Escolar Documentos
Profissional Documentos
Cultura Documentos
HV CONSTRUCTION
Back to MAIN INDEX Go to SECTION INDEX
CONSTRUCTION
DESCRIPTION
DWG
CONSTRUCTION
DESCRIPTION
DWG
11kV POLE TERMINATION CONSTRUCTION Construction code guide - 11kV cable termination and connection ABB Construction code guide - 11kV cable termination & connection Magnefix & transformer Construction code guide - 11kV Pole termination Construction code guide - 22kV cable termination & connection F&G and transformer Construction code guide - 22kV Pole termination Construction code guide - 33kV Pole termination 11kV RMU AND TRANSFORMER CONSTRUCTION 11PMCTC/ASL RMU - ABB SafeLink in padmounted 5206 Substation triplex XLPE cable termination & connection 11PMCTC/ASL RMU - ABB SafeLink in padmounted substation 5207 400mm 1C Cu. Cable termination & connection 5134/1 5134/2 5134/3 5135/1 5135/2 5247/1 Pole termination 35mm/185mm/400mm Al. and 400mm Cu XLPE cable 11CTP Pole termination 35mm/185mm/400mm AI. and 400mm Cu XLPE cable 11CTP Pole termination cable guard to pole Pole termination with links 35mm/185mm/400mm AI. XLPE Pole termination with links (trident) 35mm/185mm/400mm AI. XLPE Pole termination with ABS & EDOs 35mm/185mm/400mm AI. XLPE Pole termination with ABS & EDOs 35mm/185mm/400mm AI. XLPE Pole termination direct to mains 400mm Cu. 1 core XLPE cable 22kV RMU CONSTRUCTION RMU - F&G GA..C Triplex XLPE cable termination and connection 22CTC/FGA RMU - F&G GA..C triplex XLPE cable termination and connection RMU - Schneider Electric RM6 Triplex XLPE cable termination and connection 22CTC/RM6 RMU - Schneider Electric RM6 Triplex XLPE cable termination and connection 22 kV TRANSFORMER CONSTRUCTION Transformer Triplex XLPE cable termination and connection 22CTC/TX Transformer Triplex XLPE cable termination and connection 5120/1 5120/2 5044/1 5044/2 5279/1 5279/2 5101/1 5101/2 5101/3 5101/4 5101/5 5101/6 5101/7 5101/8
RMU - ABB SD series Triplex XLPE cable termination & connection RMU & SFU Magnefix MD & Transformer Triplex XLPE cable termination & connection RMU - ABB safelink freestanding triplex XLPE cable termination & connection RMU - ABB safelink freestanding 400mm 1C Cu. cable termination & connection
5051 5054
5244
11CTC/ASL
5245
11CTC/FBX
FBX RMU - Triplex XLPE cable term. & conn. - material 5270/1 FBX RMU - Triplex XLPE cable term. & conn. - construction 5270/2
22CTC/TX
A B C D E
APPROVED
UNDERGROUND DISTRIBUTION
HV CONSTRUCTION INDEX
DATE
PASSED
10.01.12
Ergon Energy Corporation Ltd
17.07.12
DRAWN
FILE: 5 58 5133 1
Dwg
Sh
CONSTRUCTION
DESCRIPTION
DWG
CONSTRUCTION
DESCRIPTION
DWG
22kV POLE TERMINATION CONSTRUCTION Pole termination 35mm/185mm AI. Triplex and 630mm AI. 1 core XLPE cable Pole termination 35mm/185mm AI. Triplex and 630mm AI. 1 core XLPE cable Pole termination cable guard to pole Pole termination with links 35mm/185mm AI. XLPE cable Pole termination with links (trident) 35mm/185mm AI. XLPE cable Pole termination with ABS & EDOs 35mm/185mm AI. XLPE cable Pole termination with ABS & EDOs 35mm/185mm AI. XLPE cable Pole termination direct to mains 630mm AI. 1 core XLPE cable 5076/1 5076/2 5076/3 5076/4 5076/5 5076/6 5076/7 5076/8
