Você está na página 1de 33

CRONOGRAMA DE EJECUCIN DE LA OBRA

REALIZADO: Wilson Santa Cruz Bobadilla.

PROYECTO: CASA - HABITACIN


LUGAR: CAJAMARCA
FECHA: Setiembre del 2007

Mes N 1

SIMB

Semana N1
Descripcin
TRABAJOS PRELIMINARES

COSTO
11.25

DURACION
1

% INCID.

1
2
100%

Semana N2
6

10

Semana N3

11

12

13

14

15

16

17

18

0.01
11.25

100%
TRAZO DE NIVELES Y REPLANTEO

581.10

0.42
581.10

100 %
MOVIMIENTO DE TIERRAS

4445.96

13

3.19
4446.0

100 %
OBRAS DE CONCRETO SIMPLE

9041.07

6.48
9041.1

1.28 %
OBRAS DE CONCRETO ARMADO

36186.76

30

25.95
464.27

63.64
MUROS DE LADRILLO DE ARCILLA

30666.62

11

21.99

BARANDAS Y PARAPETOS

3026.59

2.17

REVOQUES Y ENLUCIDOS

9448.11

32

6.77

CIELORASO

6643.30

13

4.76

10

PISOS Y PAVIMENTOS

3444.30

2.47

11

ZOCALOS

3006.07

10

2.16

12

19516.239

CARPINTERIA y CERRAGERIA

5014.81

17

3.60

Roy Edward Contreras Melndez

13

VIDRIOS

3397.27

13

2.44

14

PINTURA

6627.48

15

4.75

15

APARATOS SANITARIOS Y ACCESORIOS

2187.88

10

1.57

16

APARATOS VARIOS

406.47

0.29

17

DESAGE Y VENTILACIN

8067.90

5.78

18

SISTEMA DE AGUA FRIA Y CONTRAINCENDIOS

1545.28

1.11

100 %

19

ACCESORIOS DE REDES

20

SALIDAS PARA ELECTRICIDAD Y FUERZA

21

1545.28

CONEXIN A LA RED EXTERNA Y MEDIDORES

519.00

0.37

4329.81

16

3.10

866.62

0.62

139463.66
139462.39

100.00
1er mes
35605.17
25.53
25.53

Roy Edward Contreras Melndez

PROGRAM

Mes N 2
Semana N4
19

20

21

22

23

Semana N5
24

25

26

27

28

29

Semana N6
30

31

32

33

34

35

Mes N 3
Semana N7

36

37

38

39

40

41

Semana N8
42

43

44

45

46

47

Semana N9
48

49

50

51

52

Semana N10

53

54

55

56

57

58

59

Semana N11
60

61

%
57.08 %
20655.403
63.64 %
19516.239

42.92 %
15067.09

36.36 %
11150.4

Roy Edward Contreras Melndez

2do mes
31805.8
22.8
48.3

3er mes
22423.49
16.1
64.4

Roy Edward Contreras Melndez

PROGRAMACIN DE OBRAS DE INGENIERA


DIAGRAMA GANTT -REALMes N 3
Semana N11

Semana N12
D

62

63

64

65

66

67

68

69

70

71

72

100 %
3026.59

Roy Edward Contreras Melndez

100 %
4329.81

3er mes
22423.49
16.1
64.4

Roy Edward Contreras Melndez

N DE OBRAS DE INGENIERA
DIAGRAMA GANTT -REALMes N 4
Semana N13
73

74

75

76

77

Semana N14
D
I
78

79

80

81

82

83

Mes N 5
Semana N15

A
84

Semana N16

Semana N17

Semana N18

Semana N19

Semana N20

S
85

86

43.75 %
4132.274

87

88

89

90

91

92

93

94

95

96

97

98

99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117

56.25 %
5314.563
46.15
3065.883

100 %
3006.07

Roy Edward Contreras Melndez

100 %
2187.88

100 %
8067.90

100 %
519.00

100 %
866.62
4to mes
18779.74
13.5
77.9

5to mes
11824.750
8.5
86.4

Roy Edward Contreras Melndez

Mes N 6
Semana N20

Semana N21

Semana N22

Mes N 7
Semana N23

Semana N24

Semana N25

Semana N26

Semana N27

118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162

