Escolar Documentos
Profissional Documentos
Cultura Documentos
Planta
Chicago
Houston
Planta Nueva
TOTAL
Capacidad
(Cajas por
semana)
10,000
7,500
8,000
25,500
Miami
Denver
LIncoln
Jackson
Demanda
(cajas por
semana)
7,000
9,000
4,500
5,000
TOTAL
25,500
Almacn
Solucin
ALTERNATIVA
N 02 ATLANTA
Planta
CHICAGO
HOUSTON
BUFALO (Altern N 01)
COSTOS TOTALES (US$)
Miami
19216
7
6176
3
13176
6
38569
Planta
CHICAGO
HOUSTON
ATLANTA (Altern N 02)
REQUISITOS
Planta
CHICAGO
HOUSTON
ATLANTA (Altern N 02)
COSTOS TOTALES (US$)
Miami
2745.10
2058.82
2196.08
7000.00
CHICAGO
HOUSTON
BUFALO (Altern N 01)
REQUISITOS
Planta
ALTERNATIVA
N 02 ATLANTA
ALTERNATIVA
N 01BUFALO
ALTERNATIVA
N 01BUFALO
ALMACENES
Denver
Lincoln
7059
2
7059
4
2647
1
6618
5
25412
9
9882
7
35118
23559
Miami
2745.10
2058.82
2196.08
7000.00
Miami
19216
7
6176
3
4392
2
29784
ALMACENES
Denver
Lincoln
3529.41
1764.71
2647.06
1323.53
2823.53
1411.76
9000.00
4500.00
Jackson
9804
5
2941
2
6275
4
19020
ALMACENES
Denver
Lincoln
3529.41
1764.71
2647.06
1323.53
2823.53
1411.76
9000.00
4500.00
ALMACENES
Denver
Lincoln
7059
2
7059
4
2647
1
6618
5
28235
10
11294
8
37941
24971
Jackson
1960.78
1470.59
1568.63
5000.00
10000.00
7500.00
8000.00
25500.00
COSTOS (US$)
SUBTOTALES
43137
18382
54745
116265
Jackson
1960.78
1470.59
1568.63
5000.00
Jackson
9804
5
2941
2
4706
3
17451
Capacidad
Capacidad
10000.00
7500.00
8000.00
25500.00
COSTOS (US$)
SUBTOTALES
43137.3
18382.4
48627.5
110147.1
Costos Fijos
Anuales
5000,000
Santa F
4200,000
6.25
3500,000
7.25
SOLUCION
N
Enbarques
por ao
455,000
460,000
465,000
470,000
475,000
480,000
485,000
490,000
495,000
500,000
505,000
510,000
515,000
520,000
525,000
530,000
535,000
540,000
545,000
550,000
555,000
560,000
565,000
570,000
575,000
580,000
585,000
590,000
595,000
600,000
605,000
610,000
615,000
620,000
Costo Total
DENVER
7,115,750.00
7,139,000.00
7,162,250.00
7,185,500.00
7,208,750.00
7,232,000.00
7,255,250.00
7,278,500.00
7,301,750.00
7,325,000.00
7,348,250.00
7,371,500.00
7,394,750.00
7,418,000.00
7,441,250.00
7,464,500.00
7,487,750.00
7,511,000.00
7,534,250.00
7,557,500.00
7,580,750.00
7,604,000.00
7,627,250.00
7,650,500.00
7,673,750.00
7,697,000.00
7,720,250.00
7,743,500.00
7,766,750.00
7,790,000.00
7,813,250.00
7,836,500.00
7,859,750.00
7,883,000.00
CostoTotal
SANTA FE
Costo Total
SALT LAKE
CITY
7043750.00
7075000.00
7106250.00
7137500.00
7168750.00
7200000.00
7231250.00
7262500.00
7293750.00
7325000.00
7356250.00
7387500.00
7418750.00
7450000.00
7481250.00
7512500.00
7543750.00
7575000.00
7606250.00
7637500.00
7668750.00
7700000.00
7731250.00
7762500.00
7793750.00
7825000.00
7856250.00
7887500.00
7918750.00
7950000.00
7981250.00
8012500.00
8043750.00
8075000.00
6798750.00
6835000.00
6871250.00
6907500.00
6943750.00
6980000.00
7016250.00
7052500.00
7088750.00
7125000.00
7161250.00
7197500.00
7233750.00
7270000.00
7306250.00
7342500.00
7378750.00
7415000.00
7451250.00
7487500.00
7523750.00
7560000.00
7596250.00
7632500.00
7668750.00
7705000.00
7741250.00
7777500.00
7813750.00
7850000.00
7886250.00
7922500.00
7958750.00
7995000.00
8,200,000.00
8,100,000.00
8,000,000.00
7,900,000.00
7,800,000.00
7,700,000.00
7,600,000.00
7,500,000.00
7,400,000.00
7,300,000.00
7,200,000.00
7,100,000.00
7,000,000.00
6,900,000.00
6,800,000.00
6,700,000.00
6,600,000.00
6,500,000.00
6,400,000.00
6,300,000.00
6,200,000.00
6,100,000.00
455,000 465,000 475,000 485,000 495,000 505,000 515,000 525,000 535,000 545,000 555,000 565,000 575,000 585,000 595,000 605,000 615,000
PROBLEMA N 03.- Ud est al frente de un gran taller de ensamble, especializado en asignaciones de trabajo
bajo contrato. Uno de sus clientes le ha prometido un jugoso contrato por el ensamble de 1000 unidades de un
Profesor Responsable: Ing Roberto Balden Icochea
nuevo producto. El precio de cotizacin sugerido en el contrato se basa en un promedio de 20 horas de mano
de obra directa por unidad. Cuando Ud. realiza un par de ensambles en plan de prueba, descubre que aun
cuando el de la primera unidad requiri 50 horas, el ensamble de la segunda podra completarse en solo 40
horas.
a) Cuntas horas prev Ud. Que requerir el ensamble de la tercera unidad? (02 ptos)
b) Cuntas horas espera usted que requiera el ensamble de la centsima unidad? (02 ptos)
c) Es vlida la suposicin implcita en el contrato acerca de las horas promedio de trabajo por unidad o
ser necesario revisar el precio? (02 ptos)
Curva Aprendizaje
55
50
Curva Aprendizaje
45
40
Hrs Aprendizaje
35
30
25
20
15
10
0
1
10
19
28
37
46
55
Numero de ensambles
64
73
82
91
100
2200
2000
1600
Hrs promedio
1400
1200
1000
800
600
400
200
0
1
10
19
28
37
46
55
64
73
82
91
100