22CTP 22CTP
33kV POLE TERMINATION CONSTRUCTION Pole termination 50mm/300mm Al core XLPE cable - Material Pole termination 50mm/300mm Al core XLPE cable Pole termination cable guard to pole Pole termination with links 50mm/300mm Al 1 core Pole termination with ABS and EDOs 50mm/300mm Al 1 core 5248/1 5248/2 5248/3 5248/4 5248/5
33CTP
A B
APPROVED
UNDERGROUND DISTRIBUTION
HV CONSTRUCTION INDEX
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
FILE: 5 58 5133 2
Dwg
Sh
MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION QTY ASSY 512-1 512-4 512-7 510-1 510-6 536-5 553-1 DESCRIPTION
35mm Cable termination and connection to RMU 22kV 35mm
2 2 2 2 2
185mm
630mm
1 1 1 1 1 1 3 3
Earth extension elbow connector to station earth Earth extension elbow connector to station earth Clamp to suit 3 x 1 core 630mm 35mm
2 2
cable
NOTES: 1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT any metal before reaching the station earth bar.
A B
APPROVED
UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION RMU - F&G GA...C TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5044 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5044
Sh
Screen earth
F
Assy 510-1 or 6
To Station Earth
Construction Type
22CTC/FGA
A B
APPROVED
UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION RMU F&G GA...C TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5044 2
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5044
Sh
MATERIAL - ASD ASSY 514-1 514-2 514-3 514-4 541-4 541-7 DESCRIPTION
Term. & conn. (ABB SD) 11kV 35mm
2
QTY
cable
2
Term. & conn. (ABB SD) 11kV 185mm Term. & conn. (ABB SD) 11kV 35mm
2
cable 1
F
Maximum lug width is 35mm. Machine/file both sides of palm as necessary and radius edges.
Term. & conn. (ABB SD) 11kV 185mm2 cable insect prot. Cable trifoil to channel suit 11kV 35mm
2 2
cable cable insect prot. cable cable insect prot. 1 1 Assy Selection 514-1 to 4
2 2
Station Earth
F
NOTES: 1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT the unistrut bar or any earth point before reaching the station earth bar. 2. Locate cable lug and bolt head to rear of bushing.
SIDE VIEW
A B
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RMU - ABB SD SERIES TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5051 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Assy 557-21
Construction Type
11CTC/ASD
Dwg
5051
Sh
QTY
cable
2
516-2 Term. & conn. (Magnefix MD & Transf.) 11kV 185mm cable 516-3 Term. & conn. (Magnefix MD & Transf.) 11kV 35mm2 cable insect prot. 516-4 Term. & conn. (Magnefix MD & Transf.) 11kV 185mm2 cable insect prot. MATERIAL - TRANSF. ASSY 516-1 DESCRIPTION
Term. & conn. (Magnefix MD & Transf.) 11kV 35mm
2
QTY
2
F
cable 1
516-2 Term. & conn. (Magnefix MD & Transf.) 11kV 185mm cable
2 516-3 Term. & conn. (Magnefix MD & Transf.) 11kV 35mm cable insect prot. 516-4 Term. & conn. (Magnefix MD & Transf.) 11kV 185mm2 cable insect prot. 2 541-4 Clamp trefoil to channel suit 11kV 35mm cable
NOTES: 1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT the unistrut bar or any earth point before reaching the station earth bar.