53.85 %

3577.417
100 %
3444.30

100 %
5014.810
Roy Edward Contreras Melndez

100 %
3397.27
100 %
6627.48

100 %
406.47

6to mes
12395.963
8.9
95.2

7mo mes
6627.484
4.8
100.0

Roy Edward Contreras Melndez

Semana N28
163 164 165 166 167 168

Roy Edward Contreras Melndez

Roy Edward Contreras Melndez

CRONOGRAMA DE EJECUCIN DE LA OBRA


PROYECTO:
Mes N 1

SIMBOL

Semana N1
Descripcin

TRABAJOS PRELIMINARES

% PONDERADO

1
2
100%

0.02
100

100 %

100%
TRAZO DE NIVELES Y REPLANTEO

0.42

95
MOVIMIENTO DE TIERRAS

3.19

90
OBRAS DE CONCRETO SIMPLE

6.48

85
OBRAS DE CONCRETO ARMADO

25.95

80
MUROS DE LADRILLO DE ARCILLA

21.99

75
BARANDAS Y PARAPETOS

2.17

70
REVOQUES Y ENLUCIDOS

6.77

65
CIELORASO

4.76

10

60
PISOS Y PAVIMENTOS

2.47

11

55
ZOCALOS

2.16

12

50
CARPINTERIA y CERRAGERIA

3.6

13

45
VIDRIOS

2.44

14

40
PINTURA

4.75

15

35
APARATOS SANITARIOS Y ACCESORIOS

Roy Edward Contreras Melndez

1.57
30

100

15

APARATOS SANITARIOS Y ACCESORIOS

1.57

16

30
APARATOS VARIOS

0.29

17

25
DESAGE Y VENTILACIN

5.78
20

18

100
SISTEMA DE AGUA FRIA Y CONTRAINCENDIOS

1.11

19

15
ACCESORIOS DE REDES

0.37

20

10
SALIDAS PARA ELECTRICIDAD Y FUERZA

3.1

21

5
CONEXIN A LA RED EXTERNA Y MEDIDORES

0.62

# # # # # # # # # # # # 9 8

7 6 5 4 3 2 1 SIMBOL

0
PROGRAMACIN PREVISTA (en %)
PROGRAMACIN REAL (en %)

Descripcin
TRABAJOS PRELIMINARES
TRAZO DE NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
MUROS DE LADRILLO DE ARCILLA
BARANDAS Y PARAPETOS
REVOQUES Y ENLUCIDOS
CIELORASO
PISOS Y PAVIMENTOS
ZOCALOS
CARPINTERIA y CERRAGERIA
VIDRIOS
PINTURA
APARATOS SANITARIOS Y ACCESORIOS
APARATOS VARIOS
DESAGE Y VENTILACIN
SISTEMA DE AGUA FRIA Y CONTRAINCENDIOS
ACCESORIOS DE REDES
SALIDAS PARA ELECTRICIDAD Y FUERZA
CONEXIN A LA RED EXTERNA Y MEDIDORES

Roy Edward Contreras Melndez

MONTO
11.25
581.10
4445.96
9041.07
36186.76
30666.62
3026.59
9448.11
6643.30
3444.30
3006.07
5014.81
3397.27
6627.48
2187.88
406.47
8067.90
1545.28
519.00
4329.81
866.62
139463.66
139463.65

25.87
25.53

1er mes
PROGRAMADO
11.25
581.10
4445.96
9041.07
464.27
19985.44

1545.28

36074.37

PROGRAMACIN DE OBRAS D
PROYECTO:

LUGAR: CAJAMARCA

CASA - HABITACIN

FECHA:

30 DE JULIO DEL 2003

Mes N 1
Semana N2

Mes N 2
Semana N3

Semana N4

Semana N5

Semana N6
D

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

%
#REF! %

## %

100 %
100 %

100 %
1.28 %

50.86 %

1.28 %

Roy Edward Contreras Melndez

57.08 %
65.17 %

34.83 %

63.64 %

36.4 %

25.87 %
25.53 %

100 %

25.87
25.53

49.97
48.34

1er mes

2do mes

PROGRAMADO
11.25
581.10
4445.96
9041.07
464.27
19985.44

REAL
11.25
581.10
4445.96
9041.07
464.27
19516.24

1545.28

1545.28

36074.37

22930.10
10681.20

33611.30
35605.17

Roy Edward Contreras Melndez

PROGRAMADO

PROGRAMACIN DE OBRAS DE INGENIERA


DIAGRAMA GANTT FINANCIERO
REALIZADO:

