Namendra Anand Sr. Engineer (BM/RM) Ramagundam Super Thermal Power Station NTPC Limited nanand@ntpc.co.in Ramagundam Super Thermal Power Station NTPC Limited
Milling system maintenance is a challenge as it requires to use all kinds of maintenance practices to run the system effectively. Its an opportunity as it provides vide scope to implement betterment activites.
OBJECTIVE OF PULVERIZER
Gear unit First reduction one pair of Spiral bevel gears Second reduction one pair of Single Helical gears
Lub System
LOADING CYLINDER
GRINDING BALL
LOADING RING
CLASSIFIER VANES
CLASSIFIER VANES
CLASSIFIER VANES
REJECT GATE
CASE STUDY
Improvement actions 1. Highly skilled maintenance practices were developed for mill overhauling 2. Spare mill top housing is being kept ready before hand 3. Readiness of mill bay hoist is ensured These resulted in reduction of mill overhauling duration from 360 hrs to 72 hrs Ramagundam Super Thermal Power Station
NTPC Limited
Improvement actions
Day 0 : Ensure healthiness of hoist Spare mill top body housing is renovated All new spares are available near mill Erection of necessary approach platforms Day 1 : Removal of coal pipes Removal of top mill body assembly Removal of loading ring Removal of top ring Removal of grinding balls Day 2 : Cutting & removal of air regulating rings Removal of bottom ring Removal of coal drop plate Replacement of middle shell wear plates Loading of new bottom ring Ramagundam Super Thermal Power Station NTPC Limited Replacement of U clamps, knee assy.
Improvement actions
Day 3 : Replacement of air regulating ring Full welding of middle shell wear plates & air regulating rings with protection bars. Loading of new grinding balls Loading new top ring Loading of spider ring Assembly of U clamp and knee assy. Replacement of mill top body assy. with spare top body assy. Re-fixing of coal inlet pipe Re-fixing of PF discharge pipe
Improvement actions 1. Rack & pinion arrangement were taken out side of the tramp iron gate assembly 2. Stone pickers are introduced in CHP This eliminated the problem of choking / jamming
Improvement actions 1. Highly skilled maintenance practices were developed for mill gear box servicing. 2. Scheduled replacement of gear box was adopted. 3. Stringent QP for procurement 4. Photos These resulted in elimination of mill gear box break down.
Ramagundam Super Thermal Power Station NTPC Limited
Improvement actions 1. Machining of Turn Plate at landing surface 2. Banding of bottom rings 3. Photos These resulted in reduction of premature failure of grinding rings.
Problem faced
Improvement actions
1. Replacement of original carbon steel PF pipes by ceramic pipes 2. Minimizing flanged joint by direct welding, wherever possible 3. Ensuring proper machined mating surface at flanged joint This resulted in elimination of mill outages due to PF leakages
Ramagundam Super Thermal Power Station NTPC Limited
MAINTENANCE PRACTICES
AT
OBJECTIVE
OF
MAINTENANCE STRATEGY
Our philosophy is for Zero breakdown between overhaul to overhaul by adopting various new initiatives like Outage preparedness index. Activity Based planning and monitoring Contract rationalization Rolling plan of equipment. REAP
MAINTENANCE PRACTICES
Preventive Maintenance. Predictive Maintenance. Proactive Maintenance. Planned maintenance (Overhaul/Servicing) Break Down Maintenance Life Assessment.
PREVENTIVE MAINTENANCE
PREVENTIVE MAINTENANCE
PM is time based maintenance. The frequency & scope is based onOEM Recommendation Site Experience After SRCM, this frequency and scope have been revised. This is mainly based on failure modes.
Ramagundam Super Thermal Power Station NTPC Limited
MAINTENANCE PRACTICES :
DURING 4 WEEKLY PM CHECKS : 1. 2. 3. 4. 5. 6. 7. Mill Internal inspection & Repair. Mill gear box Internal Inspection. Loading system rectification. Mill coupling Healthiness Checking. Measurement of Grinding Rings & Balls. Checking of Plough brush assly.