Support Channel
F
Support Channel
Construction Type
11CTC/TX
FRONT VIEW - TRANSFORMER
11CTC/MMD
A B
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RMU & SFU - MAGNEFIX MD AND TRANSFORMER TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5054 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5054
Sh
NOTES:
QTY
1. Locate cable on opposite side of pole to oncoming traffic where possible. 2. Do Not Obstruct climbing access. 3. All metalwork that passes through or into wood shall be greased for the entire length that may come into contact with the wood. 4. Minimum dimension to ground from termination bracket king bolt allows sufficient ground clearance for an LV underground termination on pole. 5. Dimension from termination bracket king bolt to LV conductor below suits triplex cable termination. 3C cable termination requires greater dimension. 6. Polymeric cable guard is not to be use in areas: subject to grass fire where metal bladed brush cutter may be used where there is a high likelihood of impact. 7. Refer Earthing Section of the Overhead Construction Manual for minimum separation requirements between metal cable guard and communication assets.
cable
511-12 Clamp trefoil to pole term. bracket suit 22kV 630mm 2 cable 515-4
Clamp cable to wood pole
557-12 Clamp trefoil to wood pole to suit 630mm2 cable 539-1 540-2 540-3
Bracket termination (11kV, 22kV & 33kV) mounting to wood pole Arrester 22kV mounting to bracket (M12) Arrester 22kV mounting to bracket (M16) - 630mm
2
AR 1 3 cable only
546-10 Termination outdoor 22kV 185mm2 cable 546-11 Termination outdoor 22kV 630mm 2 cable 546-12 Termination outdoor 22kV 35mm cable insect protected 547-1
Guard wildlife to wood pole 1
2
QTY
A B C D
APPROVED
UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION 2 2 POLE TERMINATION - 35mm /185mm AL TRIPLEX 2 AND 630mm AL 1 CORE XLPE CABLE - MATERIAL
B 1/2 DISC
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
FILE: 5 58 5076 1
Dwg
5076
Sh
Assy 547-1
F
A B C
APPROVED
UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION 2 2 POLE TERMINATION - 35mm /185mm AL TRIPLEX AND 630mm 2 AL 1 CORE XLPE CABLE
B 1/2 DISC
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
FILE: 5 58 5076 2
Assy 539-1
22CTP
Dwg
5076
Sh
DESCRIPTION
Guard polymeric to wood pole Guard metal (100) to wood pole Guard metal (130) to wood pole
QTY
1
511-3 Clamp trefoil to pole term. bracket suit 11kV 185mm cable insect protected 511-8 Clamp trefoil to pole term. bracket suit 11kV 400mm Cu cable insect protected 511-10 Clamp trefoil to pole term. bracket suit 11kV 400mm Al cable
Clamp trefoil to pole term. bracket suit 11kV 400mm Al cable insect protected
515-4 Clamp cable to wood pole 557-8 Clamp trefoil to wood pole to suit 400mm cable 11kV 539-1 540-1 546-1
Bracket termination (11kV, 22kV & 33kV) mounting to wood pole Arrester 11kV mounting to bracket (M12)
546-2 Termination outdoor 11kV 185mm Al cable 546-3 Termination outdoor 11kV 35mm Al cable insect protected 546-4 Termination outdoor 11kV 185mm Al cable insect protected 546-6 Termination outdoor 11kV 400mm Al cable 546-7 Termination outdoor 11kV 400mm Al cable insect protected 572-1 547-1
Termination outdoor 11kV 400mm Cu cable insect protected Guard wildlife to wood pole 1
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION 35/185/400mm AL and 400mm CU XLPE CABLE
B 1/2 DISC
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
FILE: 5 58 5101 1
Dwg
5101
Sh
Assy 539-1
F
Assy Selection 546-1 to 7 or 572-1 HV Earth - Refer Overhead Construction Manual EARTHING HV Equipment Earth
F
Assy 547-1
A B C D
11CTP
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION - 35/185/400mm AL AND 400mm CU XLPE CABLE
B 1/2 DISC
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
FILE: 5 58 5101 2
Dwg
5101
Sh
00
00 00
REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.
