Você está na página 1de 215

AutoEdge

EHP4 for SAP ERP 6.0 March 2011 English

Scheduling Agreement with Summarized JIT Call (A67)

Building Block Configuration Guide

SPARTA

A KPIT Cummins Company

Corporate Headquarters

111 Woodmere Road Suite 200 Folsom, CA 95630 888-985-0301 916-985-0300

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Contents
Scheduling Agreement with Summarized JIT Call...........................................................................3 1 Purpose........................................................................................................................................3 2 Configuration................................................................................................................................3 2.1 Configuration in the Supplier System......................................................................................3 2.1.1 Master Data Maintain.......................................................................................................3 2.1.2 Other Settings................................................................................................................12 2.2 Configuration in the OEM System.......................................................................................104 2.2.1 Master Data Maintain...................................................................................................104 2.2.2 Configuration...............................................................................................................104

2011 Sparta Consulting

Page 2 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Scheduling Agreement with Summarized JIT Call 1 Purpose


This configuration guide provides the information you need to set up the configuration of this building block manually.

2 Configuration
2.1 Configuration in the Supplier System
2.1.1 2.1.1.1 Master Data Maintain Customer Master Maintenance

2.1.1.1.1 Maintaining Partner Description in Customer Master Data Use


The purpose of this activity is to maintain the partner description for the ship-to party in the customer master data.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 3 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Sales and Distribution Master Data Business Partner Customer Change Complete

2011 Sparta Consulting

Page 4 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

XD02

2011 Sparta Consulting

Page 5 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Customer Change Initial Screen, enter the following data and choose Continue.

2011 Sparta Consulting

Page 6 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Customer Sales Organization Distribution Channel

User action and values A-6701 1000 10

2011 Sparta Consulting

Page 7 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Division

User action and values 10

2011 Sparta Consulting

Page 8 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. Choose Sales Area Data. 4. Choose the Partner Functions tab, on the line SH ship-to party, make the following entries:

2011 Sparta Consulting

Page 9 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Partner Functions

User action and values

2011 Sparta Consulting

Page 10 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Partner description

User action and values 1000

2011 Sparta Consulting

Page 11 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

5. Choose Save. 6. Choose Back.

Result
The partner description for the ship-to party in the customer master data has been maintained.

2.1.2 2.1.2.1 Use

Other Settings Creating Pricing Condition

The purpose of this activity is to create condition records at supplier side.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 12 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Equipment and Tools Management Master Data Conditions Prices Others Create

2011 Sparta Consulting

Page 13 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

VK11

2011 Sparta Consulting

Page 14 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Create Condition Record screen, enter Condition Type: PR00. 3. Choose Material with release status. 4. Choose Continue. 5. On the Create Price Condition (PR00) : Fast Entry screen, make the following entries:

2011 Sparta Consulting

Page 15 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Sales Organization

Description

User action and values 1000

Note

2011 Sparta Consulting

Page 16 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Distribution Channel

Description

User action and values 10

Note Direct Sales

2011 Sparta Consulting

Page 17 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2011 Sparta Consulting

Page 18 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Material

Amount

Currency

UOM

2011 Sparta Consulting

Page 19 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

A-67-2000_SUP

12000

JPY

PC

2011 Sparta Consulting

Page 20 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

6. Choose Save. 7. Choose Back twice and go back to SAP Easy Access screen.

Result
The condition record PR00 for material A-67-2000_SUP is created.

2.1.2.2 Use

Determining Sold-To Party

In this step, you assign a sold-to party number to the following criteria: Vendor number (the number used by the customer for you, the component supplier) Partner description (such as delivering plant) Unloading point

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 21 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 22 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Sales and Distribution Sales Sales Documents Scheduling Agreements with Delivery Schedules Control EDI Inbound Processing Execute Sold-to Party Assignment for Release Orders

2011 Sparta Consulting

Page 23 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. Choose New Entries, make the following entries:

2011 Sparta Consulting

Page 24 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Vendor A-V6701

Partner desc 1000

Unloading Point

Sold-to party A-6701

2011 Sparta Consulting

Page 25 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. Choose Save.

Result
A sold-to party number is assigned according to the following criteria: Vendor number (the number used by the customer for you, the component supplier): A-V6701 Partner description (such as delivering plant): 1000

2.1.2.3 Use

Defining Special Features for Delivery Schedules

In this step, you define how the system processes delivery schedules received by Electronic Data Interchange from a particular customer, or combination of customer/unloading point. You must create a record for every customer! The system checks this record in Customizing for every incoming delivery schedule. If it cannot find a record for the particular sold-to party, it issues an error message and stops the processing of the IDoc.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 26 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 27 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Sales and Distribution Sales Sales Documents Scheduling Agreements with Delivery Schedules Control EDI Inbound Processing Define Special Features for Scheduling Agreement

2011 Sparta Consulting

Page 28 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. Choose New Entries, make the following entries:

2011 Sparta Consulting

Page 29 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Sold-To Party A-6701

Unloading Point

Check PO number X

2011 Sparta Consulting

Page 30 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. Choose Save.

