BSC6900 UO V900R012 Commissioning

www.huawei.com

Copyright 2009 Huawei Technologies Co., Ltd. All rights reserved.

Foreword
The commissioning is performed after the hardware installation and before the services are provided The OMU operating system is installed before the OMU is delivered The commissioning ensures the RNC works properly as designed

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page1

References
BSC6900 UMTS OMU Administration Guide

BSC6900 UMTS Commissioning Guide

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page2

Objectives
Upon completion of this course, you will be able to:

Describe BSC6900 commissioning procedure Outline OMU software functions Complete BSC6900 commissioning Complete BSC6900 application software installation

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page3

Contents

1. BSC6900 O&M System Introduction

2. BSC6900 Software Installation

3. BSC6900 Commissioning

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page4

BSC6900 O&M Subsystem


Component
LMT OMUa boards SCUa boards OM modules on other boards

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page5

BSC6900 O&M Subsystem


BSC6900 O&M system adopts server and client mode

OMU as a server LMT as a client

EMS (Element Management System) system

iManager M2000 works for integrated O&M

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page6

OMU IP Address Planning

IP Address Internal fixed IP address

Planning Principle The preset IP addresses of the internal Ethernet adapters are: Active BAM: 80.168.3.50 (255.0.0.0) Standby BAM: 80.168.3.60 (255.0.0.0)

External fixed IP address

The preset IP addresses of the external Ethernet adapters are: Active BAM: 172.121.139.201 (255.255.255.0) Standby BAM: 172.121.139.202 (255.255.255.0) The settings can be reconfigured on site based on the actual networking topology

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page7

OMU IP Address Planning


IP Address Internal/External virtual IP address Backup channel IP addresses Planning Principle The virtual IP address is set in the same subnet with the internal/ external fixed IP addresses of the active and standby BAMs The preset backup channel IP addresses of the active and standby BAMs are: Active BAM: 192.168.3.50 (255.255.255.0) Standby BAM: 192.168.3.60 (255.255.255.0) The IP address should not be changed Commissioning IP The preset commissioning IP addresses are: Active BAM: 192.168.6.50 (255.255.255.0) address Standby BAM: 192.168.6.60 (255.255.255.0) The IP address should not be changed.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page8

OMU Internal Network IP Address Planning


Active OMUa Standby OMUa Virtual IP Virtual IP 80.168.3.40/8 80.168.3.40/8 80.168.3.60/8 80.168.3.60/8 ETH4-SCU7 ETH5-SCU6 192.168.3.50/24 192.168.3.50/24 Intel Ethernet adapters ETH3UPDATE Dedicated backup channel Intel Ethernet adapters ETH3UPDATE SCUa SCUa Internal network segment ETH4-SCU7 ETH5-SCU6 192.168.3.60/24 192.168.3.60/24 80.168.3.50/8 80.168.3.50/8

Backboard BSC6900 FAM


Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page9

OMU External Network IP Address Planning


Active OMUa Standby OMUa Virtual IP Virtual IP 172.121.139.200/24 172.121.139.200/24

172.121.139.201/24 172.121.139.201/24 External network Segment GE adapter ETH0 ETH1 ETH0 ETH1

172.121.139.202/24 172.121.139.202/24

Hub

Commissioning Ethernet adapter 192.168.6.50/24 192.168.6.50/24

ETH2

ETH2

LMT/ M2000 192.168.6.60/24 192.168.6.60/24

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page10

Contents

1. BSC6900 O&M System Introduction

2. BSC6900 Software Installation

3. BSC6900 Commissioning

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page11

BSC6900 Software
LMT LMT Software Host Software Windows XP SP2 Java Environment Program File MPS/EPS

Data File OMU Server OMU Application Dopra Linux Mysql Database Patch File (optional)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page12

OMU Software
The OMU software consist of multilevel service monitoring entities and service processes

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page13

OMU Software Installation Procedure


Obtain the Installation Information on the OMU Remotely Logging In to the OMU Uploading the OMU Application Installation Package to the OMU Installing the OMU Application in the Active Workspace Checking the Applications Installation Directory of the OMU

Checking the Status of omud Process

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page14

Obtain the Installation Information on the OMU


Before the installation, obtain the following information from Data Sheet of BAM Software Installation

Password of the operating system administrator

Fixed IP addresses of the internal and external networks

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page15

Remotely Logging In to the OMU

On the computer run the SSH terminal, PuTTY Enter the IP address of the OMU Log in to the OMU as user root