1800
1800
2450
F
8200
F F
2450
2100
300
F
TERMINATION
STRAIN
APPROVED
DELTA INTERMEDIATE
C. Noel 24/3/03 A. Bletchly C.Lindsay
A B C
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION WITH LINKS 35/185/400mm AL XLPE
FILE: 5 58 5101 4
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
300
300
FF
DRAWN
Dwg
5101
Sh
00
00
REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.
1800
2100
8200
2650
300
F
TRIDENT INTERMEDIATE
TRIDENT TERMINATION/STRAIN
APPROVED
A B C
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION WITH LINKS (TRIDENT) 35/185/400mm AL XLPE
FILE: 5 58 5101 5
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
F
FF
300
DRAWN
Dwg
5101
Sh
00
00
REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.
8200
F
3700
1800
1800
3000
300
F
FF
TRIDENT TERMINATION/STRAIN
TRIDENT INTERMEDIATE
APPROVED
A B C
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION WITH ABS AND EDOS 35/185/400mm AL XLPE
FILE: 5 58 5101 6
DATE
PASSED
300
DRAWN
Dwg
5101
Sh
00
00
REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.
1800
1800
2700
8200
2700
300
F
FF
FLAT INTERMEDIATE
TERMINATION/STRAIN
APPROVED
A B C
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION WITH ABS AND EDOS 35/185/400mm AL XLPE
FILE: 5 58 5101 7
DATE
PASSED
DRAWN
Dwg
5101
300
Sh
11kV PADMOUNTED SUBSTATION CABLE TERMINATION & CONNECTION RMU CONSTRUCTION CODE
Code shown within dashed box appears on relevant construction detail drawings in this manual.
A 11 PM/CTC/ASL/35T
CABLE SIZE
PM = Padmounted Substation
35T = 35mm Al Triplex 185T = 185mm Al Triplex ASL = ABB SafeLink 35TI = 35mm Al Triplex insect protected FBX = Schneider Electric 185TI = 185mm Al Triplex insect protected FBX 400CUI = 400mm Cu 1 Core insect protected 400T = 400mm Al Triplex 400TI = 400mm Al Triplex insect protected HV SWITCHGEAR
EXAMPLE:- 11PMCTC/ASL/35T = 11kV, Padmounted Substation, Cable termination and connection, ABB SafeLink RMU, 35mm Al Triplex cable
A 11 CTC/ASD/35T
CABLE SIZE VOLTAGE 11 = 11kV CONSTRUCTIONS CTC = Cable Termination & Connection HV SWITCHGEAR ASD = ABB SD series ASL = ABB SafeLink ASP = ABB SafePlus ASR = ABB SafeRing 35T = 35mm Al Triplex 185T = 185mm Al Triplex 35TI = 35mm Al Triplex insect protected 185TI = 185mm Al Triplex insect protected 400CUI = 400mm Cu Triplex insect protected 400T = 400mm Al Triplex 400TI = 400mm Al Triplex insect protected
EXAMPLE:- 11CTC/ASD/35T = 11kV, Cable termination and connection, ABB SD series RMU, 35mm Al Triplex cable
A B C D
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION CONSTRUCTION CODE GUIDE CABLE TERMINATION AND CONNECTION
FILE: 5 58 5134 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5134
Sh
A 11 CTC/TX/35TI
CABLE SIZE VOLTAGE 11 = 11kV CONSTRUCTIONS CTC = Cable Termination & Connection TRANSFORMER TX = Transformer 35T = 35mm Al Triplex 185T = 185mm Al Triplex 35TI = 35mm Al Triplex insect protected 185TI = 185mm Al Triplex insect protected
EXAMPLE:-
11CTC/TX/35TI = 11kV, Cable termination and connection, Transformer, 35mm Triplex insect protected cable
A 11 CTC/MMD/185T
VOLTAGE 11 = 11kV
CABLE SIZE 35T = 35mm Al Triplex 185T = 185mm Al Triplex 35TI = 35mm Al Triplex insect protected 185TI = 185mm Al Triplex insect protected
EXAMPLE:-
11CTC/MMD/185T = 11kV, Cable termination and connection, Magnefix MD series RMU, 185mm Triplex cable
APPROVED
A B C
UNDERGROUND DISTRIBUTION
4/2/03
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
c D. M K.