30 DE JULIO DEL 2003

ROY EDWARD CONTRERAS MELENDEZ

Mes N 2
Semana N6
35

Semana N7
36

37

38

39

40

41

Semana N8
42

43

44

45

46

47

Semana N9
48

49

50

51

52

53

Mes N 3
Semana N10
Semana N11
D
I
A
S
54

55

56

60

61

62

63

64

65

49 %

41.64

100 %

100

49.97 %
48.34 %

Roy Edward Contreras Melndez

49.97
48.34

64.41
64.41

2do mes

ROGRAMADO

22930.10
10681.20

3er mes
REAL

PROGRAMADO

REAL

20655.40
11150.40

12792.41

15067.09

3026.59

3026.59

4329.81

4329.81

33611.30

20148.81
31805.80

Roy Edward Contreras Melndez

22423.49

PROGRAMACIN DE OBRAS DE INGENIERA


DIAGRAMA GANTT FINANCIERO

D CONTRERAS MELENDEZ
Mes N 3
Semana N11
I
A
S

Mes N 4
Semana N12
66

67

68

69

70

71

Semana N13
72

73

74

75

76

77

Semana N14
78

79

80

81

82

83

Semana N15
84

85

86

%
43.75 %

43.75 %
64.41

100 %

100 %

100 %

Roy Edward Contreras Melndez

87

100 %

100 %

100 %

100 %

100 %
100 %

100 %
100 %

100 %
64.41
64.41

77.88
77.88

3er mes

4to mes
REAL

PROGRAMADO

REAL

4132.27

4132.27

3006.07

3006.07

2187.88

2187.88

8067.90

8067.90

519.00

519.00

866.62
18779.74

866.62

15067.09
3026.59

4329.81

22423.49

Roy Edward Contreras Melndez

18779.74

GRAMA GANTT FINANCIERO

Mes N 4

Mes N 5
Semana N15
88

89

Semana N16
90

91

92

93

94

95

Semana N17
96

97

98

Semana N18

Semana N19

Semana N20

99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116

77.88 %

56.25 %

56.250
46.15

46.15

Roy Edward Contreras Melndez

77.88
77.88

86.36
86.36

4to mes

5to mes
REAL

PROGRAMADO

REAL

4132.27

5314.56
3065.88
3444.30

5314.56
3065.88
3444.30

3006.07

2187.88
8067.90
519.00
866.62
11824.75
18779.74

Roy Edward Contreras Melndez

11824.75

Mes N 6
Semana N20

Semana N21

Semana N22

Mes N 7
Semana N23

Semana N24

Semana N25

117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145

95.25 %

94.38

86.36 %

46.15 %

53.85 %

46.15 %

53.85 %
100 %

100 %

75.9 %

100 %
100 %

100 %

Roy Edward Contreras Melndez

100 %

100 %

86.36
86.36

94.38
95.25

100.00
100.00

6to mes

7mo mes

REAL

PROGRAMADO

REAL

5314.56
3065.88
3444.30

3577.42

3577.42

3806.22
3397.27

5014.81
3397.27

406.47

406.47

PROGRAMADO

1208.58

6627.48

11187.38
11824.75

7836.06
12395.97

Roy Edward Contreras Melndez

Mes N 7
Semana N25

Semana N26

Semana N27

Semana N28

146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168
100 %
100 %

94.38 %

24.1 %

100 %

100 %

Roy Edward Contreras Melndez

100.00
100.00

7mo mes
PROGRAMADO

REAL

1208.58

6627.48

6627.48

7836.06

1.25
6628.73

Roy Edward Contreras Melndez

SIMBOL

Actividades
i

Descripcin

Rendimientos und/da
Un.

Metr

375.00

40.0

55.0

TRABAJOS PRELIMINARES
2 Limpieza de Terreno

M2

TRAZO DE NIVELES Y REPLANTEO


4 Trazo, Niveles y Replanteo Preliminar

M2

75.18

550.0

150.0

8 Trazo de niveles y replanteo durante el proceso

M2

401.13

600.0

150.0

MOVIMIENTO DE TIERRAS
3 Nivelacin del terreno

M2

375.00

180.0

80.0

EXCAVACIONES
7 Excavacin de zanjas en cimientos y zapatas

M3

79.10

25.0

20.0

M3

9.59

12.0

10.0

M3

11.28

16.0

15.0
13.0

D
E
F
G

RELLENOS
16 52 Relleno con material propio
8 14 Relleno con material de prestamo

13

8 Material de prestamo para relleno

M3

13.19

25.0

16 18 Eliminacin de material excedente

M3

96.59

53.0

50.0

16 17 Nivelacin int. y apisonado final

M2

47.99

130.0

119.5

14 16 Cimiento corrido C:H (1:10 + 30% P.G.)

M3

51.58

28.0

30.0

OBRAS DE CONCRETO SIMPLE


SOBRECIMIENTO
18 21 Concreto en sobrecimiento reforzado fc= 140 Kg/cm2
18 19 Encofrado y desencofrado

M3

10.72

15.0

12.0

M2

105.60

40.0

20.0

18 20 Falso piso (e = 10 cm.)

M2

37.39

78.0

75.0

M3

0.89

22.0

20.0

M2

2.98

16.0

15.0

Kg

8.96

270.0

250.0

M3

24.17

28.0

25.0

M2

116.39

30.0

20.0

Kg

57.07

260.0

250.0
20.0

OBRAS DE CONCRETO ARMADO


ZAPATAS
O
P
Q
R
S
T

14 15 C para zapatas 175 Kg/cm2


7 9 Encofrado y desencofrado
7 10 Acero grado 60
COLUMNAS
24 25 Concreto f'c = 175 Kg/cm2
23 24 Encofrado y desencofrado
7 11 Acero grado 60

M3

16.51

28.0

VIGAS
30 31 Concreto para vigas fc = 175 Kg/cm2
25 29 Encofrado y desencofrado

M2

135.05

30.0

18.0

29 30 Acero grado 60

Kg

19.12

260.0

250.0

LOSAS
30 32 Concreto en Losas aligeradas fc = 210 Kg / cm2
25 26 Encofrado y desencofrado

M3

36.68

28.0

20.0

M2

324.19

30.0

21.0

Kg

56.94

260.0

250.0

1700.0

800.0
10.0

A1 26 28 Acero grado 60
B1 26 27 Ladrillo Hueco 15x30x30 para techo

Und 2313.96

ESCALERA
C1 33 34 Concreto en escalera f'c = 175 Kg/cm2
D1 31 33 Encofrado y desencofrado

M3

3.67

15.0

M2

23.81

10.0

9.0

E1

Kg

7.42

260.0

250.0

MUROS DE LADRILLO DE ARCILLA


F1 21 23 Muro de cabeza ladrillo corriente (C:C:A)

M2

207.84

20.0

18.0

G1 21 22 Muro de soga ladrillo corriente (C:C:A)

M2

212.61

28.0

25.0

Ml

21.60

15.0

15.0

Tarrajeo de tipo rayado o primario C:M =1:5

M2

36.55

24.0

20.0

Tarrajeo interior C:M = 1:5

M2

533.81

31.0

28.0

Tarrajeo exterior C:M = 1:5

M2

151.55

28.0

30.0

Vestiduras de derrames en puertas, ventanas y vanos

Ml

196.08

54.0

50.0

29.0

25.0
25.0

I1

7 12 Acero grado 60

34 36 BARANDAS Y PARAPETOS
Baranda de madera de cedro pucallpa

J1 41 43 REVOQUES Y ENLUCIDOS

32.0

K1 41 44 VESTIDURA DE ELEMENTOS EN FACHADA


Tarrajeo de superficies

M2

4.42

29.0

L1 43 46 CIELORASO
Cieloraso, incluye vigas empotradas

M2

262.27

28.0

21.0

M1 36 41 PISOS Y PAVIMENTOS
Contrapiso e = 25 mm. C:A = 1:2

60.0

20.0

M2

108.63

63.0

Pisos de Loseta Veneciana (20 x 20)

