Goals
Identify Technology Gaps and Barriers for Ultra-Deepwater Develop a Description of the Types of Test Facilities Needed Prioritize and Group the Areas in Greatest Need of Research
Format
Speakers will Provide Status Reports in Key Areas and Their Perspective on Research/Test Facilities Needed Breakout Sessions Will Enable Discussion of Priorities Breakout Leaders and A&M Students will Capture Key Topics Breakout Session Results will be Reported Back to the Group
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
Associate Professor Associate Professor Petroleum Engineering Dept. Petroleum Engineering Dept. Texas A&M University Texas A&M University
Deepwater/Subsea Production
More Production Capacity from Subsea Wells to FPSOs than Saudi Arabia or Russia 11.9 million bbl/day Deepwater Production to Account for 40% of U.S. Production by 2010 Many Discoveries > 7,000 ft
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
Operator
Operator
Anadarko Kerr-McGee Shell Chevron BP BP Mariner BHP Billton Murphy BP Shell Kerr-McGee BP BP BP BHP Billton Chevron Anadarko Chevron
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
Equipment
Multiphase Pump
Water Disposal
Sand Disposal
Type 1 Type 2
None...Pumped with Other NonePumped with Produced Fluids Other Produced Fluids
Separator and Multiphase Possible Re-Injection of None..Pumped with Liquid Pump; possible use of Wet- partial water stream, i.e. Stream Gas Compressor "free" water
Type 3
Separator and Scrubber Complete Separation of the Stages w/ Single or Re-Injection/Disposal of Production Stream at Multiphase Pump; possible Majority of Water Stream Subsea Conditions use of Gas Compressor Multi-Stage Separator and Export Pipeline Quality Oil Re-Injection/Disposal of Fluid Treatment; single-phase & Gas Entire Water Stream pumps and compressors
Must be addressed
Type 4
Must be addressed
Source: OTC 18261 COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
Large Ps Hydril
Conceptual
AkerKvaerner
Demo 2000 Project Lyell Field (CNRL) 12/2005 King Field (BP) 2007 Bornemann MPA Project Wintershall (2004)
Sulzer
Technip & IFP Announced 2004
Flowserve
Subsea7 & Shell (2005)
CAN-K
Why:
Improve Recovery Improve Flowrates
Who:
AkerKvaerner Bornemann Pumps
Status:
Deployment Dec. 26, 2005 First Oil January 2006
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
Difficulties
Not a General Testing Solution Adds Structural Rigidity Does not Capture Heat Transfer (contraction/expansion)
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
(Norway)
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
10
Ormen Lange Subsea Compressor Pilot 1 x 12.5 MW train in test pit Subsea transformer, switchgear & VSD.
Pump Module
Pump VSD
COLLEGE STATION, TX - March 9th, 2007Dr. Stuart L. Scott all rights reserved
11
Research and Unique Test Facilities are Needed for Ultra-Deepwater Production
Operating rotating equipment in a no-maintenance environment New HP/HT considerations Reduce Environment Risks (flowlines & equipment) New test facilities are needed in the U.S.A. to support GOM development Cost constraints dictate a shared qualification facility rather than facilities operated by individual companies