C.Lindsay
11kV CONSTRUCTION CONSTRUCTION CODE GUIDE CABLE TERM. & CONN. MAGNEFIX & TRANSFORMER
FILE: 5 58 5134 2
DRAWN
Dwg
5134
Sh
Code shown within dashed box appears on relevant construction detail drawings in this manual.
A 11 CT P/35T/M
VOLTAGE 11 = 11kV
POLE P = Pole
CABLE SIZE 35T = 35mm Al Triplex 185T = 185mm Al Triplex 35TI = 35mm Al Triplex insect protected 185TI = 185mm Al Triplex insect protected 400CUI = 400mm Cu 1 core insect protected 400T = 400mm Al Triplex 400TI = 400mm Al Triplex insect protected
EXAMPLE:-
11CTP/35T/M = 11kV, Cable termination, Pole, 35mm Triplex cable, Metal cable guard
APPROVED
A B C D
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION CONSTRUCTION CODE GUIDE POLE TERMINATION
FILE: 5 58 5134 3
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5134
Sh
A 22 CTC/FGA/185T
VOLTAGE 22 = 22kV
CABLE SIZE 35TI = 35mm Al Triplex insect protected 2 185T = 185mm Al Triplex 2 630 = 630mm Al 1C
2
EXAMPLE:-
22CTC/FGA/185T = 22kV, Cable termination and connection, F & G GA...-C series RMU, 185mm
Triplex cable
Code shown within dashed box appears on relevant construction detail drawings in this manual.
A 22 CTC/TX/35TI
VOLTAGE 22 = 22kV
TRANSFORMER TX = Transformer
CABLE SIZE 35TI = 35mm Al Triplex insect protected 185T = 185mm 2 Al Triplex
2
EXAMPLE:-
A B
UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION CONSTRUCTION CODE GUIDE CABLE TERM. & CONNECTION & TRANSFORMER
FILE: 5 58 5135 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5135
Sh
MATERIAL ASSY 571-1 571-2 571-3 571-4 571-8 571-9 573-2 573-4 573-9 DESCRIPTION
Term. & conn. (ABB SafeLink) 11kV 35mm cable Term. & conn. (ABB SafeLink) 11kV 185mm cable Term. & conn. (ABB SafeLink) 11kV 35mm cable insect prot. Term. & conn. (ABB SafeLink) 11kV 185mm cable insect prot. Term. & conn. (ABB SafeLink) 11kV 400mm Al cable Term. & conn. (ABB SafeLink) 11kV 400mm Al cable insect prot. Clamp to channel suit 11kV 35mm Al cable Clamp to channel suit 11kV 35mm Al cable insect protected Clamp to channel suit 11kV 185mm Al cable Clamp to channel suit 11kV 185mm Al cable insect protected Clamp to channel suit 11kV 400mm Al cable Clamp to channel suit 11kV 400mm Al cable insect protected 3
F
QTY
F
1
F
Station Earth
Bushing Boots supplied with HV switchgear. WARNING: Use only cold applied bushing boots. Heat must NOT be applied near RMU bushings. Assy Selection 573-2, 4 or 9
F
Termination and connection kit to be installed in accordance with Manufacturers installation instructions
Do not over tighten clamp on cable. Construction Type Unistrut set in concrete plinth
11PMCTC/ASL
C. Noel 23/9/05 A. Bletchly C.Lindsay
A B C D
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RMU - ABB SAFELINK IN PADMOUNTED SUBSTATION TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5206 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5206
Sh
QTY
1 WARNING: Use only cold applied bushing boots. Heat must NOT be applied near RMU bushings. Assy 570-1
Assy 573-6
F
NOTES: 1. Connect cable screens and earth straps (braid) to separate holes on station earth. Construction Type
SIDE VIEW A B
ORIGINAL ISSUE 13.11.08 APPROVED
UNDERGROUND DISTRIBUTION
27/9/05
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
c D. M K.