M2

21.59

12.0

11.0

Vereda de concreto

M2

24.50

120.0

100.0

M2

38.25

30.0

15.0

N1 44 45 ZOCALOS
Zcalo de Maylica de 15 x 15 de color

O1 46 47 CARPINTERIA DE MADERA
Puerta maciza de madera

M2

18.00

4.0

2.0

Ventana de madera

M2

19.00

2.0

1.2

Mampara de madera

M2

2.00

2.0

1.3

Par

54.00

20.0

15.0

Und

18.00

30.0

20.0

145.0

130.0

P1 46 48 CERRAJERIA
Bisagras de fierro
Cerraduras
Q1 46 49 VIDRIOS
Vidrio simple, previsin y colocacin

P2 1226.45

R1 47 51 PINTURA
Pintura ltex en interiores

0.00
M2

974.63

125.0

100.0

S1 36 40 APARATOS SANITARIOS Y ACCESORIOS


Inodoro tanque bajo blanco

Pza

4.00

4.0

2.0

Bidet de color 3 llaves

Pza

2.00

4.0

2.0

Labatorio de pared blanco 1 llave

Pza

4.00

3.0

2.0

Lavadero de cocina 2 pozas

Pza

1.00

2.0

1.0

Ducha

Pza

2.00

4.0

2.0

Tina para bao

Pza

2.00

2.0

1.0

Jaboneras de loza blanca simple de 15 x 15

Pza

4.00

10.0

6.0

Colgadores simples para bao

Pza

4.00

25.0

20.0

Colocacin de aparatos sanitarios

Pza

8.00

15.0

10.0

Colocacin de accesorios corrientes

Pza

13.00

12.0

8.0

DESAGE Y VENTILACIN
U1 36 39 Salida de desage en PVC

Pto

43.00

10.0

7.0

V1

Ml

45.00

50.0

50.0

T1 46 50 APARATOS VARIOS

6 Red de distribucin tubera de PVC de 4"

X1 36 38 Acsesorios

Y1

Und

4.00

8.0

5.0

Registro roscado de bronce 4"

Und

2.00

8.0

3.0

Trampa "P" de P.V.C. SAL para desage de 2"

Und

3.00

3.0

2.0

5 SISTEMA DE AGUA FRIA Y CONTRAINCENDIOS


Salida de agua fra

Pto

6.00

13.0

10.0

28.00

55.0

50.0

Und

2.00

2.0

1.0

Pza

6.00

2.0

1.0

Red de distribucin tubera de 1/2" PVC - SAP


Z1 36 37 ACCESORIOS DE REDES
Vlvula Check fierro fundido de 88 de 6"
Vlvula de compuerta con 2 UU
A2 34 35 SALIDAS PARA ELECTRICIDAD Y FUERZA
Salida para techo

Pto

32.00

25.0

20.0

Salida de tomacorriente vipolar simple

Pto

40.00

25.0

20.0

Tubera PVC - SAP 15 mm.

Ml

235.00

78.0

70.0

Conductor TW 2.5 MM2

Ml

590.00

160.0

150.0

Pza

5.00

28.0

20.0

Pza

1.00

2.0

1.0

Llaves de interrupcin
A3 41 42 CONEXIN A LA RED EXTERNA Y MEDIDORES

Rendimientos und/da

Tasum

duraciones
TE

(das)

tij

T Opt.

T Pes.