Result
How the system processes delivery schedules received by Electronic Data Interchange from customer A-6701, or combination of customer/unloading point is defined. A record for every customer is needed! The system checks this record in Customizing for every incoming delivery schedule. If it cannot find a record for the particular sold-to party, it issues an error message and stops processing of the IDoc.

2.1.2.4 Procedure

Defining Call Control

1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 31 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 32 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistics Execution JIT Inbound Call Control Define Call Control

2011 Sparta Consulting

Page 33 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. Choose New Entries. 3. On the New Entries: Overview of Added Entries screen, enter the following values:

2011 Sparta Consulting

Page 34 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Control Call Ctrl Short Text

Description

User action and values YA01 General control MAB

Note

2011 Sparta Consulting

Page 35 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Logging Active

Description

User action and values Deselect

Note

2011 Sparta Consulting

Page 36 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save. 5. Choose Back. 6. In the Call Control sub dialog, choose Control YA01, and then choose Status change actions from Dialog Structure. 7. On the New Entries: Overview of Added Entries screen, enter the following values:

2011 Sparta Consulting

Page 37 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

CurrStatus

New Status VF

Action CREA

2011 Sparta Consulting

Page 38 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

CurrStatus VF

New Status VF

Action MODI

2011 Sparta Consulting

Page 39 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

8. Choose Save. 9. Choose Processing statuses and actions from Dialog Structure.

2011 Sparta Consulting

Page 40 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

PrSt.Curr 0000 0000 0000 1000 1000 1000 7000

Action CREA JIT2 MODI VL10 JIT2 MODI VL10 MODI

Prc.st.new 0000 1000 1000 7000 1000 1000 7000 7000

2011 Sparta Consulting

Page 41 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

PrSt.Curr 7000

Action REOR

Prc.st.new

2011 Sparta Consulting

Page 42 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

10. Choose Save. 11. Choose Back and go to the IMG menu.

Result
The call control type YA01 is defined for the JIT call processing, which is used to control actions based on processing status. With this flexible action net you can also realize various processes in a call control. You can, for example, control a repeat order or a cancellation differently to a standard JIT call.

2.1.2.5 Procedure

Defining Control Profile for Summarized JIT Calls

1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 43 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 44 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistics Execution JIT Inbound Define Control Profiles Define Control Profile for Summarized JIT Calls (SumJC)

2011 Sparta Consulting

Page 45 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. Choose New Entries. 3. On the New Entries: Details of Added Entries screen, make the following entries:

2011 Sparta Consulting

Page 46 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name SumJC Profile Profile Text Quantity Change Procg Status Split Warning, yellow Alarm level,red Call Relevance SumJC DG Split SumJC ID Level Ref. No.Check

Description

User action and values YA0000000001 MAB_HEADERDATAF:DELIVERYSPLIT/IDOC Change in Quantity not permitted 24:00 10:00 Calls are always relevant No additional JIT criteria, standard splitting Call header (=external call number) Deselected

Note

2011 Sparta Consulting

Page 47 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name ATP Check

Description

User action and values No ATP Check

Note

2011 Sparta Consulting

Page 48 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save. 5. Choose New Entries. 6. On the New Entries: Details of Added Entries screen, make the following entries:

2011 Sparta Consulting

Page 49 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name SumJC Profile Profile Text Quantity Change Procg Status Split Warning, yellow Alarm level,red Call Relevance SumJC DG Split SumJC ID Level Ref. No.Check

Description

User action and values YA0000000002 MAB-GRP-INFO FOR DELIVERYSPLIT/IDOC Change in Quantity not permitted 24:00 10:00 Only Relevant for CGs without production scheduling Split per grouping information Components group/discrete material (=grouping information) Deselected

Note

2011 Sparta Consulting

Page 50 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name ATP Check

Description

User action and values No ATP Check

Note

2011 Sparta Consulting

Page 51 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

7. Choose Save. 8. Choose Back and go to the IMG menu.

Result
Control profile for summarized JIT calls YA0000000001 and YA0000000002 are maintained.

2.1.2.6 Procedure

Defining Components Group Determination

1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 52 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 53 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistics Execution JIT Inbound Define Control Profiles Define Components Group Determination

2011 Sparta Consulting

Page 54 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. Choose New Entries. 3. On the New Entries: Details of Added Entries screen, enter the following values:

2011 Sparta Consulting

Page 55 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Determ.Profile Text determn prof. Prio.unload.point Prio. of assby locn Comp.groups mat. Prio.of prod.vers.