C.Lindsay
11kV CONSTRUCTION RMU - ABB SAFELINK IN PADMOUNTED SUBSTATION 400mm 1C Cu. CABLE TERMINATION & CONNECTION
FILE: 5 58 5207 1
DRAWN
Dwg
Termination and connection kit to be installed in accordance with Manufacturers installation instructions
Station Earth
F
F
11PMCTC/ASL
5207
Sh
MATERIAL ASSY 571-1 571-2 571-3 571-4 573-2 573-4 577-1 DESCRIPTION
Term. & conn. (ABB SafeLink) 11kV 35mm cable Term. & conn. (ABB SafeLink) 11kV 185mm cable 1 Term. & conn. (ABB SafeLink) 11kV 35mm cable insect prot.
F
QTY
Term. & conn. (ABB SafeLink) 11kV 185mm cable insect prot. Clamp to channel suit 11kV 35mm cable Clamp to channel suit 11kV 35mm cable - Insect protected 3 Clamp to channel suit 11kV 185mm cable Clamp to channel suit 11kV 185mm cable - Insect protected ABB bushing boots 1
F
Assy 577-1
Termination and connection kit to be installed in accordance with Manufacturers installation instructions
Assy Selection 573-2 or 4 Do not over tighten clamp on cable. Construction Type
A B
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RING MAIN UNIT ABB SAFELINK FREESTANDING TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 62 5244 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5244
WARNING: Use only cold applied bushing boots. Heat must NOT be applied near RMU bushings.
Station Earth
11CTC/ASL
Sh
QTY
1 WARNING: Use only cold applied bushing boots. Heat must NOT be applied near RMU bushings.
Screen earth Termination and connection kit to be installed in accordance with Manufacturers installation instructions
Braid earth
F
SIDE VIEW
ORIGINAL ISSUE
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RMU - ABB SAFELINK FREESTANDING 400mm 1C Cu. CABLE TERMINATION & CONNECTION
FILE: 5 62 5245 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5245
Station Earth
F
Construction Type
11CTC/ASL
Sh
Code shown within dashed box appears on relevant construction detail drawings in this manual.
A 33 CT P/300/P
VOLTAGE 33 = 33kV
POLE P = Pole
EXAMPLE:-
33CTP/300/P = 33kV, Cable termination, Pole, 300mm Al 1 Core cable, Polymeric cable guard.
APPROVED
ORIGINAL ISSUE
UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION CONSTRUCTION CODE GUIDE POLE TERMINATION
FILE: 5 58 5247 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5247
Sh
NOTES:
QTY
cable 1
1. Locate cable on opposite side of pole to oncoming traffic where possible. 2. Do Not Obstruct climbing access. 3. All metalwork that passes through or into wood shall be greased for the entire length that may come into contact with the wood. 4. Minimum dimension to ground from termination bracket king bolt allows sufficient ground clearance for an LV underground termination on pole. 5. Dimension from termination bracket king bolt to LV conductor below suits 1 core cable termination. For 3 core termination a greater separation is required. 6. Polymeric cable guard is not to be use in areas: subject to grass fire where metal bladed brush cutter may be used where there is a high likelihood of impact. 7. Refer Earthing Section of the Overhead Construction Manual for minimum separation requirements between metal cable guard and communication assets.