No Crit

Varia
nza

toi

toj

t*j

FT
HA

FL

t*i

FI
Crit

60.0

9.4 6.8 6.3

7.150

0.271

-7

-7

-7

No Crit

480.0

0.1 0.5 0.2

0.383

0.000

Crit

480.0

0.7 2.7 0.8

2.034

0.001

No Crit

115.0

2.1 4.7 3.3

4.016

0.039

Crit

18.0

3.2 4.0 4.4

3.896

0.042

Crit

8.0

0.8 1.0 1.2

0.972

0.004

12

13

12

14

No Crit

13.0

0.7 0.8 0.9

0.763

0.001

10

10

No Crit

18.0

0.5 1.0 0.7

0.886

0.001

-1

No Crit

45.0

1.8 1.9 2.1

1.949

0.003

12

14

12

14

Crit

100.0

0.4 0.4 0.5

0.409

0.000

12

13

12

14

No Crit

30.0

1.8 1.7 1.7

1.740

0.000

10

12

10

12

Crit
No Crit

9.0

0.7 0.9 1.2

0.913

0.006

14

17

14

17

38.0

2.6 5.3 2.8

4.423

0.001

14

17

14

17

Crit

69.0

0.5 0.5 0.5

0.503

0.000

14

15

14

17

No Crit

17.0

0.0 0.0 0.1

0.045

0.000

10

11

10

12

No Crit

10.0

0.2 0.2 0.3

0.213

0.000

10

10

Crit

210.0

0.0 0.0 0.0

0.037

0.000

10

10

Crit

22.0

0.9 1.0 1.1

0.972

0.002

35

36

35

36

Crit

10.0

3.9 5.8 ###

6.466

1.672

29

35

29

35

Crit

210.0

0.2 0.2 0.3

0.234

0.000

10

10

Crit

17.0

0.6 0.8 1.0

0.810

0.004

54

56

54

56

No Crit

10.0

4.5 7.5 ###

8.003

2.252

36

44

36

53

No Crit

210.0

0.1 0.1 0.1

0.078

0.000

44

54

53

54

No Crit

1.3 1.8 2.2

1.801

0.020

54

56

54

56

Crit

### ### ### 17.496

16

#####

36

52

36

52

Crit

17.0
10.0
210.0

0.2 0.2 0.3

0.234

0.000

52

53

52

54

No Crit

1480.0

1.4 2.9 1.6

2.416

0.001

52

54

52

54

No Crit

8.0

0.2 0.4 0.5

0.362

0.001

59

60

59

60

Crit

7.0

2.4 2.6 3.4

2.727

0.029

56

59

56

59

Crit

210.0

0.0 0.0 0.0

0.030

0.000

10

10

Crit

### ### ### 11.467

12

0.093

17

29

17

29

Crit

0.076

17

26

17

29

No Crit

0.000

60

72

60

72

10

10

10

No Crit

81

113

81

113

Crit

81

82

81

110

28

No Crit

0.000 113

126

113

126

Crit

72

81

72

81

No Crit

82

85

110

113

28

-28

No Crit

17.0
23.0

7.6 8.5 9.2

8.476

9.0

1.4 1.4 2.4

1.600

17.0

1.5 1.8 2.2

30.757
23.0

0.026
32

0.000

1.830

0.011

### ### ### 19.448

0.996

20.0

5.4 5.1 7.6

5.533

45.0

3.6 3.9 4.4

3.946
0.178

0.130
0.015
1

0.178

0.000

21.0

0.2 0.2 0.2

22.0

9.4 ### ### 11.874

58.0

1.7 1.8 1.9

1.807

0.001

8.0

1.8 2.0 2.7

2.058

0.022

92.0

0.2 0.2 0.3

0.242

12.290
4.106

0.000
13

0.181
5

0.000
3

10.0

1.3 2.6 3.8

2.550

0.000

0.000
0.181

25.081

27

0.000 126

153

126

153

Crit

131

126

153

22

No Crit

136

126

153

17

No Crit

163

153

163

Crit

72

81

72

81

Crit

0.000 126

130

126

153

23

No Crit

2.0

4.5 9.0 9.0

8.250

0.563

1.0

9.5 ### ### 15.306

2.507

1.0

1.0 1.5 2.0

1.526
4.467

12.0

2.7 3.6 4.5

3.600

18.0

0.6 0.9 1.0

0.867
9.403

0.028
5

0.000 126
0.090
0.004

10

9.403

0.000 126

120.0

8.5 9.4 ###

90.0

7.8 9.7 ###

1.5

1.0 2.0 2.7

1.944

0.077

1.5

0.5 1.0 1.3

0.972

0.019

1.5

1.3 2.0 2.7

2.000

0.049

1.0

0.5 1.0 1.0

0.917

0.007

1.0

0.5 1.0 2.0

1.083

0.063

1.0

1.0 2.0 2.0

1.833

9.602

0.086
10

9.602
8.750

3.289

0.000 153
0.255

0.000

0.028
4

4.0

0.4 0.7 1.0

0.678

0.010

18.0

0.2 0.2 0.2

0.197

0.000

8.0

0.5 0.8 1.0

0.789

0.006

6.0

1.1 1.6 2.2

1.625

0.033

5.0

4.3 6.1 8.6

6.245

0.514

72

79

72

81

No Crit

38.0

0.9 0.9 1.2

0.947

0.002

No Crit

4.5

0.5 0.8 0.9

0.765

0.004

72

76

72

81

No Crit

4.5

0.3 0.7 0.4

0.560

1.0

1.0 1.5 3.0

1.667

No Crit

72

80

72

81

No Crit

60

72

60

72

Crit

81

82

81

113

31

No Crit

0.000

1.164
8.0

0.5 0.6 0.8

0.602

45.0

0.5 0.6 0.6

0.562
7.333

1.0

1.0 2.0 2.0

1.0

3.0 6.0 6.0

0.001
0.111
2

0.002
0.000
8

1.833

0.000
0.028

5.500
11.192

0.000

0.250
12

0.000

18.0

1.3 1.6 1.8

1.576

0.007

18.0

1.6 2.0 2.2

1.970

0.011

62.0

3.0 3.4 3.8

3.372

0.017

130.0

3.7 3.9 4.5

3.993

0.020

10.0

0.2 0.3 0.5

0.280

1.0

0.5 1.0 1.0

0.917

0.003
1

0.007

rend.
Cuadr
dia

personal