Description

values YA000001 MAB CALL CMP AS PART GROUP MATERIAL Not relevant for determination copy to JIT call Obligatory for determining components groups Not relevant for determining components groups Not relevant for determining components groups

Note

2011 Sparta Consulting

Page 56 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Derivation of CG mat

Description

values Component groups material (EDI customer exit/dialog)

Note

2011 Sparta Consulting

Page 57 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save. 5. Choose Back and go to the IMG menu.

Result
Component group determination YA000001 is maintained.

2.1.2.7 Procedure

Defining Control Profile for Delivery

1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 58 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 59 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistics Execution JIT Inbound Define Control Profiles Define Control Profile for Delivery

2011 Sparta Consulting

Page 60 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. Choose New Entries. 3. On the New Entries: Details of Added Entries screen, make the following entries:

2011 Sparta Consulting

Page 61 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Profile dely creatn Text ctrl profile Not rel. picking HU creation PackTransProfile Type Log.Match Select open dely Type of Ref. No. Ref. No. in Delivery Ref. No. in BillDoc.

Description

User action and values YA000001 PAB_LF01 / PRODN IN IDOC Selected Handling units not created 0002 No logistics matching No goods issue posted External call number Header and item lever (Segment E1EDL51 and 52) No reference numbers in Billing Document IDoc

Note

2011 Sparta Consulting

Page 62 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Status Update on GI

Description

User action and values Deselected

Note

2011 Sparta Consulting

Page 63 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save. 5. Choose Back and go to the IMG menu.

Result
Control profile for delivery YA000001 is maintained.

2.1.2.8 Use

Creating JIT Customer

This step is to create JIT customer at the supplier side.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 64 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Logistics Execution JIT Inbound Basic Data Maintain Customer

2011 Sparta Consulting

Page 65 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

JITV

2011 Sparta Consulting

Page 66 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Change View Maintain JIT Customer: Overview screen, choose Maintain JIT Customer in the Dialog Structure and then choose New Entries. 3. On the New Entries: Details of Added Entries screen, make the following entries:

2011 Sparta Consulting

Page 67 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name JIT Customer Sold-to party Partner Descr Cust. time zone Usage Determ.Profile Sig.monitor active CallType MaintenanceMode SumJC Profile

Description

User action and values UCAR A-6701 1000 JAPAN S YA000001 Select Summarized JIT Call [D] Discrete Material /SumJC YA0000000001

Note

(or your personalized data)

2011 Sparta Consulting

Page 68 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Profile dely creatn

Description

User action and values YA000001

Note

2011 Sparta Consulting

Page 69 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save. 5. Choose Back. 6. In the Maintain JIT Customer sub dialog box, on the Change View Maintain JIT Customer: Overview screen, choose JIT customer: UCAR. 7. Choose Conversion of external status information from Dialog Structure. 8. Choose New Entries. 9. On the New Entries: Overview of Added Entries screen, make the following entries:

2011 Sparta Consulting

Page 70 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Stat. Info 0000 1200

Ext. Status VF VF VF

2011 Sparta Consulting

Page 71 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Stat. Info 1400

Ext. Status VF

2011 Sparta Consulting

Page 72 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

10. Choose Maintain Lead Times from Dialog Structure:

2011 Sparta Consulting

Page 73 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name CG Type Basis Time Ext. Status Days TimeShift

Description

User action and values Time of External Status Change VF 02:00:00

Note

2011 Sparta Consulting

Page 74 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Prelim.Run

Description

User action and values

Note

2011 Sparta Consulting

Page 75 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

11. Choose Save. 12. Choose Maintain Destinations from Dialog Structure. 13. Choose New Entries. 14. Make the following entries :

2011 Sparta Consulting

Page 76 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Destination JIT Customer Unloading Point Assy Loc. DestText 1

Description

User action and values WSP3 UCAR Tor 10 YA0004

Note

Supply area

2011 Sparta Consulting

Page 77 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name DestText 2

Description

User action and values

Note

2011 Sparta Consulting

Page 78 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

15. Choose Save. 16. Choose Back. 17. In the Maintain Destination sub dialog box, on the Change View Maintain Destination: Overview screen, choose WSP3. 18. Choose Maintain Components Group Types from Dialog Structure. 19. On the Change View Maintain Components Group Types: Details screen, make the following entries:

2011 Sparta Consulting

Page 79 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Comp.Grp Type Destination CG Material Call Control Plant

Description

User action and values WSP3 WSP3 A-67-2000_SUP YA01 1000

Note

2011 Sparta Consulting

Page 80 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name CGText 1

Description

User action and values Component Group A67

Note

2011 Sparta Consulting

Page 81 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

20. Choose Save. 21. Choose Back and go back the SAP Easy Access screen.

Result
JIT customer UCAR is created. The external status information is maintained. The lead time for the JIT customer UCAR is defined. The inbound destination WSP3 is defined for the JIT customer UCAR. The component group type WSP3 is defined for the JIT customer UCAR.

