, distinguishes this stage, the appearance of any external changes in the users requirements are defined during this iteration.

CONFIDENTIAL

(C) TEAM-3, 2011

Page 4 of 6

Coventry University Track Locate and Assemble (CUTLASS) Iteration Assessment CUTLASS iteration Assessment V1.0

Version: <1.0> Date: <23/October/2011>

2. Iteration Objectives Reached The majority of the targets which determined in the iteration plan, like specified requirements of users, verification of risk list, the list of use case describe in the use case model in details, have implemented in this iteration.

3. Adherence to Plan This project carried out according to the schedule plan, for more details see the section of the iteration plan.

4. Use Cases and Scenarios Implemented List of the use cases and scenarios that were implemented : 4.1 Register 4.2 Log in to CUTLASS 4.3 Add device 4.4 Report 4.5 Tracking Device 4.6 Edit Configuration 4.7 Manage student account 4.8 Manage user account (staff, student) 4.9 Update CUTLASS system & insure security information 4.10 Log out

5. Results Relative to Evaluation Criteria

Criteria Determine the users requirements

Evaluation The use-cases and actors are mentioned in the use case model survey artifact which are designed to

CONFIDENTIAL

(C) TEAM-3, 2011

Page 5 of 6

Coventry University Track Locate and Assemble (CUTLASS) Iteration Assessment CUTLASS iteration Assessment V1.0

Version: <1.0> Date: <23/October/2011>

serve the users requirements. Specify risks The majority of risks have been specified and described in risk management & Risk list artifact . User interface prototype Completion of the design phase of the user interface prototype artifact and give it to the user to be evaluated. The schedule and cost estimates The estimated cost and schedule of the project has been specified .For more details see the iteration plan section.

6. Test Results There are no tests have been implemented because the project in the prime phase. 7. External Changes Occurred There are no new external changes in the users requirements of this phase of CUTLASS system have been determined. 8. Rework Required None rework required.