Escolar Documentos
Profissional Documentos
Cultura Documentos
CODES & STANDARDS: • Stair stringers should also be installed every 16”
• Always conform to your local building codes and the on center.
requirements of all authorities having jurisdiction. • Support joists should be installed 12" on center
for angled decking.
SAFETY:
• 4" x 4" wood posts must be used and bolted to the
• Protective safety equipment is always recommended,
substructure to support eON® railing system.
e.g., eyewear, safety boots.
STORAGE & HANDLING:
TOOLS:
• eON® is the premium decking product on the
• Standard wood working tools are recommended while
market and should be treated as such.
working with the eON® decking system (use a carbide
• Carefully remove when unloading, do not dump.
blade – 24 teeth or less). Chop saw (if available) or hand
• Do not drag decking against abrasive surfaces.
saw, 2" coated flat head deck screws (included with
• Store with the face side up.
T-clips) and 3” flat-head for railing installation, electric
drill, measuring tape, pencil, square. DIMENSIONS:
• Deck board = 5 1/2"
SUBSTRUCTURE:
• T-clip = 5/16"
• eON® decking and railing is designed to be
• Deck board and t-clip combined = 5 13/16" or 5.8125"
installed on a conventional wood substructure
(pressure treated suggested). To calculate how many deck boards you will need:
• Support joists should be installed 16" on center divide the width of your deck (in inches) by 5.8125
for 90º decking (straight application).
Note: For a simple calculation please refer to our web-
site calculator – www.eonoutdoor.com
FAHRENHEIT EXAMPLE:
• There are 3 variables that affect the expansion/contraction
of eON® decking; maximum expected temperature for a
particular region, temperature at the time of installation
and the length of the deck board being used.
1
2) DECK BOARD &
TIPS FROM THE PROS: FASCIA INSTALLATION
TIP #3: Optional Installation of Decking to INSTALLING DECKING PARALLEL TO HOUSE:
minimize visible gaps. a)Prior to laying any deck-boards, apply 2 beads of silicone
caulking to all board-supporting joists. Allow all silicone
a) In order to reduce or completely eliminate
butting boards end-to-end install deck boards minimum 12 hours to dry (follow directions on caulking).
perpendicular to house if deck width is less b)Begin by loosely screwing a row of T-clips along the
than 20'. (FIG. 7) ledger board (joist along house). If using 2" coated deck
b) A “Breaker board” can be used to reduce screws do not over tighten, just until snug. (FIG. 3)
the visual impact of the gaps between boards c) Lay first board firmly against the T-clips. (FIG. 4)
butted end-to-end. (FIG. 2A & FIG. 2B) d)At the approximate center point of each board, pre-drill
c) If decking is not installed perpendicular a hole through the outer lip of the free side of the board
to the house, or if a breaker board is not at a 45 degree angle into the joist. Fasten to joist with
used, then it is recommended that joists be a 2” deck screw.
doubled up on in areas that will experience e) Screw next row of T-clips loosely against the first board
temperature differences of 80ºF or 25ºC and tighten down the first row of T-clips. (FIG. 5)
between seasons. (FIG. 1A & FIG. 2C)
f) Once that is done, place second board firmly against
the second row of T-clips.
g) Now place another row of T-clips loosely against that
board and proceed to tighten the second row of T-clips
down firmly.
h)Continue this process (Board – T-clips – Board – T-clips)
for the remainder of the boards until reaching the edge of
the deck (Rim Joist).
g) Once the last board is in place, pre-drill slot holes
every 8" at a 45º angle through the outer lip of the
board and fasten using 2" deck screws. (FIG. 6)
FIG. 2A
FIG. 3
FIG. 2B FIG. 2C
2
INSTALLING DECKING PERPENDICULAR TO HOUSE:
a) Apply Silicone. Install first deck board along the rim
joist by pre-drilling (slot-holes SEE FIG. 6) holes every
8" at a 45º angle through the outer lip. (FIG. 8)
b)Next, install first row of T-clips against the opposite
side of the 1st board and screw down loosely. (FIG. 9A)
c) Install second board firmly against first row of T-clips.