2.1.2.9 Assigning Sales Order Types Permitted for Sales Areas Use
In this menu option, you allocate the allowed order types to each sales area.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 82 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SM30 (Customizing Object V_TVAKZ)

2011 Sparta Consulting

Page 83 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Sales and Distribution Sales Sales Documents Sales Documents Header Assign Sales Area To Sales Document Types

2011 Sparta Consulting

Page 84 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. In the Choose Activity dialog box, double-click Assign sales order types permitted for sales areas. 3. On the Change View Sales Documents. Allowed Order Types per Sales Org.: Overview screen, choose New Entries and make the following entries:

2011 Sparta Consulting

Page 85 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Ref.S 1000

RefD 10

Div 10

SaTy LZJ

2011 Sparta Consulting

Page 86 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save and then choose Back.

2.1.2.10 Use

Creating Scheduling Agreement LZJ

The purpose of this activity is to create Sales Scheduling Agreement.

Prerequisites
Related customizing must exist. Related master data is ready.

Perform the following check for your customer master data, A-6701 and so on. Transaction code: XD02 (Changing Customer master data) Menu path: Sales Area Partner Check whether the partner description 1000 exists for partner function SH, which is important for Scheduling agreement, release processing. The incoming customer scheduling agreement (56xxxxxxxx and so on) will use this entry as well as PO No., Customer-material, and sold-to party, to search the corresponding SD scheduling agreement, 35xxxxxx and so on. If not, add the partner description manually.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 87 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Logistics Execution JIT Inbound Environment Master Data Scheduling Agreement (SD) Create

2011 Sparta Consulting

Page 88 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

VA31

2011 Sparta Consulting

Page 89 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Create Scheduling Agreement: Initial Screen, make the following entries:

2011 Sparta Consulting

Page 90 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Sched.Agreemt Type Sales Organization Distribution Channel Division Sales Office

Description

User action and values LZJ 1000 10 10 1000

Note

2011 Sparta Consulting

Page 91 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Sales Group

Description

User action and values 100

Note

2011 Sparta Consulting

Page 92 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. Confirm your entries. 4. On the Create JIT Scheduling Agt: Overview screen, enter the following values:

2011 Sparta Consulting

Page 93 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name JIT Scheduling.Agt. Sold-to party Ship-to Party

Description

User action and values 35006701 A-6701 A-6701

Note

2011 Sparta Consulting

Page 94 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name PO Number

Description

User action and values 5600006701

Note

2011 Sparta Consulting

Page 95 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

5. On the Item Overview tab, enter the following entries:

2011 Sparta Consulting

Page 96 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Item Material Rounding Qty Customer Material Number PO Item

Description

User action and values 10 A-67-2000_SUP 0 A-67-2000_OEM 10

Note

2011 Sparta Consulting

Page 97 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Storage location

Description

User action and values 1040

Note

2011 Sparta Consulting

Page 98 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

6. Choose Save. 7. Choose Back and go back to SAP Easy Access screen.

Result
The Sales Scheduling Agreement 35006701 with scheduling agreement type LZJ is created.

2.1.2.11 Use

Creating Copy Control for Delivery

This activity copy controls.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 99 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

VTLA

2011 Sparta Consulting

Page 100 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistics Execution Shipping Copying Control Specify Copy Control for Deliveries

2011 Sparta Consulting

Page 101 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Display View Header: Overview screen, choose Display Change. 3. Select the required combinations of source sales document type and delivery type. Doubleclick Item in the Dialog Structure pane. 4. Choose New Entries. 5. Make the following entries:

2011 Sparta Consulting

Page 102 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Sales Doc Type LZJ

Delivery Type LF

ItemCat

Order requirements 101

Item Data 101

Item Ext. System 0

Business Data 2

Update doc flow X

+/-

LZN

2011 Sparta Consulting

Page 103 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

6. Choose Save. 7. Choose Back.

Result
Controls are copied.

2.2 Configuration in the OEM System


2.2.1 2.2.2 2.2.2.1 Use
The purpose of this activity is to creating the message record for forecast delivery schedule in MM Scheduling Agreement.

Master Data Maintain Configuration Creating Message Record for Forecast Delivery Schedule in MM Scheduling Agreement

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 104 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Materials Management Purchasing Master Data Messages Scheduling Agreement Delivery Schedule Create

2011 Sparta Consulting

Page 105 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

MN10

2011 Sparta Consulting

Page 106 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Create Output Condition Records: Purch.SchAgrRelease screen, make the following entries:

2011 Sparta Consulting

Page 107 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Output type

Description

User action and values YAH1

Note

2011 Sparta Consulting

Page 108 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. Choose Key Combination. 4. Confirm the dialog box. 5. Make the following entries:

2011 Sparta Consulting

Page 109 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Purch Organization Vendor Funct Medium

Description

User action and values 1000 A-V6701 VN 6

Note

2011 Sparta Consulting

Page 110 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Date/Time

Description

User action and values 3

Note

2011 Sparta Consulting

Page 111 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

6. Choose Save. 7. Choose Back and go to SAP Easy Access screen.

2.2.2.2 Use

Partner Profile, Only Basic Data

Partner profiles for EDI communication are created at the OEM side.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 112 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Logistics Execution Internal Whse Processes Communication with External Systems ALE Administration Runtime Settings Partner Profiles

2011 Sparta Consulting

Page 113 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

WE20

2011 Sparta Consulting

Page 114 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the right area of the Partner profiles screen, select Partner profiles Partner type LI. 3. Choose Create. 4. On the right top area of Partner profiles screen, make the following entries:

2011 Sparta Consulting

Page 115 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Partner No.