capataz operario oficial

tij red

personal

peon

capataz operario oficial

peon

40.0

0.1

0.5

#### 10

10

120.0

0.1

0.1

####

10

150.0

0.1

0.1

####

10

80.0

0.1

####

10

10

20.0

0.1

0.1

####

20

10.0

0.1

####

10

10

15.0

0.1

####

10

10

15.0

0.1

####

10

10

50.0

0.1

####

10

10

119.5

0.1

####

10

10

30.0

0.1

0.75

####

10

20

12.0

0.1

0.75

####

10

20

20.0

0.1

0.75

####

10

20

75.0

0.1

0.75

####

10

20

20.0

0.1

####

10

10

20

15.0

0.1

####

10

10

250.0

0.1

####

10

10

25.0

0.1

####

10

10

30

20.0

0.1

####

10

10

250.0

0.1

####

10

10

25.0

0.1

####

20

10

40

18.0

0.1

####

10

10

250.0

0.1

####

10

10

20.0

0.1

####

20

10

27

21.0

0.1

####

10

10

250.0

0.1

####

10

10

800.0

0.1

####

10

10

10.0

0.1

####

20

10

10

9.0

0.1

####

10

10

250.0

0.1

####

10

10

18.0

0.1

0.75

####

10

25.0

0.1

0.75

####

10

15.0

0.1

0.33

10

20.0

0.1

0.5

0.75

32

28.0

0.1

0.5

0.75

32

30.0

0.1

0.5

0.75

32

50.0

0.1

0.5

0.75

32

25.0

0.1

0.5

10

21.0

0.1

0.5

13

10

60.0

0.1

0.5

0.5

11.0

0.1

0.5

0.5

100.0

0.1

0.5

0.5

15.0

0.1

0.33

10

2.75

2.0

0.1

0.3

0.33

27

1.2

0.1

0.3

0.33

27

1.3

0.1

0.3

0.33

27

15.0

0.1

0.2

20.0

0.1

0.2

130.0

0.1

10

10

10

10

100.0

0.25

2.0

0.1

0.2

2.0

0.1

0.2

2.0

0.1

0.2

1.0

0.1

0.2

2.0

0.1

0.2

1.0

0.1

0.2

6.0

0.1

0.3

20.0

0.1

0.3

10.0

0.1

0.3

8.0

0.1

0.3

7.0

0.1

0.5

####

50.0

0.1

0.5

####

5.0

0.1

0.5

####

3.0

0.1

0.5

2.0

0.1

0.5

10.0

0.1

0.75

50.0

0.1

0.75

1.0

0.1

0.75

1.0

0.1

0.75

20.0

0.1

0.2

0.1

12

20.0

0.1

0.2

0.1

12

70.0

0.1

0.2

0.1

12

150.0

0.1

0.2

0.1

12

20.0

0.1

0.2

0.1

12

0.0

0.1

0.2

0.1

####

2
503

1
407

PROGRAMACIN DE OBRAS DE INGENIERA


CRONOGRAMA DE ACTIVIDADES DE LA OBRA

PROYECTO: CASA - HABITACIN

LUGAR:

FECHA: 30 DE JULIO DEL 2003

CAJAMARCA

REALIZADO: ROY EDWARD CONTRERAS MELENDEZ

CUADRO DE ACTIVIDADES DETALLADO


N.
02.00.00
02.01.00
02.02.00
02.02.01
02.02.02
03.00.00
03.01.00
03.02.00
03.02.02
03.03.00
03.03.01

Clave

ACTIVIDADES

Un. Metr

Precio Unit Parcial

Costo

Rend. / dia

duracin Tiempo

Durac
. Acum

Costo
0.01

0.45

0.42

Anterior

Siguiente

Paralela

----

----

D
B

C-E
G-H

G-H

C-V1-Y1

M3

9.59

9.45

90.63

10.00

0.96 #REF!

1
0
1
0
0
0
0
7
0
5
0

K-O

L-M-N

03.03.02

Relleno con material de prestamo

M3

11.28

31.14

351.26

15.00

0.75 #REF!

E-C

K-O

03.03.03

Material de prestamo para relleno

M3

13.19

22.70

299.41

15.00

0.88 #REF!

E-C

K-O

03.04.00
03.05.00
04.00.00
04.01.00
04.02.00
04.02.01
04.02.02
04.03.00
05.00.00
05.01.00
05.01.01

I
J

M3
M2

96.59
47.99

19.41
1.11

1874.81
53.27

50.00
119.50

1
1

1.93 #REF!
0.40 #REF!

4.92

K-O
K-O

M-N-L
M-N-L

M3

51.58

93.23

4808.80

30.00

1.72 #REF!

1.72

G-H-T-E1-P

I-J

I-J
I-J
I-J

F1-G1
F1-G1
F1-G1

M-N
L-N
L-M

Eliminacin de material excedente


Nivelacin int. y apisonado final
OBRAS DE CONCRETO SIMPLE
Cimiento corrido C:H (1:10 + 30% P.G.)
SOBRECIMIENTO
Concreto en sobrecimiento reforzado fc= 140 Kg/cm2
Encofrado y desencofrado
Falso piso (e = 10 cm.)
OBRAS DE CONCRETO ARMADO
ZAPATAS
C para zapatas 175 Kg/cm2

I-J
H-Q-T-E1P
G-Q-T-E1P
J-F
I-F

G-H-T-E1

I-J

05.01.02

K-O

05.01.03

K-O

K
Q-G-H-E1T
G-H-P-E1T

S
F1-G1

W-Z
R

K-O

G-H-P-E1Q

X-A1-B1
R
W

D1
X
U

Y1
Z
A1-B1

A1-B1-X
R
Z
Z

D1
A1-B1
U-Y
U-Y

U
W
B1-X
A1-X

D1
U-Y
E

I1
C1
K-O

S
G-H-Q-T-P

L-M-N
L-M-N

S
S
M1-U1-S1A2-N1
X1-Z1

B
C
D
E

K
L
M
N

M2

375.00

0.03

11.25

150.00
150.00

3
3

0.17 #REF!
0.89 #REF!

1.06

M2

375.00

1.11

416.25

80.00

2.34 #REF!

2.34

M3

79.10

22.46

1776.59

20.00

3.96 #REF!

3.96

1776.59

12.00
20.00
75.00

1
2
1

0.89 #REF!
2.64 #REF!
0.50 #REF!

179.86

20.00

0.04 #REF!

25.44

75.81

15.00

0.20 #REF!

2.84

25.45

250.00

0.04 #REF!