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page16

Uploading the OMU Application Installation Package to the OMU


Decompress the BSC6900 version software package to the local drive D Log in to the OMU through the psftp software
Run the lcd D:\ to set the local directory Run the mkdir /mbsc/upgrade to create the target directory Run the cd /mbsc/upgrade to go to the target directory Run the put -r V900R012C00 installation packet to the OMU After the loading is complete, enter the exit command to exist the psftp software to upload the OMU application

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page17

Installing the OMU Application in the Active Workarea


On the PuTTY terminal, run the following commands
cd /mbsc/upgrade/V900R012C00/install/setup chmod +x ./install_bam.sh ./install_bam.sh Enter the run mode Setting the office name Setting the language Setting the admin/FTP password Setting the external virtual IP address Setting the OMU system type

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page18

Checking the Installation Directory of the OMU Applications


Log in to the OMU by PuTTY

Run the cd /mbsc/bam

Check whether the OMU installation directory

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page19

Checking the Status of omud Process


Log in to the OMU by PuTTY Run the /etc/rc.d/omud status
The returned information is running, it means the omud is working normally The returned information is unused, run the /etc/rc.d/omud start command to start the omud The returned information is neither running nor unused, reinstall the OMU application in the active workspace

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page20

Contents

1. BSC6900 O&M System Introduction

2. BSC6900 Software Installation

3. BSC6900 Commissioning

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page21

Contents

3. BSC6900 Commissioning

3.1 BSC6900 Commissioning Introduction

3.2 BSC6900 Commissioning Procedure

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page22

Introduction to BSC6900 Commissioning


Definition of BSC6900 Commissioning

The

commissioning

of

equipment,

BSC6900

board

software and data file loading , interfaces verification , and services verification after hardware installation

To ensures that the BSC6900 works properly as designed

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page23

Preparation For BSC6900 Commissioning


Preparation For BSC6900 Commissioning
Verify hardware status
BSC6900 hardware is installed and passed the hardware installation check and powering-on check OMU is configured before delivery LMT PC meets the configuration requirements

Software preparation
BAM and LMT application software are ready License file is ready MML command script for initial configuration is ready

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page24

Preparation For BSC6900 Commissioning (Cont.)


Verify commissioning network status
At least one BTS and one NodeB are connected to the local BSC6900. The BTS and the NodeB should have passed commissioning and can provide basic functions At least one set of Core Network (CN) equipment is connected to the local BSC6900. The CN equipment should have passed the commissioning and can provide basic functions If the BSC6900 is connected to the RNC, then that RNC must have passed the commissioning Three single-mode UEs, three single-mode MSs and one dual-mode UE are ready for test and are registered in the HLR

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page25

Contents

3. BSC6900 Commissioning

3.1 BSC6900 Commissioning Introduction

3.2 BSC6900 Commissioning Procedure

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page26

BSC6900 Commissioning Procedure


Commissioing Prerequsites Local operation Check hardware operating S tatus Remote operation Load BS C6900 Board S oftware and Data files Local operation Verify OMU Locally Connect BS C6900 to M2000

R emote operation Verify OMU based on local through US Disk B coopertation

R emote operation

Log in to BS C6900 through LMT Update OMU Database Activate and Verify the License

Continued in the next page

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page27

BSC6900 Commissioning Procedure (Cont.)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page28

Checking the Operating Status of the Hardware


Before verifying the equipment, ensure that the cabinet is powered on and operates normally
Checklist of the power supply to the cabinet components

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page29

Verifying the OMU


Verifying the OMU locally
Log in to the OMU through PuTTY Checking the operation status of the OMU Checking the version of the OMU application Changing the external fixed IP address, the external virtual IP address Verify the active OMU and the standby OMU respectively

If OMU application is not installed or abnormal, please reinstall software


Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page30

Verifying the OMU (Cont.)


Verifying the OMU through USB Disk
Preparing the USB disk Installing the operating system

Verifying the LMT


Log in to the BSC6900 through the LMT Run the MML command LST VER to check the version of OMU

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page31

Updating the OMU Database


Run the MML command script to update the OMU database
Method 1 : through MML commands
Run the MML command SET CFGDATAINEFFECTIVE repeatedly to set all the subracks to the ineffective mode Run the MML command RST DATA. A dialog box is displayed. Click Yes to initialize the BSC6900 configuration data in the OMU database Upload the MML command script to the /ftp folder in the OMU active workspace directory Run the MML command RUN BATCHFILE to run the MML script file

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page32

Updating the OMU Database (Cont.)