Description

User action and values A-V6701

Note The system assigns this number if you create a master record in an application (for example, purchasing, sales). The EDI partner is identified uniquely via the partner number and partner type. If you define your own partner types, they are also identified by this number.

2011 Sparta Consulting

Page 116 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

5. On the right area of Partner profiles screen, select Post processing: permitted agent. 6. Make the following entries:

2011 Sparta Consulting

Page 117 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Ty.

Description Agent type

User action and values US

Note Agent type Classifies the recipient of error notifications. Examples 'US': An individual agent is notified. 'O': Agent type is an organizational unit: all persons assigned to this organizational unit are notified. Dependencies Individual persons are assigned to the positions, organizational units and so on in the PD Organizational Model (PD-ORG).

Agent

AM-MUSTER

Permitted users: ID Specifies the job (person or group of people) to be notified if processing errors occur on the IDoc interface. You can define up to three different jobs: In the inbound or outbound partner profiles for special partners, messages and direction. In the general partner profiles for special partners. In the general IDoc Administration settings. Use If an error occurs, only one (the most specific) job is notified. If an error occurs in the ORDERS message for partner HUGH, the system first attempts to determine whether a job responsible for ORDERS and HUGH is defined. If this is not the case, the job defined for HUGH (required entry) is notified. The IDoc administrator is notified if HUGH does not exist at all in the partner profiles. Examples If the recipient type is 'US' ('user'), enter the name of the SAP user who is to be notified. If the recipient type is 'O' ('organizational unit'), enter the organizational unit whose personnel are to be notified. Dependencies This specification depends on how you have configured the PD Organizational Model (PDORG).

2011 Sparta Consulting

Page 118 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Lang.

Description Language of notification

User action and values EN

Note If an error occurs, SAPoffice notifies the permitted user in this language.

2011 Sparta Consulting

Page 119 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

7. Choose Save.

If the partner already exists, you can change the partner or choose a different customer. If the customer number does not exist in your system, the following error message appears: Enter a permitted partner number.

Result
Partner profile for A-V6701 is created successfully.

2.2.2.3 Use

Partner Profile Outbox for DELFOR and SEQJIT

Outbound parameters in partner profiles are created at OEM side.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 120 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Logistics Execution Internal Whse Processes Communication with External Systems ALE Administration Runtime Settings Partner Profiles

2011 Sparta Consulting

Page 121 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

WE20

2011 Sparta Consulting

Page 122 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the right area of the Partner profiles screen, select Partner profiles Partner type LI AV6701. 3. On the right area of Partner profiles screen, choose Insert under Outbound parmtrs. 4. On the Partner profiles: Outbound parameters screen, make the following entries:

2011 Sparta Consulting

Page 123 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Partner Role

Description Partner function of sender

User action and values VN

Note As an optional parameter, the partner function containing the sender and the recipient can be specified. Example: 'VN' for 'vendor' or 'AG' for 'sold-to party'. SNDPFC, SNDPRN and SNDPRT provide a unique ID for the sender. They are among the key fields in the partner profiles, which are used in inbound processing, for example, to determine the process code and therefore the internal processing for the IDoc. Therefore, if the sender function has been specified in the inbound partner profiles, the external system must maintain the field with the corresponding value.

2011 Sparta Consulting

Page 124 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Message type

Description

User action and values DELFOR

Note In EDI, message types are assigned to SAP document types uniquely. Their names correspond as much as possible to those of the UN/EDIFACT standard. ALE scenarios, on the other hand, have no EDIFACT correspondence, for example when master data is transmitted. Example ORDERS for purchase order data INVOIC for invoice data

2011 Sparta Consulting

Page 125 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

5. On the bottom area of the screen Partner profiles: Outbound parameters, select outbound options tab. 6. Make the following entries:

2011 Sparta Consulting

Page 126 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Receiver Port

Description

User action and values Z_AUTO

Note Specifies how the IDocs are transferred to the EDI subsystem. There are various technical possibilities for this communication known as port types. The choice of port type also depends on the technical capabilities of the EDI subsystem. Output is started immediately for each individual IDoc. Basic types can be used without additional coding for data communication: SAP supplies functions modules, which enter application data in the basic types. Basic types can be extended by the customer with upwardcompatibility.