Ramagundam Super Thermal Power Station NTPC Limited
PREDICTIVE MAINTENANCE
VIBRATION ANALYSIS
Vibration monitored at pre determined frequencies and abnormalities reported are for corrective action. Trending done for critical equipments to keep a track of the equipment behavior.
Ramagundam Super Thermal Power Station NTPC Limited
MAINTENANCE PRACTICES :
DURING RUNNING : 1. Gear box Oil level and Oil Pressure checking 2. Gear box vibration, temperature and abnormal sound checking 3. Monitoring operating parameters 4. Checking for PF Leakages 5. Checking for hot air leakage 6. Checking for any oil leakage 7. Any abnormal sound from mill
Ramagundam Super Thermal Power Station NTPC Limited
PROACTIVE MAINTENANCE
PROACTIVE MAINTENANCE
Proactive maintenance is in the case of repeated failures. We go in to root cause of failure & do necessary correction by way of change in operating practices / small modification in system / maintenance practices.
PLANNED MAINTENANCE
PLANNED MAINTENANCE
Practices:
Pre-overhaul During overhaul Post overhaul
PLANNED MAINTENANCE
Pre-overhaul: Preparing Engineering declaration of all the units as per OPI guidelines. Identification of resources ( materials, contracts & T&P). Review of the materials & contracts status. Distribution of engineering declaration to all concerned before the start of overhaul
Ramagundam Super Thermal Power Station NTPC Limited
PLANNED MAINTENANCE
During overhaul: Ensuring proper isolation of the equipments before start of the work. Making Quality check protocols Making Re-commissioning check sheets Maintaining Communication log book
Ramagundam Super Thermal Power Station NTPC Limited
PLANNED MAINTENANCE
During overhaul: Safety survey & training to agency personnel. Constituting Knowledge team Daily review meeting Review of works planned & actual done. Feed back to all concerned.
PLANNED MAINTENANCE
Post-overhaul: Preparing executive summary Preparation of Unit overhaul completion report. Post overhaul review of improvement Pay back calculation
Ramagundam Super Thermal Power Station NTPC Limited
BREAKDOWN MAINTENANCE
BREAKDOWN MAINTENANCE
Defect registration is normally done by operation group Emergency Nature : Respective Maintenance to act immediately Other Jobs : Scheduled by MTP and then maintenance to rectify the defect.
Ramagundam Super Thermal Power Station NTPC Limited
PULVERIZER TROUBLESHOOTING
Pulverizer Troubleshooting Reasons for Poor Incorporated slots in air regulating ring to distribute fineness primary air in the mill properly Classifier cone may be eroded Incorrect adjustment of classifier blades Excessive wear out of grinding element Overloading of mill Fuel quality has deteriorated The Air/Fuel ratio is very high Increased through put
Ramagundam Super Thermal Power Station NTPC Limited
Pulverizer Troubleshooting Reason for abnormal sound from mill Most probable is the entry of foreign matter in the grinding element Break down of some internal parts, e.g. U clamp, knee assembly
Pulverizer Troubleshooting Reason for High Change in coal grindability, sulfur & ash rejects The relief gate is jammed open The air regulating ring has too much gap with bottom ring Grinding elements are in precarious conditions & adding a filler ball is the necessity
Pulverizer Troubleshooting Mill lub oil pressure low Lub oil pump is not developing pressure Leakage from lub oil lines Air suction in lub oil line Filter chockage Improper relief valve adjustment
Pulverizer Troubleshooting Mill coupling failure Over load in mill due to some foreign material Mill motor trouble Coupling material defect Mill gear box failure Lack of grease in coupling
Pulverizer Troubleshooting Lack of capacity or High power consumption High moisture Low GCV Increased raw coal size Grinding too fine Excessive wear out of race
Pulverizer Troubleshooting
Low coal / air temperature at mill outlet High moisture in coal Low PA inlet temperature Passing of cold air damper Mill got unloaded
THANK YOU
Ramagundam Super Thermal Power Station NTPC Limited