4808.80

M3

0.89

202.09

Encofrado y desencofrado

M2

2.98

Kg

8.96

M3
M2

24.17
116.39

188.96
30.61

4567.16
3562.70

05.02.03

Acero grado 60

Kg

57.07

2.84

162.08

BARANDAS Y PARAPETOS

08.00.00

J1

K1
L1

08.01.00
09.00.00

M1

10.01.00
11.00.00
11.01.00
11.02.00
11.03.00
12.00.00
12.01.00
12.02.00
13.00.00
13.01.00
14.00.00

N1
O1

P1

Q1
R1

14.01.00
15.00.00
15.01.00
15.02.00
15.03.00
15.04.00
15.05.00
15.06.00
15.07.00
15.07.01
15.07.02
15.08.00
18.09.00
16.00.00

T1

M3
M2
Kg
Und

2741.65
4548.48
54.30

36.68
324.19
56.94
2313.96

213.56
21.35
2.84
1.56

7833.38
6921.46
161.71
3609.78

M3
M2
Kg

3.67
23.81
7.42

254.69
33.06
2.84

934.71
787.16
21.07

M2
M2

207.84
212.61

91.87
54.43

19094.26
11572.36

1
1

0.97 #REF!
5.82 #REF!

250.00

0.23 #REF!

7.01

20.00
18.00
250.00

1
1
1

0.83 #REF!
7.50 #REF!
0.08 #REF!

20.00
21.00
250.00
800.00

1
1
1
2

10.00
9.00
250.00

1
1
1

0.37 #REF!
2.65 #REF!
0.03 #REF!

3.04

18.00
25.00

1
1

11.55 #REF!
8.50 #REF!

20.05

15.00

1.44

20.00
28.00
30.00
50.00

1
1
1
1

25.00

21.00

8.40
8

1.83
15.44
0.23
1.45

#REF!
#REF!
#REF!
#REF!

Ml

21.60

140.12

3026.59

18.95

M2
M2
M2
Ml

36.55
533.81
151.55
196.08

10.04
9.49
17.88
6.16

366.96
5065.86
2709.71
1207.85

20.5

3026.59

1.83
19.06
5.05
3.92

2
32
2
20
6
4

29.87

0.18

0.18

12.49

13

12.49

9350.39

1.44
31.4

97.73
M2

4.42

22.11

97.73

M2

262.27

25.33

6643.30

0.5

6643.30

13.5

3444.30
M2
M2
M2

108.63
21.59
24.50

10.96
58.61
40.34

1190.58
1265.39
988.33

5
60.00
11.00
100.00

1
1
1

1.81
1.96
0.25

M2

38.25

78.59

3006.07

15.00

2.55

4.02

M2
M2
M2

18.00
19.00
2.00

83.16
99.81
116.42

1496.88
1896.39
232.84

2.00
1.20
1.30

1
1
1

9.00
15.83
1.54

1388.70
11.05
44.00

596.70
792.00

P2

1226.45

2.77

3397.27

M2

974.63

6.80

6627.48

Inodoro tanque bajo blanco


Bidet de color 3 llaves
Labatorio de pared blanco 1 llave
Lavadero de cocina 2 pozas
Ducha
Tina para bao
APARATOS VARIOS
Jaboneras de loza blanca simple de 15 x 15
Colgadores simples para bao
Colocacin de aparatos sanitarios
Colocacin de accesorios corrientes
DESAGE Y VENTILACIN

Pza
Pza
Pza
Pza
Pza
Pza

4.00
2.00
4.00
1.00
2.00
2.00

133.96
227.82
140.34
84.28
125.38
150.00

535.84
455.64
561.36
84.28
250.76
300.00

Pza
Pza
Pza
Pza

4.00
4.00
8.00
13.00

6.25
6.61
9.88
21.23

25.00
26.44
79.04
275.99

Pto

43.00

3
27

2.55
29

26.37
5

4.5

15.00
20.00

1
1

3.60
0.90

130.00

9.43

10

9.43

100.00

9.75

10

9.75

2.00
2.00
2.00
1.00
2.00
1.00

1
1
1
1
1
1

2.00
1.00
2.00
1.00
1.00
2.00

6.00
20.00
10.00
8.00

1
1
1
2

0.67
0.20
0.80
0.81

4.50

3397.27

PINTURA

10

6627.48

APARATOS SANITARIOS Y ACCESORIOS

10

2187.88

406.47

9.00
3.5

2.48

8067.90

16.02.00

V1

Red de distribucin tubera de PVC de 4"

Ml

16.03.00

X1

Acsesorios

Und

16.04.00
16.05.00
17.00.00
17.01.00
17.02.00

Und
Und

Y1

Registro roscado de bronce 4"


Trampa "P" de P.V.C. SAL para desage de 2"
SISTEMA DE AGUA FRIA Y CONTRAINCENDIOS
Salida de agua fra
Red de distribucin tubera de 1/2" PVC - SAP

17.03.00

Z1

6
0
0

2.70

5.95
C1

8
0
0
0
8
0
0
0
0
3
0
0
0
21
0
0

3.60

0.90

2.17

C1

14.12

6.70

M1-X1-S1-Z1 L1

0.22

0.07

M1-X1-S1-Z1 L1

6.07

4.76

J1-K1-A3

O1-P1-Q1N1-A2
T1

2.02

2.47

I1-A2

J1-K1

1.12

2.16

J1-K1-A3

O1-P1-Q1L1
T1

13.04

2.60

L1-N1

R1

P1-Q1-T1

2.02

1.00

L1-N1

R1

O1-Q1-T1

4.50

2.44

L1-N1

R1

P1-O1-T1

4.50

4.75

O1-P1-Q1-T1 ----------

4.05

1.57

I1-A2

J1-K1

M1-X1-Z1U1

1.57

0.29

L1-N1

R1

P1-Q1-O1

5.62

5.78

0
32
0
0
0
0
1
0
14

3.60

1.35

9.22

5.27

13.28

1.25

21.99

A3

U1-X1-S1Z1

3
0
29
0
0
0
5
0
0
10
0
10

12.5

9
0
0
0
0
0
0
4
0
0
0
0
13

M1-X1-S1Z1
E
M1-S1-U1Z1

6.14 #REF!