Output Mode Basic type

Transfer IDoc immed. DELFOR02

2011 Sparta Consulting

Page 127 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Cancel Processing After Syntax Error

Description

User action and values X

Note If you select the syntax check, the IDoc Interface terminates the processing if a syntax error is found. If you do not select the syntax check, the IDoc Interface continues the processing. You receive a message that a syntax error was found.

2011 Sparta Consulting

Page 128 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

7. Choose Save. 8. Repeat steps 1-7 to make the following entries:

2011 Sparta Consulting

Page 129 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Partn er No.

Partn. Type

Partner Role

Mess age Type SEQJ IT

Receiv er Port

Packet Size

IDoc Type

Transfe r IDoc Immed.

Cancel Processing After Syntax Error X

AV6701

LI

VN

Z_AUT O

SEQJ IT03

2011 Sparta Consulting

Page 130 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Result
The message types DELFOR and SEQJIT are maintained for partner profile A-V6701.

2.2.2.4 Use

Partner Profiles Message Control for DELFOR and SEQJIT

Message Control of outbound parameters in partner profiles is created at OEM side.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 131 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Logistics Execution Internal Whse Processes Communication with External Systems ALE Administration Runtime Settings Partner Profiles

2011 Sparta Consulting

Page 132 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

WE20

2011 Sparta Consulting

Page 133 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the right area of the Partner profiles screen, select Partner profiles Partner type LI AV6701. 3. On the right area of Partner profiles: Outbound parmtrs screen, double-click following item.

2011 Sparta Consulting

Page 134 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Partner Role

Description

User action and values VN

Note

2011 Sparta Consulting

Page 135 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Message Type

Description

User action and values DELFOR

Note

2011 Sparta Consulting

Page 136 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. On the bottom area of the Partner profiles: Outbound parameters screen, select Message Control options tab. 5. Make the following entries:

2011 Sparta Consulting

Page 137 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Application

Description

User action and values EL

Note This key field is assigned to the corresponding message control (output control) field. Together with the output type, it uniquely identifies a message type in message control that can then be assigned uniquely to an IDoc type. Examples 'EA' = 'Purchasing RFQ' in Materials Management (MM). 'V3' = 'Billing' in Sales and Distribution (SD).

Message type

YAH1

This key field is assigned to the corresponding message control (output control) field. Together with the application, it uniquely identifies a message type in message control that can then be assigned uniquely to an IDoc type. Examples 'NEW' = 'New message', such as a new purchase order (application 'EF') or a new request for quotation (application 'EA'). 'LAVA' = 'Shipping notification' in dispatch (application 'V2').

2011 Sparta Consulting

Page 138 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Process code

Description

User action and values ME14

Note The IDoc Interface uses the process code to determine the application selection module, which converts the SAP document into an IDoc. Examples ME10: Purchase order (MM) SD09: Invoice

2011 Sparta Consulting

Page 139 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

6. Choose Save. 7. Repeat steps 1-6 to make the following entries:

2011 Sparta Consulting

Page 140 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Partner No A-V6701

Partn.Type LI

Partner Role VN

Message Type SEQJIT

Application PA

Message Type OJIT

Process Code SJCL

2011 Sparta Consulting

Page 141 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Result
The message type YAH1 has been maintained for message type DELFOR and the message type OJIT has been maintained for message type SEQJIT.

2.2.2.5 Procedure

Defining JIT Call Control

Step 1: Define Processing Status 1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 142 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 143 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistics Execution JIT Inbound Call Control Define External Status and Internal Processing Status

2011 Sparta Consulting

Page 144 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Change View Define Internal Processing Status: Overview screen, choose the Define Internal Processing Status from Dialog Structure. 3. Ensure the following values exist in the table. Otherwise, on the New Entries: Overview of Added Entries screen, choose New Entries to enter the correspondent values:

2011 Sparta Consulting

Page 145 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

ProcStat 0000 1000 1400 1600 1700

Text Call not saved/deleted JIT-call created JIT JIT-call modified JIT JITOUT MAB: ASN created JIT MSBASN JITOUT MAB: GR posted JIT MSB JITOUT MAB: JC finished JIT MSBJC

2011 Sparta Consulting

Page 146 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

ProcStat 7000

Text Delivery created

2011 Sparta Consulting

Page 147 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save. 5. Choose Back and go to the IMG menu. Step 2: Define JIT Call control 1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 148 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 149 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistics Execution JIT Outbound Call Control Define Call Control

2011 Sparta Consulting

Page 150 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. Choose New Entries. 3. On the New Entries: Overview of Added Entries screen, make the following entries:

2011 Sparta Consulting

Page 151 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Control Call Ctrl Short Text

Description

User action and values YA01 Summarized JIT call control

Note

2011 Sparta Consulting

Page 152 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Logging Active

Description

User action and values Deselect

Note

2011 Sparta Consulting

Page 153 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save. 5. Choose Back. 6. In the Call Control sub dialog, choose Control YA01, and then choose Processing statuses and actions from Dialog Structure.