d)Loosely install T-clips firmly against second deck board
and tighten first row of T-clips. (FIG. 9B)
e) Continue this process (Board – T-clips – Board – T-clips)
until last deck board along opposite rim joist, then
FIG. 5
redo step one. (FIG. 8)
FIG. 6 FIG. 8
FIG. 9A
FIG. 7 FIG. 9B
3
INSTALLING FASCIA/CLADDING (3/8"X9"X12"): 3) HANDRAIL & POST SLEEVE
a) Cut the cladding to required length. INSTALLATION
b)Then pre-drill and screw every 8" using 1 5/8"
wood screws on each groove of the fascia. (FIG. 10) INSTALLING POST SLEEVE (4.2"X4.2"X4'),
c) The cladding should only be attached to the COLLAR AND CAP:
substructure (rim joist), not into the deck board a) The eON® post sleeve is designed to simply slide over an
to allow the cladding to expand/contract. existing 4" x 4" wood post. (FIG. 12)
d)Egg shape hole or slot your hole for expansion b)The sleeve is secured once the eON® railing is attached
and contraction. by screwing 3" screws through the baluster, the sleeve
e) Tighten screw until snug to allow for expansion and into the wood posts. (FIG. 16)
and contraction. c) Slide post collar over 4” x 4” post and settle flush
to deck-boards.
POST SLEEVE
FIG. 11 FIG. 13
4
TIPS FROM THE PROS:
5
INSTALLING STAIR RAIL:
a) Use the pre-routered 33º stair rail unit. For the
installers convenience, the pre-routered 33º stair rail
unit comes in a kit (6' handrail, 15 balusters, 2 fill-it
pcs). (FIG. 18A)
b)The balusters have been routered on a 33º angle with a
width that will permit installation of stairs with angle
variances of 26º – 40º. (FIG. 18B & FIG. 18C)
FIG. 19
26.00º (FIG. 10) using 2" deck screws every 8" along each groove
40.00º
of the cladding, and pre-drill slot holes to allow fascia
FIG. 18B FIG. 18C to expand and contract. (PRO-TIP #6)
16"
16"
6
PAINTING/STAINING: LIFETIME LIMITED WARRANTY
• eON® is a maintenance free product and does not CERTIFICATE
require any treating, painting or staining. If painting
is desired, please use only latex-based paints. COVERING YOUR PURCHASE OF EON.
Subject to the limitations included in this Lifetime Limited Warranty Certificate,
CLEANING: CPI warrants to the original purchaser of eON® Product (as described below),
bought and installed (i) as a residential decking system with railings, (ii) as
• Due to the maintenance free nature of eON® decking, a residential decking, or (iii) for other similar residential uses or applications as
identified in the CPI point of sale material provided by Dealer, that such Product
simple rinse or light wash with soap and water is the is (a) rot, and water resistant, (b) free from damage by fungal decay, and (c)
only requirement to keeping your deck clean. otherwise free from defects in material and workmanship, for the period beginning
on the date the eON® Product is purchased and continuing for so long as the origi-
nal purchaser owns the property on which the eON® Product is used for one
of the purposes described above.
No abrasive or harsh chemicals should be used to
The Warranty Certificate is not transferable.
clean eON®. Avoid use of any petroleum-based
products on the eon deck surface.(see website or WARRANTY PROCESS
contact CPI Plastics Group Ltd.) CPI will repair or replace, at its expense, any eON® Product used for any one or
more of the above applications that is defective in material or workmanship. The
repair work or replacement will be at no charge to the original purchaser. To make
arrangements for the repair or replacement of eON® product, the original purchaser
must send: (i) a Warranty Certificate, (ii) the original purchase invoice indicating
the date of purchase showing sufficient eON® Product was purchased to cover the
TIPS FROM THE PROS: amount of eON® Product claimed to be defective, and (iii) the defective eON®
Product within 30 days after the original purchaser became first aware of the
TIP #11: To remove scratches from eON’s sur- alleged defects in the Products to: CPI at 979 Gana Court, Mississauga, Ontario,
I5S 1P2. CPI must concur that the eON® Product is defective (provided that CPI
face, simply use a loose exacto knife blade shall not unreasonably withhold or delay and concurrence). CPI shall deliver to
or box cutter blade to shave the scratches the original purchaser, at CPI's expense, all repaired or replacement eON® Product.
from the material. The blade should be per- CPI shall not be liable for any installation or reinstallation costs.
WARRANTY DEFINITION.
For purposes of this Warranty Certificate "eON® Product" means a thermoplastic resin
profile which, when extruded, exhibits the appearance and coloration of a simulated
natural or stained wood surface finish for installation as a residential decking and
railing system, outdoor residential decking or for other similar residential uses or
applications as identified in the CPI point of sale material provided to the Dealer.
FIG. 22