I1-A2

J1-K1

45.00

46.33

2084.85

50.00

0.90 #REF!

G-H

4.00

218.53

874.12

5.00

0.80 #REF!

I1-A2

J1-K1

2.00
3.00

37.53
10.13

75.06
30.39

3.00
2.00

1
1

0.67
1.50

1.5

0
0
2
0
0

0.67

1.11

G-H

3.60

0.37

I1-A2

J1-K1

M1-S1-U1X1

5.40

3.10

C1

M1

I1-N1

0.90

0.62

M1-X1-S1-Z1 L1

100

100

6.00
28.00

102.66
33.19

615.96
929.32

2.00
6.00

105.00
51.50

10.00
50.00

210.00
309.00

32.00
40.00
235.00
590.00
5.00

44.18
54.53
0.11
1.10
12.00

1
1

0.60
0.56

1
1

2.00
6.00

433.31

20.00
20.00
70.00
150.00
20.00

866.62

2
1
1
1
1

0.80
2.00
3.36
3.93
0.25

12

10.34
#REF!

1.00
139463.66

8.00
12

866.62
2.00

1.16
8

1.00
1.00

1413.76
2181.20
25.85
649.00
60.00

10.01
2

4329.81

Und

0.20

7.00

519.00

Pto
Pto
Ml
Ml
Pza

0.22

5003.48

ACCESORIOS DE REDES
Und
Pza

3.03

116.36

1545.28
Pto

3.45

2.02

0
9

0.90

0
0
0
2.5

3626.11

1.91

0
4.5

3006.07

2.25

1.27

0
8

30666.62

Salida de desage en PVC

A3

25.00
20.00

3.15

0
6

1742.94

U1

A2

166.06
33.68
2.84

54.00
18.00

Vlvula Check fierro fundido de 88 de 6"


Vlvula de compuerta con 2 UU
SALIDAS PARA ELECTRICIDAD Y FUERZA
Salida para techo
Salida de tomacorriente vipolar simple
Tubera PVC - SAP 15 mm.
Conductor TW 2.5 MM2
Llaves de interrupcin
CONEXIN A LA RED EXTERNA Y MEDIDORES
Medidor de Luz

0.28

18526.32

16.01.00

17.03.01
17.03.02
19.00.00
19.01.00
19.02.00
19.03.00
19.04.00
19.05.00
19.07.00
19.07.01

16.51
135.05
19.12

Par
Und

Pintura ltex en interiores


S1

M3
M2
Kg

ZOCALOS
Zcalo de Maylica de 15 x 15 de color
CARPINTERIA DE MADERA
Puerta maciza de madera
Ventana de madera
Mampara de madera
CERRAJERIA
Bisagras de fierro
Cerraduras
VIDRIOS
Vidrio simple, previsin y colocacin

0.5

7344.44

PISOS Y PAVIMENTOS
Contrapiso e = 25 mm. C:A = 1:2
Pisos de Loseta Veneciana (20 x 20)
Vereda de concreto

4.03

8291.94

CIELORASO
Cieloraso, incluye vigas empotradas

09.01.00
09.02.00
09.03.00
10.00.00

Baranda de madera de cedro pucallpa


REVOQUES Y ENLUCIDOS
Tarrajeo de tipo rayado o primario C:M =1:5
Tarrajeo interior C:M = 1:5
Tarrajeo exterior C:M = 1:5
Vestiduras de derrames en puertas, ventanas y vanos
VESTIDURA DE ELEMENTOS EN FACHADA
Tarrajeo de superficies

4.5

281.12

R
S

I1

4232.27

COLUMNAS
Concreto f'c = 175 Kg/cm2
Encofrado y desencofrado

06.02.01
07.00.00
07.01.00
07.02.00
07.03.00
07.04.00
07.05.00
07.05.01

0
0
2
0
5
0
0
0
0
1
0

1383.95
2176.42
671.90

06.02.00

2669.38

129.10
20.61
17.97

F1
G1

91.72
489.38

Acero grado 60

C1
D1
E1

0.75

1.22
1.22

Y
Z
A1
B1

0.75 #REF!

75.18
401.13

05.02.00
05.02.01
05.02.02

U
W
X

10

M2
M2

10.72
105.60
37.39

VIGAS
Concreto para vigas fc = 175 Kg/cm2
Encofrado y desencofrado
Acero grado 60
LOSAS
Concreto en Losas aligeradas fc = 210 Kg / cm2
Encofrado y desencofrado
Acero grado 60
Ladrillo Hueco 15x30x30 para techo
ESCALERA
Concreto en escalera f'c = 175 Kg/cm2
Encofrado y desencofrado
Acero grado 60
MUROS DE LADRILLO DE ARCILLA
Muro de cabeza ladrillo corriente (C:C:A)
Muro de soga ladrillo corriente (C:C:A)

50.00
581.10

M3
M2
M2

05.03.00
05.03.01
05.03.02
05.03.03
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.05.00
05.05.01
05.05.02
05.05.03
06.01.00
06.01.01
06.01.02

0.5

Plazo
0.22

TRABAJOS PRELIMINARES
Limpieza de Terreno
TRAZO DE NIVELES Y REPLANTEO
Trazo, Niveles y Replanteo Preliminar
Trazo de niveles y replanteo durante el proceso
MOVIMIENTO DE TIERRAS
Nivelacin del terreno
EXCAVACIONES
Excavacin de zanjas en cimientos y zapatas
RELLENOS
Relleno con material propio

11.25

PESO (%)

Plazo

1.00

2
1.00
222.40

0
0
12
0
0
0
0
0
2
0
223

K1

Você também pode gostar