2011 Sparta Consulting

Page 154 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

PrSt.Curr 0000 0000 0000 1400 1600 1700

Action OCRE OMOD OSDD OSHP OGRE OFIN OARC

Prc.st.new 0000 0000 1400 1400 1600 1700

2011 Sparta Consulting

Page 155 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

PrSt.Curr 1700

Action OREO

Prc.st.new

2011 Sparta Consulting

Page 156 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

7. Choose Save. 8. Choose Back and go to the IMG menu.

Result
The call control YA01 is maintained.

2.2.2.6 Use

Creating JIT Call Profile

In this step, JIT call profile is defined, which is assigned to a control cycle, thereby setting the automatic controls for all JIT calls created via this control cycle. A JIT call profile consists of: The JIT call type (the summarized JIT call is currently available) The partner role The type of summary The time definition

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 157 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 158 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistic Execution JIT Outbound Control Profiles Define JIT Call Profile

2011 Sparta Consulting

Page 159 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. Choose New Entries 3. On the New Entries: Details of Added Entries screen, make the following entries:

2011 Sparta Consulting

Page 160 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name JC profile JIT call profil JIT Call type Partner Role JC Summary Time definition Call Control

Description

User action and values YA01 SumJC (Outbound) SumJC ( ) S VN Summary by plant, unloading point YA01

Note

2011 Sparta Consulting

Page 161 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Messg Det. Usage

Description

User action and values Message Determination Required

Note

2011 Sparta Consulting

Page 162 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

4. Choose Save (Ctrl + S). 5. Choose Back (F3).

Result
The summarized JIT call profile ZJC1 has been created.

2.2.2.7 Use

Creating Condition: JIT Call

The purpose of this activity is to create the message condition for JIT calls.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 163 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Production KANBAN JIT Call Message Conditions Create

2011 Sparta Consulting

Page 164 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

PJNK1

2011 Sparta Consulting

Page 165 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Create Output - Condition Record: JIT Call screen, make the following entries:

2011 Sparta Consulting

Page 166 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Output Type

Description

User action and values OJIT

Note

2011 Sparta Consulting

Page 167 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. Choose Key Combination (Enter). 4. On the key Combination screen, select following checkbox:

2011 Sparta Consulting

Page 168 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Plant/JC Profile/vendor

Description

User action and values

Note

2011 Sparta Consulting

Page 169 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

5. Choose Enter. 6. On the Create Condition Records (Outbound JIT-Call):Fast Entry screen, select the following entry:

2011 Sparta Consulting

Page 170 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Plant JC Profile Vendor Funct Medium

Description

User action and values 1000 YA01 A-V6701

Note

Partner Function

VN 6 EDI

2011 Sparta Consulting

Page 171 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Date/Time

Description

User action and values 3

Note

2011 Sparta Consulting

Page 172 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

7. Choose Save (Ctrl + S).

Result
The message condition for summarized JIT call OJIT for A-V6701 has been created.

2.2.2.8 Use

Creating MM Scheduling Agreement

The purpose of this activity is to create the scheduling agreement, which is to be used in the replenishment of external procured components with KANBAN.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 173 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Material Management Purchasing Master Data Subsequent Settlement Vendor Rebate Arrangement Environment Vendor Environment Outline agreement Create

2011 Sparta Consulting

Page 174 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

ME31

2011 Sparta Consulting

Page 175 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Create Contract: Initial Screen, make the following entries:

2011 Sparta Consulting

Page 176 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Vendor Agreement Type Agreement Organizational Data Purch. Organization Purchasing Group Default Data for Items Plant

Description

User action and values A-V6701 LPA 5600006701 10000 100 1000

Note

2011 Sparta Consulting

Page 177 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Storage Location

Description

User action and values 1040

Note

2011 Sparta Consulting

Page 178 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. Choose Continue (Enter). 4. On the Create Scheduling Agreement: Header Data screen, make the following entries:

2011 Sparta Consulting

Page 179 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Validity end Invoicing party

Description

User action and values For example: 2099.12.31 A-V6701

Note

2011 Sparta Consulting

Page 180 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Suppl. vendor

Description

User action and values A-V6701

Note

2011 Sparta Consulting

Page 181 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

5. On the Create Scheduling Agreement: Item Overview screen, make the following entries:

2011 Sparta Consulting

Page 182 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Item Material Target Quantity

Description

User action and values 10 A-67-2000_OEM 1000000

Note

2011 Sparta Consulting

Page 183 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Net Price

Description

User action and values 120

Note

2011 Sparta Consulting

Page 184 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

6. Select the item and choose Item Details. 7. On the Display Scheduling Agreement: Item 0010 screen, make the following entries:

2011 Sparta Consulting

Page 185 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Tax Code

Description

User action and values V1

Note

2011 Sparta Consulting

Page 186 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

8. Choose Additional data and make the following entries:

2011 Sparta Consulting

Page 187 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Kanban Indicat.