511-11 Clamp trefoil to pole term. bracket suit 33kV 300mm 2 cable 557-2 557-6 539-1 540-5 584-1 584-2 547-1
Clamp trefoil to wood pole to suit 50mm cable Clamp trefoil to wood pole to suit 300mm
2
AR 1 3 1 1
cable
Bracket termination (11kV, 22kV & 33kV) mounting to wood pole Arrester 33kV mounting to bracket (M12) Termination outdoor 33kV 50mm
2
cable
2
cable
QTY
ORIGINAL ISSUE
APPROVED
UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION 2 2 POLE TERMINATION - 50mm /300mm AL 1 CORE XLPE CABLE - MATERIAL
B 1/2 DISC
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
FILE: 5 58 5248 1
Dwg
5248
Sh
Assy 547-1
F
ORIGINAL ISSUE
APPROVED
UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION 2 2 POLE TERMINATION - 50mm /300mm AL 1 CORE XLPE CABLE
B 1/2 DISC
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
FILE: 5 58 5248 2
Assy 539-1
33CTP
Dwg
5248
Sh
150 Max
Cable Support
Metal cable guard shall be earthed. Refer Overhead Construction Manual EARTHING for pole and cable guard earthing details.
2400 Min
Wood Pole
Ground Line
100 Min
Construction Type
33CTP A
ORIGINAL ISSUE APPROVED
UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION POLE TERMINATION CABLE GUARD TO POLE
FILE: 5 58 5248 3
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5248
Sh
00
00 00
REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.
2000
2000
2450
F
8400
F F
2450
2100
300
F
TERMINATION
STRAIN
APPROVED
DELTA INTERMEDIATE
C. Noel 10/5/11 A. Bletchly L. Burton
ORIGINAL ISSUE
UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION POLE TERMINATION WITH LINKS 50mm / 300mm Al 1 CORE
FILE: 5 58 5248 4
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5248
Sh
300
300
FF
00
00
REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.
2000
2000
2700
8400
2700
300
F
FF
FLAT INTERMEDIATE
TERMINATION/STRAIN
APPROVED
ORIGINAL ISSUE
UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION POLE TERMINATION WITH ABS AND EDOS 50mm / 300mm Al 1 CORE
FILE: 5 58 5248 5
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5248
300
Sh
MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION QTY ASSY 588-1 588-4 588-7 510-6 DESCRIPTION
35mm Cable termination and connection to RMU 11kV 35mm
2 2 2 2
185mm
400mm
1 1 1 1 1 1
Cable termination and connection to RMU 11kV 185mm 2 cable Cable termination and connection to RMU 11kV 400mm Earth extension elbow connector to station earth
2
cable
NOTES: 1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT any metal before reaching the station earth bar.
ORIGINAL ISSUE
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION FBX RMU TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5270 1
DATE
PASSED
DRAWN
Dwg
5270
Sh
Screen earth
F
Assy 510-6
To Station Earth
Construction Type
11CTC/FBX
ORIGINAL ISSUE
APPROVED
UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION FBX RMU TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5270 2
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5270
Sh
MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION QTY ASSY 512-1 512-4 512-7 591-1 591-3 510-1 510-6 DESCRIPTION
35mm Cable termination and connection to RMU 22kV 35mm
2 2 2 2 2
185mm
630mm
1 1 1 1 1 1 1 1
RM6 Gland plate kit with clamps to suit 35mm cable RM6 Gland plate kit with clamps to suit 630mm cable Earth extension elbow connector to station earth Earth extension elbow connector to station earth
NOTES: 1. 2. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT any metal before reaching the station earth bar. Clamping and gland plates supplied standard for 185mm cable.
ORIGINAL ISSUE
APPROVED
UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION RMU - SCHNEIDER ELECTRIC RM6 TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5279 1
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5279
Sh
Screen earth
F
Assy 510-1 or 6
To Station Earth
Construction Type
22CTC/RM6
ORIGINAL ISSUE
APPROVED
UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION RMU - SCHNEIDER ELECTRIC RM6 TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5279 2
DATE
PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062
DRAWN
Dwg
5279
Sh