Method 2 : through GUI
Run the MML command SET CFGDATAINEFFECTIVE repeatedly to set all the subracks to the ineffective mode Run the MML command RST DATA. A dialog box is displayed. Click Yes to initialize the BSC6900 configuration data in the OMU database On the LMT, click the Batch tab to enter the Batch panel Click Open and open the batch file Click Go to execute the batch file

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page33

Activating and Verifying the License


Activating and Verifying the License
Downloading license to OMU active workspace directory /ftp/license (DLD LICENSE) Querying the detail information of the license file (LST LICENSE) Activating the license file (ACT LICENSE) Checking the license consistency between host and OMU (CMP LICENSE)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page34

Loading the BSC6900 Board Software and Data Files


Loading the BSC6900 Board Software and Data Files
Generating the Data File
Clear the data in the BAM database (RST DATA) Generate the data file in ineffective state
SET CFGDATAINEFFECTIVE Batch Commands FMT DATA

Setting the Loading Mode (SET LODCTRL) Loading the MPS/EPS/TCS (RST SUBRACK) Checking the consistency of the data and the version (ACT CRC & CMP BRDVER)
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page35

Verifying the Iub Interface


Verifying the Iub Interface (over ATM)
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT) Verifying the Control Plane on the Iub Interface (DSP SAALLNK & DSP UIUBCP & DSP ADJNODE) Verifying the User Plane on the Iub Interface (DSP AAL2PATH) Verify the Management Plane on the Iub Interface (DSP IPOAPVC) Verifying the Cell Setup (DSP UCELL)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page36

Verifying the Iub Interface (Cont.)


Verifying the Iub Interface (over IP)
Verifying Physical Links at the BSC (DSP ETHPORT & DSP OPT) Verifying the Control Plane on the Iub Interface (DSP SCTPLNK & DSP UIUBCP & DSP ADJNODE) Verifying the User Plane on the Iub Interface (DSP IPPATH) Verify the Management Plane on the Iub Interface (DSP IPOAPVC) Verifying the Cell Setup (DSP UCELL)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page37

Verifying the Iu-CS Interface


Verifying the Iu-CS Interface (over ATM)
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT) Verifying the Control Plane on the Iu-CS Interface
DSP SAALLNK DSP MTP3LNK DSP SSN DSP N7DPC DSP ADJNODE

Verifying the User Plane on the Iu-CS Interface (DSP AAL2PATH)


Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page38

Verifying the Iu-CS Interface (Cont.)


Verifying the Iu-CS Interface (over IP)
Verifying Physical Links at the BSC (DSP ETHPORT & DSP OPT) Verifying the Control Plane on the Iu-CS Interface
DSP SCTPLNK DSP M3LNK DSP SSN DSP N7DPC DSP ADJNODE

Verifying the User Plane on the Iu-CS Interface (DSP IPPATH)


Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page39

Verifying the Iu-PS Interface


Verifying the Iu-PS Interface (over ATM)
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT) Verifying the Control Plane on the Iu-PS Interface
DSP SAALLNK DSP MTP3LNK DSP SSN DSP N7DPC DSP ADJNODE

Verifying the User Plane on the Iu-PS Interface (PING IP)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page40

Verifying the Iu-PS Interface (Cont.)


Verifying the Iu-PS Interface (over IP)
Verifying Physical Links at the BSC (DSP ETHPORT & DSP OPT) Verifying the Control Plane on the Iu-PS Interface
DSP SCTPLNK DSP M3LNK DSP SSN DSP N7DPC DSP ADJNODE

Verifying the User Plane on the Iu-PS Interface (DSP IPPATH)


Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved. Page41

Handling the Alarms Generated During the Commissioning


Handling Alarms During RNC Commissioning

Checking alarm on the LMT

Handling the Alarms by LMT online help

Handling alarms by HUAWEI Technical Support

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page42

Verifying the UMTS Services


To be sure BSC can provide services defined in license file

Basic services Voice service, CS stream service, PS service, mobility management, and OM management Feature services Inter-system handover, HSDPA service, HSUPA service, MBMS service, and location service

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page43

Connecting the BSC6900 to the M2000


Connect the BSC6900 to the OM network Configure the IP route from the BSC6900 to the M2000 (ADD OMUIPRT & ADD EMSIP) Create the BSC6900 on the M2000

iManagerTM M2000

DCN

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page44

Creating Scheduled Tasks

Scheduled tasks for backing up system data (ADD SCHTSK & ADD SUBTSK)

Scheduled tasks for backing up logs (ADD SCHTSK & ADD SUBTSK)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page45