Escolar Documentos
Profissional Documentos
Cultura Documentos
Design
Block System
Need careful planning on cable routing in frame design Cable diameters must be exact
RISE
No strict design criteria in planning of cable routing No need for accurate cable diameters during design stages
2.
Steel Frames
RISE
Yard fabricate own steel frames Steel frames can be design to suit the cable ladder support Maximum frame 600 x 300 mm or equivalent in surface area.
Block
Yard must use maker frames Standard width of each frame 120mm
3.
Compact
RISE
The system is very compact and can filled more cables About 30% to 50% more cables The system gives more space and spares Need only small area
Block
Restricted by the blocks and frame size. Fixed number of cables
4.
Weight
RISE
The system weight less as compare to Block system. It could be as much as 50% weight saving using RISE system.
Block
Weight more
5.
Component
RISE
There is only 2 component the FRR sleeves and FIWA sealant
Block
The system have more than 5 components
6.
No Mechanical Stress
RISE
There NO mechanical pressure to ensure or to maintain the proper seal System uses adhesion and not COMPRESSION System maintained it elasticity and tightness
Block
By COMPRESSION Rubber loses it elasticity when compressed over a prolong period
7.
No Tight tolerance
RISE
No need for tight tolerance on cables and the FRR sleeves
Block
System required a tight tolerance between cable OD and block size
8.
Fire Integrity
RISE
System is tested to the latest IMO Res A754 (18) Both FIWA sealant and the FRR sleeves expand 5 to 10 times its volume Stop fire and smoke
Block
Block material do not expand during fire
9.
Block
No Comment Yard need to check with vendor
10.
Stability
RISE
System function up to 50 years. Aging Test by TNO laboratory in the Netherlands.
Block
???
11.
Maintenance
RISE
System maintain water and gas tight without any maintenance
Block
Need constant tightening
12.
Installation
RISE
NO special tools required. NO special skill require Proven by many yards and documented RISE can be 3 to 5 times faster than Block system
Block
Take time to sort out and arrange cables
13.
RISE
Any re-routing of cables on site is not a problem for RISE system RISE can handle any changes in cable type or diameter without changing the system
Block
Need prior planning May need to buy new material
14.
certified by DERA
RISE
System passed all the tests according to NES System is certified by DERA for used on board naval vessel
15.
RISE
NES 711: Issue 2 Smoke index NES 713: Issue 3 Toxicity index ISO 4589-2 :1996 Oxygen index NES 510: Issue 2 Draft B Shock Test MIL-P-24705 Rapid Fire Test IMO Res A.653(16) Low flame characteristic
16.
RISE
Just cut, insert and seal with FIWA. NO need to dismantle the system NO need to change any sleeves Accommodate almost all cable diameter Job can be done within a minute
Block
Change all old blocks Dismantle the complete system Loosen cables on both side of the transit
17.
RISE
May need to Erroneous installation dismantle the system like leak can be May need to change replaced by applying the blocks additional FIWA Mistake can be rectify on-site immediately
Block
18.
Cost saving
RISE