Description

User action and values Z

Note

2011 Sparta Consulting

Page 188 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Creation profile

Description

User action and values YA02

Note

2011 Sparta Consulting

Page 189 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

9. Choose Save.

Result
The scheduling agreement 5600006701 with type LPA has been created.

2.2.2.9 Use

Defining Replenishment Strategies for External Procurement

The purpose of this activity is to define replenishment strategies for external procurement.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 190 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

SPRO

2011 Sparta Consulting

Page 191 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

IMG menu

Logistic Execution JIT Outbound Summarized JIT Call Define Replenishment Strategies For External Procurement

2011 Sparta Consulting

Page 192 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Change View Replenishment Strategy: Ex. Procurement for SumJC: Over screen, select following entry:

2011 Sparta Consulting

Page 193 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Plant Ext. Procurement.

Description

User action and values 1000 YA01

Note

2011 Sparta Consulting

Page 194 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Replenishment Strategy Description

Description

User action and values Rep. Strategy: Ext. Proc. for Sum. JC JC

Note

2011 Sparta Consulting

Page 195 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. Choose Details. 4. On the Change View Replenishment Strategy: Ex. Procurement for SumJC : Deta screen, make the following entries:

2011 Sparta Consulting

Page 196 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Trans.Type Variable Source Use PIs Ctrl Cycle Card

Description

User action and values 101 X No functional use, packing instruction is a commentary CONTROLCYCLE

Note

2011 Sparta Consulting

Page 197 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Print Function

Description

User action and values PK_CONTROLCYCLE_PRINT

Note

2011 Sparta Consulting

Page 198 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

5. Choose Save (Ctrl + S). 6. Choose Back (F3).

Result
The external procurement strategy YA01 is maintained.

2.2.2.10 Use

Manual Step: Creating Control Cycle

The control cycle is required when you create summarized JIT call.

Procedure
1. Access the activity using one of the following navigation options:

2011 Sparta Consulting

Page 199 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

SAP ECC menu

Logistics Production KANBAN Control Cycle Control Cycle Maintenance

2011 Sparta Consulting

Page 200 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Transaction code

PKMC

2011 Sparta Consulting

Page 201 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

2. On the Control Cycle Maintenance: Display screen, make the following entries and choose Data Selection (F8).

2011 Sparta Consulting

Page 202 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Plant

Description

User action and values 1000

Note

2011 Sparta Consulting

Page 203 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

3. On the Control Cycle Maintenance: Display screen, choose Display Change (F7) to switch to change mode. 4. On the Control Cycle Maintenance: Change screen, choose Create Control Cycle. 5. In the Create Control Cycle dialog box, choose Manual SumJC, and make the following entry, then choose Continue (Enter).

2011 Sparta Consulting

Page 204 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Material

Description

User action and values A-67-2000_OEM

Note

2011 Sparta Consulting

Page 205 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Supply Area

Description

User action and values YA0004

Note

2011 Sparta Consulting

Page 206 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

6. On the Control Cycle Maintenance: Change screen, make the following entries.

2011 Sparta Consulting

Page 207 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Call Item Qty No.Load Carrier

Description

User action and values 10 1

Note

2011 Sparta Consulting

Page 208 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Ext. Procurement

Description

User action and values YA01

Note

2011 Sparta Consulting

Page 209 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

7. Choose Flow Control Tab page and make the following entries:

2011 Sparta Consulting

Page 210 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name JIT call Profile

Description

User action and values YA01

Note

2011 Sparta Consulting

Page 211 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

8. Choose Enter. 9. Choose External Procurement tab page and make the following entries:

2011 Sparta Consulting

Page 212 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name Agreement

Description

User action and values 5600006701

Note

2011 Sparta Consulting

Page 213 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

Field name

Description Item

User action and values 10

Note

2011 Sparta Consulting

Page 214 of 215

AutoEdge Scheduling Agreement with summarized JIT Call (A67): Configuration Guide

10. Choose Enter and Save.

2.2.2.11 Use

Maintaining Source List

The purpose of this activity is to create source list.

Prerequisites
Related customizing must exist. Related master data exist.

Procedure
1. Access the activity using one of the following navigation options: SAP ECC menu Transaction code Logistic Logistics Execution JIT Outbound Environment Master Data Maintain Source List ME01

2. On the Maintain Source List: Initial Screen, make the following entries: Field name Material Plant 3. Choose Enter. 4. On the Maintain Source List: Overview screen, make the following entries: Field name Valid from Valid to Vendor Porg Agmt Item Fix MRP 5. Choose Save. 6. Choose Back. Description User action and values Today For example: 2099.12.31 A-V6701 1000 5600006701 10 X 2 Note Description User action and values A-67-2000_OEM 1000 Note

Result
Purchase Source List for material A-67-2000_OEM is created.

2011 Sparta Consulting